CN205875016U - Construction pile for road - Google Patents
Construction pile for road Download PDFInfo
- Publication number
- CN205875016U CN205875016U CN201620802518.1U CN201620802518U CN205875016U CN 205875016 U CN205875016 U CN 205875016U CN 201620802518 U CN201620802518 U CN 201620802518U CN 205875016 U CN205875016 U CN 205875016U
- Authority
- CN
- China
- Prior art keywords
- road
- pile
- road stake
- main body
- road pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 26
- OAICVXFJPJFONN-UHFFFAOYSA-N Phosphorus Chemical compound [P] OAICVXFJPJFONN-UHFFFAOYSA-N 0.000 claims abstract description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 2
- 229910052782 aluminium Inorganic materials 0.000 claims description 2
- 239000006260 foam Substances 0.000 claims description 2
- 239000000463 material Substances 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 239000007787 solid Substances 0.000 claims 1
- 238000005516 engineering process Methods 0.000 description 2
- 241000196324 Embryophyta Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 230000002596 correlated effect Effects 0.000 description 1
- 230000000875 corresponding effect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a construction pile for road, including the road pile main part road pile main part (2), road pile main part (2) mainly comprise blotter (4) and the stake body (5), and blotter (4) set up in the stake left side of (5) physically, install phosphor strip (3) in the left side of road pile main part (2), the upper end of road pile main part (2) is provided with pile post (1), installs pre -buried portion (6) at the lower extreme of road pile main part (2), and just pre -buried portion (6) mainly comprises pre -buried (7), road pile base (9) are installed to the end on the lower side of road pile main part (2) lateral wall, are provided with bolt hole (10) in road pile base (9), road pile base (9) lead to through bolt hole (10) has road pile hold -down bars (11), is provided with cone point (12) at the end of road pile hold -down bars (11), the right side wall of road pile main part (2) is provided with road pile handle (8). This construction pile for road through setting up the road pile handle, has made things convenient for constructor to move road road pile in when construction, sets up pre -buried, makes things convenient for constructor to imbed the position of below ground, labour saving and time saving, simple structure with road pile.
Description
Technical field
This utility model relates to road infrastructure field, is specially a kind of road construction pile.
Background technology
Pile is often employed in construction, and pile typically squeezes into bottom surface by pile machine.Pile machine is directly beaten
Hit pile to one downward force of pile, but the firmness to pile that hits of pile machine has certain damage, due to pile
Height be all fixing, therefore generally require and repeatedly hit pile by pile machine and could imbed underground;The stake of the most existing road
Height is certain, is easily covered by shrub, weeds, it is impossible to play corresponding effect, and the stake of existing road is at lighting condition not
In the case of good the most eye-catching, it is not easy to by it could be observed that hold when simultaneously Road stake is typically moved in construction all than
More difficult, it is more difficult to mobile, and then delay the duration.
Utility model content
For problem above, this utility model provides a kind of road construction pile, easily hammers into ground and self is firm,
During hammering into, being hardly damaged, at resolution height at night, be moved easily simultaneously, the situation of schedule delays is difficult to appearance, this
Sample can effectively solve the problem in background technology.
For achieving the above object, this utility model following technical scheme of offer: a kind of road construction pile, including road stake master
Body, described road stake main body is mainly made up of cushion pad and pile body, and cushion pad is arranged on the left side of pile body, in road stake main body
Left side phosphor strip is installed, the upper end of described road stake main body is provided with piling post, is provided with pre-buried in the lower end of road stake main body
Portion, and preburying part is mainly made up of pre-underground layering, the end on the lower side of described road stake main body wall is provided with road pile foundation seat, at road pile foundation seat
Inside being provided with bolt hole, described road pile foundation seat is connected with road stake hold-down bars by bolt hole, and the end at road stake hold-down bars is provided with
Cone point, the right side wall of described road stake main body is provided with road stake handle.
As a kind of preferably technical scheme of this utility model, the quantity of described road stake hold-down bars is four, Qie Sige road
Stake hold-down bars each between all in 90 ° of sides being positioned over road stake main body.
As a kind of preferably technical scheme of this utility model, the quantity of described pre-underground layering is four, and four pre-underground layerings
Surface all use aluminum steel material.
As a kind of preferably technical scheme of this utility model, described cushion pad is rubber layer or foam layer.
As a kind of preferably technical scheme of this utility model, the diameter of road stake hold-down bars is slightly less than the diameter of bolt hole.
As a kind of preferably technical scheme of this utility model, described road stake handle is set to oblong-shaped.
As a kind of preferably technical scheme of this utility model, the thickness of described phosphor strip is 1-3mm.
Compared with prior art, the beneficial effects of the utility model are: this road construction pile, carry by arranging road stake
Hands, facilitates workmen and moves Road stake when construction, arrange phosphor strip, driver etc. can be warned night when to be correlated with
The particular location of personnel road stake, prevents accident, coordinates the design of cushion pad, reduces the danger that accident occurs, enters one
Step has ensured the personal safety of the personnel such as driver, arranges pre-underground layering, and road stake is imbedded the position of below ground by convenient construction personnel,
Time saving and energy saving, simple structure.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is this utility model preburying part structural representation.
In figure: 1-drives piles post;2-road stake main body;3-phosphor strip;4-cushion pad;5-pile body;6-preburying part;7-is pre-buried
Bar;8-road stake handle;9-road pile foundation seat;10-bolt hole;11-road stake hold-down bars;12-cone point.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Embodiment:
Referring to Fig. 1 and Fig. 2, a kind of technical scheme of this utility model offer: a kind of road construction pile, including road stake master
Body 2, described road stake main body 2 is mainly made up of cushion pad 4 and pile body 5, and cushion pad 4 is arranged on the left side of pile body 5, on road
The left side of stake main body 2 is provided with phosphor strip 3, and the upper end of described road stake main body 2 is provided with piling post 1, in the lower end of road stake main body 2
Being provided with preburying part 6, and preburying part 6 is mainly made up of pre-underground layering 7, the end on the lower side of described road stake main body 2 sidewall is provided with road stake
Pedestal 9, is provided with bolt hole 10 in road pile foundation seat 9, and described road pile foundation seat 9 is connected with road stake hold-down bars 11 by bolt hole 10,
End at road stake hold-down bars 11 is provided with cone point 12, and the right side wall of described road stake main body 2 is provided with road stake handle 8.
Operation principle of the present utility model: during construction, the design of the unique texture of four pre-underground layerings 7 can reduce road stake at nail
The resistance being subject to when entering ground, the construction of convenient construction personnel, until preburying part 6 is imbedded underground, by road stake hold-down bars
11 with the coordinating of bolt hole 10, strengthen the integral installation intensity of pile body further.If it occur that accident collision, cushion pad 4 is permissible
Impact force when effective buffering vehicle clashes into pile body, to avoid or to alleviate the damage causing vehicle and pile body.Phosphor strip 3
The related personnel such as driver can be given with warning function at night, prevent them from bumping against the generation causing tragedy in the stake of road by mistake.Road stake
The design of handle 8, convenient construction personnel for the transport of pile body, save the duration when construction the most accordingly.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this
Any amendment, equivalent and the improvement etc. made within the spirit of utility model and principle, should be included in this utility model
Protection domain within.
Claims (7)
1. a road construction pile, including road stake main body (2), it is characterised in that: described road stake main body (2) is main by cushion pad
(4) form with pile body (5), and cushion pad (4) is arranged on the left side of pile body (5), is provided with in the left side of road stake main body (2)
Phosphor strip (3), the upper end of described road stake main body (2) is provided with piling post (1), is provided with pre-buried in the lower end of road stake main body (2)
Portion (6), and preburying part (6) is mainly made up of pre-underground layering (7), the end on the lower side of described road stake main body (2) sidewall is provided with road pile foundation
Seat (9), is provided with bolt hole (10) in road pile foundation seat (9), and it is solid that described road pile foundation seat (9) is connected with road stake by bolt hole (10)
Fixed rod (11), the end in road stake hold-down bars (11) is provided with cone point (12), and the right side wall of described road stake main body (2) is arranged
There is road stake handle (8).
A kind of road construction pile the most according to claim 1, it is characterised in that: the quantity of described road stake hold-down bars (11)
It it is four, all in 90 ° of sides being positioned over road stake main body (2) between Qie Sige road stake hold-down bars (11) each.
A kind of road construction pile the most according to claim 1, it is characterised in that: the quantity of described pre-underground layering (7) is four
Individual, and the surface of four pre-underground layerings (7) all uses aluminum steel material.
A kind of road construction pile the most according to claim 1, it is characterised in that: described cushion pad (4) be rubber layer or
Foam layer.
A kind of road construction pile the most according to claim 1, it is characterised in that: the diameter of road stake hold-down bars (11) is smaller
Diameter in bolt hole (10).
A kind of road construction pile the most according to claim 1, it is characterised in that: described road stake handle (8) is set to long
Square shape.
A kind of road construction pile the most according to claim 1, it is characterised in that: the thickness of described phosphor strip (3) is 1-
3mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620802518.1U CN205875016U (en) | 2016-07-26 | 2016-07-26 | Construction pile for road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620802518.1U CN205875016U (en) | 2016-07-26 | 2016-07-26 | Construction pile for road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205875016U true CN205875016U (en) | 2017-01-11 |
Family
ID=57698606
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620802518.1U Expired - Fee Related CN205875016U (en) | 2016-07-26 | 2016-07-26 | Construction pile for road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205875016U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107675642A (en) * | 2017-09-12 | 2018-02-09 | 汤始建华建材(苏州)有限公司 | A kind of stacked fender pile of turriform |
CN109868770A (en) * | 2019-03-13 | 2019-06-11 | 公安部第一研究所 | A kind of fixed road stake of simple installation |
-
2016
- 2016-07-26 CN CN201620802518.1U patent/CN205875016U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107675642A (en) * | 2017-09-12 | 2018-02-09 | 汤始建华建材(苏州)有限公司 | A kind of stacked fender pile of turriform |
CN109868770A (en) * | 2019-03-13 | 2019-06-11 | 公安部第一研究所 | A kind of fixed road stake of simple installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205875016U (en) | Construction pile for road | |
CN106638570B (en) | Hinge enlarged footing steel-pipe pile | |
CN207244654U (en) | Stake two layers of retaining wall structure of support | |
CN202851027U (en) | Support system treating soft rock roadway floor heaves | |
CN205444152U (en) | Geotechnique's check room is with bee check stabilising arrangement | |
CN103321203A (en) | Method for strongly impacting and expanding piles by conical rammer | |
CN202323963U (en) | Drainage and anchoring combined device for side slope | |
KR20150070843A (en) | Micro pile construction method for horizontal capacity increasing | |
CN105200991A (en) | High-strength pile driver | |
CN206529682U (en) | Urban Bridge superhigh tenacity concrete transverse direction block construction | |
CN212052804U (en) | Road side slope supporting construction | |
CN204282860U (en) | Interim board house bracing means | |
CN201915385U (en) | Compacted pile for foundation treatment of collapsed loess in tunnel | |
CN203256756U (en) | Pre-reaming flexible pile structure of integral abutment bridge | |
CN203795460U (en) | Basic structure of ballasting tower crane | |
CN203346897U (en) | Foundation raft embedded steel column positioning support | |
CN205874945U (en) | Novel U rib | |
KR101758988B1 (en) | Pile having height adjustment function | |
CN204152046U (en) | Cast-in-place concrete hollow building roof structure | |
JP2015042820A (en) | Foundation structure | |
CN207999113U (en) | A kind of jack leveller device | |
CN103233480A (en) | Pre-reamed hole flexible file structure of integrated abutment and bridge and construction method thereof | |
CN203007945U (en) | Anti-seismic ground anchor device capable of absorbing seismic waves | |
CN201704979U (en) | Saw-toothed antiskid ramp | |
CN206774928U (en) | A kind of distribution box placing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 |
|
CF01 | Termination of patent right due to non-payment of annual fee |