CN205875016U - Construction pile for road - Google Patents

Construction pile for road Download PDF

Info

Publication number
CN205875016U
CN205875016U CN201620802518.1U CN201620802518U CN205875016U CN 205875016 U CN205875016 U CN 205875016U CN 201620802518 U CN201620802518 U CN 201620802518U CN 205875016 U CN205875016 U CN 205875016U
Authority
CN
China
Prior art keywords
road
pile
road stake
main body
road pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620802518.1U
Other languages
Chinese (zh)
Inventor
赵正元
周佳萍
金�秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changxin Wanda Construction Co Ltd
Original Assignee
Changxin Wanda Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changxin Wanda Construction Co Ltd filed Critical Changxin Wanda Construction Co Ltd
Priority to CN201620802518.1U priority Critical patent/CN205875016U/en
Application granted granted Critical
Publication of CN205875016U publication Critical patent/CN205875016U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a construction pile for road, including the road pile main part road pile main part (2), road pile main part (2) mainly comprise blotter (4) and the stake body (5), and blotter (4) set up in the stake left side of (5) physically, install phosphor strip (3) in the left side of road pile main part (2), the upper end of road pile main part (2) is provided with pile post (1), installs pre -buried portion (6) at the lower extreme of road pile main part (2), and just pre -buried portion (6) mainly comprises pre -buried (7), road pile base (9) are installed to the end on the lower side of road pile main part (2) lateral wall, are provided with bolt hole (10) in road pile base (9), road pile base (9) lead to through bolt hole (10) has road pile hold -down bars (11), is provided with cone point (12) at the end of road pile hold -down bars (11), the right side wall of road pile main part (2) is provided with road pile handle (8). This construction pile for road through setting up the road pile handle, has made things convenient for constructor to move road road pile in when construction, sets up pre -buried, makes things convenient for constructor to imbed the position of below ground, labour saving and time saving, simple structure with road pile.

Description

A kind of road construction pile
Technical field
This utility model relates to road infrastructure field, is specially a kind of road construction pile.
Background technology
Pile is often employed in construction, and pile typically squeezes into bottom surface by pile machine.Pile machine is directly beaten Hit pile to one downward force of pile, but the firmness to pile that hits of pile machine has certain damage, due to pile Height be all fixing, therefore generally require and repeatedly hit pile by pile machine and could imbed underground;The stake of the most existing road Height is certain, is easily covered by shrub, weeds, it is impossible to play corresponding effect, and the stake of existing road is at lighting condition not In the case of good the most eye-catching, it is not easy to by it could be observed that hold when simultaneously Road stake is typically moved in construction all than More difficult, it is more difficult to mobile, and then delay the duration.
Utility model content
For problem above, this utility model provides a kind of road construction pile, easily hammers into ground and self is firm, During hammering into, being hardly damaged, at resolution height at night, be moved easily simultaneously, the situation of schedule delays is difficult to appearance, this Sample can effectively solve the problem in background technology.
For achieving the above object, this utility model following technical scheme of offer: a kind of road construction pile, including road stake master Body, described road stake main body is mainly made up of cushion pad and pile body, and cushion pad is arranged on the left side of pile body, in road stake main body Left side phosphor strip is installed, the upper end of described road stake main body is provided with piling post, is provided with pre-buried in the lower end of road stake main body Portion, and preburying part is mainly made up of pre-underground layering, the end on the lower side of described road stake main body wall is provided with road pile foundation seat, at road pile foundation seat Inside being provided with bolt hole, described road pile foundation seat is connected with road stake hold-down bars by bolt hole, and the end at road stake hold-down bars is provided with Cone point, the right side wall of described road stake main body is provided with road stake handle.
As a kind of preferably technical scheme of this utility model, the quantity of described road stake hold-down bars is four, Qie Sige road Stake hold-down bars each between all in 90 ° of sides being positioned over road stake main body.
As a kind of preferably technical scheme of this utility model, the quantity of described pre-underground layering is four, and four pre-underground layerings Surface all use aluminum steel material.
As a kind of preferably technical scheme of this utility model, described cushion pad is rubber layer or foam layer.
As a kind of preferably technical scheme of this utility model, the diameter of road stake hold-down bars is slightly less than the diameter of bolt hole.
As a kind of preferably technical scheme of this utility model, described road stake handle is set to oblong-shaped.
As a kind of preferably technical scheme of this utility model, the thickness of described phosphor strip is 1-3mm.
Compared with prior art, the beneficial effects of the utility model are: this road construction pile, carry by arranging road stake Hands, facilitates workmen and moves Road stake when construction, arrange phosphor strip, driver etc. can be warned night when to be correlated with The particular location of personnel road stake, prevents accident, coordinates the design of cushion pad, reduces the danger that accident occurs, enters one Step has ensured the personal safety of the personnel such as driver, arranges pre-underground layering, and road stake is imbedded the position of below ground by convenient construction personnel, Time saving and energy saving, simple structure.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is this utility model preburying part structural representation.
In figure: 1-drives piles post;2-road stake main body;3-phosphor strip;4-cushion pad;5-pile body;6-preburying part;7-is pre-buried Bar;8-road stake handle;9-road pile foundation seat;10-bolt hole;11-road stake hold-down bars;12-cone point.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Embodiment:
Referring to Fig. 1 and Fig. 2, a kind of technical scheme of this utility model offer: a kind of road construction pile, including road stake master Body 2, described road stake main body 2 is mainly made up of cushion pad 4 and pile body 5, and cushion pad 4 is arranged on the left side of pile body 5, on road The left side of stake main body 2 is provided with phosphor strip 3, and the upper end of described road stake main body 2 is provided with piling post 1, in the lower end of road stake main body 2 Being provided with preburying part 6, and preburying part 6 is mainly made up of pre-underground layering 7, the end on the lower side of described road stake main body 2 sidewall is provided with road stake Pedestal 9, is provided with bolt hole 10 in road pile foundation seat 9, and described road pile foundation seat 9 is connected with road stake hold-down bars 11 by bolt hole 10, End at road stake hold-down bars 11 is provided with cone point 12, and the right side wall of described road stake main body 2 is provided with road stake handle 8.
Operation principle of the present utility model: during construction, the design of the unique texture of four pre-underground layerings 7 can reduce road stake at nail The resistance being subject to when entering ground, the construction of convenient construction personnel, until preburying part 6 is imbedded underground, by road stake hold-down bars 11 with the coordinating of bolt hole 10, strengthen the integral installation intensity of pile body further.If it occur that accident collision, cushion pad 4 is permissible Impact force when effective buffering vehicle clashes into pile body, to avoid or to alleviate the damage causing vehicle and pile body.Phosphor strip 3 The related personnel such as driver can be given with warning function at night, prevent them from bumping against the generation causing tragedy in the stake of road by mistake.Road stake The design of handle 8, convenient construction personnel for the transport of pile body, save the duration when construction the most accordingly.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this Any amendment, equivalent and the improvement etc. made within the spirit of utility model and principle, should be included in this utility model Protection domain within.

Claims (7)

1. a road construction pile, including road stake main body (2), it is characterised in that: described road stake main body (2) is main by cushion pad (4) form with pile body (5), and cushion pad (4) is arranged on the left side of pile body (5), is provided with in the left side of road stake main body (2) Phosphor strip (3), the upper end of described road stake main body (2) is provided with piling post (1), is provided with pre-buried in the lower end of road stake main body (2) Portion (6), and preburying part (6) is mainly made up of pre-underground layering (7), the end on the lower side of described road stake main body (2) sidewall is provided with road pile foundation Seat (9), is provided with bolt hole (10) in road pile foundation seat (9), and it is solid that described road pile foundation seat (9) is connected with road stake by bolt hole (10) Fixed rod (11), the end in road stake hold-down bars (11) is provided with cone point (12), and the right side wall of described road stake main body (2) is arranged There is road stake handle (8).
A kind of road construction pile the most according to claim 1, it is characterised in that: the quantity of described road stake hold-down bars (11) It it is four, all in 90 ° of sides being positioned over road stake main body (2) between Qie Sige road stake hold-down bars (11) each.
A kind of road construction pile the most according to claim 1, it is characterised in that: the quantity of described pre-underground layering (7) is four Individual, and the surface of four pre-underground layerings (7) all uses aluminum steel material.
A kind of road construction pile the most according to claim 1, it is characterised in that: described cushion pad (4) be rubber layer or Foam layer.
A kind of road construction pile the most according to claim 1, it is characterised in that: the diameter of road stake hold-down bars (11) is smaller Diameter in bolt hole (10).
A kind of road construction pile the most according to claim 1, it is characterised in that: described road stake handle (8) is set to long Square shape.
A kind of road construction pile the most according to claim 1, it is characterised in that: the thickness of described phosphor strip (3) is 1- 3mm。
CN201620802518.1U 2016-07-26 2016-07-26 Construction pile for road Expired - Fee Related CN205875016U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620802518.1U CN205875016U (en) 2016-07-26 2016-07-26 Construction pile for road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620802518.1U CN205875016U (en) 2016-07-26 2016-07-26 Construction pile for road

Publications (1)

Publication Number Publication Date
CN205875016U true CN205875016U (en) 2017-01-11

Family

ID=57698606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620802518.1U Expired - Fee Related CN205875016U (en) 2016-07-26 2016-07-26 Construction pile for road

Country Status (1)

Country Link
CN (1) CN205875016U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675642A (en) * 2017-09-12 2018-02-09 汤始建华建材(苏州)有限公司 A kind of stacked fender pile of turriform
CN109868770A (en) * 2019-03-13 2019-06-11 公安部第一研究所 A kind of fixed road stake of simple installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107675642A (en) * 2017-09-12 2018-02-09 汤始建华建材(苏州)有限公司 A kind of stacked fender pile of turriform
CN109868770A (en) * 2019-03-13 2019-06-11 公安部第一研究所 A kind of fixed road stake of simple installation

Similar Documents

Publication Publication Date Title
CN205875016U (en) Construction pile for road
CN106638570B (en) Hinge enlarged footing steel-pipe pile
CN207244654U (en) Stake two layers of retaining wall structure of support
CN202851027U (en) Support system treating soft rock roadway floor heaves
CN205444152U (en) Geotechnique's check room is with bee check stabilising arrangement
CN103321203A (en) Method for strongly impacting and expanding piles by conical rammer
CN202323963U (en) Drainage and anchoring combined device for side slope
KR20150070843A (en) Micro pile construction method for horizontal capacity increasing
CN105200991A (en) High-strength pile driver
CN206529682U (en) Urban Bridge superhigh tenacity concrete transverse direction block construction
CN212052804U (en) Road side slope supporting construction
CN204282860U (en) Interim board house bracing means
CN201915385U (en) Compacted pile for foundation treatment of collapsed loess in tunnel
CN203256756U (en) Pre-reaming flexible pile structure of integral abutment bridge
CN203795460U (en) Basic structure of ballasting tower crane
CN203346897U (en) Foundation raft embedded steel column positioning support
CN205874945U (en) Novel U rib
KR101758988B1 (en) Pile having height adjustment function
CN204152046U (en) Cast-in-place concrete hollow building roof structure
JP2015042820A (en) Foundation structure
CN207999113U (en) A kind of jack leveller device
CN103233480A (en) Pre-reamed hole flexible file structure of integrated abutment and bridge and construction method thereof
CN203007945U (en) Anti-seismic ground anchor device capable of absorbing seismic waves
CN201704979U (en) Saw-toothed antiskid ramp
CN206774928U (en) A kind of distribution box placing structure

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170111

CF01 Termination of patent right due to non-payment of annual fee