CN205857775U - Interim security lock arrangement - Google Patents
Interim security lock arrangement Download PDFInfo
- Publication number
- CN205857775U CN205857775U CN201620762912.7U CN201620762912U CN205857775U CN 205857775 U CN205857775 U CN 205857775U CN 201620762912 U CN201620762912 U CN 201620762912U CN 205857775 U CN205857775 U CN 205857775U
- Authority
- CN
- China
- Prior art keywords
- safety rope
- security lock
- lock arrangement
- cross bar
- vertical rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The open a kind of interim security lock arrangement of this utility model, including the building frame built by cross bar and vertical rod, bamboo foot handsheet is set on cross bar, safety rope is arranged on above cross bar abreast and height flushes with people's waist, safety rope two ends are connected in vertical rod, safety rope is flexibly connected with workmen's seat belt, and described safety rope also has the device of adjusting elasticity.This utility model is arranged on construction exterior rack highest point one and encloses or face hole, limit one circle around untight; safety rope is connected with the seat belt of workmen; the hook of safety rope is provided with stopping means; reduce work high above the ground risk, reduce hidden danger, while using of seat belts, ensure corresponding work efficiency; simple in construction; firmly installing, protection effect is good, can protect the safety of high-altitude site operation workman well.
Description
Technical field
This utility model relates to a kind of interim security lock arrangement, belongs to structural steelwork construction safety protection technical field.
Background technology
Safety protection facility be construction site be prevention construction to occur what personnel casualty accidents arranged all kinds of set
Execute, equipment, utensil, as steel pipe column need to carry out installing, adjustment, weld, the work such as detection, above-mentioned work is all at high-altitude hanging part
Carry out.Work high above the ground need to set up safe operation platform, changes construction safety environment, takes into full account Super High or large span venue
Construction characteristic, in the work progress of Super High or large span venue, steel pipe column construction is relatively conventional, and the protection now used is arranged
Execute as operating platform.When operating platform is Construction of Steel Structure component dock temporarily set up face limit operating platform.Operating platform must
Must calculate through design, scheme is examined, is set up and check and accept, and accreditation of signing, and its strength and stability must is fulfilled for designing requirement.
Operating platform is set up defences guard rail rod, and interim security lock arrangement is applicable to the process of setting up of construction exterior rack maximum layer, outrigger was removed
Journey or the unclosed front personnel safety guard facing limit openings position in hole, the most also to meet corresponding safety standard and want
Ask.
Utility model content
This utility model provides a kind of interim security lock arrangement, simple in construction, firmly installs, and protection effect is good, can be very well
The safety of ground protection high-altitude site operation workman.
The technical scheme that this utility model is used by the above-mentioned technical problem of solution is as follows:
A kind of interim security lock arrangement, including the building frame built by cross bar and vertical rod, cross bar arranges bamboo foot
Handsheet, safety rope is arranged on above cross bar abreast and height flushes with people's waist, and safety rope two ends are connected in vertical rod, safety
Rope is flexibly connected with workmen's seat belt, and described safety rope also has the device of adjusting elasticity.
Further, described safety rope two ends have hook, and safety rope is hung in building vertical rod by hook.
Further, described interim security lock arrangement has the spacing fastener preventing hook from sliding, and this spacing fastener is arranged on
In the vertical rod being connected with safety rope.
Further, described workmen's seat belt is buckled on safety rope actively by safety buckle.
Further, described interim security lock arrangement has handrail, and described handrail is fixed with vertical rod and parallel with cross bar sets
Put.
The beneficial effects of the utility model are: interim security lock arrangement of the present utility model, are arranged on construction exterior rack
Eminence one is enclosed or faces hole, limit one circle around untight, and safety rope is connected by this utility model with the seat belt of workmen, peace
The hook of full rope is provided with stopping means, reduces work high above the ground risk, reduces hidden danger, ensures corresponding while using of seat belts
Work efficiency, simple in construction, firmly install, protection effect is good, can protect the safety of high-altitude site operation workman well.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand skill of the present utility model
Art means, and can being practiced according to the content of description, below with preferred embodiment of the present utility model and coordinate accompanying drawing detailed
Describe in detail bright as after.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present utility model of Armrest;
Fig. 2 is the structural representation of the present utility model of provided with fastener.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, detailed description of the invention of the present utility model is described in further detail.Below
Embodiment is used for illustrating this utility model, but is not limited to scope of the present utility model.
A kind of interim security lock arrangement, as shown in Figure 1, 2, including the building frame built by cross bar 1 and vertical rod 2,
Arranging bamboo foot handsheet 3 on cross bar, safety rope 4 is arranged on above cross bar abreast and height flushes with people's waist, safety rope two ends
Being connected in vertical rod, safety rope is flexibly connected with workmen's seat belt 5, and described safety rope also has the device of adjusting elasticity.
As it is shown in figure 1, described safety rope two ends have hook 6, safety rope is hung in building vertical rod by hook.
As in figure 2 it is shown, interim security lock arrangement of the present utility model has the spacing fastener 7 preventing hook from sliding, this limit
Position fastener is arranged in the vertical rod being connected with safety rope.
Described workmen's seat belt can be connected on safety rope actively by safety buckle or other connection members.
As it is shown in figure 1, described interim security lock arrangement has handrail 8, described handrail is fixed with vertical rod and parallel with cross bar
Arrange.
In one embodiment, enforcement standard of the present utility model is as follows:
1. use location and time: the process of setting up of construction exterior rack maximum layer, outrigger demolishing process or hole are unclosed
Front faces limit openings position;
2. occupation mode: enclose around construction exterior rack top layer highest point one or face hole, limit one circle around untight;
3. other points for attention: safety rope is confined firmly, without knotting;The proper use of seat belt of workman, exists buckle of safety belt
On safety rope;When safety rope is buckled on outrigger, fastener need to be set in lower section spacing, prevent hook from sliding.
Interim security lock arrangement of the present utility model, is arranged on construction exterior rack highest point one and encloses or around untight Lin Biandong
Mouth one circle, safety rope is connected by this utility model with the seat belt of workmen, and the hook of safety rope is provided with stopping means, fall
Low work high above the ground risk, reduces hidden danger, ensures corresponding work efficiency, simple in construction, firmly install while using of seat belts, anti-
Protect effective, the safety of high-altitude site operation workman can be protected well.
The above is only preferred implementation of the present utility model, it is noted that for the common skill of the art
For art personnel, on the premise of without departing from this utility model know-why, it is also possible to make some improvement and modification, these change
Enter and also should be regarded as protection domain of the present utility model with modification.
Claims (5)
1. an interim security lock arrangement, it is characterised in that include the building frame built by cross bar (1) and vertical rod (2),
Arranging bamboo foot handsheet (3) on cross bar, safety rope (4) is arranged on above cross bar abreast and height flushes with people's waist, safety rope
Two ends are connected in vertical rod, and safety rope is flexibly connected with workmen's seat belt (5), and described safety rope also has adjusting elasticity
Device.
2. interim security lock arrangement as claimed in claim 1, it is characterised in that described safety rope two ends have hook (6), peace
Full rope is hung in building vertical rod by hook.
3. security lock arrangement as claimed in claim 2 interim, it is characterised in that described interim security lock arrangement has and prevents from hanging
The spacing fastener (7) that hook slides, this spacing fastener is arranged in the vertical rod being connected with safety rope.
4. interim security lock arrangement as claimed in claim 1, it is characterised in that described workmen's seat belt passes through safety buckle
It is buckled in actively on safety rope.
5. the interim security lock arrangement as described in one of claim 1-4, it is characterised in that described interim security lock arrangement has
Handrail (8), described handrail is fixed with vertical rod and be arranged in parallel with cross bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620762912.7U CN205857775U (en) | 2016-07-19 | 2016-07-19 | Interim security lock arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620762912.7U CN205857775U (en) | 2016-07-19 | 2016-07-19 | Interim security lock arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205857775U true CN205857775U (en) | 2017-01-04 |
Family
ID=57647422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620762912.7U Expired - Fee Related CN205857775U (en) | 2016-07-19 | 2016-07-19 | Interim security lock arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205857775U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948608A (en) * | 2017-05-10 | 2017-07-14 | 中建局集团建设发展有限公司 | Super High curtain wall faces the security protection system and its construction method of empty construction |
CN107246140A (en) * | 2017-03-20 | 2017-10-13 | 无锡市龙海杰机械制造有限公司 | Work high above the ground bracing means |
CN107899153A (en) * | 2017-12-07 | 2018-04-13 | 中建四局第三建筑工程有限公司 | A kind of formwork supporting plate faces side operation safety protection method and device |
CN110604880A (en) * | 2019-10-30 | 2019-12-24 | 国网宁夏电力有限公司检修公司 | Anti-falling safety protection device with adjustable operation range |
CN110847589A (en) * | 2019-11-12 | 2020-02-28 | 青建集团股份公司 | Scaffold with safety protection mechanism and building method |
CN113833289A (en) * | 2021-09-29 | 2021-12-24 | 中国建筑工程(香港)有限公司 | Shed frame anti-falling system and construction method thereof |
-
2016
- 2016-07-19 CN CN201620762912.7U patent/CN205857775U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107246140A (en) * | 2017-03-20 | 2017-10-13 | 无锡市龙海杰机械制造有限公司 | Work high above the ground bracing means |
CN106948608A (en) * | 2017-05-10 | 2017-07-14 | 中建局集团建设发展有限公司 | Super High curtain wall faces the security protection system and its construction method of empty construction |
CN107899153A (en) * | 2017-12-07 | 2018-04-13 | 中建四局第三建筑工程有限公司 | A kind of formwork supporting plate faces side operation safety protection method and device |
CN110604880A (en) * | 2019-10-30 | 2019-12-24 | 国网宁夏电力有限公司检修公司 | Anti-falling safety protection device with adjustable operation range |
CN110847589A (en) * | 2019-11-12 | 2020-02-28 | 青建集团股份公司 | Scaffold with safety protection mechanism and building method |
CN113833289A (en) * | 2021-09-29 | 2021-12-24 | 中国建筑工程(香港)有限公司 | Shed frame anti-falling system and construction method thereof |
CN113833289B (en) * | 2021-09-29 | 2022-12-23 | 中国建筑工程(香港)有限公司 | Shed frame anti-falling system and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205857775U (en) | Interim security lock arrangement | |
CN206034938U (en) | Pole setting formula two pass safety rope | |
CN107744630A (en) | Sliding lock formula iron tower climbing falling-proof safety device | |
CN211470608U (en) | A protector for tower crane driver climbing | |
CN207323879U (en) | Sliding lock formula iron tower climbing falling-proof safety device | |
CN209990165U (en) | Can have enough to meet need reuse's safety and face frontier defense and protect | |
CN206103144U (en) | Safety belt hanging device | |
CN107744625A (en) | Building escape device fixed mount | |
CN205577385U (en) | Outer hanging scaffold frame convenient to dismantle | |
CN206156527U (en) | Novel elevator well frame | |
CN208594941U (en) | A kind of shield machine central security is walked on stage | |
CN206015532U (en) | A kind of security protection hanging cable for high pier construction | |
CN208759541U (en) | Security platform is made in a kind of thermally conductive oil tank recruitment | |
CN204663022U (en) | A kind of constructor's safety guard when building outer protective frame body construction | |
CN205422509U (en) | Can be used to emergency ladder on protecting window | |
CN205445455U (en) | Safe ladder that erects | |
CN208267349U (en) | A kind of security protection system of movable Scaffold | |
CN109898985A (en) | A kind of fire disaster escaping Theft-proof ladder | |
CN204357098U (en) | Overarm scaffold floor | |
CN209411653U (en) | A kind of derrick crane with anti-climbing function | |
CN205379560U (en) | A safety rope for erecting ladder | |
CN210933499U (en) | Portable anti-falling device for high-altitude operation | |
CN208440200U (en) | People channel on regularization tower crane for building | |
CN208585967U (en) | A kind of hoistway faces hole lifting operation assistance platform | |
CN203961330U (en) | Job site safe construction protective guard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170104 Termination date: 20170719 |
|
CF01 | Termination of patent right due to non-payment of annual fee |