CN205857662U - Canalization tool-type construction hanging basket - Google Patents
Canalization tool-type construction hanging basket Download PDFInfo
- Publication number
- CN205857662U CN205857662U CN201620770366.1U CN201620770366U CN205857662U CN 205857662 U CN205857662 U CN 205857662U CN 201620770366 U CN201620770366 U CN 201620770366U CN 205857662 U CN205857662 U CN 205857662U
- Authority
- CN
- China
- Prior art keywords
- hanging basket
- hook
- round steel
- steel
- base plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
nullThis utility model relates to a kind of canalization tool-type construction hanging basket,Including suspension member and hanging basket,Described suspension member is made up of steel hook and Rod Bracing,The front end of every steel hook is bent to the first hook of hook reinforcing bar respectively,The end of every steel hook is bent to the second hook of hook Hanging Basket respectively,It is in opposite direction that described first hook and described second is linked up with,Two described steel hook Parallel Symmetrics are arranged,It is provided with the Rod Bracing vertical with steel structure between described steel hook,The two ends of described Rod Bracing are fixed together with described steel hook,Described hanging basket includes hanging basket base plate and guardrail,Described hanging basket base plate is formed quadra by the alternately connection of four round steel,Some parallel round steel it are provided with in described quadra,The two ends of described round steel are fixed together with described quadra,The surrounding of described hanging basket base plate is provided with the guardrail being welded by some round steel,Described guardrail is vertically arranged with described hanging basket base plate.
Description
Technical field
This utility model relates to the security protection equipment field of architectural engineering, particularly relates to a kind of canalization tool-type construction
Hanging Basket.
Background technology
Builder for high-altitude steel beam joint fastening, weld bolt time operation time, need for hanging basket for its provide can
The work platforms leaned on, existing hanging basket installing/dismounting bothers, and weight is more and more heavier.
Because above-mentioned defect, the design people's the most in addition research and innovation, to founding the template of a kind of new structure
Flow process tool formula guard rail so that it is have more the value in industry.
Utility model content
For solving above-mentioned technical problem, the purpose of this utility model is to provide a kind of easy installation and removal, alleviates hanging basket weight
The canalization tool-type construction hanging basket of amount.
Canalization tool-type construction hanging basket of the present utility model, including suspension member and hanging basket, described suspension member is by steel hook and round steel
Supporting and constitute, the front end of every steel hook is bent to the first hook of hook reinforcing bar respectively, and the end of every steel hook is bent to respectively
Second hook of hook Hanging Basket, it is in opposite direction that described first hook and described second is linked up with, two described steel hook Parallel Symmetrics
Arranging, be provided with the Rod Bracing vertical with steel structure between described steel hook, the two ends of described Rod Bracing are fixed with described steel hook
Together;
Described hanging basket includes hanging basket base plate and guardrail, and described hanging basket base plate is formed square box by the alternately connection of four round steel
Frame, is provided with some parallel round steel in described quadra, the two ends of described round steel are fixed together with described quadra,
The surrounding of described hanging basket base plate is provided with the guardrail being welded by some round steel, and described guardrail is vertical with described hanging basket base plate to be set
Put.
Further, described guardrail includes that two root length round steel, described long round steel are respectively perpendicular and is arranged on described hanging basket base plate
The two ends on a limit of quadra, be provided with some parallel round steel between two described long round steel, oval with described
The two ends on another limit of the quadra that limit, steel place is parallel, are vertically installed with two short round steel, apart from the bottom of described hanging basket
The subframe parallel with described quadra, described subframe and described quadra size phase it is provided with at a certain distance from plate
With, four angles of described subframe are separately fixed on two root length round steel and short round steel.
Further, all described round steel weld for overlap joint with the connected mode of round steel, the interface between round steel and round steel
The lap of splice not less than 20mm.
Further, described hanging basket base plate be provided above being perpendicular to the baffle plate that the hard material of hanging basket base plate does, institute
Stating baffle plate around described hanging basket one circle, the height of described baffle plate is not less than 600mm.
Further, the band steel that specification is 60 × 8mm of described steel hook, a length of 80mm of described first hook, described
The a length of 40mm of the second hook, the specification of described Rod Bracing is the round steel of Φ 12mm, and the distance between two steel structures is
1000mm。
Further, the specification of described quadra is 960mm × 1200mm, and the guardrail length of side that described long round steel is formed is
2000mm, guardrail length of side 1200mm that described short round steel is formed, the distance between described subframe and described hanging basket base plate is
600mm, described long round steel, short round steel, round steel diameter are all Φ 12mm.
Further, described hanging basket base plate being provided with plate body, described plate body is provided with Non-slip material, and described Non-slip material is:
Described plate body is provided with the pillar that diameter is not more than 3mm, height no more than 2mm, and described column upper section is provided with diameter and is not more than
10mm, height are not more than the cap body of 5mm, and meanwhile, described cap body top is provided with pit, is pasted with rubber blanket in described pit.
Further, described canalization tool-type construction hanging basket, also include that seat belt, described seat belt include insuring waist
Band, safety waistband is connected with Telescopic vehicle-used safety belt, and described Telescopic vehicle-used safety belt is provided with the first hook, described insurance
Belt is provided with the first link, and described first link is by the second link phase of the second hook with Telescopic vehicle-used safety belt one end
Even, the other end of described Telescopic vehicle-used safety belt is connected by the 3rd link and the first hook.
Further, described hanging basket is provided with the mark skin of paint of protection warning.
By such scheme, this utility model at least has the advantage that 1, suspension member and hanging basket Split type structure, dismounting side
Just;2, hanging basket is all mainly to have round steel to be welded with suspension member, compared with the Hanging Basket in whole plate face, under safety same case,
The weight of Hanging Basket is lighter;3, it is provided with mark skin of paint on hanging basket, has at the bottom of warning function 4, basket and be provided with Non-slip material and increase it and rub
Wiping power, has anti-skidding effect;4, this canalization tool-type construction hanging basket is also equipped with safety rope, more can ensure that workmen's safety.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand skill of the present utility model
Art means, and can being practiced according to the content of description, below with preferred embodiment of the present utility model and coordinate accompanying drawing detailed
Describe in detail bright as after.
Accompanying drawing explanation
Fig. 1 is the structural representation of canalization tool-type construction hanging basket of the present utility model;
Fig. 2 is the structural representation of the suspension member of the canalization tool-type construction hanging basket shown in Fig. 1;
Fig. 3 is that the fragmentary top of the hanging basket base plate of the embodiment of canalization tool-type construction hanging basket of the present utility model regards
Figure;
Fig. 4 is the front sectional view of the Non-slip material of the embodiment of canalization tool-type construction hanging basket of the present utility model;
Fig. 5 is the structural representation of the seat belt of the canalization tool-type construction hanging basket shown in Fig. 1.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, detailed description of the invention of the present utility model is described in further detail.Below
Embodiment is used for illustrating this utility model, but is not limited to scope of the present utility model.
Seeing Fig. 1 and Fig. 2, the canalization tool-type construction hanging basket described in this utility model one preferred embodiment, including hanging
Part 1 and hanging basket 2, suspension member 1 is made up of steel hook 3 and Rod Bracing 4, and the front end of every steel hook 3 is bent to the of hook reinforcing bar respectively
One hook 7, the end of every steel hook 3 is bent to the second hook 8 of hook Hanging Basket, the first hook 7 and side of the second hook 8 respectively
To on the contrary, two steel hook 3 Parallel Symmetrics are arranged, and are provided with the Rod Bracing 4 vertical with steel structure 3, Rod Bracing 4 between steel hook 3
Two ends be fixed together with steel hook 3;
Hanging basket 2 includes hanging basket base plate 5 and guardrail 6, and hanging basket base plate 5 is formed quadra by the alternately connection of four round steel, side
Being provided with some parallel round steel in shape framework, the two ends of round steel are fixed together with quadra, and the surrounding of hanging basket base plate 5 sets
Being equipped with the guardrail 6 being welded by some round steel, guardrail 6 is vertically arranged with hanging basket base plate 5.
Optionally, guardrail 6 includes two root length round steel, and long round steel is respectively perpendicular and is arranged on the square of hanging basket base plate 5
The two ends on one limit of framework, are provided with some parallel round steel between two root length round steel, parallel with limit, long round steel place
The two ends on another limit of quadra, are vertically installed with two short round steel, are provided with at a certain distance from distance hanging basket base plate
The subframe parallel with quadra, subframe is identical with quadra size, and four angles of subframe are separately fixed at two
On long round steel and short round steel.
Optionally, all round steel weld for overlap joint with the connected mode of round steel, the interface between round steel and round steel
The lap of splice not less than 20mm.
Optionally, being provided above of hanging basket 2 base plate is perpendicular to the baffle plate that the hard material of hanging basket base plate 5 does,
Baffle plate encloses around hanging basket 2 one, and the height of baffle plate is not less than 600mm.
Optionally, the specification of steel hook 3 is the band steel of 60 × 8mm, a length of 80mm of the first hook 7, and second hangs
The a length of 40mm of hook, the specification of Rod Bracing 4 is the round steel of Φ 12mm, and the distance between two steel structures 3 is 1000mm.
Optionally, the specification of quadra is 960mm × 1200mm, and the guardrail length of side that long round steel is formed is
2000mm, guardrail length of side 1200mm that short round steel is formed, the distance between subframe and hanging basket base plate 5 is 600mm, long round steel,
Short round steel, round steel diameter are all Φ 12mm.
Seeing Fig. 3 and Fig. 4, optionally, hanging basket base plate 5 is provided with plate body 10, plate body 10 is provided with Non-slip material
20, Non-slip material 20 is: plate body 10 is provided with the pillar 21 that diameter is not more than 3mm, height no more than 2mm, described pillar 21 top
Being provided with the cap body 22 that diameter is not more than 10mm, height no more than 5mm, meanwhile, cap body 22 top is provided with pit, is pasted with in pit
Rubber blanket 23.
Optionally, outside for the barrier propterty of canalization tool-type construction hanging basket and alarming effect effect hanging basket 2
It is brushed with the mark paint having protection warning red and white.
See Fig. 5, this canalization tool-type construction hanging basket, also include seat belt, seat belt includes safety waistband 31, insurance
Belt 31 is connected with Telescopic vehicle-used safety belt 32, and Telescopic vehicle-used safety belt 32 is provided with the first hook 33, safety waistband 31
Being provided with the first link 34, the first link 34 is by the second link 36 of the second hook 35 with Telescopic vehicle-used safety belt 32 one end
Being connected, the other end of Telescopic vehicle-used safety belt 32 is connected with the first hook 33 by the 3rd link 37.
When using this canalization tool-type construction hanging basket work high above the ground, suspension member 1 hangs on reinforcing bar, the first extension of suspension member front end
Hook is stuck on reinforcing bar, is suspended on by hanging basket 2 on second hook of suspension member 1, and workmen should by double hook seat belt simultaneously simultaneously
Hang on safety rope.
The above is only preferred implementation of the present utility model, is not limited to this utility model, it is noted that
For those skilled in the art, on the premise of without departing from this utility model know-why, it is also possible to do
Going out some improvement and modification, these improve and modification also should be regarded as protection domain of the present utility model.
Claims (9)
1. a canalization tool-type construction hanging basket, including suspension member (1) and hanging basket (2), it is characterised in that described suspension member (1) by
Steel hook (3) and Rod Bracing (4) are constituted, and the front end of every steel hook (3) is bent to the first hook (7) of hook reinforcing bar respectively, often
The end of root steel hook (3) is bent to the second hook (8) of hook Hanging Basket, described first hook (7) and described second hook respectively
(8) in opposite direction, two described steel hook (3) Parallel Symmetrics are arranged, and are provided with vertical with steel structure (3) between described steel hook (3)
Rod Bracing (4), the two ends of described Rod Bracing (4) are fixed together with described steel hook (3);
Described hanging basket (2) includes that hanging basket base plate (5) and guardrail (6), described hanging basket base plate (5) are alternately connected by four round steel and is formed
Quadra, is provided with some parallel round steel in described quadra, the two ends of described round steel are fixed with described quadra
Together, the surrounding of described hanging basket base plate (5) is provided with the guardrail (6) being welded by some round steel, described guardrail (6) and institute
State hanging basket base plate (5) to be vertically arranged.
Canalization tool-type construction hanging basket the most according to claim 1, it is characterised in that described guardrail (6) includes two
Long round steel, described long round steel is respectively perpendicular the two ends on a limit of the quadra being arranged on described hanging basket base plate (5), two institutes
State and between long round steel, be provided with some parallel round steel, on another limit of the quadra parallel with limit, described long round steel place
Two ends, be vertically installed with two short round steel, be provided with and described quadra at a certain distance from described hanging basket base plate
Parallel subframe, described subframe is identical with described quadra size, and four angles of described subframe are separately fixed at two
On root length round steel and short round steel.
Canalization tool-type construction hanging basket the most according to claim 2, it is characterised in that all described round steel and round steel
Connected mode is not less than 20mm for overlap joint welding, the lap of splice of the interface between round steel and round steel.
Canalization tool-type construction hanging basket the most according to claim 2, it is characterised in that described hanging basket (2) base plate upper
Side is provided perpendicular to the baffle plate that the hard material of hanging basket base plate (5) does, and described baffle plate encloses around described hanging basket (2), described gear
The height of plate is not less than 600mm.
Canalization tool-type construction hanging basket the most according to claim 1, it is characterised in that the specification of described steel hook (3) is
The band steel of 60 × 8mm, a length of 80mm of described first hook (7), a length of 40mm of described second hook, described round steel props up
The round steel that specification is Φ 12mm of support (4), the distance between two steel structures (3) is 1000mm.
Canalization tool-type construction hanging basket the most according to claim 2, it is characterised in that the specification of described quadra is
960mm × 1200mm, the guardrail length of side that described long round steel is formed is 2000mm, the guardrail length of side that described short round steel is formed
1200mm, the distance between described subframe and described hanging basket base plate (5) is 600mm, and described long round steel, short round steel, round steel are straight
Footpath is all Φ 12mm.
Canalization tool-type construction hanging basket the most according to claim 1, it is characterised in that set on described hanging basket base plate (5)
Being equipped with plate body (10), described plate body (10) is provided with Non-slip material (20), and described Non-slip material (20) is: described plate body (10) is provided with
Diameter is not more than 3mm, height is not more than the pillar (21) of 2mm, and described pillar (21) top is provided with diameter and is not more than 10mm, highly
Being not more than the cap body (22) of 5mm, meanwhile, described cap body (22) top is provided with pit, is pasted with rubber blanket (23) in described pit.
Canalization tool-type construction hanging basket the most according to claim 1, it is characterised in that also include seat belt, described peace
Full band includes that safety waistband (31), safety waistband (31) are connected with Telescopic vehicle-used safety belt (32), and described Telescopic vehicle-used is protected
Danger band (32) is provided with the first hook (33), and described safety waistband (31) is provided with the first link (34), described first link
(34) it is connected with second link (36) of Telescopic vehicle-used safety belt (32) one end by the second hook (35), described telescopic car
It is connected with the first hook (33) by the 3rd link (37) with the other end of safety belt (32).
Canalization tool-type construction hanging basket the most according to claim 1, it is characterised in that described hanging basket is provided with on (2)
The mark skin of paint of protection warning.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620770366.1U CN205857662U (en) | 2016-07-20 | 2016-07-20 | Canalization tool-type construction hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620770366.1U CN205857662U (en) | 2016-07-20 | 2016-07-20 | Canalization tool-type construction hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205857662U true CN205857662U (en) | 2017-01-04 |
Family
ID=57648702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620770366.1U Expired - Fee Related CN205857662U (en) | 2016-07-20 | 2016-07-20 | Canalization tool-type construction hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205857662U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108032250A (en) * | 2017-10-23 | 2018-05-15 | 河北建工集团装饰工程有限公司 | A kind of outer outstanding sash mounting platform |
CN108074280A (en) * | 2017-12-18 | 2018-05-25 | 国网江苏省电力有限公司检修分公司 | The method that ultra-high-tension power transmission line Equipotential live working simulates hanging basket motion track |
CN109853931A (en) * | 2018-11-30 | 2019-06-07 | 安庆市睿霞机械有限公司 | A kind of building machinery engineering Hanging Basket |
CN115199043A (en) * | 2022-07-04 | 2022-10-18 | 广西交通职业技术学院 | Integrated device for on-site transporting and pouring of sand-free macroporous concrete |
-
2016
- 2016-07-20 CN CN201620770366.1U patent/CN205857662U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108032250A (en) * | 2017-10-23 | 2018-05-15 | 河北建工集团装饰工程有限公司 | A kind of outer outstanding sash mounting platform |
CN108074280A (en) * | 2017-12-18 | 2018-05-25 | 国网江苏省电力有限公司检修分公司 | The method that ultra-high-tension power transmission line Equipotential live working simulates hanging basket motion track |
CN108074280B (en) * | 2017-12-18 | 2021-09-03 | 国网江苏省电力有限公司检修分公司 | Method for simulating moving track of hanging basket in equipotential live working of high-voltage transmission line |
CN109853931A (en) * | 2018-11-30 | 2019-06-07 | 安庆市睿霞机械有限公司 | A kind of building machinery engineering Hanging Basket |
CN115199043A (en) * | 2022-07-04 | 2022-10-18 | 广西交通职业技术学院 | Integrated device for on-site transporting and pouring of sand-free macroporous concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205857662U (en) | Canalization tool-type construction hanging basket | |
CN206052555U (en) | Hood type safe operation platform | |
CN205975510U (en) | Pier fender maintenance platform | |
CN205502610U (en) | Convenient portable building protection canopy | |
CN205934735U (en) | A operation platform for stretch -draw of cantilever bent cap | |
CN205046825U (en) | Pier drum type fender maintenance platform | |
CN203767837U (en) | Special hanging basket structure for hanging gas pipelines | |
CN207191310U (en) | One kind is used for ship plank construction portable unit | |
CN205502613U (en) | Movable building protection canopy | |
CN205742975U (en) | A kind of direct plugging type scaffold | |
CN107587711A (en) | A kind of regularization assembled overhanging protection canopy and its assembly method | |
CN208858177U (en) | Steel Structure Installation lifeline sets up device | |
CN205369866U (en) | Assembled steel ladder | |
CN208649890U (en) | One kind being hung fence for High-speed Railway Bridges bridge pier pier top and installed the operating platform | |
CN207143754U (en) | A kind of across highway adhesion type protection canopy of continuous beam | |
CN206554484U (en) | Temporary operating platform tripod | |
CN206289991U (en) | Work high above the ground operating platform | |
CN109610325A (en) | The construction method of high-speed railway bridge hanging basket mounting platform | |
CN213139095U (en) | Adjustable cage hanging scaffold operation tool for ship construction | |
CN206434739U (en) | Rail safety band hanged hook | |
CN204038917U (en) | Dismountable external hanging service platform | |
CN209723570U (en) | Steel column docking installation operation platform | |
CN206308627U (en) | A kind of portable beam body side operation frame | |
CN207847045U (en) | A kind of swinging scaffold for building | |
CN206346507U (en) | A kind of steel truss girder bridge construction safe passageway system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170104 Termination date: 20170720 |
|
CF01 | Termination of patent right due to non-payment of annual fee |