CN205855473U - Construction dust protection transport of cement instrument - Google Patents

Construction dust protection transport of cement instrument Download PDF

Info

Publication number
CN205855473U
CN205855473U CN201620606914.7U CN201620606914U CN205855473U CN 205855473 U CN205855473 U CN 205855473U CN 201620606914 U CN201620606914 U CN 201620606914U CN 205855473 U CN205855473 U CN 205855473U
Authority
CN
China
Prior art keywords
fixed plate
hopper
support bar
base
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620606914.7U
Other languages
Chinese (zh)
Inventor
丛明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd filed Critical First Construction Co Ltd of China Construction Seventh Engineering Division Corp Ltd
Priority to CN201620606914.7U priority Critical patent/CN205855473U/en
Application granted granted Critical
Publication of CN205855473U publication Critical patent/CN205855473U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of construction dust protection transport of cement instrument, belongs to building implement field.This utility model includes base, the corner, bottom of described base is respectively mounted a buffering wheel device, hopper is installed on the top of base, hopper is the housing of upper opening, the bottom side of hopper is hinged with base, hinged second fixed plate in side, top of hopper, the side of the second fixed plate is hinged with hopper, the upper opening of hopper can be covered during construction dust protection transport of cement instrument transport cement by the first fixed plate of the present utility model and the second fixed plate, it is to avoid cement dust escapes.First foamed latex pad of the present utility model and the second foamed latex pad can fill the first fixed plate, gap between the second fixed plate and hopper when the first fixed plate and the second fixed plate cover the upper opening of hopper, avoid cement dust to escape further.

Description

Construction dust protection transport of cement instrument
Technical field
This utility model belongs to building implement field.
Background technology
Construction refers to the production activity implementation phase of engineering construction, is the building course of all kinds of building, it is also possible to Say it is the various lines on design drawing, in the place specified, become process in kind.It includes basic engineering construction, master Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is referred to as " construction site " or cries " job site ", is also named building site.Cement: powdery hydraulicity inorganic coagulation material.Add water and after stirring, become slurry, can be the hardest Change or preferably harden in water, and can be the most cemented together for the material such as sand, stone.Existing transport of cement instrument exists Although transportation prevents dust device, but protection imprecision, the most easily make dust escape.
Summary of the invention
The purpose of this utility model is to provide a kind of construction dust protection transport of cement instrument, it is possible to solve above-mentioned Problem.
This utility model for achieving the above object, is achieved through the following technical solutions:
Construction dust protection transport of cement instrument, including base, the corner, bottom of described base is respectively mounted one and delays Rushing wheel apparatus, hopper is installed on the top of base, and hopper is the housing of upper opening, and the bottom side of hopper is hinged with base, material Hinged second fixed plate in side, top of bucket, the side of the second fixed plate is hinged with hopper, and the opposite side of the second fixed plate is hinged First fixed plate, the first fixed plate and the second fixed plate are equivalently-sized platy structure, the first fixed plate and the second fixed plate Cooperation can cover hopper upper opening, and the first foamed latex pad is installed in the bottom of the first fixed plate, the bottom peace of the second fixed plate Filling the second foamed latex pad, the bottom side of the first fixed plate installs strong magnet, and the sidepiece of hopper installs fixing bar, and fixing bar is Cylindrical structural, the sidepiece installation electricity push rod of base, the push-pull bar upper end installation of electricity push rod supports seat, and support seat is semicircular ring Shape, supporting seat can coordinate with fixing bar, and handrail is installed in the side of base.
In order to realize the purpose of this utility model further, it is also possible to by the following technical solutions: the bottom of described base Corner is respectively mounted a buffering wheel device, and described buffering wheel device includes the first support bar, the lower end hinged of the first support bar Two support bars, the first support bar place straight line and the second support bar place straight line the most on the same line, under the second support bar End installs pulley, and the first support bar compression spring, the upper end of stage clip is connected with the middle part of the first support bar, the lower end of stage clip and second The middle part of support bar connects.Scraper is installed in the side, bottom of described second support bar, and the lower end of scraper is close to pulley.
The utility model has the advantage of: the first fixed plate of the present utility model and the second fixed plate can be in construction During dust protection transport of cement instrument transport cement, the upper opening of hopper is covered, it is to avoid cement dust escapes.This First foamed latex pad of utility model and the second foamed latex pad can cover hopper in the first fixed plate and the second fixed plate Upper opening time fill the first fixed plate, gap between the second fixed plate and hopper, avoid cement dust to escape further. First foamed latex pad and the second foamed latex pad have the most elastic and toughness, when the first foamed latex pad and the second foaming When latex mattress all coordinates with hopper, the first foamed latex pad and the second foamed latex pad can automatically form the top of groove and hopper Opening coordinates, thus further increases the first fixed plate, tightness between the second fixed plate and hopper.Of the present utility model First fixed plate and the second fixed plate can fold, and when needs unloading cement, the first fixed plate and the second fixed plate can be Open after folding, it is to avoid hinder workmen to take cement, reduce the first fixed plate and the second fixed plate open after take Space.Strong magnet of the present utility model can hold hopper when the first fixed plate coordinates with hopper, it is to avoid the first fixed plate exists Open during vibrations.Electricity push rod of the present utility model can be to be promoted, in facilitating hopper at the rear portion of hopper at hopper unloading cement Dump cement.Support seat of the present utility model is that semi-circular shape can conveniently support coordinating and can facilitating of seat and fixing bar Support the disengaging of seat and fixing bar.Buffering wheel device of the present utility model can facilitate construction insulating brick handbarrow While movement, insulating brick is played cushioning effect.This utility model also has simple for structure compact, cheap for manufacturing cost and makes By easy advantage.
Accompanying drawing explanation
Accompanying drawing is used for providing being further appreciated by of the present utility model, and constitutes a part for description, with this practicality Novel embodiment is used for explaining this utility model together, is not intended that restriction of the present utility model.In the accompanying drawings:
Fig. 1 is structural representation of the present utility model.
Mark parts: 1 base 2 first support bar 3 stage clip 4 second support bar 5 pulley 6 scraper 7 handrail 8 first Fixed plate 9 first foamed latex pad 10 second fixed plate 11 second foamed latex pad 12 is fixed bar 13 and is supported seat 14 electricity and push away Bar 15 hopper Final 16 Magnet.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is illustrated, it will be appreciated that described herein excellent Select embodiment to be merely to illustrate and explain this utility model, being not used to limit this utility model.
Construction dust protection transport of cement instrument, as it is shown in figure 1, include base 1, the corner, bottom of described base 1 Being respectively mounted a buffering wheel device, hopper 15 is installed on the top of base 1, and hopper 15 is the housing of upper opening, the end of hopper 15 Side, portion is hinged with base 1, hinged second fixed plate 10 in side, top of hopper 15, the side of the second fixed plate 10 and hopper 15 Hinged, hinged first fixed plate 8 of opposite side of the second fixed plate 10, the first fixed plate 8 and the second fixed plate 10 are equivalently-sized Platy structure, the first fixed plate 8 and the second fixed plate 10 coordinate can cover hopper 15 upper opening, the end of the first fixed plate 8 The first foamed latex pad 9 is installed in portion, and the second foamed latex pad 11, the end of the first fixed plate 8 are installed in the bottom of the second fixed plate 10 Strong magnet 16 is installed in side, portion, and the sidepiece of hopper 15 installs fixing bar 12, and fixing bar 12 is cylindrical structural, the sidepiece of base 1 Installing electricity push rod 14, the push-pull bar upper end of electricity push rod 14 is installed and is supported seat 13, and supporting seat 13 be semi-circular shape, and support seat 13 can be with Fixing bar 12 coordinates, and handrail 7 is installed in the side of base 1.
First fixed plate 8 of the present utility model and the second fixed plate 10 can be in construction dust protection transport of cement works During tool transport cement, the upper opening of hopper 15 is covered, it is to avoid cement dust escapes.First of the present utility model Bubble latex mattress 9 and the second foamed latex pad 11 can cover the top of hopper 15 in the first fixed plate 8 and the second fixed plate 10 and open Fill the gap between first fixed plate the 8, second fixed plate 10 and hopper 15 during mouth, avoid cement dust to escape further.The One foamed latex pad 9 and the second foamed latex pad 11 have preferably elastic and toughness, as the first foamed latex pad 9 and second Bubble latex mattress 11 is when all coordinating with hopper 15, the first foamed latex pad 9 and the second foamed latex pad 11 can automatically form groove and The upper opening of hopper 15 coordinates, thus further increase between first fixed plate the 8, second fixed plate 10 and hopper 15 tight Close property.First fixed plate 8 of the present utility model and the second fixed plate 10 can fold, and when needs unloading cement, first fixes Plate 8 and the second fixed plate 10 can be opened after folding, it is to avoid hinder workmen to take cement, reduce the first fixed plate 8 The space taken after opening with the second fixed plate 10.Strong magnet 16 of the present utility model can be at the first fixed plate 8 and hopper 15 Hopper 15 is held, it is to avoid the first fixed plate 8 is opened when vibrations during cooperation.Electricity push rod 14 of the present utility model can be at hopper 15 Unloading cement is to be promoted at the rear portion of hopper 15, facilitates the dump cement in hopper 15.Support seat 13 of the present utility model is half Annular can conveniently support the disengaging coordinating and can conveniently supporting seat 13 and fixing bar 12 of seat 13 and fixing bar 12.This reality While moving facilitating construction insulating brick handbarrow, insulating brick can be played slow with novel buffering wheel device Punching effect.First fixed plate 8 and the second fixed plate 10 are that equivalently-sized platy structure can make the first fixed plate 8 and second solid The space determining to take after plate 10 folds is minimum.
The corner, bottom of described base 1 is respectively mounted a buffering wheel device, and described buffering wheel device includes the first support bar 2, the upper end of the first support bar 2 connects base 1, hinged second support bar 4 in lower end of the first support bar 2, the first support bar 2 place The most on the same line, pulley 5, the first support bar are installed in the lower end of the second support bar 4 for straight line and the second support bar 4 place straight line 2 compression springs 3, the upper end of stage clip 3 is connected with the middle part of the first support bar 2, and the lower end of stage clip 3 connects with the middle part of the second support bar 4 Connect.Buffering wheel device of the present utility model can be executed to building when construction dust protection transport of cement instrument is vibrated Work dust protection transport of cement instrument one buffering, it is to avoid construction with dust protection transport of cement instrument due to Oscillation Amplitude mistake Transported article are caused greatly to damage.First support bar the 2, second support bar 4 of the present utility model and stage clip 3 coordinate and can be subject to By change angle, vibration is buffered to during vibration, improve the buffering effect to vibration.
Scraper 6 is installed in the side, bottom of described second support bar 4, and the lower end of scraper 6 is close to pulley 5.Due to construction Need to use the most on-site with dust protection transport of cement instrument, pulley 5 extremely becomes easily infected by mud, of the present utility model Scraper 6 can facilitate the use of pulley 5 when pulley 5 rotates by under sludge scraping.

Claims (3)

1. a construction dust protection transport of cement instrument, it is characterised in that: include base (1), the end of described base (1) Corner, portion is respectively mounted a buffering wheel device, and hopper (15) is installed on the top of base (1), and hopper (15) is the shell of upper opening Body, the bottom side of hopper (15) is hinged with base (1), hinged second fixed plate in the side, top (10) of hopper (15), and second The side of fixed plate (10) is hinged with hopper (15), hinged first fixed plate of the opposite side (8) of the second fixed plate (10), and first is solid Determining plate (8) and the second fixed plate (10) is equivalently-sized platy structure, the first fixed plate (8) and the second fixed plate (10) coordinate Can cover hopper (15) upper opening, the first foamed latex pad (9), the second fixed plate are installed in the bottom of the first fixed plate (8) (10) the second foamed latex pad (11) is installed in bottom, and the bottom side of the first fixed plate (8) installs strong magnet (16), hopper (15) sidepiece installs fixing bar (12), and fixing bar (12) is cylindrical structural, and the sidepiece of base (1) installs electricity push rod (14), The push-pull bar upper end of electricity push rod (14) is installed and is supported seat (13), and supporting seat (13) is semi-circular shape, and supporting seat (13) can be with fixing Bar (12) coordinates, and handrail (7) is installed in the side of base (1).
Construction dust protection transport of cement instrument the most according to claim 1, it is characterised in that: described buffering wheel fills Putting and include the first support bar (2), the upper end of the first support bar (2) connects base (1), the lower end of the first support bar (2) hinged the Two support bars (4), the first support bar (2) place straight line and the second support bar (4) place straight line the most on the same line, second Pulley (5), the first support bar (2) compression spring (3), the upper end of stage clip (3) and the first support bar (2) are installed in the lower end of strut (4) Middle part connect, the lower end of stage clip (3) is connected with the middle part of the second support bar (4).
Construction dust protection transport of cement instrument the most according to claim 2, it is characterised in that: described second supports Scraper (6) is installed in the side, bottom of bar (4), and the lower end of scraper (6) is close to pulley (5).
CN201620606914.7U 2016-06-21 2016-06-21 Construction dust protection transport of cement instrument Expired - Fee Related CN205855473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620606914.7U CN205855473U (en) 2016-06-21 2016-06-21 Construction dust protection transport of cement instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620606914.7U CN205855473U (en) 2016-06-21 2016-06-21 Construction dust protection transport of cement instrument

Publications (1)

Publication Number Publication Date
CN205855473U true CN205855473U (en) 2017-01-04

Family

ID=57636471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620606914.7U Expired - Fee Related CN205855473U (en) 2016-06-21 2016-06-21 Construction dust protection transport of cement instrument

Country Status (1)

Country Link
CN (1) CN205855473U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108045695A (en) * 2017-11-30 2018-05-18 杨仙君 A kind of high cement rack for building of comfort
CN108177994A (en) * 2018-02-05 2018-06-19 嘉兴恒瑞金属表面处理有限公司 A kind of automatic discharge unit with water cooling
CN109353840A (en) * 2018-11-18 2019-02-19 金清炎 Rack drives formula batch turning mechanism and batch turning method are set in shaft
CN109534006A (en) * 2018-11-18 2019-03-29 金清炎 The underlying rack drives formula batch turning mechanism of shaft and batch turning method
CN109606929A (en) * 2018-11-18 2019-04-12 金清炎 Direct-drive type batch turning mechanism and batch turning method are set in shaft
CN109606928A (en) * 2018-11-18 2019-04-12 金清炎 Shaft underlying direct-drive type batch turning mechanism and batch turning method
CN112061811A (en) * 2020-09-22 2020-12-11 怀宁县腊树四合供销合作社有限公司 Organic fertilizer transmission leakage-proof device and leakage-proof method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108045695A (en) * 2017-11-30 2018-05-18 杨仙君 A kind of high cement rack for building of comfort
CN108045695B (en) * 2017-11-30 2019-03-12 湖北亿源建筑有限公司 A kind of high cement rack for building of comfort
CN108177994A (en) * 2018-02-05 2018-06-19 嘉兴恒瑞金属表面处理有限公司 A kind of automatic discharge unit with water cooling
CN108177994B (en) * 2018-02-05 2023-10-03 嘉兴恒瑞金属科技股份有限公司 Automatic discharging device with water cooling function
CN109353840A (en) * 2018-11-18 2019-02-19 金清炎 Rack drives formula batch turning mechanism and batch turning method are set in shaft
CN109534006A (en) * 2018-11-18 2019-03-29 金清炎 The underlying rack drives formula batch turning mechanism of shaft and batch turning method
CN109606929A (en) * 2018-11-18 2019-04-12 金清炎 Direct-drive type batch turning mechanism and batch turning method are set in shaft
CN109606928A (en) * 2018-11-18 2019-04-12 金清炎 Shaft underlying direct-drive type batch turning mechanism and batch turning method
CN112061811A (en) * 2020-09-22 2020-12-11 怀宁县腊树四合供销合作社有限公司 Organic fertilizer transmission leakage-proof device and leakage-proof method thereof

Similar Documents

Publication Publication Date Title
CN205855473U (en) Construction dust protection transport of cement instrument
CN107676546A (en) A kind of plumbing installation of antidetonation
CN206234479U (en) The pipeline of inside pipe casing is centered about device
CN206840365U (en) One kind being capable of oscillation in the pitch mode type concrete plain bumper
CN205855112U (en) Construction insulating brick handbarrow
CN103343554A (en) Multidirectional dumping steering device for loader
CN208668462U (en) A kind of pipe gallery supporting structure
CN207105360U (en) A kind of copper rice shaking table vibration separate equipment
CN206319892U (en) New hydraulic tunnel loads and unloads construction trolley
CN205329548U (en) Sand section of thick bamboo temporary support
CN205242276U (en) Base stone template structure
CN208885042U (en) A kind of microwave equipment reinforced for earth site surface layer
CN205600918U (en) Dry process concrete shaking platform
CN206954949U (en) A kind of construction concrete operates hopper
CN105507326A (en) Leak-proof device for prestress concrete hollow pipe pile cap
JP2018003327A (en) Building foundation
CN216460022U (en) Dry-mixed mortar excess material recovery device
CN204475480U (en) A kind of novel plastic manhole
FI3774614T3 (en) Loading device for particulate material
CN207450739U (en) A kind of dry-mixed mortar moves silo
CN207392288U (en) The oblique spike mechanism of loading machine
CN211315350U (en) Damping noise reduction air pipe
CN203229989U (en) Lower hinge seat for mounting rear frame of loader
TWM453726U (en) Pneumatic driller punching device for backhoe
CN209522466U (en) A kind of strip cement components hanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170104

Termination date: 20190621