CN205842102U - Cold insulation pipeline fixed support - Google Patents

Cold insulation pipeline fixed support Download PDF

Info

Publication number
CN205842102U
CN205842102U CN201620726779.XU CN201620726779U CN205842102U CN 205842102 U CN205842102 U CN 205842102U CN 201620726779 U CN201620726779 U CN 201620726779U CN 205842102 U CN205842102 U CN 205842102U
Authority
CN
China
Prior art keywords
support
cold insulation
metal
wood block
block filler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620726779.XU
Other languages
Chinese (zh)
Inventor
马杰
阎立军
马喆
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Installation Work Co Ltd
Original Assignee
Tianjin Installation Work Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Installation Work Co Ltd filed Critical Tianjin Installation Work Co Ltd
Priority to CN201620726779.XU priority Critical patent/CN205842102U/en
Application granted granted Critical
Publication of CN205842102U publication Critical patent/CN205842102U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of cold insulation pipeline fixed support, pipeline passes the first cold insulation wood block filler, the lower surface of the first cold insulation wood block filler is connected with support, first cold insulation wood block filler is fixed on support by metal anchor ear, and its two ends and the anchor ear bolt hole being arranged on support are fixing is connected, the one or both sides of described support are connected with the first metal baffle in turn, second cold insulation wood block filler, support, first metal baffle, second cold insulation wood block filler connects by fixing bolt is fixing, the second metal baffle and metal floor it is sequentially connected with outside second cold insulation wood block filler, second metal baffle and metal floor weld with lower end of duct.Separate with the wood block filler of leaching bituminous primer between this utility model pipeline and support and reach to eliminate " cold bridge " phenomenon and fixation, meet design requirement, ensure that operating mode, meet related specifications standard regulation, also avoid waste simultaneously, save cost, and empirical tests effect is favourable after a procedure.

Description

Cold insulation pipeline fixed support
Technical field
This utility model belongs to pipeline construction technical field of auxiliary equipment, particularly relates to a kind of cold insulation pipeline with fixing Frame.
Background technology
During Process Piping Construction, in the case of length of pipeline can not meet natural compensation, need to add prosthetics Device compensates.Need after installing compensator additional to be fixed with slide-and-guide support by pipeline with fixed support, to reach compensation of pipeline Effect.But some the most newly-built large common facilities (such as subway subterranean stations, underground commerce center, Large-sized Communication hinge etc.) Air conditioning water system pipeline laying typically the longest, under normal circumstances more than 100 meters, and finishing furred ceiling uses grating type, Air conditioning water system pipeline easily produces " cold bridge " phenomenon according to the construction of existing atlas with support bracket fastened connection or makes numerous Trivial, therefore, technological requirement can not be fully met with reference to the construction of existing atlas.
Utility model content
The purpose of this utility model is, for the problems referred to above, to improve, thus provide one on the basis of prior art Plant cold insulation pipeline fixed support.
For realizing the purpose of this utility model, this utility model be the technical scheme is that a kind of cold insulation pipeline is with solid Fixed rack, including metal anchor ear, the first cold insulation wood block filler, support and the first metal baffle, the second cold insulation wood block filler, the second gold medal Belonging to baffle plate, metal floor, fixing bolt, described first cold insulation wood block filler includes upper and lower two parts, and two parts surround up and down The fixing hole being used in combination with pipeline, pipeline passes described fixing hole, and the lower surface of the first cold insulation wood block filler is connected with support Connecing, the first cold insulation wood block filler is fixed on support by metal anchor ear, and its two ends are solid with the anchor ear bolt hole being arranged on support Fixed connection, the one or both sides of described support are connected with the first metal baffle, the second cold insulation wood block filler, support, the first gold medal in turn Belong to baffle plate, the second cold insulation wood block filler connects by fixing bolt is fixing, is sequentially connected with the second metal outside the second cold insulation wood block filler Baffle plate and metal floor, the second metal baffle and metal floor weld with lower end of duct.
Wherein, align with pedestal lower end in the lower end of the first metal baffle, and upper end and duct bottom absolute altitude reserve between 10-15mm Gap, it is to avoid with tube contacts.
Wherein, described support is channel-section steel.
Wherein, the two ends of described support are supported by fixed support bracing frame, and described fixed support bracing frame includes Center vertical shaped steel and fix the bearing diagonal beam being connected with center vertical shaped steel lower end, support is fixing with center vertical shaped steel even Connecing, bearing diagonal beam is metal shaped steel or metal pull bar.
Wherein, support is welded to connect with center vertical shaped steel.
Compared with prior art, the beneficial effects of the utility model are: utilize and use between this utility model pipeline and support The wood block filler of leaching bituminous primer separates and reaches to eliminate " cold bridge " phenomenon and fixation, meets design requirement, it is ensured that Operating mode, has met related specifications standard regulation, also avoid waste simultaneously, has saved cost, and empirical tests effect after a procedure The most favourable.
Accompanying drawing explanation
Fig. 1 show structural representation of the present utility model;
Fig. 2 show the structural representation of this utility model the first cold insulation wood block filler;
Fig. 3 show the structural representation of this utility model the second cold insulation wood block filler;
Fig. 4 show the structural representation of this utility model the second metal baffle;
Fig. 5 show this utility model cross-sectional view;
Fig. 6 show the first structural representation of the support bracket fastened bracing frame of this utility model;
Fig. 7 show the second structural representation of the support bracket fastened bracing frame of this utility model;
Fig. 8 show this utility model parts explosive view;
Fig. 9 show this utility model installation site schematic diagram;
In figure: 1-metal anchor ear, 2-the first cold insulation wood block filler, 3-pipeline, 4-support, 41-anchor ear bolt hole, 5-the first gold medal Belonging to baffle plate, 6-the second cold insulation wood block filler, 7-the second metal baffle, 8-metal floor, 9-fixes bolt, 10-metal shaped steel, 11- Metal pull bar, 12-compensator rail plate support, 13-fixed support, 14-compensator.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.Should be appreciated that described herein Specific embodiment only in order to explain the present invention, be not intended to limit the present invention.
It should be noted that, " connection " described herein and be used for expressing the word of " connection ", as " being connected ", " being connected ", it both may refer to a certain parts and had been directly connected to another parts, it is also possible to refer to a certain parts by other portions Part is connected with another parts.
It should be noted that term used herein above merely to describe detailed description of the invention, and be not intended to restricted root Illustrative embodiments according to the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, belong to " comprising " and/or " bag when using in this manual Include " time, it indicates existing characteristics, step, operation, parts or module, assembly and/or combinations thereof.
It should be noted that term " first " in the description and claims of this application and above-mentioned accompanying drawing, " Two " it is etc. for distinguishing similar object, without being used for describing specific order or precedence.Should be appreciated that so use Data can exchange in the appropriate case, in order to presently filed embodiment described herein such as can be with except here Order beyond those of diagram or description is implemented.Additionally, term " includes " and " having " and their any deformation, it is intended that It is to cover non-exclusive comprising, such as, contains series of steps or the process of unit, method, system, product or equipment not Be necessarily limited to those steps or the unit clearly listed, but can include the most clearly listing or for these processes, side Other step that method, product or equipment are intrinsic or unit.
For the ease of describing, space relative terms here can be used, as " ... on ", " ... top ", " at ... upper surface ", " above " etc., be used for describing as parts shown in the figure or module or feature and other Parts or module or the spatial relation of feature.It should be appreciated that space relative terms is intended to comprise except parts or Different azimuth in use or operation outside the orientation that person's module is described in the drawings.Such as, if the parts in accompanying drawing Or module is squeezed, then be described as " above miscellaneous part or module or structure " or " in miscellaneous part or module or On structure " parts or module after will be positioned as " below miscellaneous part or module or structure " or " at other Under parts or module or structure ".Thus, exemplary term " ... top " can include " ... top " and " in ... lower section " two kinds of orientation.These parts or module can also other different modes location (90-degree rotations or be in other Orientation), and space used herein above is described relatively make respective explanations.
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases Combination mutually.
Air conditioning water system mainly uses under conventional construction situation of the prior art " interior conduit suspension and support atlas (05R417) " but it only designates the fixed form between support and buildings or structures.Generally use when duct length is shorter The mode of natural compensation solves problem, but uses the support (pipeline laying is between wood block filler) that existing atlas makes, pipeline Still after pipeline distance is beyond the scope of natural compensation, can need to install compensator additional along pipeline center's linear shrinkage and expansion, This type of support does not just have effect fixing with support for pipeline.If by force pipeline being welded together with support and can producing " cold bridge " phenomenon." pipeline and equipment thermal insulation-cold insulation atlas (08K507,08R418) " is with reference at us--" horizontal cold water pipe Road fixed support scheme of installation " after feel this design make the most loaded down with trivial details.Determine after being tested by analysis to use and push away Extensively employ this utility model technology.
Embodiment 1
As shown in Fig. 1-5, Fig. 8, the present embodiment includes metal anchor ear the 1, first cold insulation wood block filler 2, support 4 and the first gold medal Belong to baffle plate the 5, second cold insulation wood block filler the 6, second metal baffle 7, metal floor 8, fixing bolt 9, described first cold insulation wood block filler 2 Including upper and lower two parts, and two parts surround the fixing hole being used in combination with pipeline 3 up and down, and pipeline 3 is through described fixing Hole, the lower surface of the first cold insulation wood block filler 2 is connected with support 4, and the first cold insulation wood block filler 2 is fixed on support 4 by metal anchor ear 1 On, and its two ends are fixing with the anchor ear bolt hole 41 being arranged on support 4 is connected, the one or both sides of described support 4 connect successively Being connected to first metal baffle the 5, second cold insulation wood block filler 6, support the 4, first metal baffle the 5, second cold insulation wood block filler 6 is by fixing Bolt 9 is fixing to be connected, and is sequentially connected with the second metal baffle 7 and metal floor 8, the second metal gear outside the second cold insulation wood block filler 6 Plate 7 and metal floor 8 are welded to connect with pipeline 3 lower end.
On-the-spot in order to avoid producing cold bridge, align with support 4 lower end in the lower end of the first metal baffle 5, upper end and pipeline 3 end Portion's absolute altitude reserves 10-15mm gap, it is to avoid with tube contacts.
Described support 4 can be channel-section steel, also can be selected for I-steel according to on-site actual situations or angle steel makes.
Embodiment 2
As shown in Figure 6, Figure 7, support 4 two ends of the present utility model are supported by fixed support bracing frame, described solid It is oblique that fixed rack bracing frame includes that center vertical shaped steel and fixing with center vertical shaped steel lower end or other appropriate locations is connected Support beam, bearing diagonal beam position is depending on support height, and support is fixing with center vertical shaped steel to be connected, and bearing diagonal beam is metal mold Steel 10 or metal pull bar 11.The upper end of fixed support bracing frame is fixed with metope or other fixtures.
Support 4 is welded to connect with center vertical shaped steel, or connects in other ways.
Installation process of the present utility model is as follows:
(1), compensator 14 installation site is as it is shown in figure 9, compensator 14 two ends use double bracket mode, (note: compensator is not Can install with on pipeline as independent pipe fitting, when pipe trench and built on stilts roughing-in, double bracket must be used);
(2), on support 4, place the first cold insulation wood block filler 2, then roughing-in 3 and with metal anchor ear 1 by pipeline 3 with First cold insulation wood block filler 2 is fixed on support 4.I.e. on the basis of conventional bracket, play the most fixing longitudinally guiding effect.
(3), then along pipeline 3 centrage, the first metal baffle 5, (note: two are welded in support 4 side one or both sides It is in the case of compensator 14 is installed at fixed support two ends that the first metal baffle 5 is welded in side, such as only one compensator 14 the most not Weld the first metal baffle 5 with two ends, only the side welding of compensator 14 is being installed).First metal baffle 5 is used for stopping compensation The thrust that device 14 produces.First metal baffle 5 needs to punch in relevant position in advance, and punching quantity is relative with pipe diameter with aperture Should, generally use 2 fixing bolts 9 in order to fix the second cold insulation wood block filler.When pipeline 3 caliber more than more than DN250 time suitable Increasing fixing bolt 9 quantity and the diameter of bolt, aligns with support 4 lower end in the first metal baffle lower end, upper end and duct bottom mark Height reserves 10-15mm gap, it is to avoid with tube contacts.To reach to avoid " cold bridge " effect.
(4), with fixing bolt 9 by after fixing for the second cold insulation wood block filler 6, by the second metal baffle 7 and metal floor 8 with Pipeline 3 welds together, and with second cold insulation wood block filler patch tight after, complete this technological process.
In Pests in Tianjin Binhai New Area in the engineering of transport hub, family fort, its ground next, two layers of public territory (business and waiting Region), air conditioning water system pipeline is up to 240-300 rice (single), and pipeline absolute altitude more than 8 meters, medium design is provided with 3-5 Platform compensator, for guaranteeing that this systematic pipeline does not produce condensation in running and drips problem, we have employed this utility model Patent of invention.
The above is only preferred implementation of the present utility model, it is noted that general for the art For logical technical staff, on the premise of without departing from this utility model principle, it is also possible to make some improvements and modifications, these change Enter and retouch and also should be regarded as protection domain of the present utility model.

Claims (5)

1. a cold insulation pipeline fixed support, it is characterised in that: include metal anchor ear, the first cold insulation wood block filler, support and First metal baffle, the second cold insulation wood block filler, the second metal baffle, metal floor, fixing bolt, described first cold insulation wood block filler Including upper and lower two parts, and two parts surround the fixing hole being used in combination with pipeline up and down, and pipeline passes described fixing hole, The lower surface of the first cold insulation wood block filler is connected with support, and the first cold insulation wood block filler is fixed on support by metal anchor ear, and its Two ends are fixing with the anchor ear bolt hole being arranged on support to be connected, and the one or both sides of described support are connected with the first metal in turn Baffle plate, the second cold insulation wood block filler, support, the first metal baffle, the second cold insulation wood block filler connect by fixing bolt is fixing, and second The second metal baffle and metal floor, the second metal baffle and metal floor and lower end of duct it is sequentially connected with outside cold insulation wood block filler Welding.
Cold insulation pipeline fixed support the most according to claim 1, it is characterised in that: the lower end of the first metal baffle with Aliging in frame lower end, upper end and duct bottom absolute altitude reserve 10-15mm gap, it is to avoid with tube contacts.
Cold insulation pipeline fixed support the most according to claim 1, it is characterised in that: described support is channel-section steel.
Cold insulation pipeline fixed support the most according to claim 1, it is characterised in that: the two ends of described support are by fixing Support bracing frame is supported, and described fixed support bracing frame includes center vertical shaped steel and consolidates with center vertical shaped steel lower end The fixed bearing diagonal beam connected, support is fixing with center vertical shaped steel to be connected, and bearing diagonal beam is metal shaped steel or metal pull bar.
Cold insulation pipeline fixed support the most according to claim 4, it is characterised in that: support welds with center vertical shaped steel Connect.
CN201620726779.XU 2016-07-11 2016-07-11 Cold insulation pipeline fixed support Active CN205842102U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620726779.XU CN205842102U (en) 2016-07-11 2016-07-11 Cold insulation pipeline fixed support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620726779.XU CN205842102U (en) 2016-07-11 2016-07-11 Cold insulation pipeline fixed support

Publications (1)

Publication Number Publication Date
CN205842102U true CN205842102U (en) 2016-12-28

Family

ID=57618487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620726779.XU Active CN205842102U (en) 2016-07-11 2016-07-11 Cold insulation pipeline fixed support

Country Status (1)

Country Link
CN (1) CN205842102U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644048A (en) * 2018-06-27 2018-10-12 张家港富瑞深冷科技有限公司 Anti-shake hydrodynamic power turbine systems module
CN109296830A (en) * 2018-12-12 2019-02-01 上海宝冶集团有限公司 Air conditioner cold-heat waterpipe fixed support device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108644048A (en) * 2018-06-27 2018-10-12 张家港富瑞深冷科技有限公司 Anti-shake hydrodynamic power turbine systems module
CN109296830A (en) * 2018-12-12 2019-02-01 上海宝冶集团有限公司 Air conditioner cold-heat waterpipe fixed support device

Similar Documents

Publication Publication Date Title
US20200256498A1 (en) Trenchless integrative repair method for concrete drainage pipeline with cracking, corrosion and subsidence
CN103201511B (en) Device carrier structure and wind power generation plant in tower
CN102239303B (en) Hybrid method of erecting a cold box using prefabricated and field erected components
CN102483183B (en) Structural duct bearing system
CN105464131A (en) Combined type box-type pipe gallery
CN103243926A (en) Construction method for hoisting pipe well vertical pipe in high-rise building engineering
CN205842102U (en) Cold insulation pipeline fixed support
CN114134934A (en) Assembled pipe gallery support and installation and construction method thereof
CN105604085A (en) Substation frame column footing foundation bolt and mounting method thereof
CN104153610B (en) Plant gas modularity box over all Integration type control panel and installation method thereof
JP2014080824A (en) Method for constructing foundation structure by utilizing skeleton of existing structure, and foundation structure
CN206943591U (en) A kind of petroleum pipeline support frame
JP6066844B2 (en) Deck foundation roof equipment installation foundation and construction method
CN205444228U (en) Framework column base rag bolt of transformer substation
JPH10153014A (en) Main column member replacement construction method of steel tower made of steel pipe
CN104563306B (en) A kind of anti-horizontal displacement steel column node of expansion joint curtain wall wind resistance and its processing method of interlocking
CN210529486U (en) Cable bridge construction
CN207055773U (en) A kind of garage fire-hydrant mounting structure
CN112761245A (en) Assembled reinforced concrete building main body structure and installation construction method thereof
CN214274718U (en) Outer outdoor pipe frame structure of large-scale electronic factory building power station
CN106269255B (en) A kind of wet electrical dust precipitator being easily installed
CN219975658U (en) Channel-section steel hanging beam support based on steel structure
CN105178188B (en) Triangular frame supporting formwork
CN215441923U (en) Subway station foundation pit supporting structure with upper soft and lower hard strata
CN211850279U (en) Structure node of roofing steel structure support and equipment foundation