CN205832848U - Tower crane depositing dust and business's concrete curing device - Google Patents

Tower crane depositing dust and business's concrete curing device Download PDF

Info

Publication number
CN205832848U
CN205832848U CN201620844621.2U CN201620844621U CN205832848U CN 205832848 U CN205832848 U CN 205832848U CN 201620844621 U CN201620844621 U CN 201620844621U CN 205832848 U CN205832848 U CN 205832848U
Authority
CN
China
Prior art keywords
tower crane
business
concrete curing
conveying pipe
curing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620844621.2U
Other languages
Chinese (zh)
Inventor
蒋志新
白仕琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201620844621.2U priority Critical patent/CN205832848U/en
Application granted granted Critical
Publication of CN205832848U publication Critical patent/CN205832848U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of tower crane depositing dust and business's concrete curing device, including longitudinally disposed tower crane support, it is arranged on the tower crane transverse rotation arm above tower crane support, it is provided with spray equipment on the horizontal turning arm of described tower crane, spray equipment is connected with the water source on ground by water conveyance conduit, and water conveyance conduit is provided with pumping installations.This utility model simple in construction, easy for operation, utilize the high-altitude sky advantage that existing tower crane equipment on construction site is exclusive, by being arranged on having the spray equipment controlling airborne dust and business's concrete curing on tower crane, by pumping installations, water pump is delivered to spray equipment;Achieve the economic benefits and social benefits fruit of dust controlling and business's concrete curing;Substantially increase dust controlling and the efficiency of business's concrete curing, reduce construction operation cost, it is noted that enterprise competitiveness.

Description

Tower crane depositing dust and business's concrete curing device
Technical field
This utility model relates to Architectural Equipment field, and a kind of sky advantage processed utilizing tower crane carries out job site fall Dirt and carry out the device of business's concrete curing.
Background technology
Along with the development of society, the life of people is greatly improved and improves, but supporter sends out simultaneously Exhibition and the haze weather brought, also allow people's very headache.To this end, both the central and local governments, all put into for administering haze weather Substantial amounts of material resources, manpower and financial resources, have also been made, simultaneously for relating to the construction operation unit that airborne dust produces, work of constructing accordingly Industry controls the requirement of airborne dust.
Shang Tong, as a kind of structure the most universal in building element, its needs carry out carrying out maintenance by shower water, and Traditional maintenance method is artificial water spray, and due to the height of Shang Tong present position, many places, people's shower water is by pumping airborne dust Limit, and maintenance is got up the most difficult.
Tower crane, is the most universal overhead equipment of one of construction operation field, and it has absolute construction existing Control of the air above Chang.
Therefore, how the process of construction site airborne dust, business's concrete curing to be well combined with tower crane, make is dropping On the basis of low existing dust controlling equipment investment, it is greatly improved dust controlling effect, improves the convenience of business's concrete curing, and drop Low input cost, has been a good problem to study.
Summary of the invention
In order to overcome above-mentioned deficiency of the prior art, this utility model provides a kind of simple in construction, and can pass through The tower crane of the empty advantage of system carries out high-altitude spraying or shower water, carries out the tower crane depositing dust of building overhead dust controlling and business's concrete curing And business's concrete curing device.
The purpose of this utility model is achieved in that
Tower crane depositing dust and business's concrete curing device, including longitudinally disposed tower crane support 3, be arranged on above tower crane support 3 Tower crane transverse rotation arm, the horizontal turning arm of described tower crane is provided with spray equipment, and spray equipment is by water conveyance conduit and ground The water source in face connects, and water conveyance conduit is provided with pumping installations;
Described water conveyance conduit includes being connected with water source and the horizontal conveying pipe of conveying on ground level;Horizontal conveying pipe Longitudinally fed pipe 4 lower end being fastened in tower crane support 3;The upper end of longitudinally fed pipe 4 connects spray equipment conveying pipe 7, It is provided with spray head on described shower conveying pipe 7;
It is provided with lift water pump 1 on described horizontal conveying pipe, the horizontal conveying pipe at lift water pump rear is provided with attached Three-way interface 2 with ball valve;
The hypomere of described longitudinally fed pipe 4 is coating steel pipe, and its pressure-bearing is not less than 1.3MPA, closes thickness and is not less than 3mm;Hot-melt adhesive paste PP-R hard plastic tube is passed through in the top of coating steel pipe 4;
Described longitudinally fed pipe 4 is fixed along the tower ladder within tower crane support 3, and the scaffold of fixing employing quality of rubber materials is solid Locking member, carries out soft rubber undertaking, and connection fastener flexibility is fixed;
It is provided with high-pressure hose 6, high-pressure hose 6 at the upper end connection spray equipment conveying pipe of described longitudinally fed pipe 4 One end connects the upper end of longitudinally fed pipe 4, and the other end connects spray equipment conveying pipe 7;
Described high-pressure hose 6 is provided with the junction, upper end of longitudinally fed pipe 4 and is rotatably connected with universal joint 5;
Described high-pressure hose 6 is positioned at driver's control room 8 of tower crane, and on the high-pressure hose 6 at driver's control room 8 It is provided with secondary pressing pump 9.
Actively beneficial effect: this utility model simple in construction, easy for operation, utilize existing tower crane on construction site to set Standby exclusive high-altitude sky advantage, by being arranged on having the spray equipment controlling airborne dust and business's concrete curing on tower crane, passes through Water pump is delivered to spray equipment by pumping installations;Achieve the economic benefits and social benefits fruit of dust controlling and business's concrete curing;Substantially increase airborne dust control System and the efficiency of business's concrete curing, reduce construction operation cost, it is noted that enterprise competitiveness.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Figure is lift water pump 1, three-way interface 2, tower crane support 3, longitudinally fed pipe 4, universal joint 5, high-pressure hose 6, spray Shower device conveying pipe 7, driver's control room 8, secondary pressing pump 9.
Detailed description of the invention
Below in conjunction with the accompanying drawings and specific embodiment, this utility model is described further:
As it is shown in figure 1, tower crane depositing dust and business's concrete curing device, including longitudinally disposed tower crane support 3, it is arranged on tower crane and props up Tower crane transverse rotation arm above frame 3, the horizontal turning arm of described tower crane is provided with spray equipment, and spray equipment is carried by water Pipeline is connected with the water source on ground, and water conveyance conduit is provided with pumping installations;
Described water conveyance conduit includes being connected with water source and the horizontal conveying pipe of conveying on ground level;Horizontal conveying pipe Longitudinally fed pipe 4 lower end being fastened in tower crane support 3;The upper end of longitudinally fed pipe 4 connects spray equipment conveying pipe 7, It is provided with spray head on described shower conveying pipe 7;
It is provided with lift water pump 1 on described horizontal conveying pipe, the horizontal conveying pipe at lift water pump rear is provided with attached Three-way interface 2 with ball valve;
The hypomere of described longitudinally fed pipe 4 is coating steel pipe, and its pressure-bearing is not less than 1.3MPA, closes thickness and is not less than 3mm;Hot-melt adhesive paste PP-R hard plastic tube is passed through in the top of coating steel pipe 4;
Described longitudinally fed pipe 4 is fixed along the tower ladder within tower crane support 3, and the scaffold of fixing employing quality of rubber materials is solid Locking member, carries out soft rubber undertaking, and connection fastener flexibility is fixed;
It is provided with high-pressure hose 6, high-pressure hose 6 at the upper end connection spray equipment conveying pipe of described longitudinally fed pipe 4 One end connects the upper end of longitudinally fed pipe 4, and the other end connects spray equipment conveying pipe 7;
Described high-pressure hose 6 is provided with the junction, upper end of longitudinally fed pipe 4 and is rotatably connected with universal joint 5;
Described high-pressure hose 6 is positioned at driver's control room 8 of tower crane, and on the high-pressure hose 6 at driver's control room 8 It is provided with secondary pressing pump 9.
Embodiment 1
Atomized spray pattern: purpose condenses aerial micronic dust with water smoke, naturally declines in conjunction with gravity.Ensure building site solid empty Between dirt powder moment compacting thus purify air.Feature is that dust-laying effect is substantially quick, and scope is wide, without dead angle, without ground condition and building site Special construction environment limits.
Embodiment 2
Spray model: purpose compacting building site field ground surface dust, empty dirt, maintenance field agent business concrete simultaneously, feature is Efficiently, save time, laborsaving equivalence rain making, compacting ground surface dust, dust-laying effect are notable, take into account business's concrete curing effect;Every tower Hanging spray dust's system ovelay range is 40 60 meters of circles of radius, covers the effect of depositing dust reaching whole building-site comprehensively Really.Presetting tower crane big brachium 50m(can be with tower crane model change length), vertical tower height 90m.Rev of Sys and innovative point: in system In running, tower crane is not parking, is not required to special messenger and operates supervision spray, and it is unrestricted that spray does 3600 with tower crane large arm Rotate.
Spray, blowing portion are the pipeline that works alone, and spray and form (the synchronization of the long curtain of rain of nearly 50m for 3mm water column interval 0.5m The big arm lengths of tower crane).Making full use of the three-dimensional broad covered area of tower crane, the feature that coverage rate is complete also serves as at compacting ground surface dust simultaneously Construction layer business's concrete curing.Fully atomised spray is effective to the dust of air and three-dimensional construction space, and moment purifies.
This utility model simple in construction, easy for operation, utilize the high-altitude that on construction site, existing tower crane equipment is exclusive The empty advantage of system, by being arranged on having the spray equipment controlling airborne dust and business's concrete curing on tower crane, by pumping installations by water It is pumped to spray equipment;Achieve the economic benefits and social benefits fruit of dust controlling and business's concrete curing;Substantially increase dust controlling and business's concrete curing Efficiency, reduce construction operation cost, it is noted that enterprise competitiveness.
Above-described embodiment is merely to illustrate technical scheme that this utility model is embodied as rather than is limited, affiliated The those of ordinary skill of technical field it should be understood that on the premise of this utility model objective, do not change its performance or Any equivalent that embodiment of the present utility model is carried out by purposes substitutes or obvious modification, and all should contain please at this utility model Ask in the range of protection.

Claims (8)

1. tower crane depositing dust and business's concrete curing device, including longitudinally disposed tower crane support, be arranged on the tower crane above tower crane support Transverse rotation arm, it is characterised in that: being provided with spray equipment on the horizontal turning arm of described tower crane, spray equipment is by water conveying pipe Road is connected with the water source on ground, and water conveyance conduit is provided with pumping installations.
Tower crane depositing dust the most according to claim 1 and business's concrete curing device, it is characterised in that: described water conveyance conduit bag Include and be connected with water source and the horizontal conveying pipe of conveying on ground level;Horizontal conveying pipe is fastened on the longitudinal direction in tower crane support Conveying pipe lower end;The upper end of longitudinally fed pipe connects spray equipment conveying pipe, and described shower conveying pipe is provided with spray Head.
Tower crane depositing dust the most according to claim 2 and business's concrete curing device, it is characterised in that: on described horizontal conveying pipe It is provided with lift water pump, the horizontal conveying pipe at lift water pump rear is provided with the three-way interface of subsidiary ball valve.
Tower crane depositing dust the most according to claim 2 and business's concrete curing device, it is characterised in that: described longitudinally fed pipe Hypomere is coating steel pipe, and its pressure-bearing is not less than 1.3MPA, closes thickness not less than 3mm;Hot melt is passed through in the top of coating steel pipe Connect PP-R hard plastic tube.
Tower crane depositing dust the most according to claim 2 and business's concrete curing device, it is characterised in that: described longitudinally fed pipe edge The tower ladder of tower crane internal stent is fixed, the fixing scaffold fixture using quality of rubber materials, carries out soft rubber undertaking, connection fastener Flexible fixing.
Tower crane depositing dust the most according to claim 2 and business's concrete curing device, it is characterised in that: described longitudinally fed pipe Being provided with high-pressure hose at upper end connection spray equipment conveying pipe, high-pressure hose one end connects the upper end of longitudinally fed pipe, another End connects spray equipment conveying pipe.
Tower crane depositing dust the most according to claim 6 and business's concrete curing device, it is characterised in that: described high-pressure hose is with vertical It is provided with to be rotatably connected to the junction, upper end of conveying pipe and uses universal joint.
8. according to the tower crane depositing dust described in claim 6 or 7 and business's concrete curing device, it is characterised in that: described high-pressure hose It is positioned at driver's control room of tower crane, and is provided with secondary pressing pump on the high-pressure hose at driver's control room.
CN201620844621.2U 2016-08-03 2016-08-03 Tower crane depositing dust and business's concrete curing device Expired - Fee Related CN205832848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620844621.2U CN205832848U (en) 2016-08-03 2016-08-03 Tower crane depositing dust and business's concrete curing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620844621.2U CN205832848U (en) 2016-08-03 2016-08-03 Tower crane depositing dust and business's concrete curing device

Publications (1)

Publication Number Publication Date
CN205832848U true CN205832848U (en) 2016-12-28

Family

ID=57617691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620844621.2U Expired - Fee Related CN205832848U (en) 2016-08-03 2016-08-03 Tower crane depositing dust and business's concrete curing device

Country Status (1)

Country Link
CN (1) CN205832848U (en)

Similar Documents

Publication Publication Date Title
CN205461539U (en) High -altitude spraying dust suppression system of tower crane
CN203944254U (en) A kind of tower crane water injection system
CN207794559U (en) A kind of construction wall surface spraying device facilitating angular adjustment
CN204385675U (en) A kind of dedusting cooling system of adjustable control spraying altitude
CN203962591U (en) Multi-angle pipe fixing holder
CN204844444U (en) Concrete tower crane high altitude sprays maintenance system
CN205598830U (en) Industrial area ground dust collector is executed to building
CN206784295U (en) A kind of distance type tower crane spray system
CN205832848U (en) Tower crane depositing dust and business's concrete curing device
CN207512680U (en) A kind of sprinkling truck high-efficiency water-spraying device
CN206279701U (en) A kind of drainage arrangement of the protecting against shock of skyscraper
CN104328898A (en) Rendering maintenance device for building external wall
CN105311898A (en) Self-rotation type large-turning-spraying dust fall spraying frame
CN209353760U (en) A kind of unwrapping wire hole protective device
CN107155824A (en) A kind of agricultural Multifunctional sprinkler irrigation device
CN206267087U (en) A kind of multi-functional device for reducing dust of building engineering construction
CN202843527U (en) Building cleaning and cooling device
CN204212380U (en) A kind of external wall whitewashes curing means
CN212327756U (en) Dust device for construction site
CN211590645U (en) Hidden spray precast beam pedestal
CN104314311B (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN205130101U (en) A water jet equipment for highway roof beam is recuperated and is protected
CN201133083Y (en) Simple distributor for concrete pumping
CN209875177U (en) Tunnel concrete watering curing means
CN205130100U (en) A atomizer for highway roof beam is recuperated and is protected

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161228

Termination date: 20200803

CF01 Termination of patent right due to non-payment of annual fee