CN205823322U - A kind of boring arrangement of coal seam high-pressure hydraulic slot pressure break - Google Patents

A kind of boring arrangement of coal seam high-pressure hydraulic slot pressure break Download PDF

Info

Publication number
CN205823322U
CN205823322U CN201620764216.XU CN201620764216U CN205823322U CN 205823322 U CN205823322 U CN 205823322U CN 201620764216 U CN201620764216 U CN 201620764216U CN 205823322 U CN205823322 U CN 205823322U
Authority
CN
China
Prior art keywords
boring
pressure
slot
pressure break
coal seam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620764216.XU
Other languages
Chinese (zh)
Inventor
贺昌雨
陈华庚
廉晓冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUINAN TECHNOLOGY VENTURE CO LTD
Original Assignee
HUINAN TECHNOLOGY VENTURE CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUINAN TECHNOLOGY VENTURE CO LTD filed Critical HUINAN TECHNOLOGY VENTURE CO LTD
Priority to CN201620764216.XU priority Critical patent/CN205823322U/en
Application granted granted Critical
Publication of CN205823322U publication Critical patent/CN205823322U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

This utility model provides the boring arrangement of a kind of coal seam high-pressure hydraulic slot pressure break, three row hole drillings are offered to direction, coal seam along its length in Di Chou lane, every row hole drilling all includes that the boring of multiple slot and multiple pressure breaks are holed, and wherein the tapping point of a row hole drilling is positioned at back;The tapping point of other two row hole drillings is respectively positioned on lane side;Two described slot borings it are provided with at equal intervals between adjacent two described pressure breaks boring of every row hole drilling.Boring arrangement described in the utility model, crosses the boring of appropriate design slot and the arrangement of pressure break boring and quantity, while improving extraction efficiency, decreases the quantity of pressure break boring, reduce cost.

Description

A kind of boring arrangement of coal seam high-pressure hydraulic slot pressure break
Technical field
This utility model belongs to Coal Mining Technology field, especially relates to the brill of a kind of coal seam high-pressure hydraulic slot pressure break Hole arrangement.
Background technology
China's coal-mine mostly is high methane low-permeable mine, and gas accident accounts for the proportion of all kinds of major coal accidents of mine Greatly, the loss caused mine is the most serious.Along with society's increase day by day to coal demand, improving constantly of producing capacity, The trend that mining depth increases becomes clear day by day.Along with the seam mining degree of depth increases, coal-bed gas pressure increases, and gas bearing capacity increases Greatly, coal seam permeability reduces, and projecting coal bed quantity is also in increasing trend, and coal and gas outburst mine increases the most therewith.Therefore, It is necessary low-permeability coal seam gas enhanced gas extraction and stone door punching coal measure are studied further.
Technology that hydraulic slotted liner technique is anti-reflection is to utilize high-pressure spray slotting process slot discharge part coal body in boring, elimination Stress is concentrated, and cracks the bottle neck effect that boring around produces, and forms the anti-reflection region of large range of release in boring, it is achieved that water Defeat the controllability in crack propagation direction during splitting, simultaneously as coal body tensile strength reduces near gathering sill, thus reduce Press off pressure, expand pressure break radius, increase relief range;But there is the shortcoming that effective coverage is little in hydraulic slotted liner technique. Hydraulic fracturing technology is that in making coal body, initial fissure opens, and concurrently forms new crack, carries by injecting water under high pressure in coal body The high breathability of coal body, its advantage is that coverage is bigger, but, it is wayward that fracturing also exists pressure break direction, And easily form the problem well of stress raisers, it is unfavorable for the extraction of gas.In prior art, Publication No. CN The patent of 104389631A discloses a kind of low air permeability coal seam slot and pressure break contract network anti-reflection method, by by slot Boring intersects cooperative arrangement with pressure break boring, and holes pressure break and carry out staged fracturing, and expanding one borehole effectively affects model Enclose, it is achieved that the efficient extraction of gas, but this technology has the disadvantage in that this complex process, actual underground construction, be difficult to operation.
Utility model content
For above-mentioned technical problem, the purpose of this utility model is to provide the brill of a kind of coal seam high-pressure hydraulic slot pressure break Hole arrangement, to solve slot boring, coverage is little, the uppity problem of fracturing fracture propagation direction, it is achieved gas is high Effect extraction, meanwhile, reduces the quantity of pressure break boring, thus reduces cost.
The technical solution adopted in the utility model is:
The boring arrangement of a kind of coal seam high-pressure hydraulic slot pressure break, along its length to coal seam side in Di Chou lane To offering three row hole drillings, every row hole drilling all includes that the boring of multiple slot and multiple pressure breaks are holed, the wherein perforate of a row hole drilling Point is positioned at back;The tapping point of other two row hole drillings is respectively positioned on lane side;Adjacent two described pressure breaks boring of every row hole drilling Between be provided with the boring of two described slots at equal intervals.
The boring arrangement of coal seam described in the utility model high-pressure hydraulic slot pressure break, wherein, described in adjacent two Arrange at equal intervals between slot boring or the boring of adjacent described slot and the boring of described pressure break.
The boring arrangement of coal seam described in the utility model high-pressure hydraulic slot pressure break, wherein, between adjacent boring Distance be 10-12m.
This utility model beneficial effect:
The boring arrangement of high-pressure hydraulic slot pressure break described in the utility model, by appropriate design slot boring and The arrangement of pressure break boring and quantity, while improving extraction efficiency, decrease the quantity of pressure break boring, reduce production Cost.Can significantly improve the gas pumping amount of boring, the aspect such as another external economy, time all has and has an enormous advantage.For taking off The anti-reflection offer of coal and coal seam is instructed, and provides technical guarantee for gas smelting reason.
Accompanying drawing explanation
Fig. 1 is that the drilling plane of high-pressure hydraulic slot pressure break coal seam described in the utility model anti-reflection method arranges schematic diagram;
Fig. 2 is that the boring facade of high-pressure hydraulic slot pressure break coal seam described in the utility model anti-reflection method arranges schematic diagram;
Fig. 3 is the high-pressure hydraulic slotting process system of high-pressure hydraulic slot pressure break coal seam described in the utility model anti-reflection method Structural representation;
Fig. 4 is the high-pressure hydraulic slot fracturing technology system of high-pressure hydraulic slot pressure break coal seam of the present utility model anti-reflection method The structural representation of system.
Below in conjunction with specific embodiments and the drawings, the utility model is described in further detail.
Detailed description of the invention
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of boring for coal seam high-pressure hydraulic slot pressure break of the present embodiment is arranged Structure, job location chooses certain work surface low level gas pumping tunnel, colliery 12408, in Di Chou lane 3 along its length to Direction, coal seam 4 offers three row hole drillings, and every row hole drilling all includes multiple slot boring 1 and multiple pressure break boring 2, a wherein gang drill The tapping point in hole is positioned at back, and 1m is helped in distance lane;The tapping point of other two row hole drillings is respectively positioned on lane side, away from roadway floor 5 Distance be 2m;Being provided with two slot borings 1 at equal intervals between adjacent two pressure breaks boring 2 of every row hole drilling, adjacent two are cut Arrange at equal intervals between seam boring 1 or adjacent slot boring 1 and pressure break boring 2, the pressure break of adjacent two row hole drillings in three row hole drillings Holing 2 non-conterminous, 2 dispersed placement so that multiple pressure break is holed, the distance between adjacent boring is 10-12m.
The present embodiment uses the boring arrangement of above-mentioned coal seam high-pressure hydraulic slot pressure break to carry out anti-reflection method, including Following steps:
A () presses above-mentioned boring arrangement, each slot of constructing one by one boring 1 also uses high-pressure water jet to hole each slot 1 carries out high-pressure hydraulic slot, and the high pressure outlet side of high-pressure hydraulic pump 6 is passed sequentially through high-pressure rubber pipe 8 and swivel joint 14 and water-jet One end of stream drilling rod 10 connects, and is fixedly installed on the other end of water jet drilling rod 10 equipped with the Water jet sprayer 11 of nozzle 12;With Rig 15 drives water jet drilling rod 10 that Water jet sprayer 11 is delivered to slot and holed for 1 end, is then turned on rig 15, makes water jet bore Bar 10 rotates with minimum speed;By adjustable cut-off valve 7, controlling fluidic system pressure, pressure is 25MPa, opens nozzle 12, right The coal body of the hole wall of slot boring 1 carries out circumgyration incision, and water jet drilling rod 10 slowly moves back and forth in slot boring 1 simultaneously, Control slot hole the scope of 1 slot section by changing the length of water jet drilling rod 10 in slot boring 1, form reaming boring 13, a diameter of 500mm of reaming boring 13, until completing slot operation, use sealing material 9 to carry out each slot boring 1 often After rule sealing of hole operation, it is connected into methane gas extraction pipeline and carries out gas pumping;
B () presses above-mentioned boring arrangement, each pressure break of constructing one by one boring 2 also uses sealing material 9 to enter pressure break boring 2 Row sealing of hole, sealing material 9 is cement mortar, and after sealing of hole, described cement mortar need to solidify more than 72h;
C () carries out high-pressure hydraulic pressure break to each pressure break boring 2, by the high pressure outlet side of high-pressure hydraulic pump 6 by high-pressure rubber pipe 8 It is connected with one end of water jet drilling rod 10, the other end of water jet drilling rod 10 is delivered to pressure break and holed for 1 end, open high-pressure hydraulic pump 6, Proceed by fracturing, by pump pressure slowly rise until pressure break boring 2 there are flowing out, make the neighbouring brill of pressure break boring 2 and surrounding Between hole, coal body is pressed off formation and is run through crack passage, and carries out ickings by water under high pressure, reaches to increase gas permeability of coal seam Purpose.
In the present embodiment, choose different boring to 12408 Di Chou lane fracturing gas monitors: take slot fracturing work After, the average gas extraction concentration of 126~137# borings is between 15%~92%, and average gas extraction concentration is 48.04%;The average gas extraction concentration of 158~163# borings is between 12%~61%, and average gas extraction concentration is 32.52%;The average gas extraction concentration of 181~186# borings is between 11%~69%, and average gas extraction concentration is 45.81%;The average gas extraction concentration of 198~203# borings is between 10%~61%, and average gas extraction concentration is 36.15%;The average gas extraction concentration of 227~232# borings is between 10%~75%, and average gas extraction concentration is 40.35%;And contrast the average gas extraction concentration of conventional 116#~125# boring between 5%~35%, average gas Extraction concentration is 13.18%, as shown in table 1.
After comparing result is it can be seen that take the present embodiment anti-reflection operation of slot pressure break, the mean concentration of its gas pumping It it is 3.08 times of conventional boring;Obviously, the comprehensive anti-reflection operation of slot pressure break is taked to achieve obvious antireflective effect.
The contrast of the gas density that the boring that table 1 takes slot pressure break the most anti-reflection is holed with routine
Embodiment described above is only to be described preferred implementation of the present utility model, not to this practicality Novel scope is defined, and on the premise of without departing from this utility model design spirit, those of ordinary skill in the art are to this Various deformation that the technical scheme of utility model is made and improvement, all should fall into the protection that this utility model claims determine In the range of.

Claims (3)

1. the boring arrangement of a coal seam high-pressure hydraulic slot pressure break, it is characterised in that: in Di Chou lane (3) along its length Direction offers three row hole drillings to coal seam (4) direction, and every row hole drilling all includes multiple slot boring (1) and the boring of multiple pressure break (2), wherein the tapping point of a row hole drilling is positioned at back;The tapping point of other two row hole drillings is respectively positioned on lane side;Every row hole drilling Adjacent two described pressure breaks boring (2) between be provided with two described slots boring (1) at equal intervals.
The boring arrangement of coal seam the most according to claim 1 high-pressure hydraulic slot pressure break, it is characterised in that: adjacent two Arrange at equal intervals between individual described slot boring (1) or adjacent described slot boring (1) and described pressure break boring (2).
The boring arrangement of coal seam the most according to claim 1 and 2 high-pressure hydraulic slot pressure break, it is characterised in that: phase Distance between adjacent boring is 10-12m.
CN201620764216.XU 2016-07-19 2016-07-19 A kind of boring arrangement of coal seam high-pressure hydraulic slot pressure break Active CN205823322U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620764216.XU CN205823322U (en) 2016-07-19 2016-07-19 A kind of boring arrangement of coal seam high-pressure hydraulic slot pressure break

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620764216.XU CN205823322U (en) 2016-07-19 2016-07-19 A kind of boring arrangement of coal seam high-pressure hydraulic slot pressure break

Publications (1)

Publication Number Publication Date
CN205823322U true CN205823322U (en) 2016-12-21

Family

ID=57562907

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620764216.XU Active CN205823322U (en) 2016-07-19 2016-07-19 A kind of boring arrangement of coal seam high-pressure hydraulic slot pressure break

Country Status (1)

Country Link
CN (1) CN205823322U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971663A (en) * 2016-07-19 2016-09-28 淮南宏昌科技有限责任公司 Drill hole arrangement structure and permeability-increasing method for coal seam high-pressure waterpower slotted fracturing
CN110242256A (en) * 2019-06-19 2019-09-17 河南理工大学 A kind of efficient mash gas extraction device of drilling subsection
CN112253067A (en) * 2020-08-26 2021-01-22 煤科集团沈阳研究院有限公司 Cross fracturing cooperative permeability increasing method for grid drilling of thick coal seam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971663A (en) * 2016-07-19 2016-09-28 淮南宏昌科技有限责任公司 Drill hole arrangement structure and permeability-increasing method for coal seam high-pressure waterpower slotted fracturing
CN110242256A (en) * 2019-06-19 2019-09-17 河南理工大学 A kind of efficient mash gas extraction device of drilling subsection
CN112253067A (en) * 2020-08-26 2021-01-22 煤科集团沈阳研究院有限公司 Cross fracturing cooperative permeability increasing method for grid drilling of thick coal seam
CN112253067B (en) * 2020-08-26 2021-12-10 中煤科工集团沈阳研究院有限公司 Cross fracturing cooperative permeability increasing method for grid drilling of thick coal seam

Similar Documents

Publication Publication Date Title
CN105971663B (en) A kind of the drilling arrangement and anti-reflection method of coal seam high-pressure hydraulic slot pressure break
CN102383828B (en) Refection reducing and outburst eliminating method for deep-hole hydraulic fracture driving gas shallow hole extraction
US10370942B2 (en) Method for integrated drilling, flushing, slotting and thermal injection for coalbed gas extraction
CN101575983B (en) Directional fracturing permeability improvement outburst elimination method in coal mine and device thereof.
CN105156085B (en) The coal mine underground coal bed tree-shaped uniform anti-reflection method of drilling composite fracturing
WO2018171255A1 (en) Networked preferential gas migration passage construction and gas diversion drainage method
WO2018099262A1 (en) Rock drilling, swelling and chiselling combined machine based on high-pressure foam medium
CN102155254A (en) Method for extracting gas in low air permeability coal layer by pulse fracture anti-reflection
CN102213077A (en) Coal seam reaming system using three-dimensional (3D) swirling water jet and reaming and fracturing method for permeability enhancement
CN102619552A (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN103541710A (en) Method for forcedly draining gas from underground gas and liquid alternate phase-drive fracture coal of coal mine
CN105134286B (en) L-type well goaf gas pumping method
CN205823322U (en) A kind of boring arrangement of coal seam high-pressure hydraulic slot pressure break
CN105239983A (en) Low-gas permeability coal seam weakening and permeability increasing method combining presplitting and high-pressure water injection
CN105370256A (en) Method for increasing wetting radius of high-pressure water injection of low-air-permeability coal seams through sectioned pre-splitting
CN103147734A (en) Method for multi-section hydraulic fracture along coal layer of underground coal mine
CN206957683U (en) A kind of coal seam pressure relief and permeability improvement system
CN104763368A (en) Orifice seal device for large-diameter downhole hammer and reverse circulation construction technology for orifice seal device
CN105114116A (en) Method for strengthening regional gas extraction through hydro-thermal coupling fracturing
CN104389559A (en) Method and device for preventing and controlling gas transfinite in thick-coal-seam mining process
CN103821489B (en) Horizontal well machinery layering is acidified combination process tubing string with hydraulic jetting fracturing
CN105041218B (en) A kind of anti-collapse two-way rib winged injection grouting drill bit and its application method
CN105257256B (en) Underground gas production tubing string and gas production method
CN103075180A (en) Gas-liquid two-phase jet slotting system and method
CN104499935A (en) Reverse circulation cluster typedownhole hammer for reaming

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant