CN205822447U - A kind of truss interim structural texture of web member completion - Google Patents

A kind of truss interim structural texture of web member completion Download PDF

Info

Publication number
CN205822447U
CN205822447U CN201620623510.9U CN201620623510U CN205822447U CN 205822447 U CN205822447 U CN 205822447U CN 201620623510 U CN201620623510 U CN 201620623510U CN 205822447 U CN205822447 U CN 205822447U
Authority
CN
China
Prior art keywords
boom
web member
truss
completion
steel component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620623510.9U
Other languages
Chinese (zh)
Inventor
袁国平
蒋永扬
曹本富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Original Assignee
Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Zhongnan Construction Group Steel Structure Co Ltd filed Critical Zhejiang Zhongnan Construction Group Steel Structure Co Ltd
Priority to CN201620623510.9U priority Critical patent/CN205822447U/en
Application granted granted Critical
Publication of CN205822447U publication Critical patent/CN205822447U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of truss interim structural texture of web member completion, including top boom and lower boom, between top boom and lower boom, be provided with montant and web member, it is characterised in that: lower boom is provided with completion web member;Being provided with the first temporary steel component between top boom and lower boom, the outside of top boom is located in the upper end of the first temporary steel component, and the outside of lower boom is located in the lower end of the first temporary steel component.This utility model is when plane girder lifting, lifting, it is ensured that at segmentation, completion web member is the most elevated with other components of truss or lifts, it is to avoid follow-up benefit bar, when solving plane girder lifting, lifting, and web member and the problem of interim measure bar-crossing;Component at segmentation local reinforcement be can be carried out, it is achieved Internal Force Redistribution, truss member stability in lifting, hoisting process and compatibility of deformation fully ensured, it is to avoid joints is uneven;Being conducive to controlling joint quality, it is simple to construction, motility is strong, widely applicable simultaneously.

Description

A kind of truss interim structural texture of web member completion
Technical field
This utility model belongs to long strands field, particularly relates to a kind of truss interim structural texture of web member completion.
Background technology
The works that geometry that truss is made up of with the triangle frame that straight-bar forms some is constant, the knot between rod member Chalaza is referred to as node (or node).Axis according to composition truss member and the distribution situation of suffered external force, truss can be divided into flat Face truss and space truss.
The axis of the rod member of plane girder composition truss and suffered external force are the most at grade.Plane girder can be considered Adding what rod member was constituted on one basic triangle frame, often add two bars, palpiform becomes a new node just can make structure Geometry keeps constant.
The main member of plane girder includes at present: chord member, montant and web member, and it is real by fastener, bolt or welding The formation of existing whole truss structure.Truss is promoted, in hoisting process, truss disconnect need to stagger nodal distance 500~ 600mm, when web member corresponding to segmentation position is installed, first by chord member to connecting, then carries out web member completion, web member and interim measure structure There is the problem intersected in part, and work high above the ground work amount is big, is not easy to ensure construction quality, the most economical.
Utility model content
This utility model purpose is to solve above-mentioned technical problem present in prior art, it is provided that a kind of truss web member The interim structural texture of completion, facilitates completion web member at segmentation to pass, it is ensured that at segmentation, completion web member is with other components of truss together Elevated or lifting, it is to avoid follow-up benefit bar, component at segmentation is carried out local reinforcement, it is achieved Internal Force Redistribution simultaneously, fully protects Hinder truss member stability in lifting, hoisting process and compatibility of deformation, it is to avoid joints is uneven.
In order to solve above-mentioned technical problem, this utility model adopts the following technical scheme that
A kind of truss interim structural texture of web member completion, including top boom and lower boom, between top boom and lower boom It is provided with montant and web member, it is characterised in that: lower boom is provided with completion web member;First it is provided with interim between top boom and lower boom Steel beam column, the upper end of the first temporary steel component is located at the outside of top boom, and lower boom is located in the lower end of the first temporary steel component Outside.
Further, the lower end of completion web member is welded on lower boom.
Further, the first temporary steel component is vertically welded in the outside of top boom and lower boom.
Further, the outside of top boom and the outside of lower boom are equipped with steel plate, steel plate and the connection of the first temporary steel component.
Further, the junction of the first temporary steel component and lower boom to the distance of montant with the junction of lower boom is 200~300mm.
Further, being provided with the second temporary steel component between top boom and lower boom, the upper end of the second temporary steel component is located at The outside of top boom, the outside of lower boom, the lower end of the second temporary steel component and completion are located in the lower end of the second temporary steel component The lower end of web member is corresponding.
Further, the second temporary steel component oblique weld is in top boom and the outside of lower boom.
This utility model, owing to have employed technique scheme, has the advantages that
1, this utility model is when plane girder lifting, lifting, facilitates completion web member at segmentation to pass, it is ensured that to mend at segmentation Full web member is the most elevated with other components of truss or lifts, it is to avoid follow-up benefit bar, when solving plane girder lifting, lifting, Web member and the problem of interim measure bar-crossing.
2, this utility model vertically welds the first temporary steel component in the both sides of top boom and lower boom, during lifting, each Docking location uses one group of vertical steel component;At both sides oblique weld the second temporary steel component of top boom and lower boom, promote Time, each docking location uses one group of vertical steel component and one group of oblique steel beam column.So component at segmentation can be carried out local repair By force, it is achieved Internal Force Redistribution, truss member stability in lifting, hoisting process and compatibility of deformation are fully ensured, it is to avoid joint Point unbalance stress.
3, this utility model is conducive to controlling joint quality simultaneously;Operation principle is simple, it is simple to construction;Motility is strong, suitable With wide, it is easy to promote.
Accompanying drawing explanation
The utility model is described in further detail below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of this utility model a kind of truss interim structural texture of web member completion;
Fig. 2 is structural representation during this utility model lifting;
Fig. 3 is the structural representation that in Fig. 1, A-A connects to top boom, lower boom and the first temporary steel component.
In figure, 1-top boom;2-lower boom;3-montant;4-web member;5-completion web member;6-the first temporary steel component;7- Two temporary steel components;8-steel plate.
Detailed description of the invention
As shown in figures 1 and 3, for this utility model one truss interim structural texture of web member completion, including top boom 1 With lower boom 2, between top boom 1 and lower boom 2, it is provided with montant 3 and web member 4.When to truss spelling, the lower end of completion web member 5 Being welded on lower boom 2, the upper end ancillary method of completion web member 5 is fixed temporarily.Set between top boom 1 and lower boom 2 Having the first temporary steel component 6, the first temporary steel component 6 is vertically welded in top boom 1 and the outside of lower boom 2, outside top boom 1 The outside of side and lower boom 2 is equipped with steel plate 8, and steel plate 8 is connected with the first temporary steel component 6, it is simple to top boom 1 and lower boom 2 It is connected with the first temporary steel component 6.The junction of the first temporary steel component 6 and lower boom 2 is to the connection of montant 3 with lower boom 2 The distance at place is 200~300mm.Ensure that between top boom 1 and lower boom 2, Leading Edge Deformation is coordinated, it is simple to control joint quality.Often Individual docking location uses one group of vertical steel component, it is adaptable to plane girder lifts, and suspension centre is generally arranged at panel point.
As in figure 2 it is shown, based on the original structure that plane girder is lifted, arrange between top boom 1 and lower boom 2 Second temporary steel component 7, the second temporary steel component 7 oblique weld in top boom 1 and the outside of lower boom 2, the second temporary steel structure The node that the lower end of part 7 is welded with the lower end of completion web member 5 is corresponding.The centrage of the second temporary steel component 7 is with completion abdomen Bar 5 node is parallel with hoist point line, and in the same plane.Each docking location use one group of vertical steel component and one group oblique Steel beam column, it is adaptable to plane girder promotes.First temporary steel component and the second temporary steel component can be square tube, pipe, channel-section steel, angle Steel.
This utility model, when plane girder lifting, lifting, facilitates completion web member at segmentation to pass, it is ensured that completion at segmentation Web member is the most elevated with other components of truss or lifts, it is to avoid follow-up benefit bar, when solving plane girder lifting, lifting, and abdomen Bar and the problem of interim measure bar-crossing.This utility model can carry out local reinforcement to component at segmentation, it is achieved internal force heavily divides Cloth, fully ensures truss member stability in lifting, hoisting process and compatibility of deformation, it is to avoid joints is uneven.Simultaneously This utility model is conducive to controlling joint quality;Operation principle is simple, it is simple to construction;Motility is strong, widely applicable, it is easy to push away Extensively.
These are only specific embodiment of the utility model, but technical characteristic of the present utility model is not limited thereto.Appoint How based on this utility model, for solving essentially identical technical problem, it is achieved essentially identical technique effect, done Simple change, equivalent or modification etc., be all covered by among protection domain of the present utility model.

Claims (7)

1. the interim structural texture of truss web member completion, including top boom and lower boom, described top boom and described lower edge Montant and web member it is provided with between bar, it is characterised in that: described lower boom is provided with completion web member;Described top boom and described lower edge Being provided with the first temporary steel component between bar, the outside of described top boom is located in the upper end of described first temporary steel component, and described The outside of described lower boom is located in the lower end of one temporary steel component.
A kind of truss interim structural texture of web member completion the most according to claim 1, it is characterised in that: described completion abdomen The lower end of bar is welded on described lower boom.
A kind of truss interim structural texture of web member completion the most according to claim 1, it is characterised in that: described first faces Time steel beam column be vertically welded in described top boom and the outside of described lower boom.
A kind of truss interim structural texture of web member completion the most according to claim 1, it is characterised in that: described top boom Outside and the outside of described lower boom be equipped with steel plate, described steel plate is connected with described first temporary steel component.
A kind of truss interim structural texture of web member completion the most according to claim 1, it is characterised in that: described first faces Time steel beam column and described lower boom junction be 200~300mm to the distance of described montant Yu the junction of described lower boom.
A kind of truss interim structural texture of web member completion the most according to claim 1, it is characterised in that: described top boom And it being provided with the second temporary steel component between described lower boom, the upper end of described second temporary steel component is located at outside described top boom Side, the outside of described lower boom, the lower end of described second temporary steel component and institute are located in the lower end of described second temporary steel component The lower end stating completion web member is corresponding.
A kind of truss interim structural texture of web member completion the most according to claim 6, it is characterised in that: described second faces Time steel beam column oblique weld in described top boom and the outside of described lower boom.
CN201620623510.9U 2016-06-21 2016-06-21 A kind of truss interim structural texture of web member completion Active CN205822447U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620623510.9U CN205822447U (en) 2016-06-21 2016-06-21 A kind of truss interim structural texture of web member completion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620623510.9U CN205822447U (en) 2016-06-21 2016-06-21 A kind of truss interim structural texture of web member completion

Publications (1)

Publication Number Publication Date
CN205822447U true CN205822447U (en) 2016-12-21

Family

ID=58145740

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620623510.9U Active CN205822447U (en) 2016-06-21 2016-06-21 A kind of truss interim structural texture of web member completion

Country Status (1)

Country Link
CN (1) CN205822447U (en)

Similar Documents

Publication Publication Date Title
CN109231006A (en) The construction method of hanging hang structure under a kind of steel structure truss
CN205444492U (en) H type cantilever girder steel post geometric cross section mosaic structure
CN108678417A (en) A kind of floor of steel structure transformation node
CN107931928A (en) A kind of Portable clamp for aiding in transverse and longitudinal beam welding equipment
CN205711701U (en) A kind of steel plate combination beam bridge pier consolidation structure
CN103821234A (en) Joint construction for steel-reinforced concrete column and reinforced concrete beam
CN205822447U (en) A kind of truss interim structural texture of web member completion
CN204850048U (en) Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel
DE202021102448U1 (en) Cantilever bracket and flange template for steel-concrete composite girders
CN102635070B (en) Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge
CN106835929A (en) A kind of assembled Wavelike steel webplate continuous composite beam
CN201962795U (en) Box-shaped column and girder for bended combined type building steel structure
CN107838619A (en) A kind of gate fixture for aiding in girder and aggregate cross weld
CN104310241A (en) Standard knot of tower crane
CN203583776U (en) Truss structure of reinforced concrete beam
CN208792806U (en) A kind of floor of steel structure transformation node
CN207376809U (en) Temporary reinforcing device is installed without support in a kind of large overhanging steel structure high-altitude
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure
CN207293949U (en) Containment type node list girder based on trapezium structure face
CN208309868U (en) A kind of buckling restrained brace device
CN105544955A (en) Elevator shaft tool type operation steel platform and manufacturing method thereof
CN208329151U (en) A kind of assemble welding formula steel construction
CN205617580U (en) Assembled primary and secondary roof beam connection structure
CN206034905U (en) Board combination design mould falls in bathroom
CN214141266U (en) Circular tube structure crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant