CN205821912U - Glued joint clamping plate sulfuration demountor - Google Patents

Glued joint clamping plate sulfuration demountor Download PDF

Info

Publication number
CN205821912U
CN205821912U CN201620011993.7U CN201620011993U CN205821912U CN 205821912 U CN205821912 U CN 205821912U CN 201620011993 U CN201620011993 U CN 201620011993U CN 205821912 U CN205821912 U CN 205821912U
Authority
CN
China
Prior art keywords
main frame
clamping plate
sulfuration
demountor
gas pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620011993.7U
Other languages
Chinese (zh)
Inventor
袁清来
张万忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Xianhu Railway Equipment Manufacturing Co Ltd
Original Assignee
Qinhuangdao Xianhu Railway Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=58147531&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN205821912(U) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Qinhuangdao Xianhu Railway Equipment Manufacturing Co Ltd filed Critical Qinhuangdao Xianhu Railway Equipment Manufacturing Co Ltd
Priority to CN201620011993.7U priority Critical patent/CN205821912U/en
Application granted granted Critical
Publication of CN205821912U publication Critical patent/CN205821912U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model discloses a kind of clamping plate that glued joint and vulcanize demountor, including main frame, control system, automatic ignition system and curing system, the both sides of main frame are provided with channel-section steel, and the bottom of main frame is provided with wheel, and wheel is placed on rail rear rotary displacement;Main frame be provided above two water spray beams, two water spray beams are connected by three water service pipes, with quickly cooling down after satisfied sulfuration;Control system includes infrared temperature measurement device, The Cloud Terrace and support;Automatic ignition system connects with gas cylinder;Combustion gas is transported at the flame gun head of curing system by the pipeline being interconnected, and is lighted by fire maker, it is achieved to the sulfuration of gluded joint after circuit gluded joint and track switch, this vulcanisation operation only needs 5min, and working time relatively prior art saves 92%.This utility model scientific structure design is reasonable, easy to operate, improves construction operation efficiency, reduces labor intensity, it is ensured that driving, the safety of workmen.

Description

Glued joint clamping plate sulfuration demountor
Technical field
This utility model relates to railway construction section, electricity business section vulcanizes, to glueing joint clamping plate, the specific purpose tool technical field dismantled, Particularly relate to a kind of clamping plate that glued joint and vulcanize demountor.
Background technology
Recently as the development of railway, invented the new technology of gluded joint, as track division, high ferro section, electricity business section right The a great problem of frozen joint dismounting is gluedd joint after circuit gluded joint and track switch.At present, each track division, high ferro section, electricity business section exist Onsite application benzine blow lamp vulcanizes, and after vulcanizing an insulating joint and track switch, frozen joint needs about 60min, ferrum Road is inadequate to dead point time of putting in a skylight, and must apply for that second time is blocked.How to develop a railway, circuit is gluedd joint by electricity business Glued joint the specific purpose tool of frozen joint dismounting after joint and track switch, with shortening joint cure time, improve work efficiency and become this The technical problem that skilled person is urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of clamping plate sulfuration demountor that glueds joint, solution prior art benzine blow lamp sulfuration Operating time is long, and railway dead point opening time is inadequate, the problem causing application second time block.
For solving above-mentioned technical problem, this utility model adopts the following technical scheme that
This utility model one glueds joint clamping plate sulfuration demountor, including main frame, control system, automatic ignition system and sulfur Change system, the both sides of described main frame are provided with channel-section steel, and the bottom of main frame is provided with wheel, and described wheel is placed on rail Rear rotary displacement;Described main frame be provided above two water spray beams, two described water spray beams are connected by three water service pipes Logical;
Described control system includes that infrared temperature measurement device, The Cloud Terrace and support, the bottom of described support are connected to described main frame One end, the top of described support connects has The Cloud Terrace, described infrared temperature measurement device to be arranged on described The Cloud Terrace;
Described automatic ignition system includes that instrument box, the side of described instrument box are arranged on described main frame, instrument box Opposite side be provided with gas flow valve and the pipe joint connected with gas cylinder, described instrument box be provided above instrument Shell, is provided with battery component, the first copper pipe, tee pipe coupling, the second copper pipe and lighter in described instrument box, and described first One end of copper pipe is connected with described pipe joint, and the other end is connected with one end of described gas flow valve, described gas flow The other end of valve is connected with one end of described tee pipe coupling by described second copper pipe, other the two of described tee pipe coupling End is connected with the outlet bottom described instrument box by connecting tube;
Described curing system includes gas conduct pipe and flame gun head, and described gas conduct pipe includes the first gas pipeline and second Gas pipeline, one end of described first gas pipeline is connected with described connecting tube, and the other end passes through described second gas pipeline Being connected with described flame gun head, the side of described flame gun head is provided with igniting needle, and described igniting needle is provided with ceramic jacket Pipe.
Further, the both sides of described wheel are provided with the light rail clamping plate of location.
Further, described wheel is specifically provided with two, and two described wheels are positioned at the two ends of described main frame.
Further, the number of described flame gun head and the second gas pipeline is identical, and one_to_one corresponding.
Further, described flame gun head and the second gas pipeline are provided with two rows, and are symmetrical arranged;Described flame gun The quantity of head and the second gas pipeline is 10, and often row arranges 5.
Further, described first gas pipeline, the second gas pipeline and tee pipe coupling all use copper pipe material.
Further, described channel-section steel is fixed on the both sides of described main frame by the first connector;Described wheel passes through The bearing pin of center, second connector at two ends are fixed on the bottom of described main frame, and described meter case is by the 3rd even Fitting is fixed on described instrument box.
Further, the first connector, the second connector and the 3rd connector are screws bolts assembly.
Compared with prior art, Advantageous Effects of the present utility model:
This utility model one glueds joint clamping plate sulfuration demountor, including main frame, control system, automatic ignition system and sulfur Change system, this demountor is placed on rail by wheel, is pushed to gluded joint position after circuit gluded joint and track switch, first First being connected with gas cylinder by the pipe joint on instrument box, two water spray beams are connected with water source by three water service pipes, then beat Valve opening door is connected combustion gas and is lighted by lighter so that multiple flame gun heads ejection flare, adjustment of combustion gas flow valve makes fire Seedling is in suitable size, and two row's flame gun heads are positioned at the both sides of rail, and rail is just sprayed by flare, to circuit gluded joint and road After trouble, gluded joint carries out scorching to sulfuration, then opens water source, is cooled down rail by the cold water of two water spray beam ejections. In this unloading process, after circuit gluded joint and track switch, gluded joint sulfuration only needs 5min, with the work of prior art 60min Time is compared, and the working time saves 92%, it is not necessary to secondary blocks.This utility model scientific structure design is reasonable, operation side Just, it is ensured that while quality, improve construction operation efficiency, operating personnel's labor intensity is alleviated, it is ensured that driving, workmen Safety.
Accompanying drawing explanation
The utility model is described in further detail in explanation below in conjunction with the accompanying drawings.
Fig. 1 is that this utility model glueds joint clamping plate sulfuration demountor structural representation;
Fig. 2 is that this utility model glueds joint clamping plate sulfuration demountor front view;
Fig. 3 is that this utility model glueds joint clamping plate sulfuration demountor left view;
Fig. 4 is that this utility model glueds joint clamping plate sulfuration demountor top view;
Fig. 5 is this utility model " A-A " sectional view;
Fig. 6 is this utility model " B-B " sectional view;
Fig. 7 is this utility model " C-C " sectional view;
Fig. 8 is this utility model " I " position enlarged drawing;
Description of reference numerals: 1, infrared temperature measurement device;2, The Cloud Terrace;3, support;4, gas flow valve;5, pipe joint;6, rail; 7, the first gas pipeline;8, channel-section steel;9, main frame;10, porcelain bushing;11, water spray beam;12, the first connector;13, second even Fitting;14, flame gun head;15, wheel;16, light rail clamping plate;17, bearing pin;18, the 3rd connector;19, the 4th connector;20、 Second gas pipeline;21, meter case;22, instrument box;23, battery component;24, first paragraph copper pipe;25, tee pipe coupling; 26, second segment copper pipe;27, lighter;28, connecting tube;29, suspension ring.
Detailed description of the invention
As shown in Fig. 1~8, a kind of clamping plate that glued joint vulcanize demountor, including main frame 9, control system, automatic ignition system And curing system, the both sides of described main frame 9 are provided with channel-section steel 8, and the bottom of main frame 9 is provided with wheel 15, described wheel 15 Rotary displacement after being placed on rail 6;Described main frame 9 be provided above two water spray beams 11, two described water spray beams 11 are connected by three water service pipes.
Specifically, as shown in Figure 1 and Figure 2, described control system includes infrared temperature measurement device 1, The Cloud Terrace 2 and support 3, described The bottom of support 3 is connected to one end of described main frame 9, and the top of described support 3 connects The Cloud Terrace 2, described infrared temperature measurement device 1 It is arranged on described The Cloud Terrace 2.
As shown in Fig. 1,2,3,5, described automatic ignition system includes that instrument box 22, the side of described instrument box 22 are arranged on On described main frame 9, the opposite side of instrument box 22 is provided with gas flow valve 4 and the pipe joint 5 connected with gas cylinder, institute That states instrument box 22 is provided above meter case 21, is provided with battery component the 23, first copper pipe 24, three in described instrument box 22 Connection for bbreather pipe the 25, second copper pipe 26 and lighter 27, one end of described first copper pipe 24 is connected with described pipe joint 5, another End is connected with one end of described gas flow valve 4, and the other end of described gas flow valve 4 passes through described second copper pipe 26 and institute The one end stating tee pipe coupling 25 is connected, and the other two ends of described tee pipe coupling 25 are by connecting tube 28 and described instrument box Outlet bottom 22 connects.
As shown in Fig. 1,2,3,8, described curing system includes gas conduct pipe and flame gun 14, and described gas conduct pipe includes First gas pipeline 7 and the second gas pipeline 20, one end of described first gas pipeline 7 is connected, separately with described connecting tube 28 One end is connected with described flame gun 14 by described second gas pipeline 20, and the side of described flame gun 14 is provided with to be beaten Fire pin, described igniting needle is provided with porcelain bushing 10.
The both sides of described wheel 15 are provided with the light rail clamping plate 16 of location.Described wheel 15 is specifically provided with two, and two Individual described wheel 15 is positioned at the two ends of described main frame 9, so that main frame 9 is placed on rail can keep balance.Additionally, it is main The dual-side of framework 9 is provided above the suspension ring 29 conveniently carried, and two groups of suspension ring are symmetrical arranged, and often group suspension ring specifically have two Individual.
As shown in Fig. 4, Fig. 8, described flame gun 14 is identical with the number of the second gas pipeline 20, and one_to_one corresponding.Institute State flame gun 14 and the second gas pipeline 20 is provided with two rows, and be symmetrical arranged;Described flame gun 14 and the second Gas Pipe The quantity in road 20 is 10, and often row arranges 5.
Described first gas pipeline the 7, second gas pipeline 20 and tee pipe coupling 25 all use copper pipe material.
As shown in Figure 2,3, described channel-section steel 8 is fixed on the both sides of described main frame 9 by the first connector 12;Described wheel 15 are fixed on the bottom of described main frame 9, described meter case by the bearing pin 17 of center, second connector 13 at two ends 21 are fixed on described instrument box 22 by the 3rd connector 18.First connector the 12, second connector 13 and the 3rd connector 18 are screws bolts assembly.
Work process of the present utility model is as follows:
First, being placed into by the demountor assembled on the rail 6 needing operation, former and later two wheels 15 are overlapped on rail On 6, the light rail clamping plate 16 of both sides are clamped on the effect playing location on rail 6;Then by the pipe joint 5 on instrument box 22 and combustion Gas cylinder connects, and is connected with water source by three water service pipes by two water spray beams 11 on main frame 9;Open valve and connect combustion Gas, combustion gas sequentially passes through first copper pipe the 24, second copper pipe 26 in instrument box 22 and two combustion gas of tee pipe coupling 25 sub-runner In conduit, enter in 10 flame gun 14 being arranged side by side respectively through the first gas pipeline 7 and the second gas pipeline 20, Initial igniter 27, lights the combustion gas at flame gun 14, and adjustment of combustion gas flow valve 4 makes the flare that flame gun 14 sprays Being in suitable size, two row's flame gun heads are positioned at the both sides of rail, it is achieved enter gluded joint after circuit gluded joint and track switch Row scorches to sulfuration;Finally, open water source and control valve, tear open after rail being cooled down by the cold water of two water spray beam ejections Unload.
Embodiment described above is only to be described optimal way of the present utility model, not to of the present utility model Scope is defined, and on the premise of without departing from this utility model design spirit, those of ordinary skill in the art are new to this practicality Various deformation that the technical scheme of type is made and improvement, all should fall into the protection domain that this utility model claims determine In.

Claims (8)

1. one kind glued joint clamping plate sulfuration demountor, it is characterised in that: include main frame (9), control system, automatic ignition system and Curing system, the both sides of described main frame (9) are provided with channel-section steel (8), and the bottom of main frame (9) is provided with wheel (15), described Wheel (15) is placed on the upper rear rotary displacement of rail (6);Described main frame (9) be provided above two water spray beams (11), Two described water spray beams (11) are connected by three water service pipes;
Described control system includes infrared temperature measurement device (1), The Cloud Terrace (2) and support (3), and the bottom of described support (3) is connected to institute Stating one end of main frame (9), it is described that the top connection of described support (3) has The Cloud Terrace (2), described infrared temperature measurement device (1) to be arranged on On The Cloud Terrace (2);
Described automatic ignition system includes that instrument box (22), the side of described instrument box (22) are arranged on described main frame (9), The opposite side of instrument box (22) is provided with gas flow valve (4) and the pipe joint (5) connected with gas cylinder, described instrument box (22) be provided above meter case (21);Be provided with in described instrument box (22) battery component (23), the first copper pipe (24), Tee pipe coupling (25), the second copper pipe (26) and lighter (27), one end of described first copper pipe (24) and described pipe joint (5) Being connected, the other end is connected with one end of described gas flow valve (4), and the other end of described gas flow valve (4) passes through institute Stating the second copper pipe (26) to be connected with one end of described tee pipe coupling (25), the other two ends of described tee pipe coupling (25) lead to Cross connecting tube (28) to be connected with the outlet of described instrument box (22) bottom;
Described curing system includes gas conduct pipe and flame gun head (14), described gas conduct pipe include the first gas pipeline (7) and Second gas pipeline (20), one end of described first gas pipeline (7) is connected with described connecting tube (28), and the other end passes through institute Stating the second gas pipeline (20) to be connected with described flame gun head (14), the side of described flame gun head (14) is provided with sparking Pin, described igniting needle is provided with porcelain bushing (10).
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: the both sides of described wheel (15) are arranged There are the light rail clamping plate (16) of location.
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described wheel (15) is specifically provided with Two, two described wheels (15) are positioned at the two ends of described main frame (9).
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described flame gun head (14) and second The number of gas pipeline (20) is identical, and one_to_one corresponding.
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described flame gun head (14) and second Gas pipeline (20) is provided with two rows, and is symmetrical arranged;The quantity of described flame gun head (14) and the second gas pipeline (20) is equal Being 10, often row arranges 5.
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described first gas pipeline (7), the Two gas pipelines (20) and tee pipe coupling (25) all use copper pipe material.
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described channel-section steel (8) is by first even Fitting (12) is fixed on the both sides of described main frame (9);Described wheel (15) by the bearing pin (17) of center, the of two ends Two connectors (13) are fixed on the bottom of described main frame (9), and described meter case (21) is fixed by the 3rd connector (18) On described instrument box (22).
Splicing clamping plate the most according to claim 7 sulfuration demountor, it is characterised in that: the first connector (12), the second company Fitting (13) and the 3rd connector (18) are screws bolts assembly.
CN201620011993.7U 2016-01-08 2016-01-08 Glued joint clamping plate sulfuration demountor Active CN205821912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620011993.7U CN205821912U (en) 2016-01-08 2016-01-08 Glued joint clamping plate sulfuration demountor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620011993.7U CN205821912U (en) 2016-01-08 2016-01-08 Glued joint clamping plate sulfuration demountor

Publications (1)

Publication Number Publication Date
CN205821912U true CN205821912U (en) 2016-12-21

Family

ID=58147531

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620011993.7U Active CN205821912U (en) 2016-01-08 2016-01-08 Glued joint clamping plate sulfuration demountor

Country Status (1)

Country Link
CN (1) CN205821912U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106835867A (en) * 2017-04-18 2017-06-13 山东德龙电子科技有限公司 Railroad track insulating joint scene fast assembling-disassembling technique and corollary apparatus
CN110055839A (en) * 2019-05-05 2019-07-26 丽水市莲都区京承机械厂 A kind of auxiliary of railway insulating joint is cold to tear equipment open
CN110700027A (en) * 2019-10-23 2020-01-17 北京地平线轨道技术有限公司 Dismounting device for steel rail insulation clamping plate

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106835867A (en) * 2017-04-18 2017-06-13 山东德龙电子科技有限公司 Railroad track insulating joint scene fast assembling-disassembling technique and corollary apparatus
CN110055839A (en) * 2019-05-05 2019-07-26 丽水市莲都区京承机械厂 A kind of auxiliary of railway insulating joint is cold to tear equipment open
CN111622028A (en) * 2019-05-05 2020-09-04 丽水市莲都区京承机械厂 Auxiliary cold disassembling equipment for railway glued insulating joint
CN110700027A (en) * 2019-10-23 2020-01-17 北京地平线轨道技术有限公司 Dismounting device for steel rail insulation clamping plate

Similar Documents

Publication Publication Date Title
CN205821912U (en) Glued joint clamping plate sulfuration demountor
CN102865576A (en) High-efficiency energy-saving incandescent light
CN103111607A (en) Metal die preheating device and metal die preheating technology thereof
CN205998135U (en) It is applied to the injection equipment of flame device
CN202835356U (en) Semi-jet type nozzle
CN102423824B (en) Disassembly method of damaged bridge pipe of coke oven
CN203977251U (en) A kind of energy-conservation fast molten asphalt tank
CN102817309B (en) Infrared heater for heating pitch on inspection wellhead road surface
CN202450421U (en) Handheld pavement crack pouring gun
CN107551435A (en) A kind of parallel fire monitor
CN210291949U (en) Fuel gas supply device for drying furnace of carbon black reaction furnace
CN204345632U (en) One is integral prefabricated builds molten aluminium holding furnace burner
CN206582896U (en) Torch ignitor
CN2591226Y (en) Gas fuel steam generator
CN207563966U (en) A kind of double-row type weld seam preheats trolley
CN105903941A (en) Online steel ladle roaster
CN206001458U (en) Flame equipment with support component
CN206001457U (en) It is applied to the flame device of unmanned plane
CN206764171U (en) A kind of long distance pipeline weld bond preheating device
CN205398671U (en) A unloader for LF refining furnace
CN205763817U (en) Ladle online baking device
CN212653619U (en) Heating device is used in production of assembled PC prefabricated component
CN205842659U (en) A kind of large-scale burner burner igniting device
CN210711393U (en) Guide sleeve device of smoke guide vehicle of coke oven
CN218936343U (en) Blowtorch equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant