CN205821912U - Glued joint clamping plate sulfuration demountor - Google Patents
Glued joint clamping plate sulfuration demountor Download PDFInfo
- Publication number
- CN205821912U CN205821912U CN201620011993.7U CN201620011993U CN205821912U CN 205821912 U CN205821912 U CN 205821912U CN 201620011993 U CN201620011993 U CN 201620011993U CN 205821912 U CN205821912 U CN 205821912U
- Authority
- CN
- China
- Prior art keywords
- main frame
- clamping plate
- sulfuration
- demountor
- gas pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Machines For Laying And Maintaining Railways (AREA)
Abstract
The utility model discloses a kind of clamping plate that glued joint and vulcanize demountor, including main frame, control system, automatic ignition system and curing system, the both sides of main frame are provided with channel-section steel, and the bottom of main frame is provided with wheel, and wheel is placed on rail rear rotary displacement;Main frame be provided above two water spray beams, two water spray beams are connected by three water service pipes, with quickly cooling down after satisfied sulfuration;Control system includes infrared temperature measurement device, The Cloud Terrace and support;Automatic ignition system connects with gas cylinder;Combustion gas is transported at the flame gun head of curing system by the pipeline being interconnected, and is lighted by fire maker, it is achieved to the sulfuration of gluded joint after circuit gluded joint and track switch, this vulcanisation operation only needs 5min, and working time relatively prior art saves 92%.This utility model scientific structure design is reasonable, easy to operate, improves construction operation efficiency, reduces labor intensity, it is ensured that driving, the safety of workmen.
Description
Technical field
This utility model relates to railway construction section, electricity business section vulcanizes, to glueing joint clamping plate, the specific purpose tool technical field dismantled,
Particularly relate to a kind of clamping plate that glued joint and vulcanize demountor.
Background technology
Recently as the development of railway, invented the new technology of gluded joint, as track division, high ferro section, electricity business section right
The a great problem of frozen joint dismounting is gluedd joint after circuit gluded joint and track switch.At present, each track division, high ferro section, electricity business section exist
Onsite application benzine blow lamp vulcanizes, and after vulcanizing an insulating joint and track switch, frozen joint needs about 60min, ferrum
Road is inadequate to dead point time of putting in a skylight, and must apply for that second time is blocked.How to develop a railway, circuit is gluedd joint by electricity business
Glued joint the specific purpose tool of frozen joint dismounting after joint and track switch, with shortening joint cure time, improve work efficiency and become this
The technical problem that skilled person is urgently to be resolved hurrily.
Utility model content
The purpose of this utility model is to provide a kind of clamping plate sulfuration demountor that glueds joint, solution prior art benzine blow lamp sulfuration
Operating time is long, and railway dead point opening time is inadequate, the problem causing application second time block.
For solving above-mentioned technical problem, this utility model adopts the following technical scheme that
This utility model one glueds joint clamping plate sulfuration demountor, including main frame, control system, automatic ignition system and sulfur
Change system, the both sides of described main frame are provided with channel-section steel, and the bottom of main frame is provided with wheel, and described wheel is placed on rail
Rear rotary displacement;Described main frame be provided above two water spray beams, two described water spray beams are connected by three water service pipes
Logical;
Described control system includes that infrared temperature measurement device, The Cloud Terrace and support, the bottom of described support are connected to described main frame
One end, the top of described support connects has The Cloud Terrace, described infrared temperature measurement device to be arranged on described The Cloud Terrace;
Described automatic ignition system includes that instrument box, the side of described instrument box are arranged on described main frame, instrument box
Opposite side be provided with gas flow valve and the pipe joint connected with gas cylinder, described instrument box be provided above instrument
Shell, is provided with battery component, the first copper pipe, tee pipe coupling, the second copper pipe and lighter in described instrument box, and described first
One end of copper pipe is connected with described pipe joint, and the other end is connected with one end of described gas flow valve, described gas flow
The other end of valve is connected with one end of described tee pipe coupling by described second copper pipe, other the two of described tee pipe coupling
End is connected with the outlet bottom described instrument box by connecting tube;
Described curing system includes gas conduct pipe and flame gun head, and described gas conduct pipe includes the first gas pipeline and second
Gas pipeline, one end of described first gas pipeline is connected with described connecting tube, and the other end passes through described second gas pipeline
Being connected with described flame gun head, the side of described flame gun head is provided with igniting needle, and described igniting needle is provided with ceramic jacket
Pipe.
Further, the both sides of described wheel are provided with the light rail clamping plate of location.
Further, described wheel is specifically provided with two, and two described wheels are positioned at the two ends of described main frame.
Further, the number of described flame gun head and the second gas pipeline is identical, and one_to_one corresponding.
Further, described flame gun head and the second gas pipeline are provided with two rows, and are symmetrical arranged;Described flame gun
The quantity of head and the second gas pipeline is 10, and often row arranges 5.
Further, described first gas pipeline, the second gas pipeline and tee pipe coupling all use copper pipe material.
Further, described channel-section steel is fixed on the both sides of described main frame by the first connector;Described wheel passes through
The bearing pin of center, second connector at two ends are fixed on the bottom of described main frame, and described meter case is by the 3rd even
Fitting is fixed on described instrument box.
Further, the first connector, the second connector and the 3rd connector are screws bolts assembly.
Compared with prior art, Advantageous Effects of the present utility model:
This utility model one glueds joint clamping plate sulfuration demountor, including main frame, control system, automatic ignition system and sulfur
Change system, this demountor is placed on rail by wheel, is pushed to gluded joint position after circuit gluded joint and track switch, first
First being connected with gas cylinder by the pipe joint on instrument box, two water spray beams are connected with water source by three water service pipes, then beat
Valve opening door is connected combustion gas and is lighted by lighter so that multiple flame gun heads ejection flare, adjustment of combustion gas flow valve makes fire
Seedling is in suitable size, and two row's flame gun heads are positioned at the both sides of rail, and rail is just sprayed by flare, to circuit gluded joint and road
After trouble, gluded joint carries out scorching to sulfuration, then opens water source, is cooled down rail by the cold water of two water spray beam ejections.
In this unloading process, after circuit gluded joint and track switch, gluded joint sulfuration only needs 5min, with the work of prior art 60min
Time is compared, and the working time saves 92%, it is not necessary to secondary blocks.This utility model scientific structure design is reasonable, operation side
Just, it is ensured that while quality, improve construction operation efficiency, operating personnel's labor intensity is alleviated, it is ensured that driving, workmen
Safety.
Accompanying drawing explanation
The utility model is described in further detail in explanation below in conjunction with the accompanying drawings.
Fig. 1 is that this utility model glueds joint clamping plate sulfuration demountor structural representation;
Fig. 2 is that this utility model glueds joint clamping plate sulfuration demountor front view;
Fig. 3 is that this utility model glueds joint clamping plate sulfuration demountor left view;
Fig. 4 is that this utility model glueds joint clamping plate sulfuration demountor top view;
Fig. 5 is this utility model " A-A " sectional view;
Fig. 6 is this utility model " B-B " sectional view;
Fig. 7 is this utility model " C-C " sectional view;
Fig. 8 is this utility model " I " position enlarged drawing;
Description of reference numerals: 1, infrared temperature measurement device;2, The Cloud Terrace;3, support;4, gas flow valve;5, pipe joint;6, rail;
7, the first gas pipeline;8, channel-section steel;9, main frame;10, porcelain bushing;11, water spray beam;12, the first connector;13, second even
Fitting;14, flame gun head;15, wheel;16, light rail clamping plate;17, bearing pin;18, the 3rd connector;19, the 4th connector;20、
Second gas pipeline;21, meter case;22, instrument box;23, battery component;24, first paragraph copper pipe;25, tee pipe coupling;
26, second segment copper pipe;27, lighter;28, connecting tube;29, suspension ring.
Detailed description of the invention
As shown in Fig. 1~8, a kind of clamping plate that glued joint vulcanize demountor, including main frame 9, control system, automatic ignition system
And curing system, the both sides of described main frame 9 are provided with channel-section steel 8, and the bottom of main frame 9 is provided with wheel 15, described wheel 15
Rotary displacement after being placed on rail 6;Described main frame 9 be provided above two water spray beams 11, two described water spray beams
11 are connected by three water service pipes.
Specifically, as shown in Figure 1 and Figure 2, described control system includes infrared temperature measurement device 1, The Cloud Terrace 2 and support 3, described
The bottom of support 3 is connected to one end of described main frame 9, and the top of described support 3 connects The Cloud Terrace 2, described infrared temperature measurement device 1
It is arranged on described The Cloud Terrace 2.
As shown in Fig. 1,2,3,5, described automatic ignition system includes that instrument box 22, the side of described instrument box 22 are arranged on
On described main frame 9, the opposite side of instrument box 22 is provided with gas flow valve 4 and the pipe joint 5 connected with gas cylinder, institute
That states instrument box 22 is provided above meter case 21, is provided with battery component the 23, first copper pipe 24, three in described instrument box 22
Connection for bbreather pipe the 25, second copper pipe 26 and lighter 27, one end of described first copper pipe 24 is connected with described pipe joint 5, another
End is connected with one end of described gas flow valve 4, and the other end of described gas flow valve 4 passes through described second copper pipe 26 and institute
The one end stating tee pipe coupling 25 is connected, and the other two ends of described tee pipe coupling 25 are by connecting tube 28 and described instrument box
Outlet bottom 22 connects.
As shown in Fig. 1,2,3,8, described curing system includes gas conduct pipe and flame gun 14, and described gas conduct pipe includes
First gas pipeline 7 and the second gas pipeline 20, one end of described first gas pipeline 7 is connected, separately with described connecting tube 28
One end is connected with described flame gun 14 by described second gas pipeline 20, and the side of described flame gun 14 is provided with to be beaten
Fire pin, described igniting needle is provided with porcelain bushing 10.
The both sides of described wheel 15 are provided with the light rail clamping plate 16 of location.Described wheel 15 is specifically provided with two, and two
Individual described wheel 15 is positioned at the two ends of described main frame 9, so that main frame 9 is placed on rail can keep balance.Additionally, it is main
The dual-side of framework 9 is provided above the suspension ring 29 conveniently carried, and two groups of suspension ring are symmetrical arranged, and often group suspension ring specifically have two
Individual.
As shown in Fig. 4, Fig. 8, described flame gun 14 is identical with the number of the second gas pipeline 20, and one_to_one corresponding.Institute
State flame gun 14 and the second gas pipeline 20 is provided with two rows, and be symmetrical arranged;Described flame gun 14 and the second Gas Pipe
The quantity in road 20 is 10, and often row arranges 5.
Described first gas pipeline the 7, second gas pipeline 20 and tee pipe coupling 25 all use copper pipe material.
As shown in Figure 2,3, described channel-section steel 8 is fixed on the both sides of described main frame 9 by the first connector 12;Described wheel
15 are fixed on the bottom of described main frame 9, described meter case by the bearing pin 17 of center, second connector 13 at two ends
21 are fixed on described instrument box 22 by the 3rd connector 18.First connector the 12, second connector 13 and the 3rd connector
18 are screws bolts assembly.
Work process of the present utility model is as follows:
First, being placed into by the demountor assembled on the rail 6 needing operation, former and later two wheels 15 are overlapped on rail
On 6, the light rail clamping plate 16 of both sides are clamped on the effect playing location on rail 6;Then by the pipe joint 5 on instrument box 22 and combustion
Gas cylinder connects, and is connected with water source by three water service pipes by two water spray beams 11 on main frame 9;Open valve and connect combustion
Gas, combustion gas sequentially passes through first copper pipe the 24, second copper pipe 26 in instrument box 22 and two combustion gas of tee pipe coupling 25 sub-runner
In conduit, enter in 10 flame gun 14 being arranged side by side respectively through the first gas pipeline 7 and the second gas pipeline 20,
Initial igniter 27, lights the combustion gas at flame gun 14, and adjustment of combustion gas flow valve 4 makes the flare that flame gun 14 sprays
Being in suitable size, two row's flame gun heads are positioned at the both sides of rail, it is achieved enter gluded joint after circuit gluded joint and track switch
Row scorches to sulfuration;Finally, open water source and control valve, tear open after rail being cooled down by the cold water of two water spray beam ejections
Unload.
Embodiment described above is only to be described optimal way of the present utility model, not to of the present utility model
Scope is defined, and on the premise of without departing from this utility model design spirit, those of ordinary skill in the art are new to this practicality
Various deformation that the technical scheme of type is made and improvement, all should fall into the protection domain that this utility model claims determine
In.
Claims (8)
1. one kind glued joint clamping plate sulfuration demountor, it is characterised in that: include main frame (9), control system, automatic ignition system and
Curing system, the both sides of described main frame (9) are provided with channel-section steel (8), and the bottom of main frame (9) is provided with wheel (15), described
Wheel (15) is placed on the upper rear rotary displacement of rail (6);Described main frame (9) be provided above two water spray beams (11),
Two described water spray beams (11) are connected by three water service pipes;
Described control system includes infrared temperature measurement device (1), The Cloud Terrace (2) and support (3), and the bottom of described support (3) is connected to institute
Stating one end of main frame (9), it is described that the top connection of described support (3) has The Cloud Terrace (2), described infrared temperature measurement device (1) to be arranged on
On The Cloud Terrace (2);
Described automatic ignition system includes that instrument box (22), the side of described instrument box (22) are arranged on described main frame (9),
The opposite side of instrument box (22) is provided with gas flow valve (4) and the pipe joint (5) connected with gas cylinder, described instrument box
(22) be provided above meter case (21);Be provided with in described instrument box (22) battery component (23), the first copper pipe (24),
Tee pipe coupling (25), the second copper pipe (26) and lighter (27), one end of described first copper pipe (24) and described pipe joint (5)
Being connected, the other end is connected with one end of described gas flow valve (4), and the other end of described gas flow valve (4) passes through institute
Stating the second copper pipe (26) to be connected with one end of described tee pipe coupling (25), the other two ends of described tee pipe coupling (25) lead to
Cross connecting tube (28) to be connected with the outlet of described instrument box (22) bottom;
Described curing system includes gas conduct pipe and flame gun head (14), described gas conduct pipe include the first gas pipeline (7) and
Second gas pipeline (20), one end of described first gas pipeline (7) is connected with described connecting tube (28), and the other end passes through institute
Stating the second gas pipeline (20) to be connected with described flame gun head (14), the side of described flame gun head (14) is provided with sparking
Pin, described igniting needle is provided with porcelain bushing (10).
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: the both sides of described wheel (15) are arranged
There are the light rail clamping plate (16) of location.
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described wheel (15) is specifically provided with
Two, two described wheels (15) are positioned at the two ends of described main frame (9).
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described flame gun head (14) and second
The number of gas pipeline (20) is identical, and one_to_one corresponding.
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described flame gun head (14) and second
Gas pipeline (20) is provided with two rows, and is symmetrical arranged;The quantity of described flame gun head (14) and the second gas pipeline (20) is equal
Being 10, often row arranges 5.
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described first gas pipeline (7), the
Two gas pipelines (20) and tee pipe coupling (25) all use copper pipe material.
Splicing clamping plate the most according to claim 1 sulfuration demountor, it is characterised in that: described channel-section steel (8) is by first even
Fitting (12) is fixed on the both sides of described main frame (9);Described wheel (15) by the bearing pin (17) of center, the of two ends
Two connectors (13) are fixed on the bottom of described main frame (9), and described meter case (21) is fixed by the 3rd connector (18)
On described instrument box (22).
Splicing clamping plate the most according to claim 7 sulfuration demountor, it is characterised in that: the first connector (12), the second company
Fitting (13) and the 3rd connector (18) are screws bolts assembly.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620011993.7U CN205821912U (en) | 2016-01-08 | 2016-01-08 | Glued joint clamping plate sulfuration demountor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620011993.7U CN205821912U (en) | 2016-01-08 | 2016-01-08 | Glued joint clamping plate sulfuration demountor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205821912U true CN205821912U (en) | 2016-12-21 |
Family
ID=58147531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620011993.7U Active CN205821912U (en) | 2016-01-08 | 2016-01-08 | Glued joint clamping plate sulfuration demountor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205821912U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106835867A (en) * | 2017-04-18 | 2017-06-13 | 山东德龙电子科技有限公司 | Railroad track insulating joint scene fast assembling-disassembling technique and corollary apparatus |
CN110055839A (en) * | 2019-05-05 | 2019-07-26 | 丽水市莲都区京承机械厂 | A kind of auxiliary of railway insulating joint is cold to tear equipment open |
CN110700027A (en) * | 2019-10-23 | 2020-01-17 | 北京地平线轨道技术有限公司 | Dismounting device for steel rail insulation clamping plate |
-
2016
- 2016-01-08 CN CN201620011993.7U patent/CN205821912U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106835867A (en) * | 2017-04-18 | 2017-06-13 | 山东德龙电子科技有限公司 | Railroad track insulating joint scene fast assembling-disassembling technique and corollary apparatus |
CN110055839A (en) * | 2019-05-05 | 2019-07-26 | 丽水市莲都区京承机械厂 | A kind of auxiliary of railway insulating joint is cold to tear equipment open |
CN111622028A (en) * | 2019-05-05 | 2020-09-04 | 丽水市莲都区京承机械厂 | Auxiliary cold disassembling equipment for railway glued insulating joint |
CN110700027A (en) * | 2019-10-23 | 2020-01-17 | 北京地平线轨道技术有限公司 | Dismounting device for steel rail insulation clamping plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205821912U (en) | Glued joint clamping plate sulfuration demountor | |
CN102865576A (en) | High-efficiency energy-saving incandescent light | |
CN103111607A (en) | Metal die preheating device and metal die preheating technology thereof | |
CN205998135U (en) | It is applied to the injection equipment of flame device | |
CN202835356U (en) | Semi-jet type nozzle | |
CN102423824B (en) | Disassembly method of damaged bridge pipe of coke oven | |
CN203977251U (en) | A kind of energy-conservation fast molten asphalt tank | |
CN102817309B (en) | Infrared heater for heating pitch on inspection wellhead road surface | |
CN202450421U (en) | Handheld pavement crack pouring gun | |
CN107551435A (en) | A kind of parallel fire monitor | |
CN210291949U (en) | Fuel gas supply device for drying furnace of carbon black reaction furnace | |
CN204345632U (en) | One is integral prefabricated builds molten aluminium holding furnace burner | |
CN206582896U (en) | Torch ignitor | |
CN2591226Y (en) | Gas fuel steam generator | |
CN207563966U (en) | A kind of double-row type weld seam preheats trolley | |
CN105903941A (en) | Online steel ladle roaster | |
CN206001458U (en) | Flame equipment with support component | |
CN206001457U (en) | It is applied to the flame device of unmanned plane | |
CN206764171U (en) | A kind of long distance pipeline weld bond preheating device | |
CN205398671U (en) | A unloader for LF refining furnace | |
CN205763817U (en) | Ladle online baking device | |
CN212653619U (en) | Heating device is used in production of assembled PC prefabricated component | |
CN205842659U (en) | A kind of large-scale burner burner igniting device | |
CN210711393U (en) | Guide sleeve device of smoke guide vehicle of coke oven | |
CN218936343U (en) | Blowtorch equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |