CN103111607A - Metal die preheating device and metal die preheating technology thereof - Google Patents

Metal die preheating device and metal die preheating technology thereof Download PDF

Info

Publication number
CN103111607A
CN103111607A CN201210596907XA CN201210596907A CN103111607A CN 103111607 A CN103111607 A CN 103111607A CN 201210596907X A CN201210596907X A CN 201210596907XA CN 201210596907 A CN201210596907 A CN 201210596907A CN 103111607 A CN103111607 A CN 103111607A
Authority
CN
China
Prior art keywords
metal die
preheating device
metal
heating
shunt pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210596907XA
Other languages
Chinese (zh)
Other versions
CN103111607B (en
Inventor
叶锦瑞
郭剑
戴光永
赵晓光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Ruiming Industrial Co Ltd
Original Assignee
Wenzhou Ruiming Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Ruiming Industrial Co Ltd filed Critical Wenzhou Ruiming Industrial Co Ltd
Priority to CN201210596907.XA priority Critical patent/CN103111607B/en
Publication of CN103111607A publication Critical patent/CN103111607A/en
Application granted granted Critical
Publication of CN103111607B publication Critical patent/CN103111607B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a metal die preheating device. A first split-flow branch pipe and a second split-flow branch pipe are respectively arranged at two ends of a heating main pipe, and an initial end of the heating main pipe is provided with a tee connector which is respectively provided with a first connector through a first valve and a second connector through a second valve. The metal die preheating technology of the metal die preheating device includes the steps of firstly opening dies at two sides of a metal die, then fixing the metal die preheating device on the metal die so that the first split-flow branch pipe is floated in a shape cavity of the metal die and the second split-flow branch pipe is floated in a pouring gate of the metal die, then connecting a fuel source on the first connector and connecting a pneumatic supply on the second connector, opening valve switches so that fuel gas flows into the two split-flow branch pipes through the heating main pipe to be ignited and burned after flowing out of nozzles, and adjusting size of flame by adjusting switches of two valves until the metal die is evenly heated to reach relevant technology parameters. The metal die preheating device and the metal die preheating technology of the metal die preheating device has the advantages of being capable of solving the problems that the existing die is low in service life, long in heating time, high in cost, large in labor intensity of workers and unstable in the technology parameters.

Description

Preheating device for metal mould and metal die pre-heating technique thereof
Technical field
The present invention relates to preheating device for metal mould and pre-heating technique thereof that aluminium parts gravity casting and low-pressure casting casting technique are used, be specifically related to preheating device for metal mould and metal die pre-heating technique thereof.
Background technology
At present, all at gravity casting and low-pressure casting explained hereafter alloy product (aluminium parts) before, all need metal die is carried out preheating, each mold heated evenly and after being heated to 300 ± 50 ℃ (technological requirement of different product is different) is just begun to pour into a mould product., out-of-shape many due to the metal die quantity of some product, size is larger, position distribution is irregular features such as (particularly cups), and be subjected to the impact of these factors, existing pre-heating technique adopts two firelocks to carry out the flame burning facing to mold cavity mostly, that this technique can cause burning is inhomogeneous, the temperature local temperature difference is large, thereby causes be heated inequality, life-span of mould to reduce; Make temperature all reach relevant requirements, will make local temperature too high, waste combustion gas, lose time, increase cost; If only have local temperature to reach requirement, former products of output are wasted as scalding module (being waste product), increase material, artificial, combustion gas cost.And cup and mold cavity generally can not heat simultaneously due to position problems, thereby the sequencing that produces causes lengthen preheating time, the problems such as waste of fuel.
Summary of the invention
The object of the invention is to overcome above-mentioned deficiency, and provide a kind of metal die be heated evenly, local temperature difference is less, technique is simple, operation is practical and convenient preheating device for metal mould and metal die pre-heating technique thereof.
Purpose of the present invention is realized by following technical scheme: preheating device for metal mould, comprise the heating supervisor, be equipped with under the first shunt pipe, its other end under described heating supervisor's a end the second shunt pipe is housed, initiating terminal described heating supervisor is equipped with three-way connection, an end of this three-way connection by the first valve the first joint is housed, its other end is equipped with the second joint by the second valve.
According to the metal die pre-heating technique of described preheating device for metal mould gained be: at first, metal die is loaded onto board, its two side form is opened to both sides respectively, then this preheating device for metal mould is fixed on metal die, allow its first shunt pipe be suspended in the middle of the die cavity of metal die, the die cavity position of main heating of metal mould allows its second shunt pipe be suspended in the middle of the running channel of metal die, the running channel position of main heating of metal mould; Again gas hose and the air hose of fuels sources, pneumatic supply are received respectively on the first joint, the second joint, and open the switch of first, second valve, under the condition of air pressure, combustion gas is responsible for by heating, flow to two shunt pipes, combustion gas is evenly flowed out from the nozzle of the first shunt pipe, the second shunt pipe, and then ignition on this nozzle, the size of regulating at last flame by the switch of regulating two valves; After the metal die homogeneous heating reaches the related process parameter, then with two valve switch Close Alls.
After adopting the present invention, die cavity and running channel two parts to metal die heat simultaneously, make that metal die is heated evenly, local temperature difference is less, utilize simple to operate and highly versatile and the low characteristics of cost, only need this preheating device is put into metal die, connect gas hose and air hose, then igniting, process time in accordance with regulations closes, and just can solve current die life low, and heat time heating time is long, cost is higher, labor strength is large, the unsettled problem of technological parameter.And this preheating device structure, technique are simple, make easily, and cost is lower.
According to design concept of the present invention, special characteristics according to each metal die, appropriate change and increase its internal shunt arm and nozzle thereof, make any one position that the flame of ejection can the homogeneous heating metal die, thereby the temperature one-time heating that realizes metal die is to needed technological parameter.
Description of drawings
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.
Fig. 1 is the structural representation of preheating device for metal mould of the present invention.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the left view of Fig. 1.
The specific embodiment
In conjunction with example, technical scheme of the present invention is done further specific description.
Referring to figs. 1 through Fig. 3, preheating device for metal mould of the present invention, comprise heating supervisor 1, be equipped with under described heating supervisor's 1 a end the second shunt pipe 12 is housed under the first shunt pipe 2, its other end, initiating terminal (by interior nipple 6) described heating supervisor 1 is equipped with three-way connection 7, an end of this three-way connection 7 by the first valve 20 (ball valve class) be equipped with the first joint 21, its other end by (in the right angle to Threaded Connector Coupling 8, outer to Threaded Connector Coupling 9 and) the second valve 10 (ball valve class) is equipped with the second joint 11.
Wherein: balancing patch 4, alignment pin 5 are equipped with respectively in described heating supervisor's 1 both sides, use as being arranged on metal die; Described the first rectangular shape of shunt pipe 2 (being specially adapted to the cavity positions of metal die is sprayed) is equipped with catch 3 on this first shunt pipe 2 and with heating supervisor 1 junction, be used for regulating institute advance fuel how much and the uniformity.Described the second shunt pipe 12 is " people " font, is specially adapted to the running channel position of metal die is sprayed.The first joint 21, the second joint 11 are separately by fuel hose, corresponding fuels sources (for the combustion gas class), the pneumatic supply of connecting of air hose.All have several (little) nozzles on the first shunt pipe 2, the second shunt pipe 12.Described three-way connection 7, the first valve 20, the first joint 21, and in the right angle to Threaded Connector Coupling 8, can be referred to as total joint 22 to Threaded Connector Coupling 9, the second valve 10, the second joint 11 outward, be the rectangle frame part in Fig. 1, Fig. 3.
Total joint 22 of this preheating device for metal mould is connected (this total joint can be general) by interior nipple 6 with heating supervisor 1.according to the metal die pre-heating technique of described preheating device for metal mould gained be: at first, metal die is loaded onto board (and all connecting plates are all connected), its two side form is opened respectively (approximately 75mm space) to both sides, then this preheating device for metal mould (by balancing patch 4 and the alignment pin 5 of its both sides) is fixed on (different metal die structures can design the fixed form different with preheating device on metal die) on metal die, allow its first shunt pipe 2 (rectangle) be suspended in the middle of the die cavity of metal die, the die cavity position of main heating of metal mould, allow its second shunt pipe 12 (" people " font) be suspended in the middle of the running channel of metal die, the running channel position of main heating of metal mould, again gas hose and the air hose of fuels sources (for the combustion gas class), pneumatic supply are received respectively on the first joint 21, the second joint 11, and open the switch of first, second valve, under the condition of air pressure, combustion gas is responsible for 1 by heating, flow to two shunt pipes, (and by being responsible for the adjusting of 1 junction catch 3 on the first shunt pipe 2 and with heating) evenly flows out combustion gas from the nozzle of the first shunt pipe 2, the second shunt pipe 12, and then ignition on this nozzle, the size of regulating at last flame by the switch of regulating two valves, after the metal die homogeneous heating reaches the related process parameter, then with two valve switch Close Alls.
The present invention is divided into the metal die die cavity according to the characteristic of product and running channel two parts heat simultaneously, can design according to the concrete structure of mould the different structure of preheating device at the design other products, lays shunt pipe and nozzle thereof.

Claims (4)

1. preheating device for metal mould, comprise heating supervisor (1), it is characterized in that: be equipped with under described heating supervisor's (1) a end the second shunt pipe (12) is housed under the first shunt pipe (2), its other end, initiating terminal described heating supervisor (1) is equipped with three-way connection (7), an end of this three-way connection (7) by the first valve (20) the first joint (21) is housed, its other end is equipped with the second joint (11) by the second valve (10).
2. preheating device for metal mould as claimed in claim 1 is characterized in that: the rectangular shape of described the first shunt pipe (2), and upper and with heating supervisor (1) junction, catch (3) is housed at this first shunt pipe (2).
3. preheating device for metal mould as claimed in claim 1 or 2, it is characterized in that: described the second shunt pipe (12) is " people " font.
4. the metal die pre-heating technique of preheating device for metal mould gained according to claim 1, it is characterized in that: at first, metal die is loaded onto board, its two side form is opened to both sides respectively, then this preheating device for metal mould is fixed on metal die, allows its first shunt pipe be suspended in the middle of the die cavity of metal die, the die cavity position of main heating of metal mould, allow its second shunt pipe be suspended in the middle of the running channel of metal die, the running channel position of main heating of metal mould; Again gas hose and the air hose of fuels sources, pneumatic supply are received respectively on the first joint, the second joint, and open the switch of first, second valve, under the condition of air pressure, combustion gas is responsible for by heating, flow to two shunt pipes, combustion gas is evenly flowed out from the nozzle of the first shunt pipe, the second shunt pipe, and then ignition on this nozzle, the size of regulating at last flame by the switch of regulating two valves; After the metal die homogeneous heating reaches the related process parameter, then with two valve switch Close Alls.
CN201210596907.XA 2012-12-31 2012-12-31 Metal die preheating device and metal die preheating technology thereof Active CN103111607B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210596907.XA CN103111607B (en) 2012-12-31 2012-12-31 Metal die preheating device and metal die preheating technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210596907.XA CN103111607B (en) 2012-12-31 2012-12-31 Metal die preheating device and metal die preheating technology thereof

Publications (2)

Publication Number Publication Date
CN103111607A true CN103111607A (en) 2013-05-22
CN103111607B CN103111607B (en) 2015-03-11

Family

ID=48410020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210596907.XA Active CN103111607B (en) 2012-12-31 2012-12-31 Metal die preheating device and metal die preheating technology thereof

Country Status (1)

Country Link
CN (1) CN103111607B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103934434A (en) * 2014-05-07 2014-07-23 广西玉柴机器股份有限公司 Die heating device
CN104028693A (en) * 2014-06-24 2014-09-10 江苏亚太安信达铝业有限公司 Tool structure for heating of dies and molds
CN104907512A (en) * 2015-06-24 2015-09-16 上海安可科技有限公司 Heat accumulating-type baking apparatus and method of steel ingot die
CN105149491A (en) * 2015-09-21 2015-12-16 南京力源锻造有限公司 Forging die preheating tube
CN106392024A (en) * 2016-09-30 2017-02-15 马鞍山钢铁股份有限公司 Die casting mold baking device and using method thereof
CN107695323A (en) * 2017-09-14 2018-02-16 云南云铝涌鑫铝业有限公司 Mould preheating device and die assembly
WO2021143196A1 (en) * 2020-01-18 2021-07-22 温州瑞明工业股份有限公司 Metal mold preheating flame gun device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0538518A (en) * 1991-07-31 1993-02-19 Nakajima Kokan Kk Method and apparatus for forming large diameter square steel tube
CN201744654U (en) * 2010-05-24 2011-02-16 荆门航特有色金属铸造有限公司 Movable mold preheating device
CN201880892U (en) * 2010-12-03 2011-06-29 刘景权 Pipe die preheating device of water-cooling centrifugal spheroidal graphite pipe casting machine
CN203018719U (en) * 2012-12-31 2013-06-26 温州瑞明工业股份有限公司 Metal die preheating device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0538518A (en) * 1991-07-31 1993-02-19 Nakajima Kokan Kk Method and apparatus for forming large diameter square steel tube
CN201744654U (en) * 2010-05-24 2011-02-16 荆门航特有色金属铸造有限公司 Movable mold preheating device
CN201880892U (en) * 2010-12-03 2011-06-29 刘景权 Pipe die preheating device of water-cooling centrifugal spheroidal graphite pipe casting machine
CN203018719U (en) * 2012-12-31 2013-06-26 温州瑞明工业股份有限公司 Metal die preheating device

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103934434A (en) * 2014-05-07 2014-07-23 广西玉柴机器股份有限公司 Die heating device
CN104028693A (en) * 2014-06-24 2014-09-10 江苏亚太安信达铝业有限公司 Tool structure for heating of dies and molds
CN104907512A (en) * 2015-06-24 2015-09-16 上海安可科技有限公司 Heat accumulating-type baking apparatus and method of steel ingot die
CN105149491A (en) * 2015-09-21 2015-12-16 南京力源锻造有限公司 Forging die preheating tube
CN106392024A (en) * 2016-09-30 2017-02-15 马鞍山钢铁股份有限公司 Die casting mold baking device and using method thereof
CN107695323A (en) * 2017-09-14 2018-02-16 云南云铝涌鑫铝业有限公司 Mould preheating device and die assembly
WO2021143196A1 (en) * 2020-01-18 2021-07-22 温州瑞明工业股份有限公司 Metal mold preheating flame gun device

Also Published As

Publication number Publication date
CN103111607B (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN103111607B (en) Metal die preheating device and metal die preheating technology thereof
CN203018719U (en) Metal die preheating device
CN104456947B (en) Heat accumulating type pure air heating system
CN106401794A (en) Multi-shot feed divider for charging of tactic engine
CN203957290U (en) Monoblock type needle valve hot flow passage system
CN208632937U (en) Road-maintaining truck modified pitch spraying mechanism
CN201744654U (en) Movable mold preheating device
CN203737978U (en) In-mold spot-spraying machine
CN205363035U (en) Frock is preheated in butt joint of tubular product groove
CN205005273U (en) Mould preheating device
CN104275457A (en) Die casting system for solenoid valve body
CN202571276U (en) Random mold heater
CN203778739U (en) Mould heating device
CN206326116U (en) A kind of online preheating device of casting mould
CN106392015B (en) A kind of molding flat underside apparatus for baking
CN105028541B (en) Multilayer food automatic production equipment
CN105208690A (en) Mould preheating device
CN207900111U (en) A kind of efficient mold preheating tooling
CN205869455U (en) Naturally, dual -preheating ladle roaster of breathing in
CN204665906U (en) The lower water jacket of modified air blast smelting furnace
CN203245326U (en) Forging die preheating device
CN103934434A (en) Die heating device
CN202412558U (en) Mold heater
CN203349659U (en) Heat-preserving furnace inlet pouring nozzle
CN219881237U (en) Knuckle die baking device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Metal mold preheating device and its metal mold preheating process

Effective date of registration: 20211020

Granted publication date: 20150311

Pledgee: Industrial and Commercial Bank of China Limited Rui'an sub branch

Pledgor: WENZHOU RUIMING INDUSTRIAL Co.,Ltd.

Registration number: Y2021330001982

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220519

Granted publication date: 20150311

Pledgee: Industrial and Commercial Bank of China Limited Rui'an sub branch

Pledgor: WENZHOU RUIMING INDUSTRIAL Co.,Ltd.

Registration number: Y2021330001982

PC01 Cancellation of the registration of the contract for pledge of patent right