CN205815463U - A kind of gas diversion tube of tape guide - Google Patents
A kind of gas diversion tube of tape guide Download PDFInfo
- Publication number
- CN205815463U CN205815463U CN201620709076.6U CN201620709076U CN205815463U CN 205815463 U CN205815463 U CN 205815463U CN 201620709076 U CN201620709076 U CN 201620709076U CN 205815463 U CN205815463 U CN 205815463U
- Authority
- CN
- China
- Prior art keywords
- grades
- tower
- mozzle body
- towers
- elbow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Gas Separation By Absorption (AREA)
Abstract
The utility model proposes the gas diversion tube of a kind of tape guide, including mozzle body, mozzle body is made up of multiple pipeline sections, being provided with adpting flange between adjacent tubular segments, mozzle body is semicircle shape, and the entrance of mozzle body is arranged on the tower wall of first stage tower, the outlet of mozzle body is arranged on the tower wall of two grades of towers, the outlet of mozzle body connects a guider stretched in two grades of towers, and guider is the elbow of band radian, and the radian of elbow is 30 °.This gas diversion tube increases the elbow of 30 ° by inside, both solve first stage tower pouring in down a chimney to two grades of tower serosity, solved again the skewness of gas, improve the utilization rate of serosity, add the absorbance of sprayed slurry, improve the absorbance of sulfur dioxide.
Description
Technical field
This utility model belongs to mozzle field, particularly to the gas diversion tube of a kind of tape guide.
Background technology
At present, mozzle is the important component part of desulfurizing tower work in the double cycle system of single column, and it assume responsibility for from one
Level tower enters the important channel of two grades of towers, and existing common configuration is in operation two shortcomings of existence, one be liquid along tower wall from
Flowing in first stage tower in two grades of towers, in causing two grades of towers, spray liquid measure reduces, and in first stage tower, spray liquid measure increases, and two is that gas holds
Easily directly rise along tower wall, cause gas skewness.Therefore, the gas diversion tube of a kind of tape guide is needed now badly.
Utility model content
The utility model proposes the gas diversion tube of a kind of tape guide, solve in prior art first stage tower to two grades
Tower serosity pours in down a chimney and gas problem pockety.
The technical solution of the utility model is achieved in that the gas diversion tube of a kind of tape guide, is arranged on one
Level tower and the junction of two grades of towers, is provided with dividing plate between described first stage tower and described two grades of towers, including mozzle body, described in lead
Flow tube body is made up of multiple pipeline sections, is provided with adpting flange between adjacent described pipeline section, and described mozzle body is semicircle shape, institute
The entrance stating mozzle body is arranged on the tower wall of described first stage tower, and the outlet of described mozzle body is arranged on described two grades
On the tower wall of tower, the outlet of described mozzle body connects a guider stretched in two grades of towers.
As one preferred embodiment, described guider is the elbow of band radian.
As one preferred embodiment, the radian of described elbow is 30 °.
As one preferred embodiment, the number of described mozzle body is two, and the number of described elbow is also two
Individual.
After have employed technique scheme, the beneficial effects of the utility model are: increase by one in the inside of gas diversion tube
The elbow of individual 30 °, had both solved first stage tower pouring in down a chimney to two grades of tower serosity, and had solved again the skewness of gas, improve
The utilization rate of serosity, adds the absorbance of sprayed slurry, improves the absorbance of sulfur dioxide.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, the accompanying drawing in describing below is only
It is embodiments more of the present utility model, for those of ordinary skill in the art, before not paying creative work
Put, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the overall structure schematic diagram of the gas diversion tube of this utility model tape guide.
In figure, 1-first stage tower;Bis-grades of towers of 2-;3-dividing plate;4-pipeline section;5-adpting flange;6-elbow.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole
Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise
The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Embodiment:
As it is shown in figure 1, the gas diversion tube of a kind of tape guide, it is arranged on first stage tower 1 and the junction of two grades of towers 2,
Being provided with dividing plate 3 between first stage tower 1 and two grades of towers 2, including mozzle body, mozzle body is made up of multiple pipeline sections 4, adjacent tubes
Being provided with adpting flange 5 between section 4, mozzle body is semicircle shape, and the entrance of mozzle body is arranged on the tower wall of first stage tower 1
On, the outlet of mozzle body is arranged on the tower wall of two grades of towers 2, and the outlet of mozzle body connects has one to stretch into two grades of towers
Guider in 2, guider is the elbow 6 of band radian, and the radian of elbow 6 is 30 °, and the number of mozzle body is two
Individual, the number of elbow 6 is also two.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this
Within the spirit of utility model and principle, any modification, equivalent substitution and improvement etc. made, should be included in this utility model
Protection domain within.
Claims (4)
1. a gas diversion tube for tape guide, is arranged on first stage tower and the junction of two grades of towers, described first stage tower and institute
Stating and be provided with dividing plate between two grades of towers, it is characterised in that including: mozzle body, described mozzle body is made up of multiple pipeline sections,
Being provided with adpting flange between adjacent described pipeline section, described mozzle body is semicircle shape, and the entrance of described mozzle body is arranged
On the tower wall of described first stage tower, the outlet of described mozzle body is arranged on the tower wall of described two grades of towers, described mozzle
The outlet of body connects a guider stretched in two grades of towers.
The gas diversion tube of a kind of tape guide the most as claimed in claim 1, it is characterised in that: described guider is band
The elbow of radian.
The gas diversion tube of a kind of tape guide the most as claimed in claim 2, it is characterised in that: the radian of described elbow is
30°。
The gas diversion tube of a kind of tape guide the most as claimed in claim 3, it is characterised in that: described mozzle body
Number is two, and the number of described elbow is also two.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620709076.6U CN205815463U (en) | 2016-07-06 | 2016-07-06 | A kind of gas diversion tube of tape guide |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620709076.6U CN205815463U (en) | 2016-07-06 | 2016-07-06 | A kind of gas diversion tube of tape guide |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205815463U true CN205815463U (en) | 2016-12-21 |
Family
ID=57564627
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620709076.6U Active CN205815463U (en) | 2016-07-06 | 2016-07-06 | A kind of gas diversion tube of tape guide |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205815463U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110052207A (en) * | 2019-05-05 | 2019-07-26 | 新疆德安环保科技股份有限公司 | Sewage treatment automatic medicine adding apparatus |
-
2016
- 2016-07-06 CN CN201620709076.6U patent/CN205815463U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110052207A (en) * | 2019-05-05 | 2019-07-26 | 新疆德安环保科技股份有限公司 | Sewage treatment automatic medicine adding apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205815463U (en) | A kind of gas diversion tube of tape guide | |
CN103447180A (en) | Wet process flue gas desulfurization water drop-shaped grout spraying pipe | |
CN204147762U (en) | A kind of circulating fluid bed flue-gas desulfurizing device adopting special-shaped many venturi | |
CN107289228A (en) | A kind of petroleum transportation pipeline | |
CN204042940U (en) | A kind of flue system and water-sealed valve thereof | |
CN102650361B (en) | Flat-bottom equal-section steel bifurcated pipe | |
CN204225219U (en) | The direct hush pipe of a kind of swirling flow | |
CN201991882U (en) | Reducing flow pipe section | |
CN209146578U (en) | A kind of tee tube | |
CN203671109U (en) | Air tube accessory | |
CN203123813U (en) | Spraying device for desulfurization tower | |
CN104990080B (en) | Molecular sealer | |
CN204300594U (en) | A kind of elbow for oil pipeline | |
CN206277293U (en) | A kind of long tube processing support | |
CN206027414U (en) | Torrent device and desulfurization absorption tower in desulfurization absorption tower | |
CN203768021U (en) | Efficient tubular acid distributor with two main tubes for acid fabrication production by concentrated sulfuric acid | |
CN204973554U (en) | Wet flue gas desulfurization absorption tower pH value measurement system | |
CN104373695A (en) | Petroleum pipeline | |
CN203464308U (en) | Multi-tube accelerated flue gas desulfurization device | |
CN204187197U (en) | Pipeline | |
CN209378732U (en) | A kind of absorption tower PH metering conduit system for saving electrode | |
CN204271605U (en) | One is used for protection tube low pressure is entered to show line and gone out to show wire routing during to family | |
CN204000943U (en) | Make the plastic inspection well that current are more unimpeded | |
CN203869069U (en) | Smoke and air flue and two-in-one flow collecting pipe thereof | |
CN203768022U (en) | Tubular efficient acid distributor with four-way main pipes for concentrated sulfuric acid production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |