CN205809256U - A kind of test system of hydroelectric generator performance - Google Patents

A kind of test system of hydroelectric generator performance Download PDF

Info

Publication number
CN205809256U
CN205809256U CN201620658552.6U CN201620658552U CN205809256U CN 205809256 U CN205809256 U CN 205809256U CN 201620658552 U CN201620658552 U CN 201620658552U CN 205809256 U CN205809256 U CN 205809256U
Authority
CN
China
Prior art keywords
observing
controlling
test
cabinet
hydroelectric generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620658552.6U
Other languages
Chinese (zh)
Inventor
树泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Chuan Technology Co Ltd
Original Assignee
Hangzhou Chuan Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Chuan Technology Co Ltd filed Critical Hangzhou Chuan Technology Co Ltd
Priority to CN201620658552.6U priority Critical patent/CN205809256U/en
Application granted granted Critical
Publication of CN205809256U publication Critical patent/CN205809256U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

The test system of a kind of hydroelectric generator performance described herein, including the main cabinet of observing and controlling (1), frequency conversion tank (2), test platform (3), load cabinet (4), the main cabinet of described observing and controlling (1) is for being arranged on centre position body structure, the outside of the main cabinet of observing and controlling (1) is provided with test platform (3), the left side of the main cabinet of observing and controlling (1) is provided with load cabinet (4) and is electrically connected with test platform (3) left side, and the right side of the main cabinet of observing and controlling (1) is provided with frequency conversion tank (2) and is electrically connected with test platform (3) right side;At least have and realize the separate analogue to hydroelectric generator performance and the effect of test.

Description

A kind of test system of hydroelectric generator performance
Technical field
The application relates to the test system of a kind of hydroelectric generator performance, in the test of hydroelectric generator performance.
Background technology
Hydroelectric generation be a kind of cleaning, free from environmental pollution, do not affect the regenerative resource of ecological balance.At present, energy-conservation, ring Protect, efficient unit has become the developing direction of generating equipment product, and the waterpower as hydro-electric power generating equipment important component part is sent out Motor, also will develop towards high-power and high parameter direction future.Therefore the performance test to hydroelectric generator will be the heaviest Want.
The shortcoming of prior art:
In the prior art, to the test of hydroelectric generator mainly around parts such as water wheels, microcomputer protecting device and units, And have ignored hydroelectric generator self generating efficiency, the test of turn frequency performance such as characteristic, load capacity, to improving, improving water The technical matters of power generator brings the biggest puzzlement.Independent hydroelectric generator performance will comprehensively be tried by the application targetedly Test, it is provided that complete hydroelectric generator performance data and form.
In consideration of it, how to design the test system of a kind of hydroelectric generator performance, overcome in above-mentioned prior art and deposited Defect, be those skilled in the art's technical problems urgently to be resolved hurrily.
Utility model content
The application aims to overcome that technical problem present in prior art, and provides a kind of hydroelectric generator performance Test system.
The purpose of the application completes by following technical solution, the test system of a kind of hydroelectric generator performance, Including the main cabinet of observing and controlling, frequency conversion tank, test platform, load cabinet, the main cabinet of described observing and controlling is for being arranged on centre position body structure, observing and controlling The outside of main cabinet is provided with test platform, and the left side of the main cabinet of observing and controlling is provided with load cabinet and is electrically connected with on the left of test platform, observing and controlling master The right side of cabinet is provided with frequency conversion tank and is electrically connected with on the right side of test platform.
Described test platform includes the verifying bench of level, and the left side of verifying bench is fixed with former dynamic frequency control electricity Dynamic, the right side of verifying bench is fixed with hydroelectric generator to be measured, between former dynamic electrical variable frequency adjustable speed and hydroelectric generator to be measured Verifying bench on be fixed with Dynamic High-accuracy torque rotary speed sensor.
Being additionally provided with high-power high speed reducing ratio reductor on the centre position of described verifying bench, high-power high speed reducing ratio is slowed down Machine is fixed on the left of the Dynamic High-accuracy torque rotary speed sensor between former dynamic electrical variable frequency adjustable speed and hydroelectric generator to be measured Row transmission.
It is fixed with diaphragm Left-wing Federation axial organ on the left of described high-power high speed reducing ratio reductor and between former dynamic electrical variable frequency adjustable speed, Being fixed with shaft coupling in diaphragm between high-power high speed reducing ratio reductor and Dynamic High-accuracy torque rotary speed sensor, high accuracy is dynamic The right shaft coupling of diaphragm it is fixed with between state torque rotary speed sensor and hydroelectric generator to be measured.
The main cabinet of described observing and controlling includes industrial computer and is connected to the Programmable Logic Controller on the right side of industrial computer.
The bottom of the main cabinet of described observing and controlling is provided with the load cabinet that electric parameters testing module is fixing with observing and controlling main cabinet left hand external Connecting, electric parameters testing module is upwards connected with industrial computer.
Temperature test module, torque rotary speed test module also it is parallel with between described industrial computer and test platform.
The application compared with prior art, at least has following obvious advantage and an effect:
1, the separate analogue to hydroelectric generator performance and test are realized.
2, easy and simple to handle, highly versatile, data comprehensively, be easy to analyze.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing further understanding of the present application, constitutes the part of the application, this Shen Schematic description and description please is used for explaining the application, is not intended that the improper restriction to the application.In the accompanying drawings:
Fig. 1 is the system construction drawing of the application.
Fig. 2 is the use state diagram of the application.
Detailed description of the invention
For making the purpose of the application, technical scheme and advantage clearer, below in conjunction with the application specific embodiment and Technical scheme is clearly and completely described by corresponding accompanying drawing.Obviously, described embodiment is only the application one Section Example rather than whole embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not doing Go out the every other embodiment obtained under creative work premise, broadly fall into the scope of the application protection.
The test system of a kind of hydroelectric generator performance described herein, including the main cabinet of observing and controlling 1, frequency conversion tank 2, test Platform 3, load cabinet 4, the main cabinet of described observing and controlling 1 is for being arranged on centre position body structure, and it is flat that the outside of the main cabinet of observing and controlling 1 is provided with test Platform 3, the left side of the main cabinet of observing and controlling 1 is provided with load cabinet 4 and is electrically connected with on the left of test platform 3, and the right side of the main cabinet of observing and controlling 1 is provided with frequency conversion It is electrically connected with on the right side of cabinet 2 and test platform 3;At least have and realize the separate analogue to hydroelectric generator performance and the effect of test Really.
In the embodiment of the present application,
Former dynamic frequency-conversion and speed-regulation motor on the left of the load cabinet 4 fixing by the left side of the main cabinet of observing and controlling 1 and test platform 3 31 are electrically connected with, and utilize load cabinet 4 that former dynamic frequency-conversion and speed-regulation motor 31 is driven and is controlled.
Carried out by the hydroelectric generator to be measured 35 on the right side of the fixing frequency conversion tank 2 in the right side of the main cabinet of observing and controlling 1 and test platform 3 It is electrically connected with, utilizes frequency conversion tank 2 to be driven hydroelectric generator 35 to be measured controlling.
By bi-directional drive, the industrial computer 11 in the recycling main cabinet of centre position observing and controlling 1 and Programmable Logic Controller 12 logarithm According to carrying out unifying collection and comparison, and then detect the performance of hydroelectric generator, the performance of hydroelectric generator 35 the most to be measured, pass through Comparison with former dynamic frequency-conversion and speed-regulation motor 31 can be learnt.
Because driving and the driving of hydroelectric generator 35 to be measured of former dynamic frequency-conversion and speed-regulation motor 31, use a work simultaneously Control machine 11 realizes.
The machine that utilizes water for producing electric power tests system by upper computer software as master control, by the control to slave computer PLC etc., Realize converter regulation, load loading capacity regulation, voltage, electric current, generated output and frequency measurement, temperature monitors in real time, waterpower The measurement of electromotor input speed, torque and power, completes control and the collection of all data of whole action, and is summarised in soft Part, intuitively, show easily, and can carry out internal data process and calculating, draw hydroelectric generator combination property data and Corresponding curve, it is simple to hydroelectric generator performance is examined and improves use.
Seeing shown in Fig. 1~Fig. 2, the test system of a kind of hydroelectric generator performance, including the main cabinet of observing and controlling 1, frequency conversion tank 2, test platform 3, load cabinet 4, the main cabinet of described observing and controlling 1 is for being arranged on centre position body structure, and the outside of the main cabinet of observing and controlling 1 is provided with Test platform 3, the left side of the main cabinet of observing and controlling 1 is provided with load cabinet 4 and is electrically connected with on the left of test platform 3, and the right side of the main cabinet of observing and controlling 1 sets Have on the right side of frequency conversion tank 2 and test platform 3 and be electrically connected with.
Utilize the main cabinet of observing and controlling 1 in centre position by outside test platform 3 and the frequency conversion tank 2 of the left and right sides and load cabinet 4 centralized integration together, carry out integrated test.
And this test mode, fairly simple, and use unified industrial computer 11 to be controlled, it is possible to realize synchrodata Transmission and detection and contrast effect.
In the embodiment of the present application,
Described test platform 3 includes the verifying bench 36 of level, the left side of verifying bench 36 is fixed with former dynamic frequency conversion and adjusts Speed electronic 31, the right side of verifying bench 36 is fixed with hydroelectric generator 35 to be measured, former dynamic electrical variable frequency adjustable speed 31 and water to be measured It is fixed with Dynamic High-accuracy torque rotary speed sensor 34 on verifying bench 36 between power generator 35.
Hydroelectric generator 35 to be measured is parts to be detected.
By former dynamic electrical variable frequency adjustable speed 31, using frequency control motor as prime mover, motor can be at converter Realizing different rotating speeds and moment of torsion under driving, to adapt to the changes in demand of load, frequency-conversion and speed-regulation motor has smooth speed control, effect The features such as rate is high, speed adjustable range is wide, noise is low, bearing load capacity is high, good reliability, fully meet waterpower in a test system The simulation of electromotor actual operating mode.
In the embodiment of the present application,
High-power high speed reducing ratio reductor 33, high-power high speed reducing ratio it is additionally provided with on the centre position of described verifying bench 36 The Dynamic High-accuracy torque rotary speed that reductor 33 is fixed between former dynamic electrical variable frequency adjustable speed 31 and hydroelectric generator to be measured 35 passes Transmission is carried out on the left of sensor 34.
Use in prior art, model be H/B high-power gear reducer be high-power high speed reducing ratio reductor 33.
Space can be saved, reliability and durability, bear overload capacity height, energy consumption is low, superior performance, and retardation efficiency is up to More than 95%, vibrate little, noise low powder mixer ferrosteel casing, gear surface processes through high frequency heat, adds through precision Work, constitutes helical gear, and bevel gear compact conformation, volume are little, stable working, the output speed range of choice are wide, highly versatile, effect Rate is up to 95%.
Detection platform 36 in the application is cast iron surface plate, and material is high-strength cast iron HT200-300, work surface hardness: HB170-240, precision is performed by national standard measurement verification regulations, and cast iron platform is applicable to various inspection work, accurate measurement Datum plane, for mechanical measurement benchmark, make there is accurate line, be indispensable basic composition in a test system.
The load cabinet 4 that the application selects is hydroelectric generator special low frequency duty cabinet, and its load can meet load size Adjustable, the delayed adjustable function of power factor, meet after hydroelectric generator actual power different loads and power in switching process The demand of factor.
The hydroelectric generator Performance Test System of the application uses upper computer software centralized Control and measurement, it is achieved action control Making the high degree of uniformity with DATA REASONING and synchronicity, whole system has full closed loop control, in real time detection, automatic imitation, follows The functions such as ring is aging.
The hydroelectric generator Performance Test System of the application can complete the generating no-load test of hydroelectric generator, load of electrical generation Test, reliability test, long duration test, degradation, temperature rise test, rotating speed-frequency performance test, the examination of voltage-frequency performance Test, efficiency and loss test, the test of total harmonic distortion factor and transient test etc..
In the embodiment of the present application,
It is fixed with the diaphragm Left-wing Federation on the left of described high-power high speed reducing ratio reductor 33 and between former dynamic electrical variable frequency adjustable speed 31 Axial organ 321, is fixed with in diaphragm connection between high-power high speed reducing ratio reductor 33 and Dynamic High-accuracy torque rotary speed sensor 34 Axial organ 322, is fixed with the right shaft coupling of diaphragm between Dynamic High-accuracy torque rotary speed sensor 34 and hydroelectric generator to be measured 35 323。
In diaphragm Left-wing Federation axial organ 321, diaphragm, shaft coupling 322, the unification of diaphragm right shaft coupling 323 are diaphragm coupling, wherein, It is because its position arranged different, therefore uses position to make a distinction.
In the application, each mechanical rotation is in transmission connection use diaphragm coupling, and diaphragm coupling comes by the elastic deformation of diaphragm Compensating the relative displacement being joined two axles, be a kind of high performance metal strong element flexible coupling, need not moisten oil, structure is tighter Gathering, intensity is high, and service life is long, without spin gap, is not affected by temperature and greasy dirt, has etch-proof feature acidproof, alkaline-resisting, Play key effect in testing.
In the embodiment of the present application,
The main cabinet of described observing and controlling 1 includes industrial computer 11 and is connected to the Programmable Logic Controller 12 on the right side of industrial computer 11.
Utilize industrial computer 11 that the motor of both sides is carried out unified driving and control, and the state that is used for detects.
Utilize programmable controller 12 that the use state in frequency conversion tank 2 is detected timely, and data signal is carried Signal processing is carried out to industrial computer 11.
In the embodiment of the present application,
The bottom of the main cabinet of described observing and controlling 1 is provided with bear fixing with observing and controlling main cabinet 1 left hand external of electric parameters testing module 13 Carrying cabinet 4 to connect, electric parameters testing module 13 is upwards connected with industrial computer 11.
Electric parameters testing module 13: electric parameters testing module can realize 0 800Hz wideband measurement, frequency detecting, voltage electricity Stream power measurement, power analysis, frequency analysis and data communication interface.
In the embodiment of the present application,
Temperature test module 14, torque rotary speed test module 15 also it is parallel with between described industrial computer 11 and test platform 3.
Temperature-measuring module 14: temperature-measuring module can be at maximum up to the real-time measurement of 8 channel temperatures, historical temperature curve Display and data communication interface;
Torque rotary speed measuring module 15: torque rotary speed measuring module precision prescribed, up to 0.2 grade, meets slow-speed of revolution precision and wants Ask, it is allowed to impact torque loads, for simulating hydroelectric generator demand in load simulation process of the test.The application selects 0.2 grade of high-precision sensor selected by dynamic torque speed probe, and umber of pulse reaches 2000P/R, it is ensured that hydroelectric generator The accurate measurement of rotating speed during universal slow-speed of revolution operating condition.
In the industrial computer 11 of the main cabinet of described observing and controlling 1, install and there is special industrial computer and dedicated water power generator Performance measurement software: the corresponding Standard of Software-Coincidence, has data display function, data preservation function, data base administration Function, graphic analyses function, slave computer control function and interface etc..
The overall obvious advantage of the application and effect:
1, the separate analogue to hydroelectric generator performance and test are realized.
2, easy and simple to handle, highly versatile, data comprehensively, be easy to analyze.
The foregoing is only embodiments herein, and, the title that in the application, parts are taken can not also With, the title being not limiting as in the application.To those skilled in the art, the application can have various modifications and variations. Any modification, equivalent substitution and improvement etc. made within all designs in the application and principle, should be included in the power of the application Within profit claimed range.

Claims (7)

1. a test system for hydroelectric generator performance, including the main cabinet of observing and controlling (1), frequency conversion tank (2), test platform (3), load Cabinet (4), it is characterised in that: the main cabinet of described observing and controlling (1) is for being arranged on centre position body structure, and the outside of the main cabinet of observing and controlling (1) sets Have test platform (3), the left side of the main cabinet of observing and controlling (1) to be provided with load cabinet (4) to be electrically connected with test platform (3) left side, observing and controlling master The right side of cabinet (1) is provided with frequency conversion tank (2) and is electrically connected with test platform (3) right side.
Test system the most as claimed in claim 1, it is characterised in that: described test platform (3) includes the verifying bench of level (36), the left side of verifying bench (36) is fixed with former dynamic electrical variable frequency adjustable speed (31), fixing on the right side of verifying bench (36) There are hydroelectric generator to be measured (35), the verifying bench between former dynamic electrical variable frequency adjustable speed (31) and hydroelectric generator to be measured (35) (36) Dynamic High-accuracy torque rotary speed sensor (34) it is fixed with on.
Test system the most as claimed in claim 2, it is characterised in that: it is additionally provided with on the centre position of described verifying bench (36) High-power high speed reducing ratio reductor (33), high-power high speed reducing ratio reductor (33) be fixed on former dynamic electrical variable frequency adjustable speed (31) with Dynamic High-accuracy torque rotary speed sensor (34) left side between hydroelectric generator to be measured (35) carries out transmission.
Test system the most as claimed in claim 3, it is characterised in that: described high-power high speed reducing ratio reductor (33) left side with Being fixed with diaphragm Left-wing Federation axial organ (321) between former dynamic electrical variable frequency adjustable speed (31), high-power high speed reducing ratio reductor (33) is with high Being fixed with shaft coupling in diaphragm (322) between precision dynamic torque rotary speed sensor (34), Dynamic High-accuracy torque rotary speed senses The right shaft coupling of diaphragm (323) it is fixed with between device (34) and hydroelectric generator to be measured (35).
Test system the most as claimed in claim 1, it is characterised in that: the main cabinet of described observing and controlling (1) include industrial computer (11) and It is connected to the Programmable Logic Controller (12) on industrial computer (11) right side.
Test system the most as claimed in claim 5, it is characterised in that: the bottom of the main cabinet of described observing and controlling (1) is provided with electrical quantity Test module (13) cabinet main with observing and controlling (1) left hand external fix load cabinet (4) be connected, electric parameters testing module (13) upwards with Industrial computer (11) connects.
Test system the most as claimed in claim 6, it is characterised in that: between described industrial computer (11) and test platform (3) also It is parallel with temperature test module (14), torque rotary speed test module (15).
CN201620658552.6U 2016-06-23 2016-06-23 A kind of test system of hydroelectric generator performance Expired - Fee Related CN205809256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620658552.6U CN205809256U (en) 2016-06-23 2016-06-23 A kind of test system of hydroelectric generator performance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620658552.6U CN205809256U (en) 2016-06-23 2016-06-23 A kind of test system of hydroelectric generator performance

Publications (1)

Publication Number Publication Date
CN205809256U true CN205809256U (en) 2016-12-14

Family

ID=57512186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620658552.6U Expired - Fee Related CN205809256U (en) 2016-06-23 2016-06-23 A kind of test system of hydroelectric generator performance

Country Status (1)

Country Link
CN (1) CN205809256U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111077448A (en) * 2019-12-29 2020-04-28 江苏航天动力机电有限公司 Large-scale feedback type alternating current synchronous generator test system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111077448A (en) * 2019-12-29 2020-04-28 江苏航天动力机电有限公司 Large-scale feedback type alternating current synchronous generator test system

Similar Documents

Publication Publication Date Title
CN204495970U (en) Energy-saving of motor system test platform
CN205262736U (en) Multistage planetary gear case combined test platform
CN202110062U (en) Automobile manual transmission testing device
CN105372064A (en) Performance detection and analysis test stand of engineering machinery transmission assembly and test method thereof
CN106481617A (en) A kind of hydraulic motor test platform and method of testing
CN203719917U (en) Extended-range hybrid power test system
CN101644624A (en) Steering test bench of electrical-closed tracked vehicle transmission device
CN108152742B (en) A kind of vehicle generator efficiency test method
CN103964312B (en) Electric block energy efficiency testing device and test method
CN205958710U (en) Test platform of hydroelectric generator performance
CN205384141U (en) Engineering machine tool transmission assembly performance detection and analysis test bench
CN207318087U (en) Harmonic speed reducer comprehensive test system
CN209117835U (en) A kind of locomotive AC motor performance testing stand
CN109298347A (en) A kind of three electric system health control testing stand of new-energy automobile and method
CN205809256U (en) A kind of test system of hydroelectric generator performance
CN203024971U (en) Intelligent testing device for mechanical transmission performances of speed reducer
CN209606581U (en) A kind of energy-saving electrical machine band load pilot system
CN1283984C (en) Direct current power ergometer and its control system
CN104931265B (en) Large-scale Wind Turbines usability test device and its test method
CN204740137U (en) Large -scale wind generating set work performance test device
CN102636346B (en) Stress analysis system of self-powered wireless gear
CN208937324U (en) A kind of speed changer fatigue life test device
CN205940974U (en) Efficiency curve testing arrangement
CN202182915U (en) Energy conservation online monitoring device for frequency converter
CN212723234U (en) Motor performance testing machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214

Termination date: 20190623