CN205806741U - A kind of heavy ore deposit case tail goes out pipe adpting flange - Google Patents

A kind of heavy ore deposit case tail goes out pipe adpting flange Download PDF

Info

Publication number
CN205806741U
CN205806741U CN201620604081.0U CN201620604081U CN205806741U CN 205806741 U CN205806741 U CN 205806741U CN 201620604081 U CN201620604081 U CN 201620604081U CN 205806741 U CN205806741 U CN 205806741U
Authority
CN
China
Prior art keywords
flange
tail
ore deposit
goes out
discharge nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620604081.0U
Other languages
Chinese (zh)
Inventor
何天飞
何亚龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Original Assignee
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd filed Critical Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority to CN201620604081.0U priority Critical patent/CN205806741U/en
Application granted granted Critical
Publication of CN205806741U publication Critical patent/CN205806741U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of heavy ore deposit case tail and go out pipe adpting flange, pipe is gone out including heavy ore deposit case and tail, tail goes out pipe and is arranged on the bottom of heavy ore deposit case, tail goes out the bottom of pipe and is provided with flange, flange goes out pipe by fixing bolt with tail and is connected, being fixedly connected with discharge nozzle in flange, the bottom of flange is fixedly connected with securing plate.The utility model has the advantage of, discharge nozzle it is fixedly connected with in flange, discharge nozzle extends to the inside of heavy ore deposit case, and the minimum discharging opening of pipe is gone out higher than tail, make entrance sink the ore pulp of ore deposit case to be buffered and deposit, when the ore pulp of deposition did not had the top of discharge nozzle, ore pulp flows out than relatively low speed with one from discharge nozzle, the securing plate of flange base is effectively protected flange, and coordinate buffering tentacle, reduce the flow velocity of ore pulp further, slow down the abrasion of flange, extend the service life of flange, decrease the replacing number of times of flange, not only reduce the labor intensity of workman, and reduce production cost.

Description

A kind of heavy ore deposit case tail goes out pipe adpting flange
Technical field
This utility model belongs to metallurgical choosing and burns coordinative composition of equipments apparatus field, is specifically related to a kind of heavy ore deposit case tail and goes out pipe connection method Blue.
Background technology
Burning in operation in metallurgy choosing, ore pulp falls in the case of heavy ore deposit after sorting, and goes out bank of tubes by the tail of heavy ore deposit case and go out, Tail goes out the direction that the diameter of pipe flows along with ore pulp and tapers into, and the flow velocity of ore pulp accelerates, original tail go out bottom pipe general the most all Being provided with flange, go out pipe and drainage conduit by Flange joint tail, owing to the flow velocity of ore pulp is accelerated, tail goes out pipe flange connecting portion by ore deposit The very fast of slurry is washed away, and makes flange serious wear, changes frequently, changes quantity many, affect normal processing, and workman is frequently Change flange, not only increase the labor intensity of workman, and improve production cost.
Utility model content
The purpose of this utility model is to provide a kind of heavy ore deposit case tail and goes out pipe adpting flange, to solve in prior art, and flange Serious wear, changes quantity many, and number of times is frequent, and labor strength is big, the problem that production cost is high.
For reaching above-mentioned purpose, the technical solution of the utility model is: a kind of heavy ore deposit case tail goes out pipe adpting flange, including sinking Ore deposit case 1 and tail go out pipe 2, and tail goes out pipe 2 and is arranged on the bottom of heavy ore deposit case 1, and tail goes out the bottom of pipe 2 and is provided with flange 3, and flange 3 is by solid Determining bolt 4 to go out pipe 2 with tail and be connected, be fixedly connected with discharge nozzle 5 in flange 3, the bottom of flange 3 is fixedly connected with securing plate 6.
Preferably, discharge nozzle 5 is extended in heavy ore deposit case 1, and the top of discharge nozzle 5 goes out pipe 2 higher than tail.
Preferably, the inner and outer wall of discharge nozzle 5 is provided with buffering tentacle 7.
Preferably, the inwall of heavy ore deposit case 1 is provided with buffering tentacle 7.
Preferably, buffering tentacle 7 is flexible material.
The utility model has the advantage of: be fixedly connected with discharge nozzle in flange, discharge nozzle extends to the inside of heavy ore deposit case, And go out the minimum discharging opening of pipe higher than tail, make entrance sink the ore pulp of ore deposit case and buffer and deposit, when the ore pulp deposited did not had During the top of discharge nozzle, ore pulp flows out than relatively low speed with one from discharge nozzle, and the securing plate of flange base is effective Protect flange, and coordinate buffering tentacle, reduce the flow velocity of ore pulp further, slow down the abrasion of flange, extend flange In service life, decrease the replacing number of times of flange, not only reduce the labor intensity of workman, and reduce production cost.
Accompanying drawing explanation
Fig. 1 is cross-sectional view of the present utility model.
Detailed description of the invention
The utility model is described in further detail in explanation below in conjunction with the accompanying drawings.
One as shown in Figure 1 is sunk ore deposit case tail and is gone out pipe adpting flange, goes out pipe 2 including heavy ore deposit case 1 and tail, and tail goes out pipe 2 and arranges In the bottom of heavy ore deposit case 1, tail goes out the bottom of pipe 2 and is provided with flange 3, and flange 3 goes out pipe 2 by fixing bolt 4 with tail and is flexibly connected, method Being fixedly connected with discharge nozzle 5 in blue 3, discharge nozzle 5 extends to the inside of heavy ore deposit case 1, and goes out the minimum discharging opening of pipe 2 higher than tail, Make entrance sink the ore pulp of ore deposit case 1 to be buffered and deposit, when the ore pulp of deposition did not had the top of discharge nozzle 5, ore pulp with One flows out from discharge nozzle 5 than relatively low speed, and the bottom of flange 3 is fixedly connected with securing plate 6, and securing plate 6 is effectively protected Demonstrate,prove the stability of flange 3.
In order to slow down the flow velocity of ore pulp, go out at tail and can effectively ore pulp be buffered at pipe 2 mouthfuls, discharge nozzle 5 is prolonged Stretching and be arranged in heavy ore deposit case 1, the top of discharge nozzle 5 goes out pipe 2 higher than tail.
In order to effectively reduce the flow velocity of ore pulp, alleviating the abrasion of flange 3, extend flange 3 is service life, in discharging Buffering tentacle 7 is set on the inner and outer wall of pipe 5, and buffering tentacle 7 is also set on the inwall of heavy ore deposit case 1.
Buffering tentacle 7 can effectively reduce the flow velocity of ore pulp for convenience, will not be easily by ore pulp that flow velocity is higher Wash out, utilize flexible material as the material of buffering tentacle 7.
Work process of the present utility model is as follows: the ore pulp after sorting falls in heavy ore deposit case 1, and ore pulp is with higher stream Speed phase tail goes out the flowing of pipe 2 direction, and the buffering tentacle 7 of heavy ore deposit case 1 inwall carries out reduction of speed, buffering for the first time to the flow velocity of ore pulp, when Ore pulp flow to tail when going out at pipe 2, owing to discharge nozzle 5 extends to the inside of heavy ore deposit case 1, and goes out the minimum discharging opening of pipe 2 higher than tail, Make entrance sink the ore pulp of ore deposit case 1 to be buffered and deposit, when the ore pulp of deposition did not had the top of discharge nozzle 5, ore pulp with One flows out from discharge nozzle 5 than relatively low speed, and the buffering tentacle 7 of discharge nozzle 5 inner and outer wall reduce further ore pulp Flow velocity, securing plate 6 ensure that the stability of flange 3, is effectively protected flange, slow down the abrasion of flange, extends method In blue service life, decrease the replacing number of times of flange, reduce the labor intensity of workman, reduce production cost.
Above-described is only preferred embodiments of the present utility model, and the technical solution of the utility model is not limited thereto, Should be understood that to those skilled in the art, under technology provided by the utility model is enlightened, as this area Common knowledge, it is also possible to make other equivalent modifications and improvement, also should be regarded as protection domain of the present utility model.

Claims (5)

1. heavy ore deposit case tail goes out a pipe adpting flange, goes out pipe (2) including heavy ore deposit case (1) and tail, described tail go out pipe (2) be arranged on heavy The bottom of ore deposit case (1), it is characterised in that: described tail goes out the bottom of pipe (2) and is provided with flange (3), and described flange (3) is by fixing spiral shell Bolt (4) goes out pipe (2) with tail and is connected, and is fixedly connected with discharge nozzle (5) in described flange (3), and the bottom of described flange (3) is fixing even It is connected to securing plate (6).
2. a kind of heavy ore deposit as claimed in claim 1 case tail goes out pipe adpting flange, it is characterised in that: described discharge nozzle (5) extends Being arranged in heavy ore deposit case (1), the top of described discharge nozzle (5) goes out pipe (2) higher than tail.
3. ore deposit as claimed in claim 2 a kind of heavy case tail goes out pipe adpting flange, it is characterised in that: described discharge nozzle (5) interior Wall and outer wall are provided with buffering tentacle (7).
4. ore deposit as claimed in claim 3 a kind of heavy case tail goes out pipe adpting flange, it is characterised in that: described heavy ore deposit case (1) interior Wall is provided with buffering tentacle (7).
5. a kind of heavy ore deposit as claimed in claim 4 case tail goes out pipe adpting flange, it is characterised in that: described buffering tentacle (7) is Flexible material.
CN201620604081.0U 2016-06-20 2016-06-20 A kind of heavy ore deposit case tail goes out pipe adpting flange Expired - Fee Related CN205806741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620604081.0U CN205806741U (en) 2016-06-20 2016-06-20 A kind of heavy ore deposit case tail goes out pipe adpting flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620604081.0U CN205806741U (en) 2016-06-20 2016-06-20 A kind of heavy ore deposit case tail goes out pipe adpting flange

Publications (1)

Publication Number Publication Date
CN205806741U true CN205806741U (en) 2016-12-14

Family

ID=58142962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620604081.0U Expired - Fee Related CN205806741U (en) 2016-06-20 2016-06-20 A kind of heavy ore deposit case tail goes out pipe adpting flange

Country Status (1)

Country Link
CN (1) CN205806741U (en)

Similar Documents

Publication Publication Date Title
CN206351233U (en) A kind of new sand preparing machine
CN204247402U (en) A kind of bar seam liner high-efficiency abrasion-proof Separation of Solid and Liquid hydrocyclone
CN205806741U (en) A kind of heavy ore deposit case tail goes out pipe adpting flange
CN205217164U (en) Catch ring device about swirler overflow pipe
CN106238203B (en) A kind of New type wet permanent magnetic separator
CN202667016U (en) Hydrocyclone
CN205042628U (en) Gradually burst at seams and cut into formula pan feeding hydraulic cyclone
CN204769204U (en) Pond method of filling out sediment thick liquid conveyor that builds a dam
CN205815944U (en) A kind of novel wear resistant heavy medium cyclone
CN204051803U (en) A kind of Novel wet ball mill feed arrangement
CN202012200U (en) Buffering device for concrete sliding chute
CN104623934B (en) Pre-grading thickener
CN211099622U (en) Cyclone type mud separator
CN204395547U (en) Rotational-flow high-efficient deep cone thickener
CN204182493U (en) Horizontal screw centrifuge changeable type distribution device
CN203794012U (en) Stock bin unloader for silicon carbide granular sand
CN206943813U (en) It is a kind of that there is the ore pulp delivery duct for checking dredging mechanism
CN104258940A (en) Feeding device of wet ball mill
CN204448594U (en) The air outlet abrasion-proof structure of cement powder concentrator
CN204051802U (en) A kind of wet ball mill feed device
CN105583067A (en) Spiral chute ore-separating device
CN204281818U (en) Whirlwind-type cone bucket settling bowl
CN204159133U (en) A kind of multi-functional Pulp pump pump pond
CN203874540U (en) Novel pressure screen
CN203044145U (en) Water flush ore charge classificator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214

Termination date: 20170620