CN205806741U - A kind of heavy ore deposit case tail goes out pipe adpting flange - Google Patents
A kind of heavy ore deposit case tail goes out pipe adpting flange Download PDFInfo
- Publication number
- CN205806741U CN205806741U CN201620604081.0U CN201620604081U CN205806741U CN 205806741 U CN205806741 U CN 205806741U CN 201620604081 U CN201620604081 U CN 201620604081U CN 205806741 U CN205806741 U CN 205806741U
- Authority
- CN
- China
- Prior art keywords
- flange
- tail
- ore deposit
- goes out
- discharge nozzle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of heavy ore deposit case tail and go out pipe adpting flange, pipe is gone out including heavy ore deposit case and tail, tail goes out pipe and is arranged on the bottom of heavy ore deposit case, tail goes out the bottom of pipe and is provided with flange, flange goes out pipe by fixing bolt with tail and is connected, being fixedly connected with discharge nozzle in flange, the bottom of flange is fixedly connected with securing plate.The utility model has the advantage of, discharge nozzle it is fixedly connected with in flange, discharge nozzle extends to the inside of heavy ore deposit case, and the minimum discharging opening of pipe is gone out higher than tail, make entrance sink the ore pulp of ore deposit case to be buffered and deposit, when the ore pulp of deposition did not had the top of discharge nozzle, ore pulp flows out than relatively low speed with one from discharge nozzle, the securing plate of flange base is effectively protected flange, and coordinate buffering tentacle, reduce the flow velocity of ore pulp further, slow down the abrasion of flange, extend the service life of flange, decrease the replacing number of times of flange, not only reduce the labor intensity of workman, and reduce production cost.
Description
Technical field
This utility model belongs to metallurgical choosing and burns coordinative composition of equipments apparatus field, is specifically related to a kind of heavy ore deposit case tail and goes out pipe connection method
Blue.
Background technology
Burning in operation in metallurgy choosing, ore pulp falls in the case of heavy ore deposit after sorting, and goes out bank of tubes by the tail of heavy ore deposit case and go out,
Tail goes out the direction that the diameter of pipe flows along with ore pulp and tapers into, and the flow velocity of ore pulp accelerates, original tail go out bottom pipe general the most all
Being provided with flange, go out pipe and drainage conduit by Flange joint tail, owing to the flow velocity of ore pulp is accelerated, tail goes out pipe flange connecting portion by ore deposit
The very fast of slurry is washed away, and makes flange serious wear, changes frequently, changes quantity many, affect normal processing, and workman is frequently
Change flange, not only increase the labor intensity of workman, and improve production cost.
Utility model content
The purpose of this utility model is to provide a kind of heavy ore deposit case tail and goes out pipe adpting flange, to solve in prior art, and flange
Serious wear, changes quantity many, and number of times is frequent, and labor strength is big, the problem that production cost is high.
For reaching above-mentioned purpose, the technical solution of the utility model is: a kind of heavy ore deposit case tail goes out pipe adpting flange, including sinking
Ore deposit case 1 and tail go out pipe 2, and tail goes out pipe 2 and is arranged on the bottom of heavy ore deposit case 1, and tail goes out the bottom of pipe 2 and is provided with flange 3, and flange 3 is by solid
Determining bolt 4 to go out pipe 2 with tail and be connected, be fixedly connected with discharge nozzle 5 in flange 3, the bottom of flange 3 is fixedly connected with securing plate 6.
Preferably, discharge nozzle 5 is extended in heavy ore deposit case 1, and the top of discharge nozzle 5 goes out pipe 2 higher than tail.
Preferably, the inner and outer wall of discharge nozzle 5 is provided with buffering tentacle 7.
Preferably, the inwall of heavy ore deposit case 1 is provided with buffering tentacle 7.
Preferably, buffering tentacle 7 is flexible material.
The utility model has the advantage of: be fixedly connected with discharge nozzle in flange, discharge nozzle extends to the inside of heavy ore deposit case,
And go out the minimum discharging opening of pipe higher than tail, make entrance sink the ore pulp of ore deposit case and buffer and deposit, when the ore pulp deposited did not had
During the top of discharge nozzle, ore pulp flows out than relatively low speed with one from discharge nozzle, and the securing plate of flange base is effective
Protect flange, and coordinate buffering tentacle, reduce the flow velocity of ore pulp further, slow down the abrasion of flange, extend flange
In service life, decrease the replacing number of times of flange, not only reduce the labor intensity of workman, and reduce production cost.
Accompanying drawing explanation
Fig. 1 is cross-sectional view of the present utility model.
Detailed description of the invention
The utility model is described in further detail in explanation below in conjunction with the accompanying drawings.
One as shown in Figure 1 is sunk ore deposit case tail and is gone out pipe adpting flange, goes out pipe 2 including heavy ore deposit case 1 and tail, and tail goes out pipe 2 and arranges
In the bottom of heavy ore deposit case 1, tail goes out the bottom of pipe 2 and is provided with flange 3, and flange 3 goes out pipe 2 by fixing bolt 4 with tail and is flexibly connected, method
Being fixedly connected with discharge nozzle 5 in blue 3, discharge nozzle 5 extends to the inside of heavy ore deposit case 1, and goes out the minimum discharging opening of pipe 2 higher than tail,
Make entrance sink the ore pulp of ore deposit case 1 to be buffered and deposit, when the ore pulp of deposition did not had the top of discharge nozzle 5, ore pulp with
One flows out from discharge nozzle 5 than relatively low speed, and the bottom of flange 3 is fixedly connected with securing plate 6, and securing plate 6 is effectively protected
Demonstrate,prove the stability of flange 3.
In order to slow down the flow velocity of ore pulp, go out at tail and can effectively ore pulp be buffered at pipe 2 mouthfuls, discharge nozzle 5 is prolonged
Stretching and be arranged in heavy ore deposit case 1, the top of discharge nozzle 5 goes out pipe 2 higher than tail.
In order to effectively reduce the flow velocity of ore pulp, alleviating the abrasion of flange 3, extend flange 3 is service life, in discharging
Buffering tentacle 7 is set on the inner and outer wall of pipe 5, and buffering tentacle 7 is also set on the inwall of heavy ore deposit case 1.
Buffering tentacle 7 can effectively reduce the flow velocity of ore pulp for convenience, will not be easily by ore pulp that flow velocity is higher
Wash out, utilize flexible material as the material of buffering tentacle 7.
Work process of the present utility model is as follows: the ore pulp after sorting falls in heavy ore deposit case 1, and ore pulp is with higher stream
Speed phase tail goes out the flowing of pipe 2 direction, and the buffering tentacle 7 of heavy ore deposit case 1 inwall carries out reduction of speed, buffering for the first time to the flow velocity of ore pulp, when
Ore pulp flow to tail when going out at pipe 2, owing to discharge nozzle 5 extends to the inside of heavy ore deposit case 1, and goes out the minimum discharging opening of pipe 2 higher than tail,
Make entrance sink the ore pulp of ore deposit case 1 to be buffered and deposit, when the ore pulp of deposition did not had the top of discharge nozzle 5, ore pulp with
One flows out from discharge nozzle 5 than relatively low speed, and the buffering tentacle 7 of discharge nozzle 5 inner and outer wall reduce further ore pulp
Flow velocity, securing plate 6 ensure that the stability of flange 3, is effectively protected flange, slow down the abrasion of flange, extends method
In blue service life, decrease the replacing number of times of flange, reduce the labor intensity of workman, reduce production cost.
Above-described is only preferred embodiments of the present utility model, and the technical solution of the utility model is not limited thereto,
Should be understood that to those skilled in the art, under technology provided by the utility model is enlightened, as this area
Common knowledge, it is also possible to make other equivalent modifications and improvement, also should be regarded as protection domain of the present utility model.
Claims (5)
1. heavy ore deposit case tail goes out a pipe adpting flange, goes out pipe (2) including heavy ore deposit case (1) and tail, described tail go out pipe (2) be arranged on heavy
The bottom of ore deposit case (1), it is characterised in that: described tail goes out the bottom of pipe (2) and is provided with flange (3), and described flange (3) is by fixing spiral shell
Bolt (4) goes out pipe (2) with tail and is connected, and is fixedly connected with discharge nozzle (5) in described flange (3), and the bottom of described flange (3) is fixing even
It is connected to securing plate (6).
2. a kind of heavy ore deposit as claimed in claim 1 case tail goes out pipe adpting flange, it is characterised in that: described discharge nozzle (5) extends
Being arranged in heavy ore deposit case (1), the top of described discharge nozzle (5) goes out pipe (2) higher than tail.
3. ore deposit as claimed in claim 2 a kind of heavy case tail goes out pipe adpting flange, it is characterised in that: described discharge nozzle (5) interior
Wall and outer wall are provided with buffering tentacle (7).
4. ore deposit as claimed in claim 3 a kind of heavy case tail goes out pipe adpting flange, it is characterised in that: described heavy ore deposit case (1) interior
Wall is provided with buffering tentacle (7).
5. a kind of heavy ore deposit as claimed in claim 4 case tail goes out pipe adpting flange, it is characterised in that: described buffering tentacle (7) is
Flexible material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620604081.0U CN205806741U (en) | 2016-06-20 | 2016-06-20 | A kind of heavy ore deposit case tail goes out pipe adpting flange |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620604081.0U CN205806741U (en) | 2016-06-20 | 2016-06-20 | A kind of heavy ore deposit case tail goes out pipe adpting flange |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205806741U true CN205806741U (en) | 2016-12-14 |
Family
ID=58142962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620604081.0U Expired - Fee Related CN205806741U (en) | 2016-06-20 | 2016-06-20 | A kind of heavy ore deposit case tail goes out pipe adpting flange |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205806741U (en) |
-
2016
- 2016-06-20 CN CN201620604081.0U patent/CN205806741U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206351233U (en) | A kind of new sand preparing machine | |
CN204247402U (en) | A kind of bar seam liner high-efficiency abrasion-proof Separation of Solid and Liquid hydrocyclone | |
CN205806741U (en) | A kind of heavy ore deposit case tail goes out pipe adpting flange | |
CN205217164U (en) | Catch ring device about swirler overflow pipe | |
CN106238203B (en) | A kind of New type wet permanent magnetic separator | |
CN202667016U (en) | Hydrocyclone | |
CN205042628U (en) | Gradually burst at seams and cut into formula pan feeding hydraulic cyclone | |
CN204769204U (en) | Pond method of filling out sediment thick liquid conveyor that builds a dam | |
CN205815944U (en) | A kind of novel wear resistant heavy medium cyclone | |
CN204051803U (en) | A kind of Novel wet ball mill feed arrangement | |
CN202012200U (en) | Buffering device for concrete sliding chute | |
CN104623934B (en) | Pre-grading thickener | |
CN211099622U (en) | Cyclone type mud separator | |
CN204395547U (en) | Rotational-flow high-efficient deep cone thickener | |
CN204182493U (en) | Horizontal screw centrifuge changeable type distribution device | |
CN203794012U (en) | Stock bin unloader for silicon carbide granular sand | |
CN206943813U (en) | It is a kind of that there is the ore pulp delivery duct for checking dredging mechanism | |
CN104258940A (en) | Feeding device of wet ball mill | |
CN204448594U (en) | The air outlet abrasion-proof structure of cement powder concentrator | |
CN204051802U (en) | A kind of wet ball mill feed device | |
CN105583067A (en) | Spiral chute ore-separating device | |
CN204281818U (en) | Whirlwind-type cone bucket settling bowl | |
CN204159133U (en) | A kind of multi-functional Pulp pump pump pond | |
CN203874540U (en) | Novel pressure screen | |
CN203044145U (en) | Water flush ore charge classificator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161214 Termination date: 20170620 |