CN205804422U - A kind of basement bottom plate rear pouring tape structural texture of band steel plate for sealing water - Google Patents
A kind of basement bottom plate rear pouring tape structural texture of band steel plate for sealing water Download PDFInfo
- Publication number
- CN205804422U CN205804422U CN201620760010.XU CN201620760010U CN205804422U CN 205804422 U CN205804422 U CN 205804422U CN 201620760010 U CN201620760010 U CN 201620760010U CN 205804422 U CN205804422 U CN 205804422U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- sealing water
- basement bottom
- distributing bar
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
This utility model provides the basement bottom plate rear pouring tape structural texture of a kind of band steel plate for sealing water, including baseplate reinforcing bar, distributing bar, steel plate for sealing water, bed course, basement bottom board;Described baseplate reinforcing bar, before basement bottom board casting concrete, is layed in the relevant position of basement bottom board;Described steel plate for sealing water is arranged between bed course and basement bottom board;Described distributing bar is connected by steel wire lashing with baseplate reinforcing bar;The fixation that described steel plate for sealing water arranges 180 degree of hooks with distributing bar by distributing bar end is connected.
Description
Technical field
This utility model relates to building engineering construction field, waters after particularly relating to the basement bottom board of a kind of band steel plate for sealing water
Band structural texture.
Background technology
Along with basement develops to maximization and multifunction direction, pouring after settlement and temperature are set
Degree post-cast strip basement be on the increase, if working measure is improper, construction quality then it is difficult to ensure that,
Post-cast strip also can become the weak band of the weak band of basement structure, seepage.Basement bottom plate rear pouring tape is executed
For work, there is problems in that at basement bottom plate rear pouring tape, hydrops is more, and be difficult to emptying, it is difficult to ensure post-cast strip coagulation
The quality of soil construction;During cleaning bottom plate rear pouring tape, intensive reinforcing bar carries out prune jobs such as rejecting, slag tap, operating condition
Extremely difficult, the careless slightly fish tail and waterproof layer that can dig brokenly base plate and the waterproof layer of bottom;In buried steel plate for sealing water fast easy-to-closing
Netease is agglomerating, and steel plate for sealing water bottom concrete rejects difficulty, concreting leakiness;In buried sealing rod and first pouring concrete
Be close together constructional difficulties.
Utility model content
In order to solve the problems referred to above, this utility model provides the basement bottom plate rear pouring tape structure of a kind of band steel plate for sealing water
Structure, can solve the problems referred to above very easily.
Technical solution adopted in the utility model is: the basement bottom plate rear pouring tape structure knot of a kind of band steel plate for sealing water
Structure, including baseplate reinforcing bar 1, distributing bar 2, distributing bar 3, distributing bar 4, distributing bar 5, steel plate for sealing water 6, bed course 7, underground
Room base plate 8;Described baseplate reinforcing bar 1, before basement bottom board 8 casting concrete, is layed in the relevant position of basement bottom board 8;
Described steel plate for sealing water 6 is arranged between bed course 7 and basement bottom board 8;Described distributing bar 2,3,4,5 passes through with baseplate reinforcing bar 1
Steel wire lashing is connected;Described steel plate for sealing water 6 and distributing bar 2 arrange the fixing work of 180 degree of hooks by distributing bar 2 end
With being connected.
As preferably, deepen 100mm at each 300mm of the basement bottom board 8 of the described both sides, post-cast strip first watered, add deep
Position arranges distributing bar, and distributing bar arranges 180 degree of crotches;Overall laying steel plate for sealing water 6, water-stopping steel on post-cast strip bed course 7
In the base plate of both sides, embedding post-cast strip, plate 6 two ends, under wherein 150mm is pressed in the base plate that both sides, post-cast strip are first watered, 150mm embeds first
In the underplate concrete watered, utilize the steel plate for sealing water 6 that distributing bar 2 crotch is fixedly embedded;Steel plate for sealing water 6 sets in the middle part of post-cast strip
Being set to arc, temperature post-cast strip arc length determines (pouring after settlement action determines) according to both sides settling amount according to stroke, after water
Before band bed course 7 concrete initial set, steel plate for sealing water is close to concrete;Along direction, post-cast strip, steel plate for sealing water uses welding manner
Connect.
As preferably, on described post-cast strip bed course 7, entirety lays steel plate for sealing water 6, embedding post-cast strip, steel plate for sealing water 6 two ends two
In the underplate concrete of side, steel plate for sealing water 6, by being welded to connect formation entirety, reaches advanced waterproof effect, in the effect of subsoil water
Descending or under the effect of differential settlement, on post-cast strip bed course 7 and bed course, steel plate for sealing water 6 composition is similar to the simply supported slab of reverse stress
Structure, takes full advantage of the tensile property of steel plate for sealing water 6 and the compressive property of concrete, survivable.Cleaning bottom plate rear pouring tape
Time, steel plate water stopper is not easy to destroy.
The beneficial effect that this utility model is reached: on the bed course of post-cast strip, overall steel plate for sealing water of laying can effectively stop underground
Water penetrates in post-cast strip, it is ensured that post-cast strip concrete construction quality, and can be substantially reduced difficulty of construction.
Accompanying drawing explanation
Accompanying drawing described herein is used to offer and is further appreciated by of the present utility model, constitutes of the application
Point, but be not intended that restriction of the present utility model.
Fig. 1 is this utility model organigram.
Wherein, 1 is baseplate reinforcing bar, and 2,3,4,5 is distributing bar, and 6 is steel plate for sealing water, and 7 is bed course, and 8 is basement bottom board.
Detailed description of the invention
For this utility model is described in further detail, its detailed description of the invention is now disclosed as follows.
According to Fig. 1, the basement bottom plate rear pouring tape structural texture of a kind of band steel plate for sealing water, described bottom plate rear pouring tape structure bag
Include at the bottom of baseplate reinforcing bar 1, distributing bar 2, distributing bar 3, distributing bar 4, distributing bar 5, steel plate for sealing water 6, bed course 7, basement
Plate 8;Described baseplate reinforcing bar 1, before basement bottom board 8 casting concrete, is layed in the relevant position of basement bottom board 8;Described
Steel plate for sealing water 6 is arranged between bed course 7 and basement bottom board 8;Described distributing bar 2,3,4,5 passes through steel wire with baseplate reinforcing bar 1
Colligation is connected;Described steel plate for sealing water 6 and distributing bar 2 arrange the fixation phase of 180 degree of hooks by distributing bar 2 end
Connect.
In being embodied as, deepen 100mm at each 300mm of the described basement bottom board 8 first watering both sides, post-cast strip, add deep
Position arranges distributing bar, and distributing bar arranges 180 degree of crotches;Overall laying steel plate for sealing water 6, water-stopping steel on post-cast strip bed course 7
In the base plate of both sides, embedding post-cast strip, plate 6 two ends, under wherein 150mm is pressed in the base plate that both sides, post-cast strip are first watered, 150mm embeds first
In the underplate concrete watered, utilize the steel plate for sealing water 6 that distributing bar 2 crotch is fixedly embedded;Steel plate for sealing water 6 sets in the middle part of post-cast strip
Being set to arc, temperature post-cast strip arc length determines (pouring after settlement action determines) according to both sides settling amount according to stroke, after water
Before band bed course 7 concrete initial set, steel plate for sealing water is close to concrete;Along direction, post-cast strip, steel plate for sealing water uses welding manner
Connect.
In being embodied as, overall laying steel plate for sealing water 6, embedding post-cast strip, steel plate for sealing water 6 two ends on described post-cast strip bed course 7
In the underplate concrete of both sides, steel plate for sealing water 6, by being welded to connect formation entirety, reaches advanced waterproof effect, at the work of subsoil water
With under the lower or effect of differential settlement, on post-cast strip bed course 7 and bed course, steel plate for sealing water 6 composition is similar to the freely-supported of reverse stress
Plate structure, takes full advantage of the tensile property of steel plate for sealing water 6 and the compressive property of concrete, survivable.Water after cleaning base plate
During band, steel plate water stopper is not easy to destroy.
Claims (2)
1. the basement bottom plate rear pouring tape structural texture of a band steel plate for sealing water, it is characterised in that described bottom plate rear pouring tape constructs
Including baseplate reinforcing bar (1), distributing bar (2), distributing bar (3), distributing bar (4), distributing bar (5), steel plate for sealing water (6),
Bed course (7), basement bottom board (8);Described baseplate reinforcing bar (1), before basement bottom board (8) casting concrete, is layed in underground
The relevant position of room base plate (8);Described steel plate for sealing water (6) is arranged between bed course (7) and basement bottom board (8);Described structure
Reinforcing bar (2,3,4,5) is connected by steel wire lashing with baseplate reinforcing bar (1);Described steel plate for sealing water (6) passes through with distributing bar (2)
Distributing bar (2) end arranges the fixation of 180 degree of hooks and is connected.
The basement bottom plate rear pouring tape structural texture of a kind of band steel plate for sealing water the most according to claim 1, it is characterised in that
Deepen 100mm at each 300mm of the basement bottom board (8) of the described both sides, post-cast strip first watered, deepen position and distributing bar is set,
Distributing bar arranges 180 degree of crotches;Laying steel plate for sealing water (6) in the upper entirety of post-cast strip bed course (7), steel plate for sealing water (6) two ends are embedding
Entering in the base plate of both sides, post-cast strip, under wherein 150mm is pressed in the base plate that both sides, post-cast strip are first watered, 150mm embeds the base plate first watered and mixes
In solidifying soil, utilize the steel plate for sealing water (6) that distributing bar (2) crotch is fixedly embedded;Steel plate for sealing water (6) is arranged in the middle part of post-cast strip
Arc, steel plate for sealing water uses welding manner to connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620760010.XU CN205804422U (en) | 2016-07-19 | 2016-07-19 | A kind of basement bottom plate rear pouring tape structural texture of band steel plate for sealing water |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620760010.XU CN205804422U (en) | 2016-07-19 | 2016-07-19 | A kind of basement bottom plate rear pouring tape structural texture of band steel plate for sealing water |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205804422U true CN205804422U (en) | 2016-12-14 |
Family
ID=57508100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620760010.XU Active CN205804422U (en) | 2016-07-19 | 2016-07-19 | A kind of basement bottom plate rear pouring tape structural texture of band steel plate for sealing water |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205804422U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258650A (en) * | 2019-07-15 | 2019-09-20 | 广州万构建筑工程设计有限公司 | A kind of basement shear wall late poured band structure and its construction method |
-
2016
- 2016-07-19 CN CN201620760010.XU patent/CN205804422U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258650A (en) * | 2019-07-15 | 2019-09-20 | 广州万构建筑工程设计有限公司 | A kind of basement shear wall late poured band structure and its construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204000956U (en) | A kind of basement bottom plate rear pouring tape structure | |
CN206233584U (en) | Narrow zone exterior wall formwork erecting structure | |
CN103321257A (en) | Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement | |
CN105735364B (en) | Concrete joint waterproof system, construction method and the protection component for the system | |
CN106120801A (en) | In water-rich sand layer, pipeline crosses the construction method at foundation ditch | |
CN209129037U (en) | One kind is for high-rise annex bottom plate post-poured strip waterproof structure | |
CN205804422U (en) | A kind of basement bottom plate rear pouring tape structural texture of band steel plate for sealing water | |
CN206418526U (en) | The construction joint structure of subregion construction | |
CN105908676A (en) | Dike underwater concrete paving construction method | |
CN203334285U (en) | Underground concrete structure engineering seam waterproof preparation grouting system | |
CN205676931U (en) | A kind of basement waterproofing base plate | |
CN209309459U (en) | Pipeline balance briquetting | |
CN204163113U (en) | A kind of nethike embrane formula ater-casting being applied to basement wall slab | |
CN204676607U (en) | Poured band of outer wall of basement plugging structure | |
CN107100208A (en) | The anti-floating waterproof construction and construction method of a kind of underground structure | |
CN203960813U (en) | Anchorage part for earth work membrane | |
CN207092158U (en) | A kind of anti-floating waterproof construction of underground structure | |
CN105040677B (en) | Foundation ditch prefabricated pile and the method for attachment of cast-in-place overlapping inwall stirrup | |
CN209456823U (en) | A kind of porous base course | |
CN208121825U (en) | Waterstop and construction joint water sealing structure including the waterstop | |
CN208965797U (en) | A kind of shear wall of pre-buried air conditioner condensation pipeline | |
CN206396625U (en) | A kind of prefabricated beam-ends joint filling construction | |
CN206309016U (en) | A kind of post-cast strip side form and waterproof construction | |
CN207419806U (en) | A kind of girt strip lacing wire for built-in square plaster mould box cast-in-place concrete hollow floor slab | |
JP5047861B2 (en) | Stabilization method of long fiber mixed reinforced soil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |