CN205786408U - Band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block - Google Patents

Band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block Download PDF

Info

Publication number
CN205786408U
CN205786408U CN201620738800.8U CN201620738800U CN205786408U CN 205786408 U CN205786408 U CN 205786408U CN 201620738800 U CN201620738800 U CN 201620738800U CN 205786408 U CN205786408 U CN 205786408U
Authority
CN
China
Prior art keywords
reference block
main body
block main
liquefied ammonia
containment vessel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620738800.8U
Other languages
Chinese (zh)
Inventor
贾强
帅家盛
李伟
梁旭
董茂辉
崔海捷
姚锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiasheng Chi Inspection Technology Co Ltd
Beijing Fengtai District Special Equipment Inspection & Testing Institute
Original Assignee
Beijing Jiasheng Chi Inspection Technology Co Ltd
Beijing Fengtai District Special Equipment Inspection & Testing Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jiasheng Chi Inspection Technology Co Ltd, Beijing Fengtai District Special Equipment Inspection & Testing Institute filed Critical Beijing Jiasheng Chi Inspection Technology Co Ltd
Priority to CN201620738800.8U priority Critical patent/CN205786408U/en
Application granted granted Critical
Publication of CN205786408U publication Critical patent/CN205786408U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of band Cold-keeping Layer liquefied ammonia pressure pipeline DR and detect reference block, including cylindrical containment vessel be located at the reference block main body within containment vessel, reference block main body is cone, the top of reference block main body is fixed with the first connecting portion, bottom surface is fixed with the second connecting portion, the inner radial of containment vessel be fixed with successively first be connected with the first connecting portion fix axle and be connected with the second connecting portion second fix axle, the axis of reference block main body coincides with the axis of containment vessel, it is filled with polyurethane material between containment vessel and reference block main body.The beneficial effects of the utility model: this utility model can remove liquefied ammonia gray scale, tested piping jacket and the Cold-keeping Layer impact on liquefied ammonia pipe detection gray scale, accuracy of detection is high.

Description

Band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block
Technical field
This utility model relates to special equipment pressure pipeline technical field of nondestructive testing, it particularly relates to a kind of band is protected Cooling layer liquefied ammonia pressure pipeline DR detects reference block.
Background technology
The most many special equipment testing agencies are all at the application DR detection technique ammonia refrigeration to non-stop-machine band Cold-keeping Layer Inspection work implemented by pressure pipeline, and the Chinese patent of Patent No. ZL201110391098.4 discloses band Cold-keeping Layer liquid ammonia tube The weld defect in road carries out the method detecting, evaluating, including using the gray level method corruption to band Cold-keeping Layer liquefied ammonia pressure pipeline Erosion, the lack of penetration degree of depth, undercut, slag inclusion, the defect such as oneself height of incomplete fusion measure.
But for liquefied ammonia pressure pipeline, owing to liquefied ammonia makes compared with blank pipe, such as Fig. 1 institute for the absorption of ray Show, during transillumination band liquid pipe wall thickness gray scale than during same blank pipe transillumination everywhere wall thickness gray scale increase, directly according to this gray scale Measuring depth of defect with common test block, the depth of defect obtained can differ relatively big with the actual defects degree of depth, thus causes detection The erroneous judgement of conclusion.
Utility model content
The purpose of this utility model is that proposing a kind of band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block, it is possible to disappear Except liquefied ammonia and the Cold-keeping Layer gray scale shadow to detection when the ammonia refrigeration pressure pipeline of non-stop-machine band Cold-keeping Layer being carried out DR detection Ring.
For realizing above-mentioned technical purpose, the technical solution of the utility model is achieved in that
A kind of band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block, including cylindrical containment vessel be located at described guarantor Reference block main body within protective case, described reference block main body is cone, and the cross section of its top and bottom surface is disc, institute The top stating reference block main body is fixed with the first connecting portion, and bottom surface is fixed with the second connecting portion, described containment vessel interior Portion is radially fixed with first successively and fixes axle and second and fix axle, and described first connecting portion is fixed axle with described first and fixed phase Even, described second connecting portion is fixed axle with described second and is fixedly linked, the axis of described reference block main body and containment vessel Axis coincides, and is filled with polyurethane material between described containment vessel and reference block main body.
Further, described first connecting portion runs through and is fixed at described first and fixes axle, and described second connecting portion runs through It is fixed at described second and fixes axle.
Further, the lateral surface of described reference block main body is along the circumferential direction provided with location line.
Further, a diameter of 5mm of the top disc of described reference block main body, a diameter of 29mm of bottom surface, a height of 48mm, the thickness of described containment vessel is 0.5mm, and internal diameter is 39mm.
Further, described location line is the groove along reference block main body outer circumference direction, the width of described groove It is 0.2mm with the degree of depth near reference block body floor one side.
Further, described first fix axle and second to fix the material of axle be lucite, described reference block main body Material be No. 20 steel, the material of described containment vessel is aluminum.
The beneficial effects of the utility model: this utility model is right by liquefied ammonia defect inspection position wall thickness is projected to Measure up than test block main body, eliminate the impact on detection of the liquefied ammonia gray scale;By reference block main body is fixed at a guarantor In protective case, and between containment vessel and reference block main body, fill polyurethane material, thus eliminate tested piping jacket With the Cold-keeping Layer some effects to gray scale.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to embodiment The accompanying drawing used required in is briefly described, it should be apparent that, the accompanying drawing in describing below is the most of the present utility model Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to this A little accompanying drawings obtain other accompanying drawing.
Fig. 1 is that band liquid pipe wall thickness gray scale described in the prior art compares schematic diagram with blank pipe wall thickness gray scale;
Fig. 2 is the cross-sectional view of the reference block described in this utility model embodiment;
Fig. 3 is that the described reference block that uses described in this utility model embodiment carries out the schematic diagram of pipe detection.
Shown in figure:
1-containment vessel;2-reference block main body;3-the first connecting portion;4-the second connecting portion;5-first fixes axle;6-second Fixing axle;7-positions line.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out clearly Chu, it is fully described by, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole realities Execute example.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained, broadly fall into The scope of this utility model protection.
As in figure 2 it is shown, detect according to a kind of band Cold-keeping Layer liquefied ammonia pressure pipeline DR described in embodiment of the present utility model Reference block, including cylindrical containment vessel 1 be located at the reference block main body 2 within described containment vessel 1, described reference block Main body 2 is in cone, and the cross section of its top and bottom surface is disc, and the top of described reference block main body 2 is fixed with first Connecting portion 3, bottom surface is fixed with the second connecting portion 4, and the inner radial of described containment vessel 1 is fixed with first successively and fixes axle 5 Fixing axle 6 with second, described first connecting portion 3 is fixed axle 5 with described first and is fixedly linked, and described second connecting portion 4 is with described Second fixes axle 6 is fixedly linked, and the axis of described reference block main body 2 coincides with the axis of containment vessel 1, described protection It is filled with polyurethane material between shell 1 and reference block main body 2.
For pipe diameter at the liquefied ammonia pipeline of 20mm~159mm, in the present embodiment, described reference block main body 2 A diameter of 5mm of top disc, a diameter of 29mm of bottom surface, a height of 48mm, the thickness of described containment vessel 1 is 0.5mm, and internal diameter is 39mm。
In the present embodiment, described first connecting portion 3 and the second connecting portion 4 are a cylinder component, and described first even Meeting portion 3 to run through and be fixed at described first and fix axle 5, described second connecting portion 4 runs through and is fixed at described second and fixes axle 6.
Further, in the present embodiment, the lateral surface of described reference block main body 2 is along the circumferential direction provided with location line 7, Described location line 7 is along the equally distributed groove in reference block main body 2 outer circumference direction, the width of described groove and right edge The degree of depth be 0.2mm.It can be seen that the lateral surface of reference block main body 2 is provided with two location lines 7, two location Line 7 adds the connection of the first connecting portion 3 and the connecting line of reference block main body 2 and the second connecting portion 4 and reference block main body 2 A total of 4 restraining lines of line, this 4 restraining lines distance the most between any two is 16mm, wall thickness be changed to 8mm, by black Degree comparing calculation wall thickness change, it is also possible to changed by distance measurement calculated wall thickness, reference block main body 2 is decorated with centralized positioning Labelling, can conveniently determine the relative position of defect.
In the present embodiment, described first fix axle 5 and second to fix the material of axle 6 be lucite, described organic glass The thickness of glass is 3mm, and the material of described reference block main body 2 is No. 20 steel, and the material of described containment vessel 1 is aluminum.
Operation principle of the present utility model:
For liquefied ammonia pressure pipeline, owing to liquefied ammonia makes compared with blank pipe for the absorption of ray, band liquid during transillumination Pipe wall thickness gray scale with as blank pipe transillumination time everywhere wall thickness gray scale increase, directly employing band liquid time gray scale and reference block Gray scale be compared to measure depth of defect, the depth of defect obtained be less than the actual defects degree of depth, cause the mistake of test result Sentence.
In order to get rid of the impact on pipeline gray scale of the liquefied ammonia gray scale, liquefied ammonia in pipeline is equivalent to carbon steel to the absorption of ray Thickness change into the solid iron rod of a path, ignore minor variations and the pipeline manufacture of hollow pipe transillumination direction wall thickness The little deviation of wall thickness, be simplified to a pipeline waiting wall thickness, then diameter is more than the 50mm liquefied ammonia pipeline less than 159mm Wall thickness change and liquefied ammonia are equivalent to the thickness of carbon steel to the absorption of ray can project to a cone contrast calculated In test block.Owing to the shape of cone reference block is equivalent to the consecutive variations of pipeline wall thickness, thus liquefied ammonia thickness pair can be removed The impact of pipeline gray scale, thus draw the residual thickness of defective locations.
Owing to liquid medium can produce certain attenuation to ray, the aqueous medium introduced in the universal standard is relative to carbon The attenuation factor of steel is than about 9:1, NH3And H2The mass attenuation system of O is roughly the same, and its line attenuation coefficient is relevant with density, NH3Compare H2The density of O is little, and density with temperature's change is about about 0.7, thus can calculate that 10-13mm liquefied ammonia thickness is equivalent to 1mm steel plate thickness (estimated value), the liquid thickness in utilizing No. 20 steel to replace pipe, make cone reference block.
Impact pipeline test specimen gray scale measured in view of liquefied ammonia piping jacket and anti-cooling layer, cone reference block master Circular lucite first thick for two ends 3mm before and after body 2 fixes axle 5, lucite second is fixed axle 6 and entangled, cone Reference block main body 2 is fixed in the aluminum containment vessel 1 that 0.5mm is thick, fills between taper test block main body 2 and aluminum containment vessel 1 Polyurethane material, is used for simulating the cold insulation situation of liquefied ammonia pipeline, offsets the part gray scale of liquefied ammonia pipeline Cold-keeping Layer.
Understand technique scheme of the present utility model for convenience, below by way of new to this practicality in specifically used mode The technique scheme of type is described in detail.
When specifically used, as Figure 2-3, test obtains the DR figure of cone reference block and tested pipe fitting in experiment Picture, follow-up various measurements and calculating, all it is by mean of related software and carries out on the DR image obtained.DR at tested pipe fitting On image, by tested etch pit gray scale maximum point C, at the axis of parallel pipe fitting, draw a line B1, in cone reference block Axially one line B of pull-up obtains cone reference block centerline grey scale change curve, can find and not corrode pipe on B line The gray value of road C1 point, can find and C point on tested pipe fitting and C1 point gray scale same position C' point and C1' point on B line, logical Crossing the calibration function that computer software carries, with 5mm and 29mm in reference block, measured point being carried out wall thickness correction can distinguish Measuring C' point and the wall thickness of C1', both differences are exactly the corrosion pit depth of C point.
In sum, by means of technique scheme of the present utility model, this utility model is by liquefied ammonia defect of pipeline Detection position wall thickness projects to reference block main body and measures up, eliminates the impact on detection of the liquefied ammonia gray scale;By contrasting Test block main body is fixed in a containment vessel, and fills polyurethane material between containment vessel and reference block main body, thus Eliminate tested piping jacket and the Cold-keeping Layer some effects to gray scale.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all at this Within the spirit of utility model and principle, any modification, equivalent substitution and improvement etc. made, should be included in this utility model Protection domain within.

Claims (6)

1. a band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block, it is characterised in that include the containment vessel (1) of cylinder The reference block main body (2) internal with being located at described containment vessel (1), described reference block main body (2) is in cone, and its top Being disc with the cross section of bottom surface, the top of described reference block main body (2) is fixed with the first connecting portion (3), and bottom surface is fixing to be set Have the second connecting portion (4), the inner radial of described containment vessel (1) to be fixed with first successively to fix axle (5) and second and fix axle (6), described first connecting portion (3) is fixed axle (5) with described first and is fixedly linked, described second connecting portion (4) and described second Fixing axle (6) is fixedly linked, and the axis of described reference block main body (2) coincides with the axis of containment vessel (1), described guarantor It is filled with polyurethane material between protective case (1) and reference block main body (2).
Band Cold-keeping Layer liquefied ammonia pressure pipeline DR the most according to claim 1 detects reference block, it is characterised in that described A junction (3) runs through and is fixed at described first and fixes axle (5), and described second connecting portion (4) is run through and is fixed at described Two fix axle (6).
Band Cold-keeping Layer liquefied ammonia pressure pipeline DR the most according to claim 2 detects reference block, it is characterised in that described right Location line (7) along the circumferential direction it is provided with than the lateral surface of test block main body (2).
Band Cold-keeping Layer liquefied ammonia pressure pipeline DR the most according to claim 3 detects reference block, it is characterised in that described right Ratio a diameter of 5mm of the top disc of test block main body (2), a diameter of 29mm of bottom surface, a height of 48mm, described containment vessel (1) Thickness is 0.5mm, and internal diameter is 39mm.
Band Cold-keeping Layer liquefied ammonia pressure pipeline DR the most according to claim 4 detects reference block, it is characterised in that described fixed Bit line (7) is the groove along reference block main body (2) outer circumference direction, the width of described groove and close reference block main body (2) the bottom surface degree of depth on one side is 0.2mm.
Band Cold-keeping Layer liquefied ammonia pressure pipeline DR the most according to claim 1 detects reference block, it is characterised in that described One fix axle (5) and second to fix the material of axle (6) be lucite, and the material of described reference block main body (2) is No. 20 steel, The material of described containment vessel (1) is aluminum.
CN201620738800.8U 2016-07-13 2016-07-13 Band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block Active CN205786408U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620738800.8U CN205786408U (en) 2016-07-13 2016-07-13 Band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620738800.8U CN205786408U (en) 2016-07-13 2016-07-13 Band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block

Publications (1)

Publication Number Publication Date
CN205786408U true CN205786408U (en) 2016-12-07

Family

ID=58122989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620738800.8U Active CN205786408U (en) 2016-07-13 2016-07-13 Band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block

Country Status (1)

Country Link
CN (1) CN205786408U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110646506A (en) * 2019-09-21 2020-01-03 北京嘉盛智检科技有限公司 Blade boss defect in-situ detection method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110646506A (en) * 2019-09-21 2020-01-03 北京嘉盛智检科技有限公司 Blade boss defect in-situ detection method
CN110646506B (en) * 2019-09-21 2023-04-07 北京嘉盛智检科技有限公司 Blade boss defect in-situ detection method

Similar Documents

Publication Publication Date Title
CN103792243B (en) The ray detection method of a kind of lack of penetration degree of depth of small diameter tube weld bond
JP2007024855A (en) Device and method for detecting heat transfer tube state of heat exchanger
CN109596709B (en) Detection method of fixed pressure container
CN102954997A (en) Non-contact magnetic stress detection method for pipe defects
CN102901748A (en) Nondestructive testing device and method based on pipeline temperature field distribution
US6677748B2 (en) Method of discriminating through-wall cracks and measuring through-wall length of cracks in nuclear steam generator tubes using eddy current signals
CN109765296B (en) Three-dimensional positioning method for ultrasonic detection of internal defects of thick-wall pipe
Zhou et al. A reference free ultrasonic phased array to identify surface cracks in welded steel pipes based on transmissibility
Shi et al. High-precision diameter detector and three-dimensional reconstruction method for oil and gas pipelines
CN205786408U (en) Band Cold-keeping Layer liquefied ammonia pressure pipeline DR detects reference block
CN111638146A (en) Penetration crack steel pipe blasting test method
CN206523466U (en) A kind of outer corrosion default residual intensity measurement apparatus of oil-gas pipeline
CN101750429A (en) Pressure pipeline ray detection defect positioning method and tool
CN102520064B (en) Time reversal focusing method-based method for judging size of pipeline defect
WO2023274089A1 (en) Curved-surface sonolucent wedge design method for circumferential ultrasonic detection of small-diameter tube
CN107178710B (en) It is a kind of based on it is inside and outside detection signal characteristic abstraction defect of pipeline inside and outside discrimination method
CN105014369A (en) Tool assembly for precise installation of crankshaft timing gear
CN210514191U (en) Ultrasonic guided wave detection calibration reference test block
Yang et al. Ultrasonic monitoring system for oil and gas pipeline corrosion
RU2671296C1 (en) Method of metal corrosion loss assessment in pipeline inaccessible area
KR101659483B1 (en) Device for the inspection of the heat exchanger IRIS
Zhang et al. Analyses of magnetic field in spiral steel pipe
CN220626280U (en) Universal circumferential stepped tube calibration test block
CN213398342U (en) Ultrasonic contrast test block for calibrating crack depth of sliding pair weld toe of boiler heated surface pipe
Casperson et al. Eddy current testing of composite pressure vessels

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant