CN205783218U - Full automatic control unit able to programme - Google Patents

Full automatic control unit able to programme Download PDF

Info

Publication number
CN205783218U
CN205783218U CN201520974530.6U CN201520974530U CN205783218U CN 205783218 U CN205783218 U CN 205783218U CN 201520974530 U CN201520974530 U CN 201520974530U CN 205783218 U CN205783218 U CN 205783218U
Authority
CN
China
Prior art keywords
exchangers
heat
plate type
level pipeline
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520974530.6U
Other languages
Chinese (zh)
Inventor
赵宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DALIAN JIUYUAN GROUP CO LTD
Original Assignee
DALIAN JIUYUAN GROUP CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DALIAN JIUYUAN GROUP CO LTD filed Critical DALIAN JIUYUAN GROUP CO LTD
Priority to CN201520974530.6U priority Critical patent/CN205783218U/en
Application granted granted Critical
Publication of CN205783218U publication Critical patent/CN205783218U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Abstract

This utility model relates to full automatic control unit able to programme, belongs to manufacture and the package technique field of plate type regenerator group.It includes first-level pipeline network blood circulation, secondary network blood circulation, water charging system and switch board, first-level pipeline network blood circulation uses first-level pipeline network feed water inlet the first y-type filter, electric control valve, H1 arm to be respectively connecting to the first heat-exchangers of the plate type and the second heat-exchangers of the plate type, then is communicated to be arranged on HR1 and props up the first-level pipeline network water return outlet of tube end.Secondary network blood circulation uses secondary network water return outlet to be respectively connecting to the first heat-exchangers of the plate type and the second heat-exchangers of the plate type through circulating pump arm, circulating pump, HR2 arm, then be respectively connecting to secondary network feed water inlet.This unit has secondary water-supply temp. control function and Isobarically Control function, meets user and uses requirement.Converter is installed on water pump by this unit, shortens manufacturing time, improves production efficiency, reduces manufacture and maintenance cost.

Description

Full automatic control unit able to programme
Technical field
This utility model relates to full automatic control unit able to programme, belongs to manufacture and the package technique field of plate type regenerator group.
Background technology
Along with computer technology, mechanics of communication develop the raising with automatization level and application rapidly, the requirement of heating quality is improved constantly by especially people, automatic technology heat exchange station application and be to receive unmanned, energy-conservation purpose just to seem imperative.
Along with the increase of labour cost, the maximum human resources saving user is necessary, and by the touch screen being equipped with, this system has good man machine interface, can show complete system running state, equipment actuality and various thermal parameter operational factor centralized displaying.Can control on the spot, also can network with central control room, facilitate user remotely to monitor, fault can send wireless alarm signal in time to manager's mobile phone when occurring, system to be overhauled in the very first time, develop full automatic control unit able to programme in sum the most necessary.
Summary of the invention
For solving problems of the prior art, this utility model provides full automatic control unit able to programme, manufactures complexity and expends that man-hour is many, power consumption is big, the problem of maintenance difficult solving unit design, to simplify unit design step and to improve unit and manufacture efficiency.
The technical solution adopted in the utility model is: full automatic control unit able to programme, this unit is arranged on base, it includes first-level pipeline network blood circulation, secondary network blood circulation, water charging system and switch board, described first-level pipeline network blood circulation uses first-level pipeline network feed water inlet the first y-type filter, electric control valve, first-level pipeline network water supply arm is connected to the first heat-exchangers of the plate type by the first first-level pipeline network water supply water inlet pipe the most respectively, second first-level pipeline network water supply water inlet pipe is connected to the second heat-exchangers of the plate type, it is communicated to be arranged on the first-level pipeline network water return outlet of first-level pipeline network return branch end again by the first first-level pipeline network backwater exit branch being arranged on the first heat-exchangers of the plate type and the second first-level pipeline network backwater exit branch being arranged on the second heat-exchangers of the plate type;Described secondary network blood circulation uses secondary network water return outlet through circulating pump arm, circulating pump, secondary network return branch, be connected to the first heat-exchangers of the plate type by the first secondary network backwater water inlet pipe the most respectively, the second secondary network backwater water inlet pipe is connected to the second heat-exchangers of the plate type, then is connected to be arranged on the secondary network feed water inlet of secondary network water supply tube end by the first secondary network water supply exit branch being arranged on the first heat-exchangers of the plate type and the second secondary network water supply exit branch being arranged on the second heat-exchangers of the plate type;Described water charging system uses water tank to be connected to circulating pump arm through water supplement port, small pump;The relief valve of relief valve port it is provided with on described circulating pump arm;Described switch board is electrically connected with circulating pump through converter, and switch board is electrically connected with small pump through converter.
The beneficial effects of the utility model are: this unit is arranged on base, including first-level pipeline network blood circulation, secondary network blood circulation, water charging system and switch board, first-level pipeline network blood circulation uses first-level pipeline network feed water inlet the first y-type filter, electric control valve, first-level pipeline network water supply arm is connected to the first heat-exchangers of the plate type by the first first-level pipeline network water supply water inlet pipe the most respectively, second first-level pipeline network water supply water inlet pipe is connected to the second heat-exchangers of the plate type, it is communicated to be arranged on the first-level pipeline network water return outlet of first-level pipeline network return branch end again by the first first-level pipeline network backwater exit branch being arranged on the first heat-exchangers of the plate type and the second first-level pipeline network backwater exit branch being arranged on the second heat-exchangers of the plate type.Secondary network blood circulation uses secondary network water return outlet through circulating pump arm, circulating pump, secondary network return branch, be connected to the first heat-exchangers of the plate type by the first secondary network backwater water inlet pipe the most respectively, the second secondary network backwater water inlet pipe is connected to the second heat-exchangers of the plate type, then is connected to be arranged on the secondary network feed water inlet of secondary network water supply tube end by the first secondary network water supply exit branch being arranged on the first heat-exchangers of the plate type and the second secondary network water supply exit branch being arranged on the second heat-exchangers of the plate type.This unit has blood circulation and water charging system in secondary pipe network, has secondary water-supply temp. control function and Isobarically Control function, meets user and use requirement.Converter is installed on water pump by this unit, shortens manufacturing time, improves production efficiency, reduces manufacture and maintenance cost.
Accompanying drawing explanation
Fig. 1 is the front view of full automatic control unit able to programme.
Fig. 2 is the top view of full automatic control unit able to programme.
Fig. 3 is the P direction view in Fig. 1.
Fig. 4 is the process chart of full automatic control unit able to programme.
nullIn figure: 1、Base,2、First heat-exchangers of the plate type,2a、Second heat-exchangers of the plate type,3、Electric control valve,4、First y-type filter,5、Small pump,5a、Water supplement port,6、Circulating pump,6a、Circulating pump arm,7、Second y-type filter,8、Relief valve,8a、Relief valve port,9、Switch board,10、Water tank,11、First-level pipeline network water supply arm,11a、First first-level pipeline network water supply water inlet pipe,11b、Second first-level pipeline network water supply water inlet pipe,12、First-level pipeline network return branch,12a、First first-level pipeline network backwater exit branch,12b、Second first-level pipeline network backwater exit branch,13、Secondary network return branch,13a、First secondary network backwater water inlet pipe,13b、Second secondary network backwater water inlet pipe,14、Secondary network water supply arm,14a、First secondary network water supply exit branch,14b、Second secondary network water supply exit branch,H1、First-level pipeline network feed water inlet,HR1、First-level pipeline network water return outlet,H2、Secondary network feed water inlet,HR2、Secondary network water return outlet.
Detailed description of the invention
Fig. 1,2,3 and 4 show full automatic control unit able to programme, and it is arranged on base 1, including first-level pipeline network blood circulation, secondary network blood circulation, water charging system and switch board 9.First-level pipeline network blood circulation uses first-level pipeline network feed water inlet H1 through the first y-type filter 4, electric control valve 3, first-level pipeline network water supply arm 11 is connected to the first heat-exchangers of the plate type 2 by the first first-level pipeline network water supply water inlet pipe 11a the most respectively, second first-level pipeline network water supply water inlet pipe 11b is connected to the second heat-exchangers of the plate type 2a, it is communicated to be arranged on the first-level pipeline network water return outlet HR1 of first-level pipeline network return branch 12 end again by the first first-level pipeline network backwater exit branch 12a being arranged on the first heat-exchangers of the plate type 2 and the second first-level pipeline network backwater exit branch 12b being arranged on the second heat-exchangers of the plate type 2a;Secondary network blood circulation uses secondary network water return outlet HR2 through circulating pump arm 6a, circulating pump 6, secondary network return branch 13, it is connected to the first heat-exchangers of the plate type 2 the most respectively by the first secondary network backwater water inlet pipe 13a, second secondary network backwater water inlet pipe 13b is connected to the second heat-exchangers of the plate type 2a, it is connected to be arranged on the secondary network feed water inlet H2 of secondary network water supply arm 14 end again by the first secondary network water supply exit branch 14a being arranged on the first heat-exchangers of the plate type 2 and the second secondary network water supply exit branch 14b being arranged on the second heat-exchangers of the plate type 2a;Water charging system uses water tank 10 to be connected to circulating pump arm 6a through water supplement port 5a, small pump 5;The relief valve 8 of relief valve port 8a it is provided with on circulating pump arm 6a;Switch board 9 is electrically connected with circulating pump 6 through converter, and switch board 9 is electrically connected with small pump 5 through converter.
When using technique scheme work, water is entered by first-level pipeline network feed water inlet H1, through the first y-type filter 4, electric control valve 3, first-level pipeline network water supply arm 11 enters the first heat-exchangers of the plate type 2 by the first first-level pipeline network water supply water inlet pipe 11a the most respectively, second first-level pipeline network water supply water inlet pipe 11b enters the second heat-exchangers of the plate type 2a, the first first-level pipeline network backwater exit branch 12a and the second first-level pipeline network backwater exit branch 12b being arranged on the second heat-exchangers of the plate type 2a by being arranged on the first heat-exchangers of the plate type 2 are pooled to be arranged in first-level pipeline network return branch 12 again, discharged by first-level pipeline network water return outlet HR1 again;Water is entered by secondary network water return outlet HR2, through circulating pump arm 6a, circulating pump 6, secondary network return branch 13, enter first heat-exchangers of the plate type the 2, second secondary network backwater water inlet pipe 13b by the first secondary network backwater water inlet pipe 13a the most respectively and enter the second heat-exchangers of the plate type 2a, it is pooled to secondary network water supply arm 14 by the first secondary network water supply exit branch 14a being arranged on the first heat-exchangers of the plate type 2 and the second secondary network water supply exit branch 14b being arranged on the second heat-exchangers of the plate type 2a again, then is discharged by secondary network feed water inlet H2.Water in water tank 10 entered water supplement port 5a and is pumped in circulating pump arm 6a by small pump 5 and carries out moisturizing.The switch board 9 flow by Frequency Converter Control small pump 5, the switch board 9 flow by Frequency Converter Control circulating pump 6.
According to outdoor temperature and secondary water-supply temperature relation setting curve, it is automatically adjusted primary side flow, it is ensured that the temperature required for user.One-level water supply network arranges electric hydaulic regulation valve, change according to secondary water-supply temperature, outdoor temperature makes comparisons (temperature curve can require to arrange according to user) with being set in advance in director demon local heating demand curve, then make PID arithmetic output 0-10V signal and regulate valve actuator to electric hydaulic, executor drives the aperture of valve core regulation electric control valve, change once pipe net flow, secondary side supply water temperature changes the most therewith, it is achieved once the amount regulation of pipe net flow and the matter of secondary side supply water temperature regulate.
Frequency conversion automatic constant-pressure moisturizing, supplementing water pressure can set, and can report to the police when breaking down;Unit, according to setting pressure reduction, is supplied water by converter and circulating pump automatic constant pressure reduction.In secondary pipe network, circulating pump 6, small pump 5 all use VFC.Unit is after putting into operation, and because many reasons not necessarily can run under rated load, after particularly realizing household-based heat metering, load variations fluctuation is very big, and the resistance of secondary pipe webmaster also changes, and heat exchanger supply head changes the most therewith.Control circulating pump converting operation by the backwater pressure reduction that supplies of secondary network, reach to save electric energy, the purpose of heat energy.Secondary records pressure signal for the pressure transducer on water return pipeline, via controller calculates actual pressure differential value and contrasts with controller pressure differential resetting value, after PID arithmetic, regulate cycloconvertor frequency, change circulating pump 6 rotating speed, thus realize secondary circulation system constant-pressure drop and run.When a frequency variable circulating pump full-speed operation does not still reach setting pressure reduction, controller starts power frequency circulating pump, the simultaneously regulation of variable frequency pump reduction of speed automatically, prevents the unexpected supercharging of system pipe network, the safety of protection pipe network.Secondary heat supply network moisturizing is frequency-changing pressure stabilizing moisturizing, records signal according to the pressure transducer being contained in secondary returning water lines and compares with setting value in controller, then exports to converter through PID arithmetic, reaches the purpose of stabilisation systems pressure regulating small pump motor speed.
Manually operated step computer is carried out working out control program, makes plant equipment be controlled step by step performing according to the program that computer controls, produce corresponding action.Converter is used to combine with programmable controller, utilize PID proportional integral link that the digital signals such as an on-the-spot secondary network supply and return water temperature, pressure are converted into analogue signal and carry out proportional integral calculating, give PC process afterwards, result after process is converted into switching value and gives converter and catalyst realization output control, again output is sent into input and input signal compares superposition, it is re-fed into input, forms closed loop control.

Claims (1)

  1. nullFull automatic control unit the most able to programme,This unit is arranged on base (1),It is characterized in that: it includes first-level pipeline network blood circulation、Secondary network blood circulation、Water charging system and switch board (9),Described first-level pipeline network blood circulation uses first-level pipeline network feed water inlet (H1) through the first y-type filter (4)、Electric control valve (3)、First-level pipeline network water supply arm (11) is connected to the first heat-exchangers of the plate type (2) by the first first-level pipeline network water supply water inlet pipe (11a) the most respectively、Second first-level pipeline network water supply water inlet pipe (11b) is connected to the second heat-exchangers of the plate type (2a),It is communicated to be arranged on the first-level pipeline network water return outlet (HR1) of first-level pipeline network return branch (12) end again by the first first-level pipeline network backwater exit branch (12a) being arranged on the first heat-exchangers of the plate type (2) and the second first-level pipeline network backwater exit branch (12b) being arranged on the second heat-exchangers of the plate type (2a);Described secondary network blood circulation uses secondary network water return outlet (HR2) through circulating pump arm (6a), circulating pump (6), secondary network return branch (13), it is connected to the first heat-exchangers of the plate type (2) the most respectively by the first secondary network backwater water inlet pipe (13a), second secondary network backwater water inlet pipe (13b) is connected to the second heat-exchangers of the plate type (2a), it is connected to be arranged on the secondary network feed water inlet (H2) of secondary network water supply arm (14) end by the first secondary network water supply exit branch (14a) being arranged on the first heat-exchangers of the plate type (2) and the second secondary network water supply exit branch (14b) being arranged on the second heat-exchangers of the plate type (2a) again;Described water charging system uses water tank (10) to be connected to circulating pump arm (6a) through water supplement port (5a), small pump (5);The relief valve (8) of relief valve port (8a) it is provided with on described circulating pump arm (6a);Described switch board (9) is electrically connected with circulating pump (6) through converter, and switch board (9) is electrically connected with small pump (5) through converter.
CN201520974530.6U 2015-12-01 2015-12-01 Full automatic control unit able to programme Expired - Fee Related CN205783218U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520974530.6U CN205783218U (en) 2015-12-01 2015-12-01 Full automatic control unit able to programme

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520974530.6U CN205783218U (en) 2015-12-01 2015-12-01 Full automatic control unit able to programme

Publications (1)

Publication Number Publication Date
CN205783218U true CN205783218U (en) 2016-12-07

Family

ID=57413529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520974530.6U Expired - Fee Related CN205783218U (en) 2015-12-01 2015-12-01 Full automatic control unit able to programme

Country Status (1)

Country Link
CN (1) CN205783218U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112555979A (en) * 2020-12-10 2021-03-26 青岛新奥能源有限公司 Digital simulation system and method for heat supply temperature curve and hydraulic balance adjustment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112555979A (en) * 2020-12-10 2021-03-26 青岛新奥能源有限公司 Digital simulation system and method for heat supply temperature curve and hydraulic balance adjustment
CN112555979B (en) * 2020-12-10 2021-10-01 青岛新奥能源有限公司 Digital simulation system and method for heat supply temperature curve and hydraulic balance adjustment

Similar Documents

Publication Publication Date Title
CN108842857B (en) Self-learning intelligent peak regulation secondary water supply system and control method thereof
CN103438503A (en) Unattended intelligent control method and control system for heat exchange station
CN204327464U (en) A kind of conversion
CN203454309U (en) Special central air conditioning energy-saving control system for operating room
CN104317281A (en) Energy-saving and water-saving device for distributed control over industrial circulating water and control method thereof
CN206094287U (en) Heat exchange station automatic control system
CN106152250A (en) Blood circulation that a kind of heat exchange station automatically controls and circulation controlling means
CN203928130U (en) The unattended intelligence control system of heat exchange station
CN205783218U (en) Full automatic control unit able to programme
CN107023882A (en) A kind of heat supply regulating system saved for gas fired-boiler
CN107272561A (en) Heat exchange station central heating equipment remote monitoring device
CN205447932U (en) Energy -saving heat supply circulating system
CN105652908A (en) Automatic portable hydraulic equilibrium debugging device for branch pipe network of heat exchange station
CN201503063U (en) Full-automatic unattended heat exchanger unit
CN110543672B (en) Simulation optimization system of heat supply network hydraulic working condition system
CN208859715U (en) A kind of heat station system with frequency converter
CN110056941A (en) A kind of gas furnace heating project intelligent management control method
CN203939086U (en) A kind of SCM Based intelligent pump set control system
CN205481240U (en) Novel series connection heat supply network drainage system
CN205065901U (en) Centralized heat supply control system
CN201259267Y (en) Automatic constant temperature water supply installation
CN206755336U (en) A kind of heat supply regulating system for gas fired-boiler energy-conservation
CN114151842A (en) Automatic control system for water heat source centralized heat supply and heat exchange station
CN209484719U (en) A kind of hot water supply intelligence control system based on living area
CN204026837U (en) A kind of novel heat exchange unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20171201