CN205781379U - A kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type - Google Patents
A kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type Download PDFInfo
- Publication number
- CN205781379U CN205781379U CN201620461827.7U CN201620461827U CN205781379U CN 205781379 U CN205781379 U CN 205781379U CN 201620461827 U CN201620461827 U CN 201620461827U CN 205781379 U CN205781379 U CN 205781379U
- Authority
- CN
- China
- Prior art keywords
- door type
- type frame
- bracket
- girder
- sides
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Elevator Door Apparatuses (AREA)
Abstract
This utility model relates to a kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type.The most conventional each systematic pipeline mounting process, support and the pipeline of whole installation aspect are disorderly and unsystematic, are difficult to meet the process requirements of maintenance factory workshop.This utility model includes parallel two girder, and girder two ends are erected on the bracket that both sides are arranged and form single span structure;Article two, girder two ends are down-set door type frame under the bracket being perpendicular to girder, the down-set both sides door type frame having twice to be perpendicular to girder in the middle part of two girders between door type frame under bracket;It is provided with screw mandrel between door type frame top and the bottom of adjacent both sides door type frame under bracket;It is provided with screw mandrel between the bottom of adjacent both sides door type frame.This utility model uses pin-connected panel to install with bracket for fulcrum, it is not necessary to welding, simple installation;Stability Analysis of Structures, loading capacity can reach 8 tons;From heavy and light, 25Kg/M.
Description
Technical field
This utility model relates to a kind of comprehensive pipeline integrated hangar system structure, is specifically related to a kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type.
Background technology
Large-scale maintenance factory internal pipeline gets more and more, become increasingly complex, existing various draft tube liner, air conditioning piping and various fire-fighting and spray pipe, there is again automatic alarm, monitoring, acousto-optic, the signal electric lines of force such as broadcast, and overhaul factory's limited space, at present when carrying out factory's pipeline designs, according to the design specification of each system and requirement is used to arrange corresponding pipeline voluntarily by each specialty, typically no pipeline layout suspension and support, a lot of spaces pipeline is caused more to concentrate, even position conflict is interfered, indoor pipeline is caused often to occur arranging unreasonable, invest uneconomical, outward appearance is unsightly, consider the most comprehensive problem.
And the most conventional each systematic pipeline mounting process, support and the pipeline of whole installation aspect are disorderly and unsystematic, not only it is difficult to meet the process requirements of maintenance factory workshop, and this field standard is relatively low, still use traditional shape steel bracket, the use requirement of present stage all can not be met plus welding and coating paint, outward appearance or durability.So do not only result in construction, transformation and upgrade task amount greatly, and safety, maintainability, reliability and economy with the having higher standard requirement to system operation.Therefore make full use of advanced technology and successful experience, system that large-scale maintenance factory pipeline is carried out general space management research is the most very urgent, imperative.
Summary of the invention
The purpose of this utility model is to provide a kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type, it is adaptable in building, the layering of various pipelines and cable bridge is installed.
The technical scheme that this utility model is used is:
A kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type, it is characterised in that:
Including two parallel girders, girder two ends are erected on the bracket that both sides are arranged and form single span structure;
Article two, it is hung with door type frame under the bracket being perpendicular to girder below girder two ends, the down-set both sides door type frame having twice to be perpendicular to girder in the middle part of two girders between door type frame under bracket;
It is provided with screw mandrel between door type frame top and the bottom of adjacent both sides door type frame under bracket;It is provided with screw mandrel between the bottom of adjacent both sides door type frame.
Distance between the door type frame of twice both sides is 3 meters, and the distance between both sides door type frame with door type frame under adjacent bracket is 3 meters.
The end that screw mandrel is positioned at bottom the door type frame of both sides is fixed by the multi-direction screw connecting piece arranged bottom the door type frame of both sides.
Screw mandrel is positioned at the end at door type frame top under bracket to be fixed by the bracket otic placode arranged on bracket.
Under bracket, door type frame and both sides door type frame are the rectangle frame structure of layering.
This utility model has the advantage that
This utility model uses pin-connected panel to install with bracket for fulcrum, it is not necessary to welding, simple installation;Stability Analysis of Structures, loading capacity can reach 8 tons;From heavy and light, 25Kg/M.
Accompanying drawing explanation
Fig. 1 is this utility model elevation.
Fig. 2 is this utility model plane graph.
Fig. 3 is door type frame structure chart under bracket.
Fig. 4 is both sides door type frame structure charts.
In figure, 1-girder, door type frame under 2-bracket, 3-both sides door type frame, 4-screw mandrel, the multi-direction screw connecting piece of 5-, 6-bracket otic placode, 7-bracket.
Detailed description of the invention
Below in conjunction with detailed description of the invention, this utility model is described in detail.
A kind of 9m span heavy duty that this utility model relates to, assembled, the comprehensive hanger system of bridge-type, including two parallel girders 1, girder 1 two ends are erected on the bracket 7 that both sides are arranged and form single span structure.Article two, it is hung with door type frame 2 under the bracket being perpendicular to girder 1 below girder 1 two ends, the down-set both sides door type frame 3 having twice to be perpendicular to girder 1 in the middle part of two girders 1 between door type frame 2 under bracket, under bracket, door type frame 2 and both sides door type frame 3 are connected with three-dimensional connector with girder 1.Distance between twice both sides door type frame 3 is 3 meters, and the distance between both sides door type frame 3 with door type frame 2 under adjacent bracket is 3 meters, and single span structure adds up to 9 meters, it is ensured that minimum spacing 3 meters has a strong point.Under the bracket at two ends, door type frame 2 is bolted on bracket 7 by special heavy duty suspension bracket hanger, clamping fixed with beam.
It is provided with screw mandrel 4 between door type frame 2 top and the bottom of adjacent both sides door type frame 3 under bracket;It is provided with screw mandrel 4 between the bottom of adjacent both sides door type frame 3.The end that screw mandrel 4 is positioned at bottom both sides door type frame 3 is fixed by the multi-direction screw connecting piece 5 arranged bottom both sides door type frame 3.Screw mandrel 4 is positioned at the end at door type frame 2 top under bracket to be fixed by the bracket otic placode 6 arranged on bracket 7.
Under bracket, door type frame 2 and both sides door type frame 3 are by U-shaped finished product channel-section steel, push button snap close, right-angle connector composition, and structure is the rectangle frame of layering, arranges tube bank in layer as required, and pipeline can be fixed in tube bank.Restrain the opening surface being fixed on U-lag steel by tube bank button pad screw mandrel.Cable bridge can be laid in door type frame, is screwed on the long aperture of U-lag steel.
Content of the present utility model is not limited to cited by embodiment, the conversion of any equivalence that technical solutions of the utility model are taked by those of ordinary skill in the art by reading this utility model description, is claim of the present utility model and is contained.
Claims (5)
1. the heavy duty of 9m span, assembled, the comprehensive hanger system of bridge-type, it is characterised in that:
Including two parallel girders (1), girder (1) two ends are erected on bracket (7) the upper formation single span structure that both sides are arranged;
Article two, it is hung with door type frame (2) under the bracket being perpendicular to girder (1) below girder (1) two ends, down-set both sides door type frames (3) having twice to be perpendicular to girder (1) in two girders (1) middle part between door type frame (2) under bracket;
Screw mandrel (4) it is provided with between door type frame (2) top and the bottom of adjacent both sides door type frame (3) under bracket;It is provided with screw mandrel (4) between the bottom of adjacent both sides door type frame (3).
A kind of 9m span heavy duty the most according to claim 1, assembled, the comprehensive hanger system of bridge-type, it is characterised in that:
Distance between twice both sides door type frame (3) is 3 meters, and both sides door type frame (3) is 3 meters with distance between door type frame (2) under adjacent bracket.
A kind of 9m span heavy duty the most according to claim 1, assembled, the comprehensive hanger system of bridge-type, it is characterised in that:
Screw mandrel (4) is positioned at the end of both sides door type frame (3) bottom to be fixed by the multi-direction screw connecting piece (5) of both sides door type frame (3) bottom setting.
A kind of 9m span heavy duty the most according to claim 1, assembled, the comprehensive hanger system of bridge-type, it is characterised in that:
Screw mandrel (4) is positioned at the end at door type frame under bracket (2) top to be fixed by the upper bracket otic placode (6) arranged of bracket (7).
A kind of 9m span heavy duty the most according to claim 1, assembled, the comprehensive hanger system of bridge-type, it is characterised in that:
Under bracket, door type frame (2) and both sides door type frame (3) are the rectangle frame structure of layering.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620461827.7U CN205781379U (en) | 2016-05-20 | 2016-05-20 | A kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620461827.7U CN205781379U (en) | 2016-05-20 | 2016-05-20 | A kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205781379U true CN205781379U (en) | 2016-12-07 |
Family
ID=58118170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620461827.7U Active CN205781379U (en) | 2016-05-20 | 2016-05-20 | A kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205781379U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106907525A (en) * | 2017-04-20 | 2017-06-30 | 中天西北建设投资集团有限公司 | A kind of para-seismic support installation engineering method |
-
2016
- 2016-05-20 CN CN201620461827.7U patent/CN205781379U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106907525A (en) * | 2017-04-20 | 2017-06-30 | 中天西北建设投资集团有限公司 | A kind of para-seismic support installation engineering method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204297955U (en) | The three-dimensional accurate positioning device of crane in bridge type and crane in bridge type thereof | |
CN202370147U (en) | Ceiling lamp groove structure of lightgage steel joist framework | |
CN104963407A (en) | Building structure and construction method thereof | |
CN205639870U (en) | A pipeline gallows is synthesized in heavy construction | |
CN205781379U (en) | A kind of 9m span heavy duty, assembled, the comprehensive hanger system of bridge-type | |
CN204475513U (en) | A kind of building structure | |
CN204284665U (en) | A kind of diagonal-bracing type suspension and support of rationally arranging for line classification | |
CN205804586U (en) | A kind of 12m span comprehensive hanger system of bridge-type heavily loaded, assembled | |
CN105587058A (en) | Perforated aluminum plate curtain wall of external wall | |
CN203237404U (en) | Passenger cabin main pipe positioning and installing device | |
CN205479755U (en) | A synthesize integrated suspension system of pipe support that is used for motor car application storehouse of inspecting | |
CN203230140U (en) | Overhead movable floor | |
CN203213321U (en) | Construction structure of outer wall deformation joint of building | |
CN102278532A (en) | Two-directional bridge frame connector | |
CN204139398U (en) | The syndeton of a kind of curtain wall crossbeam and column | |
CN204475534U (en) | A kind of syndeton of column node | |
CN205155357U (en) | Crane span structure supporting component with prop up gallows installation function | |
CN209567694U (en) | A kind of assembling type steel structure hoistway section of preset track | |
CN204187128U (en) | A kind of cable testing bridge threeway underframe | |
CN104832708A (en) | Pipeline pre-installing frame | |
CN204385887U (en) | A kind of seal channel based on aluminium extruded sections | |
CN208074291U (en) | Prefabricated for pipeline ensemble, installation precast combined holder | |
CN203701555U (en) | Movable type pipe truss installation platform | |
CN218449331U (en) | Layered multi-way bridge frame assembly member | |
CN205478716U (en) | A connecting piece that is used for motor car application institute storehouse of inspecting synthesis pipe support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: BEIJING YAOU ZHENDA TECHNOLOGY DEVELOPMENT CO.,LTD. Assignor: CHINA RAILWAY FIRST SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd. Contract record no.: X2022980015517 Denomination of utility model: A 9m-span heavy-duty, assembled, bridge-type integrated support and hanger system Granted publication date: 20161207 License type: Common License Record date: 20220919 |
|
EE01 | Entry into force of recordation of patent licensing contract |