CN205776268U - Compartment greening structure is fixed in the roadside of a kind of highway - Google Patents

Compartment greening structure is fixed in the roadside of a kind of highway Download PDF

Info

Publication number
CN205776268U
CN205776268U CN201620469885.4U CN201620469885U CN205776268U CN 205776268 U CN205776268 U CN 205776268U CN 201620469885 U CN201620469885 U CN 201620469885U CN 205776268 U CN205776268 U CN 205776268U
Authority
CN
China
Prior art keywords
fixed
roadside
compartment
highway
greening structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620469885.4U
Other languages
Chinese (zh)
Inventor
罗广羽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou City Lin Hua Garden Construction Engineering Co Ltd
Original Assignee
Guangzhou City Lin Hua Garden Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou City Lin Hua Garden Construction Engineering Co Ltd filed Critical Guangzhou City Lin Hua Garden Construction Engineering Co Ltd
Priority to CN201620469885.4U priority Critical patent/CN205776268U/en
Application granted granted Critical
Publication of CN205776268U publication Critical patent/CN205776268U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Compartment greening structure is fixed in the roadside of a kind of highway, relate to slope problem technical field, including express highway roadbed (1) and roadbed side slope (2), described roadbed side slope (2) is arranged on the side of highway subgrade (1), it is additionally provided with roadside on described roadbed side slope (2) and fixes compartment greening structure, described roadside is fixed compartment greening structure and is included geotextiles (3), fixed grating room module (4), one group of J-type anchor studs (5), one group of reinforced steel (6) and the pipeline (7) for draining, described geotextiles (3) sticks on the surface of roadbed side slope (2), described fixed grating room module (4) is formed by one group of baffle combination, the groove for loading soil is formed between dividing plate;Compartment greening structure is fixed in the roadside of this utility model highway, and each grid units has high intensity, can realize rapid draining, form again the three-dimensional barrier of a balanced weight distribution, can effectively prevent displacement deformation, soil erosion, slope body from subsiding.

Description

Compartment greening structure is fixed in the roadside of a kind of highway
Technical field
This utility model relates to slope problem technical field, and compartment greening structure is fixed in the roadside being specifically related to a kind of highway.
Background technology
The process of highway roadside side slope is extremely important, not only acts as the effect of greening, good Slope Treatment mode, plays very important effect for express highway roadbed maintenance.The advantages such as the greening of ecology bag side slope protection is environmentally friendly with it, protection effect good, maintenance cost is low, become one of construction method important in expressway slope greening, municipal administration greening, afforestation, deserted mountain, mine reparation, bank slope protection and inland river regulation.In prior art, when using elongated ecology bag to carry out side slope protection greening, typically just ecology bag is longitudinally layed in along side slope at the bottom of intercepting ditch and slope between ground, and it is anchor rod anchored by many, there is some deficiency following in this structure: due to the action of gravity of ecology bag self, and the active force between anchor pole and ecology bag near ecology bag upper end is relatively big, and anchor pole is the most serious to the destruction of ecology bag, and ecology bag fixes less reliable, the stability of side slope is also by large effect;Ecology bag lower end is directly hung at the bottom of slope, and its weight is born by anchor pole completely, is also unfavorable for strengthening the stability of side slope bottom.
Utility model content
The purpose of this utility model is contemplated to solve above-mentioned technical problem, and provides the roadside of a kind of highway to fix compartment greening structure.
nullThis utility model includes express highway roadbed and roadbed side slope,Described roadbed side slope is arranged on the side of highway subgrade,It is additionally provided with roadside on described roadbed side slope and fixes compartment greening structure,Described roadside is fixed compartment greening structure and is included geotextiles、Fixed grating room module、One group of J-type anchor studs、One group of reinforced steel and the pipeline for draining,Described geotextiles sticks on the surface of roadbed side slope,Described fixed grating room module is formed by one group of baffle combination,The groove for loading soil is formed between dividing plate,Dividing plate is provided with for the perforate through drainage pipeline,Fixed grating room module by one group of J-type anchor studs be anchored at geotextiles cover roadbed side slope domatic on,Described one group of reinforced steel is each passed through the dividing plate of fixed grating room module,Described pipeline is through the perforate on fixed grating room module dividing plate,One end communicates with express highway roadbed discharge outlet,The other end communicates with Water Drainage of Expressway supervisor.
Described fixed grating room module uses mould molding, and the size forming the groove for loading soil between dividing plate is 200mm × 200mm.
Described fixed grating room module is filled to plant on hack, and hack in the groove loading soil and is implanted with vegetation 8.
The unit mass area of described geotextiles is 200g/.
This utility model has the advantage that compartment greening structure is fixed in the roadside of this utility model highway, each grid units has high intensity, rapid draining can be realized, form again the three-dimensional barrier of a balanced weight distribution, can effectively prevent displacement deformation, soil erosion, slope body from subsiding.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
In figure: 1, express highway roadbed;2, roadbed side slope;3, geotextiles;4, fixed grating room module;5, one group of J-type anchor studs;6, one group of reinforced steel;7, pipeline.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described further.
nullAs shown in Figure 1,This utility model includes express highway roadbed 1 and roadbed side slope 2,Described roadbed side slope 2 is arranged on the side of highway subgrade 1,It is additionally provided with roadside on described roadbed side slope 2 and fixes compartment greening structure,Described roadside is fixed compartment greening structure and is included geotextiles 3、Fixed grating room module 4、One group of J-type anchor studs 5、One group of reinforced steel 6 and the pipeline 7 for draining,Described geotextiles 3 sticks on the surface of roadbed side slope 2,Described fixed grating room module 4 is formed by one group of baffle combination,The groove for loading soil is formed between dividing plate,Dividing plate is provided with for the perforate through drainage pipeline,Fixed grating room module 4 by one group of J-type anchor studs 5 be anchored at roadbed side slope 2 that geotextiles 3 covers domatic on,Described one group of reinforced steel 6 is each passed through the dividing plate of fixed grating room module 4,Described pipeline 7 is through the perforate on fixed grating room module 4 dividing plate,One end communicates with express highway roadbed discharge outlet,The other end communicates with Water Drainage of Expressway supervisor.
Described fixed grating room module 4 uses mould molding, and the size forming the groove for loading soil between dividing plate is 200mm × 200mm.
Described fixed grating room module 4 is filled to plant on hack, and hack in the groove loading soil and is implanted with vegetation 8.
The unit mass area of described geotextiles 3 is 200g/.
Working method and principle: this utility model uses the side slope fixed structure of set form, fixed grating room module uses mould one-shot forming, lay convenient and swift, first by geotextile laying on roadbed side slope inclined-plane, by one group of J-type anchor studs, fixed grating room module is anchored in side slope land slope afterwards, filling soil in the groove of room module dividing plate composition that fixes, one group of reinforced steel integral reinforcing of rear insertion, then on filling soil, plant vegetation.Each grid units has high intensity, can realize rapid draining, form again the three-dimensional barrier of a balanced weight distribution, can effectively prevent displacement deformation, soil erosion, slope body from subsiding.
Embodiment of above is merely to illustrate this utility model; and be not limitation of the utility model; those of ordinary skill about technical field; in the case of without departing from spirit and scope of the present utility model; can also make a variety of changes and modification; the technical scheme of the most all equivalents falls within category of the present utility model, and scope of patent protection of the present utility model should be defined by the claims.

Claims (4)

  1. null1. compartment greening structure is fixed in the roadside of a highway,Including express highway roadbed (1) and roadbed side slope (2),Described roadbed side slope (2) is arranged on the side of highway subgrade (1),It is characterized in that being additionally provided with roadside on described roadbed side slope (2) fixes compartment greening structure,Described roadside is fixed compartment greening structure and is included geotextiles (3)、Fixed grating room module (4)、One group of J-type anchor studs (5)、One group of reinforced steel (6) and the pipeline (7) for draining,Described geotextiles (3) sticks on the surface of roadbed side slope (2),Described fixed grating room module (4) is formed by one group of baffle combination,The groove for loading soil is formed between dividing plate,Dividing plate is provided with for the perforate through drainage pipeline,Fixed grating room module (4) by one group of J-type anchor studs (5) be anchored at roadbed side slope (2) that geotextiles (3) covers domatic on,Described one group of reinforced steel (6) is each passed through the dividing plate of fixed grating room module (4),Described pipeline (7) is through the perforate on fixed grating room module (4) dividing plate,One end communicates with express highway roadbed discharge outlet,The other end communicates with Water Drainage of Expressway supervisor.
  2. Compartment greening structure is fixed in the roadside of a kind of highway the most according to claim 1, it is characterised in that described fixed grating room module (4) uses mould molding, and the size forming the groove for loading soil between dividing plate is 200mm × 200mm.
  3. Compartment greening structure is fixed in the roadside of a kind of highway the most according to claim 1, it is characterised in that described fixed grating room module (4) is filled to plant on hack, and hack in the groove loading soil and is implanted with vegetation (8).
  4. Compartment greening structure is fixed in the roadside of a kind of highway the most according to claim 1, it is characterised in that the unit mass area of described geotextiles (3) is 200g/.
CN201620469885.4U 2016-05-20 2016-05-20 Compartment greening structure is fixed in the roadside of a kind of highway Active CN205776268U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620469885.4U CN205776268U (en) 2016-05-20 2016-05-20 Compartment greening structure is fixed in the roadside of a kind of highway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620469885.4U CN205776268U (en) 2016-05-20 2016-05-20 Compartment greening structure is fixed in the roadside of a kind of highway

Publications (1)

Publication Number Publication Date
CN205776268U true CN205776268U (en) 2016-12-07

Family

ID=58114566

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620469885.4U Active CN205776268U (en) 2016-05-20 2016-05-20 Compartment greening structure is fixed in the roadside of a kind of highway

Country Status (1)

Country Link
CN (1) CN205776268U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109588300A (en) * 2018-12-25 2019-04-09 深圳华熙环境建设有限公司 A kind of greening structure on highway mountain forest ground

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109588300A (en) * 2018-12-25 2019-04-09 深圳华熙环境建设有限公司 A kind of greening structure on highway mountain forest ground

Similar Documents

Publication Publication Date Title
CN201952698U (en) Roadbed structure reinforced by geotextile discrete material piles
CN202298556U (en) Novel prevention structure for landslide converting-type debris flow
CN102561370B (en) Protective structure for reinforcing high-liquid-limit soil slope
CN104594287B (en) Ecological and economic bank protection structure
CN205296212U (en) Geogrid adds muscle counterfort retaining wall
CN205653749U (en) River course butyl dam structure and spur dike protection system
CN106149625A (en) A kind of ecological self-purification type landscape revetment reconstruction structure and construction method thereof
JP2015183419A (en) Ground formation method and ground structure
CN105839605A (en) Novel slope water interception and drainage ditch and design method thereof
CN105862671A (en) Construction method based on ecological organic sponge
CN208934006U (en) The double-deck barrier wall structure
CN210049252U (en) Protection structure of inflation soil slope secondary mud flow
CN205776268U (en) Compartment greening structure is fixed in the roadside of a kind of highway
CN203249668U (en) Dam body saturation line monitoring model testing device
CN101614005A (en) A kind of sand-protecting barrier and collocation method thereof that utilizes Biodegradable material to make
CN202124854U (en) Grid-type gravel pile
JP2018204391A (en) Gabion and slope reinforcing structure using the same
CN106368288A (en) Shallow disc type moniliform wave type water-cutting off and drainage system for refuse dump
CN208501619U (en) A kind of Ecosystem restoration system for river falling zone
CN202850038U (en) Ecological composite slope protection plate and slope protective structure
CN205444104U (en) Building block of inspection well
CN205917646U (en) Hydraulic engineering is with having retaining wall device that anti - filter constructs
CN205776269U (en) A kind of side slope fixed structure using fixing compartment
CN109440622A (en) A kind of ecotype water environment overcurrent and restorative procedure
CN107059775A (en) Ecological wetland channel revetment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant