CN205771294U - A kind of Combined section bar storage rack - Google Patents
A kind of Combined section bar storage rack Download PDFInfo
- Publication number
- CN205771294U CN205771294U CN201620489739.8U CN201620489739U CN205771294U CN 205771294 U CN205771294 U CN 205771294U CN 201620489739 U CN201620489739 U CN 201620489739U CN 205771294 U CN205771294 U CN 205771294U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- column
- storage rack
- section bar
- vertical columns
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Warehouses Or Storage Devices (AREA)
Abstract
The utility model discloses a kind of Combined section bar storage rack, installed by crossbeam and longeron and form, described longeron is arranged side by side is formed by a pair vertical columns and a pair active column, described active column is vertically connected by some movable short columns and forms, connected by parallel installation of some described crossbeams between vertical columns with active column, constitute section bar between upper and lower crossbeam and deposit layer.This utility model storage rack can space, Appropriate application place, by increase longitudinal space thus reduce horizontal space, improve utilization of area rate.Additionally, the movable short column in this utility model storage rack front is detachable, in addition to increasing except storage rack height can be made to change with the number of plies of storage rack or reduces, also meet crane gears such as using in door machine, truck crane and workshop fork truck and transport steel pipe.
Description
Technical field
This utility model belongs to engineering construction or plant area uses corollary apparatus field, particularly relates to a kind of Combined section bar storage rack.
Background technology
Processing in operation in existing engineering construction project job site or plant area, section bar (such as steel pipe) is often as Oil, Water, Gas
Use in a large number Deng conveyance conduit and the structural material of medium.And the section bar including steel pipe is deposited and is typically required big place, and
Handling inconvenience, protection difficulty, the most unordered.
Summary of the invention
For above-mentioned technical problem, this utility model provides a kind of Combined section bar storage rack, it is achieved that including steel pipe
Depositing in order of section bar, saves space, place, is suitable for all kinds of handling facilities and has raw material defencive function.Attached in conjunction with description
Figure, the technical solution of the utility model is as follows:
A kind of Combined section bar storage rack, is installed by crossbeam and longeron and forms, and described longeron is by a pair vertical columns 1 and a pair work
Dynamic column is arranged side by side composition;
Described active column is vertically connected by some movable short columns and forms;
Connected by parallel installation of some described crossbeams between vertical columns 1 and active column;Section bar is constituted between upper and lower crossbeam
Deposit layer;
Described crossbeam includes the crossbeam 2 14 being arranged on bottom and is arranged on the crossbeam 1 at middle part;
Described crossbeam 2 14 be fixedly connected on bottom vertical columns 1 and bottom active column between;
Described crossbeam 1 be arranged in the middle part of vertical columns 1 and in the middle part of active column between;
Being installed with draw-in groove 3 on described vertical columns 1, described beam-end is provided with end plate;
Described crossbeam is inserted in draw-in groove 3 by end plate, and presses by adjusting the bolt 6 column top respectively with draw-in groove 3 and two ends
Connect;
Adjusted the degree of tightness of bolt 6 by regulation, the gap between crossbeam 2 14 and two ends column can be adjusted;
Described crossbeam 2 14 by crossbeam seat board 8 and fastening bolt 7 respectively with the vertical columns 1 at two ends bottom and active column
Bottom is fixing to be connected.
Described active column is by being positioned at the movable short column 1 at top, being positioned at the movable short column 2 11 at middle part and be positioned at bottom
Movable short column 3 12 passes sequentially through short column adapter sleeve 10 and vertically connects composition;
Being welded with steel plate capping above described movable short column 1, its height is not less than 1/2nd of profile height to be stored;
Described movable short column 2 11 height is not less than profile height to be stored;
Described movable short column 3 12 bottom surface is welded with seat board, contacts with ground.
Described movable short column 1 and movable short column 2 11 interchanging positions.
Between the top of described vertical columns 1, between bottom and diagonally adjacent be respectively connected with support angle steel 4;
Connect between bottom described active column and have support angle steel 4.
Compared with prior art, the beneficial effects of the utility model are:
1, this utility model storage rack contributes to section bar and stores classifiedly, and access is convenient.
2, this utility model storage rack can space, Appropriate application place, by increase longitudinal space thus reduce horizontal space,
Save storage site area.
3, this utility model storage rack contribute to material stack uniform, improve storage deposit safety.Solve thing simultaneously
Deformation in material stacking process and pollution problem, provide defencive function for raw material.
3, the movable short column in this utility model storage rack front is detachable, and storage rack height can be made to change with the number of plies of storage rack
Outside increasing or reducing, except fork truck loads and unloads in meeting factory, also meet the handling facilities such as door machine, truck crane.
4, the column of this utility model storage rack uses the design that draw-in groove is connected with crossbeam, and crossbeam can be made to be inserted directly into column,
Form upper strata and deposit layer.
5, adjust the design of bolt between column and the crossbeam of this utility model storage rack so that this storage rack when assembly, nothing
Need to consider that passing through the instruments such as chock because ground is uneven adjusts verticality of stand column;Curved without column caused after considering crossbeam pressure-bearing
Song causes the phenomenon that crossbeam cannot insert;Also without considering to cause, because of reasons such as processing, welding, the flexural deformation that column is bigger, fall
Low requirement on machining accuracy, thus cost-effective.By turning adjustment bolt, the gap between crossbeam and column can be adjusted,
I.e. can finely tune the opening with vertical columns above movable short column, so that crossbeam can put into the draw-in groove on column easily.
Accompanying drawing explanation
Fig. 1 is this utility model front view.
Fig. 2 is vertical columns and annexation schematic diagram thereof.
Fig. 3 a is the annexation schematic diagram in this utility model between movable short column and crossbeam one.
Fig. 3 b is Fig. 3 a left view.
In figure:
1-vertical columns, 2-supports connecting plate, 3-draw-in groove, and 4-supports angle steel, 5-reinforcement, and 6-adjusts bolt, 7-fastening bolt,
8-crossbeam seat board, 9-activity short column one, 10-short column adapter sleeve, 11-activity short column two, 12-activity short column three, 13-crossbeam one,
14-crossbeam two.
Detailed description of the invention
For further illustrating the technical solution of the utility model, in conjunction with Figure of description, detailed description of the invention of the present utility model is such as
Under:
As it is shown in figure 1, the utility model discloses a kind of Combined section bar storage rack, in the present embodiment by steel pipe as an example
Section bar illustrates.The size of this utility model storage rack can adjust accordingly according to the concrete size of steel pipe to be stored, can
It is applicable to the steel pipe that overall diameter is 114mm-600mm deposit.In order to clear, illustrate technical solutions of the utility model all sidedly
Implementation process, is now set to five layers by the number of plies of this utility model storage rack in specific embodiment, and wherein top is equal with the bottom
Deposit the steel pipe that six roots of sensation overall diameter is 406mm.
This utility model Combined section bar storage rack is installed by crossbeam and stringer combination and is formed, and described longeron is by a pair vertical columns 1
It is arranged side by side composition with a pair active column;Described active column is vertically connected by four movable short columns and is assemblied to form, including
It is positioned at the movable short column 1 of top, is positioned at the movable short column 3 12 of bottommost and is positioned at two movable short columns two at middle part
11, all installed by short column adapter sleeve 10 between adjacent two short columns and connect, be positioned at above the movable short column 1 at top and weld
There is steel plate to cover, and the height of this activity short column 1 should be greater than the outer radius of steel pipe, i.e. 203mm;Movable short column 3 12 end
Face is welded with the seat board contacted with ground.Additionally, according to depositing needs, movable short column 1 is interchangeable with movable short column 2 11
Position.The height of short column one, short column two and short column three is all to be advisable between 1000mm-1200mm.
Vertical columns 1 and active column all use the lattice type steel column that channel-section steel makes, and for ease of forklift transport, column total height is not
The lifting altitude of fork truck should be exceeded.
Often between group vertical columns 1 and active column, five crossbeams are installed, parallel installation between each crossbeam, upper and lower crossbeam
Spacing more than the overall diameter 406mm of steel pipe, i.e. constitute steel pipe and deposit layer;
In five crossbeams that often group is installed, including being arranged on a crossbeam 2 14 of bottommost and being arranged on four of middle part
Crossbeam 1;
Wherein, crossbeam 2 14 be fixedly connected on bottom vertical columns 1 and bottom active column between, at crossbeam 2 14 two ends and
Column bottom is all machined with installation connecting hole, and crossbeam 2 14 is fixing with two ends respectively by crossbeam seat board 8 and fastening bolt 7
Fix bottom column 1 and bottom active column and connect.
Crossbeam 1 be arranged in the middle part of vertical columns 1 and in the middle part of active column between, as shown in Figure 3 a and Figure 3 b shows, in activity
Being welded with draw-in groove 3 in column seating side, this draw-in groove 3 is welded to form by two U-section superpositions, is positioned at outside U-shaped type
At material U-shaped mouth, distance is less than being positioned at distance at the U-section U-shaped mouth of inner side, after draw-in groove 3 is welded on active column, is positioned at
U-shaped groove is formed between U-section and the active column in outside.Crossbeam 2 14 uses I-steel to make, and both ends are welded with
The end plate perpendicular with crossbeam 2 14, end plate is concordant with the flange plate up and down of crossbeam 2 14;At geosynclinal concave notch longitudinally wide be preferably
1.5 times of crossbeam 2 14 end plate thickness, at end plate width ratio draw-in groove 3 groove port, lateral length is apart from little 10mm;Crossbeam two
End plate is inserted in draw-in groove 3 groove port by 14, and has installing hole in end plate top and middle part position on the lower side, and end plate top leads to
Cross adjustment bolt 6 to be connected with active column, be connected with the U-section of draw-in groove 3 by adjustment bolt 6 in the middle part of end plate, described
Crossbeam is inserted in draw-in groove by end plate, forms top pressure relation with column and crossbeam end plate respectively, by adjusting by adjusting bolt 6
Joint adjusts the degree of tightness of bolt 6, can adjust the gap between crossbeam 2 14 and active column, such as, insert draw-in groove at crossbeam 2 14
During 3, if because of crossbeam 2 14 carrying or ground inequality reason, causing between the opening of active column and vertical columns 1
Away from diminishing or becoming big, make crossbeam 2 14 cannot insert draw-in groove 3, the adjustment bolt 6 of lower floor can be screwed, adjust aperture pitch,
Make crossbeam can insert draw-in groove 3 smoothly.
Connected mode between crossbeam 2 14 with the connected mode of vertical columns 1 and crossbeam 2 14 and active column is identical.
As in figure 2 it is shown, in order to strengthen the stability between each longeron, between the top of vertical columns 1, between bottom and
There is support angle steel 4 diagonally adjacent all connection by support connecting plate 2 and fastening bolt 7;Between bottom active column also admittedly
Determine connection and have support angle steel 4.
Specifically used operating process of the present utility model is as follows:
Deposit steel pipe: first pass through support angle steel 4, crossbeam 2 14 and bolt, by vertical columns 1 with movable short column 3 12 even
Connect fixing, form ground floor (bottom) rock-steady structure of storage rack.After ground floor steel pipe is piled, by two short columns two successively
Short column below insertion, then inserts in the vertical columns 1 of draw-in groove 3 correspondence and the groove port of movable short column, i.e. by crossbeam 1
The second layer can be formed and third layer deposits layer, now can continue steel pipe is put into storage rack.Finally activity short column 1 is plugged on
The top, forms storage rack top, now storage rack can be occupied steel pipe.
Transport steel pipe: use crane gear, after all being taken out by the superiors' steel pipe, taken out from draw-in groove 3 by crossbeam 1,
The crane gears such as a machine, bridge machine, truck crane now can be used to be taken out by lower floor's steel pipe.Fortune steel pipe is taken for fork truck in considering workshop,
Advise, after crossbeam 2 14 takes out, useless movable short column one or movable short column two being removed, thus reducing forklift lifting
Highly, Zai Quyun lower floor steel pipe.By that analogy, until taking out orlop steel pipe.
Claims (6)
1. a Combined section bar storage rack, is installed by crossbeam and longeron and forms, it is characterised in that:
Described longeron is arranged side by side is formed by a pair vertical columns and a pair active column;
Described active column is vertically connected by some movable short columns and forms;
Connected by parallel installation of some described crossbeams between vertical columns with active column;
Constitute section bar between upper and lower crossbeam and deposit layer.
2. a kind of Combined section bar storage rack, it is characterised in that:
Described crossbeam includes the crossbeam two being arranged on bottom and is arranged on the crossbeam one at middle part;
Described crossbeam two be fixedly connected on bottom vertical columns and bottom active column between;
Described crossbeam one be arranged in the middle part of vertical columns and in the middle part of active column between.
3. a kind of Combined section bar storage rack, it is characterised in that:
Being installed with draw-in groove on described vertical columns, described beam-end is provided with end plate;
Described crossbeam is inserted in draw-in groove by end plate, and is connected with the column top pressure at draw-in groove and two ends respectively by adjusting bolt;
Adjusted the degree of tightness of bolt by regulation, the gap between crossbeam two and two ends column can be adjusted.
4. a kind of Combined section bar storage rack, it is characterised in that:
Described crossbeam two by beam seat plate and fastening bolt respectively with the vertical columns at two ends bottom and active column bottom fixing
Connect.
5. a kind of Combined section bar storage rack, it is characterised in that:
Described active column by be positioned at top movable short column one, be positioned at middle part movable short column two and be positioned at bottom activity short
Post three passes sequentially through short column adapter sleeve and vertically connects composition;
Being welded with steel plate capping above described movable short column one, its height is not less than 1/2nd of profile height to be stored;
Described movable short column two height is not less than profile height to be stored;
Described movable short column three bottom surface is welded with seat board, contacts with ground.
6. a kind of Combined section bar storage rack, it is characterised in that:
Between described vertical columns top, between bottom and diagonally adjacent be respectively connected with support angle steel;
Connect between bottom described active column and have support angle steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620489739.8U CN205771294U (en) | 2016-05-26 | 2016-05-26 | A kind of Combined section bar storage rack |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620489739.8U CN205771294U (en) | 2016-05-26 | 2016-05-26 | A kind of Combined section bar storage rack |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205771294U true CN205771294U (en) | 2016-12-07 |
Family
ID=58110126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620489739.8U Expired - Fee Related CN205771294U (en) | 2016-05-26 | 2016-05-26 | A kind of Combined section bar storage rack |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205771294U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107140475A (en) * | 2017-06-30 | 2017-09-08 | 湖州杰盛高科纺织有限公司 | A kind of detachable double-layer cloth rack |
CN111055744A (en) * | 2019-12-20 | 2020-04-24 | 无锡市宏泰商品混凝土有限公司 | Storage and transportation trailer for concrete conveying pipe |
-
2016
- 2016-05-26 CN CN201620489739.8U patent/CN205771294U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107140475A (en) * | 2017-06-30 | 2017-09-08 | 湖州杰盛高科纺织有限公司 | A kind of detachable double-layer cloth rack |
CN111055744A (en) * | 2019-12-20 | 2020-04-24 | 无锡市宏泰商品混凝土有限公司 | Storage and transportation trailer for concrete conveying pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205771294U (en) | A kind of Combined section bar storage rack | |
CN201932489U (en) | Plate storing and transporting tool | |
CN103803446A (en) | Supporting device | |
CN203770835U (en) | Spliced structure of modularized pipe gallery transportation unit | |
CN204024084U (en) | Easy unloading type triangular pipe truss just spells moulding bed | |
CN217461470U (en) | Thick and large template structure in compact space | |
CN103334584B (en) | Template regulating system for sliding form system | |
CN202780329U (en) | Three-dimensional adjusting structure for butt-jointing welding pieces | |
CN203062175U (en) | Welding tool of rail | |
CN2770895Y (en) | Movable dieframe for storing large-sized dies | |
CN205600693U (en) | Frame is put to portable stirrup | |
CN212222192U (en) | Petrochemical device module with guide rail sliding block | |
CN114348870A (en) | Installation device and installation method for internal equipment of large-scale chemical equipment | |
CN204919348U (en) | Supplementary head tower of using of self anchored suspension bridge installation | |
CN210823588U (en) | Storage device for slender metal components | |
CN210482063U (en) | Wedge-shaped device for bottom die unloading | |
CN203245325U (en) | Main rack of forging press | |
CN113401498A (en) | Three-dimensional storage and transfer frame for separated plate components | |
DE202011110853U1 (en) | Means for repairing metal shelves | |
CN103343620B (en) | Sliding form system for kai (being a Chinese character and meaning open in English)-shaped lifting frame with adjustable width | |
CN201620592U (en) | Scaffold double-steel-pipe welding base | |
CN104648876A (en) | Cantilever structure for cantilever type goods shelf and arrangement method for cantilever structure | |
CN213976095U (en) | Light stacker stand column | |
CN218752476U (en) | Steel reinforcement cage strorage device | |
CN210968843U (en) | Steel part placing frame convenient to assemble |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161207 Termination date: 20170526 |
|
CF01 | Termination of patent right due to non-payment of annual fee |