CN205766736U - Shear wall internal stay is machining tool in batches - Google Patents

Shear wall internal stay is machining tool in batches Download PDF

Info

Publication number
CN205766736U
CN205766736U CN201620505603.1U CN201620505603U CN205766736U CN 205766736 U CN205766736 U CN 205766736U CN 201620505603 U CN201620505603 U CN 201620505603U CN 205766736 U CN205766736 U CN 205766736U
Authority
CN
China
Prior art keywords
internal stay
command
outside framework
shear wall
outer frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620505603.1U
Other languages
Chinese (zh)
Inventor
吴智
刘圣国
钟昌富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN201620505603.1U priority Critical patent/CN205766736U/en
Application granted granted Critical
Publication of CN205766736U publication Critical patent/CN205766736U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a shear force wall internal stay is machining tool in batches, first long outer frame (1), the long outer frame of second (7), first short outer frame (4) and the short outer frame of second (6) enclose into a rectangular frame first long outer frame (1) with the long outer frame of second (7) between be connected with many interior wall (3), adjacent interior wall (3) with rectangular frame between be formed with interior bracing member cavity (8) that are used for making interior bracing member. The connection form of each component is fixed by adopting double-sided spot welding. The batch processing tool for the shear wall inner support has the advantages of simple structure, convenient and labor-saving operation, practicality, convenient material drawing and economy while ensuring the quality of the manufactured inner support component.

Description

A kind of shear wall internal stay batch machining instrument
Technical field
This utility model relates to a kind of internal stay machining tool, particularly relates to a kind of shear wall internal stay Batch machining instrument.
Background technology
Shear wall is the body of wall watered by armored concrete.Reinforced concrete shear wall not only has Good vertical bearing capacity, and there is the ability resisting horizontal loading very well, extensively apply In architectural design.Guarantee to water to well control the spacing of shear wall formwork at work progress Build up the shear wall's thickness error of type in specification allowed band.General way is at shear wall It is horizontally disposed with internal stay component between two side templates, comes between Control architecture by inserting internal stay component Away from, to ensure shear wall entity flatness.Job site uses the quantity of internal stay very greatly, needs Batch production could meet the requirement of construction speed.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of at construction site energy Make batch concrete internal stay component easily and fast, it is ensured that the shear wall internal stay of construction speed is criticized Amount machining tool.
In order to solve above-mentioned technical problem, the shear wall internal stay batch machining that this utility model provides Instrument, the first long outside framework, the second long outside framework, the first short outside framework and the second short outside framework Surround a rectangular frame, the first long outside framework of rectangular frame and the second long outside framework it Between connect have many in cut off, be formed for making between adjacent interior partition and rectangular frame Make the internal stay member cavities of internal stay component.
Further, rectangular frame is provided with the first in command and the second in command.
Specifically, the first in command and the second in command are welded on the first long outside framework and the second long housing On frame.
The spacing of the first in command and the second in command is 1m.
Use the shear wall internal stay batch machining instrument of technique scheme, during use, workman's hands Hold the first in command and this utility model is lain in ground by the second in command, in concrete is injected into In support member cavities, then workman holds the first in command and this utility model is taken by the second in command Walk, concrete curing after be internal stay component.This utility model has the advantages that
(1) draw materials convenient, easy to process;
(2) according to job site situation, suitable rapidoprint can freely be chosen;
(3) easy and simple to handle, use flexibly;
(4) cost-effective, save time, easy left-hand seat, it is not required to skilled worker.
In sum, this utility model is that one can make easily and fast at construction site Concrete internal stay component in batches, it is ensured that the shear wall internal stay batch machining instrument of construction speed.
Accompanying drawing explanation
Fig. 1 is the schematic three dimensional views of this utility model product;
Fig. 2 is the left elevation of this utility model product;
Fig. 3 is this utility model product top view;
Fig. 4 is elevation before this utility model product;
In figure:
The long outside framework of 1-first 1;The 2-first in command 2;3 are cut off in 3-;The short housing of 4-first Frame 4;The 5-second in command 5;The short outside framework of 6-second 6;The long outside framework of 7-second 7;8-internal stay Member cavities.
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings.
See Fig. 1, Fig. 2, Fig. 3 and Fig. 4, first long outside framework the 1, second long outside framework 7, First short outside framework 4 and the second short outside framework 6 surround a rectangular frame, at rectangular frame The first long outside framework 1 and the second long outside framework 7 between be connected have many in cut off 3, adjacent Interior partition 3 and rectangular frame between to be formed with internal stay component for manufacturing internal stay component empty Chamber 8.
Further, rectangular frame is provided with the first in command 2 and the second in command 5.
Specifically, the first in command 2 and the second in command 5 are welded on the first long outside framework 1 and second On long outside framework 7.The spacing of the first in command 2 and the second in command 5 is 1m.
The type of attachment of each component all uses two-sided welding.
See Fig. 1, Fig. 2, Fig. 3 and Fig. 4, first determine first according to the length of internal stay component Long outside framework 1, second long outside framework 7, first short outside framework the 4, second short outside framework 6 and interior Cut off the size of 3.First by first long outside framework the 1, second long outside framework 7 and the first short housing Frame the 4, second short outside framework 6 spot welding is fixed;Size according to internal stay component is by interior partition 3 first Also spot welding is taked to fix with the first long outside framework 1 and the second long outside framework 7 after discharge is good;Then The first in command 2 and the second in command 5 are welded with rectangular frame.
Seeing Fig. 1, Fig. 2, Fig. 3 and Fig. 4, during use, workman holds the first in command 2 He This utility model is lain in ground by the second in command 5, and concrete is injected into internal stay member cavities In 8, then workman holds the first in command 2 and this utility model is taken away by the second in command 5, mixed It is internal stay component after solidifying soil solidification.

Claims (4)

1. a shear wall internal stay batch machining instrument, it is characterised in that: the first long outside framework (1), the second long outside framework (7), the first short outside framework (4) and the second short outside framework (6) surround one Rectangular frame, the long outside framework of first described in described rectangular frame (1) with described The second long outside framework (7) between connect have many in cut off (3), adjacent described interior partition (3) the internal stay component for manufacturing internal stay component and it is formed with between described rectangular frame empty Chamber (8).
Shear wall internal stay batch machining instrument the most according to claim 1, its feature exists In: on described rectangular frame, it is provided with the first in command (2) and the second in command (5).
Shear wall internal stay batch machining instrument the most according to claim 2, its feature exists In: the described first in command (2) and the described second in command (5) are welded on outside the first described length On framework (1) and the described second long outside framework (7).
Shear wall internal stay batch machining instrument the most according to claim 2, its feature exists In: the spacing of the described first in command (2) and the described second in command (5) is 1m.
CN201620505603.1U 2016-05-30 2016-05-30 Shear wall internal stay is machining tool in batches Expired - Fee Related CN205766736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620505603.1U CN205766736U (en) 2016-05-30 2016-05-30 Shear wall internal stay is machining tool in batches

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620505603.1U CN205766736U (en) 2016-05-30 2016-05-30 Shear wall internal stay is machining tool in batches

Publications (1)

Publication Number Publication Date
CN205766736U true CN205766736U (en) 2016-12-07

Family

ID=59979999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620505603.1U Expired - Fee Related CN205766736U (en) 2016-05-30 2016-05-30 Shear wall internal stay is machining tool in batches

Country Status (1)

Country Link
CN (1) CN205766736U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106994740A (en) * 2017-04-21 2017-08-01 云南建投第六建设有限公司 A kind of method of scene self-control pea gravel concreten wall column inner bracing strip

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106994740A (en) * 2017-04-21 2017-08-01 云南建投第六建设有限公司 A kind of method of scene self-control pea gravel concreten wall column inner bracing strip

Similar Documents

Publication Publication Date Title
CN206057056U (en) A kind of instrument for making the prefabricated crack of concrete test block
CN205766736U (en) Shear wall internal stay is machining tool in batches
CN104141351A (en) Sealing method for reserved paying-off hole and paying-off hole mold
CN201865245U (en) Steel pipe concrete column with transverse and longitudinal stiffening plates
CN203684414U (en) Rapid blocking structure of screw hole of concrete structure outer wall
CN103452319A (en) Chiseling-free device for concrete splicing interface and construction method for chiseling-free device
CN205530340U (en) Precast concrete retaining wall block
CN202575889U (en) Brick clamping machine of aerated concrete building block
CN204566362U (en) A kind of energy-conservation environmental protection wall plate automatic assembly line
CN210233487U (en) Concrete mixing pouring device
CN102240720A (en) Environment-friendly liquid extrusion method
CN202370010U (en) Post-cast strip structure
CN103321413A (en) Bolt sleeve and waterproof through-wall bolt device for formwork support
CN208486585U (en) It is a kind of exempt to demolish walls reinforce the device of side column
CN202299442U (en) Concrete slurry casting device
CN205735430U (en) Brick compacting mold
CN202324668U (en) Multifunctional ruler for building communication wall body
CN105328771A (en) Method for manufacturing hollow block in laboratory room, special die and manufacturing method of special die
CN203334675U (en) Bolt sleeve and waterproof through-wall bolt device for supporting template of bolt sleeve
CN203569693U (en) Pre-buried iron part with steel ties arranged on concrete structure
CN207295425U (en) A kind of hole-forming device for bridge pad pinner anchor hole
CN208456108U (en) Body flexible connection of building a wall after a kind of seismic crack pours mold
CN202644483U (en) Pier large steel template
CN206230190U (en) A kind of device for the welding of tunnel steel arch frame lock foot anchor tube locating ring
CN206144186U (en) Structure of bamboo reinforcement recycled concrete increase method of section reinforcing concrete post

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161207

Termination date: 20210530

CF01 Termination of patent right due to non-payment of annual fee