CN205766736U - Shear wall internal stay is machining tool in batches - Google Patents
Shear wall internal stay is machining tool in batches Download PDFInfo
- Publication number
- CN205766736U CN205766736U CN201620505603.1U CN201620505603U CN205766736U CN 205766736 U CN205766736 U CN 205766736U CN 201620505603 U CN201620505603 U CN 201620505603U CN 205766736 U CN205766736 U CN 205766736U
- Authority
- CN
- China
- Prior art keywords
- internal stay
- command
- outside framework
- shear wall
- outer frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003754 machining Methods 0.000 title claims abstract description 13
- 238000005192 partition Methods 0.000 claims description 4
- 238000004519 manufacturing process Methods 0.000 claims description 2
- 238000003466 welding Methods 0.000 abstract description 4
- 239000000463 material Substances 0.000 abstract description 2
- 239000004567 concrete Substances 0.000 description 6
- 238000010276 construction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 2
- 238000010923 batch production Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a shear force wall internal stay is machining tool in batches, first long outer frame (1), the long outer frame of second (7), first short outer frame (4) and the short outer frame of second (6) enclose into a rectangular frame first long outer frame (1) with the long outer frame of second (7) between be connected with many interior wall (3), adjacent interior wall (3) with rectangular frame between be formed with interior bracing member cavity (8) that are used for making interior bracing member. The connection form of each component is fixed by adopting double-sided spot welding. The batch processing tool for the shear wall inner support has the advantages of simple structure, convenient and labor-saving operation, practicality, convenient material drawing and economy while ensuring the quality of the manufactured inner support component.
Description
Technical field
This utility model relates to a kind of internal stay machining tool, particularly relates to a kind of shear wall internal stay
Batch machining instrument.
Background technology
Shear wall is the body of wall watered by armored concrete.Reinforced concrete shear wall not only has
Good vertical bearing capacity, and there is the ability resisting horizontal loading very well, extensively apply
In architectural design.Guarantee to water to well control the spacing of shear wall formwork at work progress
Build up the shear wall's thickness error of type in specification allowed band.General way is at shear wall
It is horizontally disposed with internal stay component between two side templates, comes between Control architecture by inserting internal stay component
Away from, to ensure shear wall entity flatness.Job site uses the quantity of internal stay very greatly, needs
Batch production could meet the requirement of construction speed.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of at construction site energy
Make batch concrete internal stay component easily and fast, it is ensured that the shear wall internal stay of construction speed is criticized
Amount machining tool.
In order to solve above-mentioned technical problem, the shear wall internal stay batch machining that this utility model provides
Instrument, the first long outside framework, the second long outside framework, the first short outside framework and the second short outside framework
Surround a rectangular frame, the first long outside framework of rectangular frame and the second long outside framework it
Between connect have many in cut off, be formed for making between adjacent interior partition and rectangular frame
Make the internal stay member cavities of internal stay component.
Further, rectangular frame is provided with the first in command and the second in command.
Specifically, the first in command and the second in command are welded on the first long outside framework and the second long housing
On frame.
The spacing of the first in command and the second in command is 1m.
Use the shear wall internal stay batch machining instrument of technique scheme, during use, workman's hands
Hold the first in command and this utility model is lain in ground by the second in command, in concrete is injected into
In support member cavities, then workman holds the first in command and this utility model is taken by the second in command
Walk, concrete curing after be internal stay component.This utility model has the advantages that
(1) draw materials convenient, easy to process;
(2) according to job site situation, suitable rapidoprint can freely be chosen;
(3) easy and simple to handle, use flexibly;
(4) cost-effective, save time, easy left-hand seat, it is not required to skilled worker.
In sum, this utility model is that one can make easily and fast at construction site
Concrete internal stay component in batches, it is ensured that the shear wall internal stay batch machining instrument of construction speed.
Accompanying drawing explanation
Fig. 1 is the schematic three dimensional views of this utility model product;
Fig. 2 is the left elevation of this utility model product;
Fig. 3 is this utility model product top view;
Fig. 4 is elevation before this utility model product;
In figure:
The long outside framework of 1-first 1;The 2-first in command 2;3 are cut off in 3-;The short housing of 4-first
Frame 4;The 5-second in command 5;The short outside framework of 6-second 6;The long outside framework of 7-second 7;8-internal stay
Member cavities.
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings.
See Fig. 1, Fig. 2, Fig. 3 and Fig. 4, first long outside framework the 1, second long outside framework 7,
First short outside framework 4 and the second short outside framework 6 surround a rectangular frame, at rectangular frame
The first long outside framework 1 and the second long outside framework 7 between be connected have many in cut off 3, adjacent
Interior partition 3 and rectangular frame between to be formed with internal stay component for manufacturing internal stay component empty
Chamber 8.
Further, rectangular frame is provided with the first in command 2 and the second in command 5.
Specifically, the first in command 2 and the second in command 5 are welded on the first long outside framework 1 and second
On long outside framework 7.The spacing of the first in command 2 and the second in command 5 is 1m.
The type of attachment of each component all uses two-sided welding.
See Fig. 1, Fig. 2, Fig. 3 and Fig. 4, first determine first according to the length of internal stay component
Long outside framework 1, second long outside framework 7, first short outside framework the 4, second short outside framework 6 and interior
Cut off the size of 3.First by first long outside framework the 1, second long outside framework 7 and the first short housing
Frame the 4, second short outside framework 6 spot welding is fixed;Size according to internal stay component is by interior partition 3 first
Also spot welding is taked to fix with the first long outside framework 1 and the second long outside framework 7 after discharge is good;Then
The first in command 2 and the second in command 5 are welded with rectangular frame.
Seeing Fig. 1, Fig. 2, Fig. 3 and Fig. 4, during use, workman holds the first in command 2 He
This utility model is lain in ground by the second in command 5, and concrete is injected into internal stay member cavities
In 8, then workman holds the first in command 2 and this utility model is taken away by the second in command 5, mixed
It is internal stay component after solidifying soil solidification.
Claims (4)
1. a shear wall internal stay batch machining instrument, it is characterised in that: the first long outside framework
(1), the second long outside framework (7), the first short outside framework (4) and the second short outside framework (6) surround one
Rectangular frame, the long outside framework of first described in described rectangular frame (1) with described
The second long outside framework (7) between connect have many in cut off (3), adjacent described interior partition
(3) the internal stay component for manufacturing internal stay component and it is formed with between described rectangular frame empty
Chamber (8).
Shear wall internal stay batch machining instrument the most according to claim 1, its feature exists
In: on described rectangular frame, it is provided with the first in command (2) and the second in command (5).
Shear wall internal stay batch machining instrument the most according to claim 2, its feature exists
In: the described first in command (2) and the described second in command (5) are welded on outside the first described length
On framework (1) and the described second long outside framework (7).
Shear wall internal stay batch machining instrument the most according to claim 2, its feature exists
In: the spacing of the described first in command (2) and the described second in command (5) is 1m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620505603.1U CN205766736U (en) | 2016-05-30 | 2016-05-30 | Shear wall internal stay is machining tool in batches |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620505603.1U CN205766736U (en) | 2016-05-30 | 2016-05-30 | Shear wall internal stay is machining tool in batches |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205766736U true CN205766736U (en) | 2016-12-07 |
Family
ID=59979999
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620505603.1U Expired - Fee Related CN205766736U (en) | 2016-05-30 | 2016-05-30 | Shear wall internal stay is machining tool in batches |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205766736U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106994740A (en) * | 2017-04-21 | 2017-08-01 | 云南建投第六建设有限公司 | A kind of method of scene self-control pea gravel concreten wall column inner bracing strip |
-
2016
- 2016-05-30 CN CN201620505603.1U patent/CN205766736U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106994740A (en) * | 2017-04-21 | 2017-08-01 | 云南建投第六建设有限公司 | A kind of method of scene self-control pea gravel concreten wall column inner bracing strip |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206057056U (en) | A kind of instrument for making the prefabricated crack of concrete test block | |
CN205766736U (en) | Shear wall internal stay is machining tool in batches | |
CN104141351A (en) | Sealing method for reserved paying-off hole and paying-off hole mold | |
CN201865245U (en) | Steel pipe concrete column with transverse and longitudinal stiffening plates | |
CN203684414U (en) | Rapid blocking structure of screw hole of concrete structure outer wall | |
CN103452319A (en) | Chiseling-free device for concrete splicing interface and construction method for chiseling-free device | |
CN205530340U (en) | Precast concrete retaining wall block | |
CN202575889U (en) | Brick clamping machine of aerated concrete building block | |
CN204566362U (en) | A kind of energy-conservation environmental protection wall plate automatic assembly line | |
CN210233487U (en) | Concrete mixing pouring device | |
CN102240720A (en) | Environment-friendly liquid extrusion method | |
CN202370010U (en) | Post-cast strip structure | |
CN103321413A (en) | Bolt sleeve and waterproof through-wall bolt device for formwork support | |
CN208486585U (en) | It is a kind of exempt to demolish walls reinforce the device of side column | |
CN202299442U (en) | Concrete slurry casting device | |
CN205735430U (en) | Brick compacting mold | |
CN202324668U (en) | Multifunctional ruler for building communication wall body | |
CN105328771A (en) | Method for manufacturing hollow block in laboratory room, special die and manufacturing method of special die | |
CN203334675U (en) | Bolt sleeve and waterproof through-wall bolt device for supporting template of bolt sleeve | |
CN203569693U (en) | Pre-buried iron part with steel ties arranged on concrete structure | |
CN207295425U (en) | A kind of hole-forming device for bridge pad pinner anchor hole | |
CN208456108U (en) | Body flexible connection of building a wall after a kind of seismic crack pours mold | |
CN202644483U (en) | Pier large steel template | |
CN206230190U (en) | A kind of device for the welding of tunnel steel arch frame lock foot anchor tube locating ring | |
CN206144186U (en) | Structure of bamboo reinforcement recycled concrete increase method of section reinforcing concrete post |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||