CN205750592U - The humiture automatic regulating system of power equipment prefabricated cabin - Google Patents

The humiture automatic regulating system of power equipment prefabricated cabin Download PDF

Info

Publication number
CN205750592U
CN205750592U CN201521074372.5U CN201521074372U CN205750592U CN 205750592 U CN205750592 U CN 205750592U CN 201521074372 U CN201521074372 U CN 201521074372U CN 205750592 U CN205750592 U CN 205750592U
Authority
CN
China
Prior art keywords
cabin
air
heater
temperature
conditioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521074372.5U
Other languages
Chinese (zh)
Inventor
王苏娥
高玮
孔祥敏
张文灏
宋巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanxi Electric Power Survey Design & Research Institute Co., Ltd.
Original Assignee
State Grid Shandong Electrical Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electrical Design Institute filed Critical State Grid Shandong Electrical Design Institute
Priority to CN201521074372.5U priority Critical patent/CN205750592U/en
Application granted granted Critical
Publication of CN205750592U publication Critical patent/CN205750592U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Air Conditioning Control Device (AREA)
  • Air-Conditioning For Vehicles (AREA)

Abstract

The humiture automatic regulating system of power equipment prefabricated cabin belongs to power transmission and distribution project technical field.It is made up of thermostat units, monitoring unit two large divisions.Thermostat units is made up of two air-conditionings, 6, two heaters 7 of 5, two exhaust fans.Monitoring unit is formed by being above filled with the switch board 1 of monitor screen 2, temperature sensor 3,4, four catalysts 8 of Temperature Humidity Sensor and five control main power, air-conditioning 5, exhaust fan 6, the press buttones 9 of heater 7.When temperature out of range in cabin experienced by two sensors, make air-conditioning 5, exhaust fan 6, heater 7, be respectively started according to cabin temperature height, constitute different homoiothermics and run system, make cabin temperature control at 18~25 DEG C.According to temperature height, air-conditioning 5, exhaust fan 6 are used alternatingly, use heater 7, it is ensured that proper temperature in cabin, using electricity wisely in good time, cut operating costs.For power equipment prefabricated cabin.

Description

The humiture automatic regulating system of power equipment prefabricated cabin
Technical field
Power transmission and distribution project.
Background technology
The secondary device of power equipment has many to be the equipment of semiconductor components and devices ginseng group, and these equipment are warm and humid to environment Degree, electromagnetism interference requirement higher.When running in they are placed in outdoor local mounted metal prefabricated cabin, in order in summer High temperature, winter severe cold environment in can be properly functioning, in cabin, humiture must timely adjustment.Present way is to install air-conditioning Solve;But the spring and autumn that homoiothermic amplitude is little or even early summer winter Mo total air-conditioning, not only increase operation cost, and shorten air-conditioning Years Of Service.
Summary of the invention
The humiture automatic regulating system of power equipment prefabricated cabin to solve the technical problem that and to be: according to temperature changes in temperature journey Degree, the ventilation in automatic alternate run cabin, air-conditioning, heater.
The technical scheme is that installing air-conditioning, exhaust fan, heater in prefabricated cabin, and automatic by monitoring system in cabin Manipulation, it is ensured that the operation of the suitable below deck equipment of humiture in cabin.
The humiture automatic regulating system (accompanying drawing) of power equipment prefabricated cabin is by thermostat units, monitoring unit two large divisions's group Become.Thermostat units is made up of two air-conditionings, 6, two heaters 7 of 5, two exhaust fans.Two air-conditionings 5 are attached separately to passageway in cabin The center on top, two halves cabin, top, averraged space in cabin.Two exhaust fans 6 are attached separately to leaning on of nacelle two halves Hou Qiang axis At nearly top, cabin, averraged space in cabin;The air intake window of band filter screen is had at front wall symmetry.Two heaters 7 are attached separately to nacelle Two halves front wall axis by being located in, averraged space in cabin.
Monitoring unit is by being above filled with the switch board 1 of monitor screen 2, temperature sensor 3, Temperature Humidity Sensor 4, four contact 8, five press buttones 9 of device form.Five press buttones 9 control the power supply of switch board 1,5, two exhaust fans of two air-conditionings respectively 6, the power supply of two heaters 7.Four 8: two, catalysts control two air-conditionings 5 respectively;One controls two aerofluxuss in parallel Fan 6;One controls two heaters 7 in parallel.
Four catalysts 8, temperature sensor 3, Temperature Humidity Sensor 4 it is filled with in switch board 1.It is filled with power supply on monitor screen 2 Voltmeter, frequency meter, be filled with the button 9 of two air-conditionings, 6, two heaters 7 of 5, two exhaust fans, fuse, ammeter, instruction Lamp.Switch board 1 has earth lead.
Temperature sensor 3, Temperature Humidity Sensor 4, experience temperature in cabin when exceeding temperature control scope, through catalyst 8, control respectively Air-conditioning 5 processed, exhaust fan 6, heater 7 run homoiothermic.
The humiture automatic regulating system of power equipment prefabricated cabin provides the benefit that: according to temperature height, be used alternatingly Air-conditioning 5, exhaust fan 6, use heater 7 in good time, can be with using electricity wisely, humiture required in both having ensure that cabin;Can reduce again Operation cost, extends the service life of temperature equipment.
Accompanying drawing explanation
Accompanying drawing shows the humiture automatic regulating system structural representation of power equipment prefabricated cabin.
In figure: 1 switch board;2 monitor screens;3 temperature sensors;4 Temperature Humidity Sensors;5—— Air-conditioning;6 exhaust fans;7 heaters;8 catalysts;9 press buttones.
Detailed description of the invention
Air-conditioning 5 uses the split ceiling-mounted type air conditioner having power failure self-starting function.Two air-conditionings use major-minor mode to run, if Determining ladder start-up temperature, main air-conditioning can not meet cooling and be taken, and auxiliary air-conditioning starts in time, jointly lowers the temperature.Exhaust fan 6 is axial flow Formula, ventilation 1000m3/h.Heater 7 is oil matchmaker's heat dissipation type, power 2000W/ platform.
Air-conditioning 5, exhaust fan 6, heater 7 alternate run system as follows: in cabin, temperature is when 24~26 DEG C, start exhaust fan 6 run;When 26~28 DEG C, start exhaust fan 6 and main air-conditioning 5 runs;When 28~30 DEG C, start major-minor air-conditioning 5 and run;25~18 DEG C time, close exhaust fan 6, air-conditioning 5;During less than 18 DEG C, start heater 7 and run.Air-conditioning uses wheel to keep on duty, it is to avoid a director Phase is run, all the load use time.
In cabin, temperature controls at 18~25 DEG C.

Claims (4)

1. the humiture automatic regulating system of power equipment prefabricated cabin, the ventilation in automatic alternate run cabin, air-conditioning, heater, It is characterized in that: be made up of thermostat units, monitoring unit two large divisions;Thermostat units by two air-conditionings (5), two exhaust fans (6), Two heater (7) compositions;Two air-conditionings (5) are attached separately in cabin that above passageway the center on top, two halves cabin;Two exhaust fans (6) It is attached separately to, at the top, close cabin of nacelle two halves Hou Qiang axis, at front wall symmetry, have the air intake window of band filter screen;Two heaters (7) be attached separately to nacelle two halves front wall axis by being located in;Monitoring unit by be above filled with monitor screen (2) switch board (1), Temperature sensor (3), Temperature Humidity Sensor (4), four catalysts (8), five press button (9) compositions;Five press buttones (9) power supply of switch board (1), two air-conditionings (5), two exhaust fans (6), the power supplys of two heaters (7) are controlled respectively;Four Catalyst (8), two control two air-conditionings (5) respectively, and one controls two exhaust fans in parallel (6), and one controls two also The heater (7) of connection;Four catalysts (8), temperature sensor (3), Temperature Humidity Sensor (4) it is filled with in switch board (1);Monitoring It is filled with line voltmeter, frequency meter on screen (2);It is filled with two air-conditionings (5), two exhaust fans (6), the pressing of two heater (7) Button switch (9), fuse, ammeter, display lamp;Switch board (1) has earth lead.
The humiture automatic regulating system of power equipment prefabricated cabin the most according to claim 1, is characterized in that: air-conditioning (5) It it is the split ceiling type having power failure self-starting function.
The humiture automatic regulating system of power equipment prefabricated cabin the most according to claim 1, is characterized in that: exhaust fan (6) it is axial-flow type, ventilation 1000m3/h。
The humiture automatic regulating system of power equipment prefabricated cabin the most according to claim 1, is characterized in that: heater (7) it is oil matchmaker's heat dissipation type, power 2000W/ platform.
CN201521074372.5U 2015-12-23 2015-12-23 The humiture automatic regulating system of power equipment prefabricated cabin Active CN205750592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521074372.5U CN205750592U (en) 2015-12-23 2015-12-23 The humiture automatic regulating system of power equipment prefabricated cabin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521074372.5U CN205750592U (en) 2015-12-23 2015-12-23 The humiture automatic regulating system of power equipment prefabricated cabin

Publications (1)

Publication Number Publication Date
CN205750592U true CN205750592U (en) 2016-11-30

Family

ID=57389077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521074372.5U Active CN205750592U (en) 2015-12-23 2015-12-23 The humiture automatic regulating system of power equipment prefabricated cabin

Country Status (1)

Country Link
CN (1) CN205750592U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108541186A (en) * 2018-03-22 2018-09-14 东莞理工学院 intelligent cooling system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108541186A (en) * 2018-03-22 2018-09-14 东莞理工学院 intelligent cooling system

Similar Documents

Publication Publication Date Title
CN101545660B (en) Indoor temperature and humidity independent control system
CN101476763B (en) Energy-saving control method of clean room and clean room thereof
CN107917509B (en) Control method of air conditioning system of machine room
CN204786887U (en) Automatically controlled box structure of air condensing units and air conditioner that has this structure
US20140242899A1 (en) Fan Coil Unit/CRAC Optimizer System
CN103486695A (en) Air conditioner fault diagnosis method based on theoretical model
CN108131755A (en) A kind of electrical equipment component cabinet humiture cooperative control method
JP2014185832A (en) Air conditioning system, air conditioning control device, and air conditioning system control method
CN108592336A (en) Dehumidification control method and air conditioner in machine room for air conditioner in machine room
CN212108911U (en) Intelligent control system for ventilation air conditioner of factory building
KR20170084735A (en) The apparatus of energy management for computer room air conditioner in modular data center
CN205750592U (en) The humiture automatic regulating system of power equipment prefabricated cabin
CN112303853A (en) Control method of air suction type air conditioner
CN207335104U (en) A kind of exhaust apparatus for central air-conditioning
Fauchoux The effect of energy recovery on perceived air quality, energy consumption, and the economics of an office building
CN207365357U (en) Air conditioner energy saving air register
CN107504593A (en) A kind of fresh air purifying air conditioner dehumidification integral type unit
CN203149426U (en) Modular data room with automatically controlled temperature/humidity
US10274228B2 (en) Packaged HVAC unit with secondary system capability
KR101385584B1 (en) An automatic control system for cooling/heating and air-pressure in the buiding using the smart grid
EP3460349A1 (en) Latent heat reduction
CN206959689U (en) Cooling tower intelligent controlling device
EP3296652A1 (en) Method for reducing latent heat in a space
Munk et al. Residential Variable-Capacity Heat Pumps Sized to Heating Loads
CN103912919A (en) Marine total-climate air cooling air conditioner device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Huang Yu No. 89 building, 030002 Shanxi city of Taiyuan Province East 9 layer Xinghualing District

Patentee after: State Grid Shanxi Electric Power Survey Design & Research Institute Co., Ltd.

Address before: Huang Yu No. 89 building, 030002 Shanxi city of Taiyuan Province East 9 layer Xinghualing District

Patentee before: STATE GRID SHANDONG ELECTRICAL DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder