CN205741094U - A kind of five metals vee-block comprehensive removal internal stress device - Google Patents

A kind of five metals vee-block comprehensive removal internal stress device Download PDF

Info

Publication number
CN205741094U
CN205741094U CN201620405222.6U CN201620405222U CN205741094U CN 205741094 U CN205741094 U CN 205741094U CN 201620405222 U CN201620405222 U CN 201620405222U CN 205741094 U CN205741094 U CN 205741094U
Authority
CN
China
Prior art keywords
metals
vee
cylinder
block
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620405222.6U
Other languages
Chinese (zh)
Inventor
徐子光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan City Dong Xiao Hardware Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620405222.6U priority Critical patent/CN205741094U/en
Application granted granted Critical
Publication of CN205741094U publication Critical patent/CN205741094U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

This utility model relates to a kind of removal internal stress device, particularly relates to a kind of five metals vee-block comprehensive removal internal stress device.The technical problems to be solved in the utility model is to provide a kind of internal stress and eliminates completely, time-consuming, save the five metals vee-block comprehensive removal internal stress device of goods and materials, include base plate, spring I, flame frame, tank, right support, right bearing seat, screw mandrel, nut, ceiling hold, left shaft holder, servomotor, wedge, contact roller, fixed stop, spring II, elevating lever, cylinder I, briquetting, five metals vee-block, V shaped slab, cylinder II, fixed plate, guide plate and flame spray head, base plate top is sequentially provided with spring I from left to right, flame frame, tank and right support, spring I top connects V shaped slab, flame top of the trellis is provided with flame spray head.This utility model has reached internal stress and has eliminated complete, time-consuming, to save goods and materials effect, and simple to operate, easy to use.

Description

A kind of five metals vee-block comprehensive removal internal stress device
Technical field
This utility model relates to a kind of removing internal stress device, particularly relates to that a kind of five metals vee-block is comprehensive goes Except internal stress device.
Background technology
Traditional hardware, also referred to as " hardware ".Refer to gold, silver, copper, ferrum, five kinds of metals of stannum.Through people Work processing can make the art work such as cutter, sword or metal device.The five metals of modern society is the most extensive, such as Hardware & tools, five metals parts, haberdashery and hardware, architectural hardware and security protection articles for use etc..
Internal stress, refers to after external loads is removed, and still remains in the stress of interior of articles.It is due to The tissue of material internal macroscopic view or microcosmic there occurs that uneven change in volume produces.
Eliminate the several method of internal stress: one is that object is carried out heat treatment (for metal material, macromolecule The workpiece such as material);Two is to be put under natural conditions to carry out eliminating (i.e. natrual ageing elimination internal stress);Three are Manually eliminate by beaing the modes such as vibration;Four is to shake optimizing stress by ultrasonic impact, or changes The direction of varying stress.
There is internal stress and eliminate not exclusively, lose time, waste goods and materials in existing five metals vee-block removal internal stress Shortcoming, therefore need badly research and develop a kind of internal stress eliminate complete, time-consuming, save goods and materials five metals vee-block Comprehensive removal internal stress device.
Utility model content
(1) to solve the technical problem that
This utility model in order to overcome existing five metals vee-block remove internal stress exist internal stress eliminate not exclusively, Losing time, waste the shortcoming of goods and materials, the technical problems to be solved in the utility model is to provide a kind of internal stress Eliminate complete, time-consuming, to save goods and materials five metals vee-block comprehensive removal internal stress device.
(2) technical scheme
In order to solve above-mentioned technical problem, this utility model provides the such a comprehensive removal of five metals vee-block Internal stress device, include base plate, spring I, flame frame, tank, right support, right bearing seat, screw mandrel, Nut, ceiling hold, left shaft holder, servomotor, wedge, contact roller, fixed stop, spring II, Elevating lever, cylinder I, briquetting, five metals vee-block, V shaped slab, cylinder II, fixed plate, guide plate and flame Shower nozzle, base plate top is sequentially provided with spring I, flame frame, tank and right support from left to right, and spring I pushes up Portion connects has V shaped slab, flame top of the trellis to be provided with flame spray head, and right support top left side is provided with ceiling hold, topmast Servomotor, left shaft holder and right bearing seat, left shaft holder and right bearing it is sequentially provided with from left to right bottom frame Being provided with screw mandrel, screw mandrel and servomotor between Zuo to connect, screw mandrel is provided with nut, nut and screw mandrel and coordinates, It is provided with fixed plate bottom nut, on the left of fixed plate, is sequentially provided with cylinder II and guide plate, cylinder II from top to bottom Left side connects wedge, has pilot hole, be provided with contact roller bottom wedge on the left of guide plate, contact Roller contacts with wedge, is provided with elevating lever bottom contact roller, and elevating lever passes pilot hole, on elevating lever Being provided with fixed stop, fixed stop is located at above guide plate, is provided with spring II between fixed stop and guide plate, Elevating lever passes spring II, and bottom elevating lever, the left and right sides is arranged with cylinder I, and connecting bottom cylinder I has Briquetting.
Preferably, also including guide cylinder, guide cylinder is located at base plate top left side, and spring I is located at guide cylinder In.
Preferably, also including vibrating motor, vibrating motor is located on the left of elevating lever, and vibrating motor is located at leads Below plate.
Operation principle: when five metals vee-block is carried out comprehensive removal internal stress, is placed on V by five metals vee-block On shape plate, start cylinder II, make cylinder II constantly extend shortening, make wedge move right the most to the left, Make contact roller move up downwards, drive briquetting by elevating lever, move up downwards, make Briquetting constantly clashes into five metals vee-block, and the spring I being simultaneously located at five metals vee-block lower end constantly extends shortening, makes Five metals vee-block rock more violent, eliminate internal stress successively, after cylinder II works a period of time, cylinder II drives wedge to reset, and then cylinder II extends, and makes wedge move to the most left, is driven by elevating lever Briquetting moves down, and makes briquetting contact five metals vee-block, starts cylinder I and extends, when five metals tightly pushed down by briquetting During vee-block, closing cylinder I, then cylinder II shortens, and wedge moves right a segment distance, by lifting Bar drives five metals vee-block to move up a segment distance, closes cylinder II, starts servomotor and rotates clockwise, Drive screw mandrel rotates clockwise, and makes nut move right, by fixed plate and guide plate drive five metals vee-block to Move right, close servomotor when five metals vee-block moves to directly over flame spray head, start flame spray head, Five metals vee-block is carried out flame heating, five metals vee-block is carried out heat treatment and can make the internal stress of five metals vee-block Eliminate, after five metals vee-block flame heats a period of time, close flame spray head, start servomotor clockwise Rotating, drive screw mandrel to rotate clockwise, nut moves right, and drives five metals V-arrangement by fixed plate and guide plate Block moves right, and closes servomotor when five metals vee-block moves to directly over tank, starts cylinder II and extends, Make wedge be moved to the left, drive five metals vee-block to move down by elevating lever, make five metals vee-block all soak It is less than in water, the five metals vee-block having carried out heat treatment is immersed in the water and preferably it can be eliminated internal stress, When soaking complete, start cylinder II and shorten, make wedge move right, drive five metals V-arrangement by elevating lever Block moves up, and makes five metals vee-block remove tank, starts servomotor and rotates counterclockwise, drives the screw mandrel inverse time Pin rotates, and makes nut be moved to the left, and drives five metals vee-block to be moved to the left reset by fixed plate and guide plate, Then start cylinder II to extend, make wedge be moved to the left, drive five metals vee-block to move down by elevating lever, When five metals vee-block touches V shaped slab, close cylinder II, start cylinder I and foreshorten to reset, start cylinder II shortens, and makes wedge move right, and drives briquetting to be moved upward to reset by elevating lever, thus may be used Five metals vee-block to be carried out omnibearing elimination internal stress.
Because also including guide cylinder, guide cylinder is located at base plate top left side, and spring I is located in guide cylinder, When preventing briquetting from clashing into five metals vee-block, five metals vee-block departs from from V shaped slab.
Because also including vibrating motor, vibrating motor is located on the left of elevating lever, and vibrating motor is located at guide plate Lower section, after five metals vee-block removal tank, Vibration on Start-up motor, make five metals vee-block vibrate, can be by Water on five metals vee-block shakes, and after vibration, closes vibrating motor.
(3) beneficial effect
This utility model has reached internal stress and has eliminated complete, time-consuming, to save goods and materials effect, Er Qiecao Make simple, easy to use.
Accompanying drawing explanation
Fig. 1 is the first main TV structure schematic diagram of the present utility model.
Fig. 2 is the second of the present utility model main TV structure schematic diagram.
Fig. 3 is the third main TV structure schematic diagram of the present utility model.
Being labeled as in accompanying drawing: 1-base plate, 2-spring I, 3-flame frame, 4-tank, 5-right support, 6- Right bearing seat, 7-screw mandrel, 8-nut, 9-ceiling hold, 10-left shaft holder, 11-servomotor, 12-wedge shape Block, 13-contact roller, 14-fixed stop, 15-spring II, 16-pilot hole, 17-elevating lever, 18-gas Cylinder I, 19-briquetting, 20-five metals vee-block, 21-V shape plate, 22-cylinder II, 23-fixed plate, 24-guides Plate, 25-flame spray head, 26-guide cylinder, 27-vibrating motor.
Detailed description of the invention
With embodiment, this utility model is further described below in conjunction with the accompanying drawings.
Embodiment 1
A kind of five metals vee-block comprehensive removal internal stress device, as Figure 1-3, includes base plate 1, spring I 2, flame frame 3, tank 4, right support 5, right bearing seat 6, screw mandrel 7, nut 8, ceiling hold 9, left axle Bearing 10, servomotor 11, wedge 12, contact roller 13, fixed stop 14, spring II 15, lifting Bar 17, cylinder I 18, briquetting 19, five metals vee-block 20, V shaped slab 21, cylinder II 22, fixed plate 23, lead To plate 24 and flame spray head 25, base plate 1 top is sequentially provided with spring I 2, flame frame 3, tank 4 from left to right With right support 5, spring I 2 top connects has V shaped slab 21, flame frame 3 top to be provided with flame spray head 25, the right side Frame 5 top left side is provided with ceiling hold 9, is sequentially provided with servomotor 11, left bearing bottom ceiling hold 9 from left to right Seat 10 and right bearing seat 6, be provided with screw mandrel 7, screw mandrel 7 and servo electricity between left shaft holder 10 and right bearing seat 6 Machine 11 connects, and screw mandrel 7 is provided with nut 8, nut 8 and screw mandrel 7 and coordinates, and is provided with fixed plate 23 bottom nut 8, Being sequentially provided with cylinder II 22 and guide plate 24 on the left of fixed plate 23 from top to bottom, connecting on the left of cylinder II 22 has wedge Shape block 12, has pilot hole 16 on the left of guide plate 24, be provided with contact roller 13, contact rolling bottom wedge 12 Wheel 13 contacts with wedge 12, is provided with elevating lever 17 bottom contact roller 13, and elevating lever 17 passes pilot hole 16, Elevating lever 17 is provided with fixed stop 14, and fixed stop 14 is located at above guide plate 24, fixed stop 14 and leading Being provided with spring II 15 between plate 24, elevating lever 17 is through spring II 15, the left and right sides pair bottom elevating lever 17 Claiming to be provided with cylinder I 18, connecting bottom cylinder I 18 has briquetting 19.
Also including guide cylinder 26, guide cylinder 26 is located at base plate 1 top left side, and spring I 2 is located at guide cylinder 26 In.
Also including vibrating motor 27, vibrating motor 27 is located on the left of elevating lever 17, and vibrating motor 27 is located at leads Below plate 24.
Operation principle: when five metals vee-block 20 is carried out comprehensive removal internal stress, five metals vee-block 20 is put Put on V shaped slab 21, start cylinder II 22, make cylinder II 22 constantly extend shortening, make wedge 12 constantly to From left to right moves, and makes contact roller 13 constantly move up downwards, drives briquetting 19 by elevating lever 17, no Break and move up downwards, make briquetting 19 constantly clash into five metals vee-block 20, be located at five metals vee-block 20 lower end simultaneously Spring I 2 constantly extend shortening, make five metals vee-block 20 rock more violent, eliminate internal stress successively, When, after cylinder II 22 work a period of time, cylinder II 22 drives wedge 12 to reset, then cylinder II 22 elongation, Make wedge 12 move to the most left, drive briquetting 19 to move down by elevating lever 17, make briquetting 19 contact five Gold vee-block 20, starts cylinder I 18 elongation, when five metals vee-block 20 tightly pushed down by briquetting 19, closes cylinder I 18, then cylinder II 22 shortens, and wedge 12 moves right a segment distance, drives five by elevating lever 17 Gold vee-block 20 moves up a segment distance, closes cylinder II 22, starts servomotor 11 and rotates clockwise, band Movable wire bar 7 rotates clockwise, and makes nut 8 move right, and drives five metals V-arrangement by fixed plate 23 and guide plate 24 Block 20 moves right, and closes servomotor 11 when five metals vee-block 20 moves to directly over flame spray head 25, opens Dynamic flame spray head 25, carries out flame heating to five metals vee-block 20, five metals vee-block 20 is carried out heat treatment permissible The internal stress making five metals vee-block 20 eliminates, and after five metals vee-block 20 flame heats a period of time, closes flame Shower nozzle 25, starts servomotor 11 and rotates clockwise, and drives screw mandrel 7 to rotate clockwise, and nut 8 moves right, Five metals vee-block 20 is driven to move right by fixed plate 23 and guide plate 24, when five metals vee-block 20 moves to water Close servomotor 11 time directly over groove 4, start cylinder II 22 elongation, make wedge 12 be moved to the left, pass through Elevating lever 17 drives five metals vee-block 20 to move down, and makes five metals vee-block 20 all be immersed in water, will carry out The five metals vee-block 20 of complete heat treatment is immersed in the water and preferably it can be eliminated internal stress, when soaking complete, Start cylinder II 22 to shorten, make wedge 12 move right, drive five metals vee-block 20 upwards by elevating lever 17 Mobile, make five metals vee-block 20 remove tank 4, start servomotor 11 and rotate counterclockwise, drive screw mandrel 7 inverse time Pin rotates, and makes nut 8 be moved to the left, drives five metals vee-block 20 to moving to left by fixed plate 23 and guide plate 24 Move to reset, then start cylinder II 22 elongation, make wedge 12 be moved to the left, driven by elevating lever 17 Five metals vee-block 20 moves down, and when five metals vee-block 20 touches V shaped slab 21, closes cylinder II 22, starts Cylinder I 18 foreshortens to reset, and starts cylinder II 22 and shortens, makes wedge 12 move right, pass through elevating lever 17 drive briquetting 19 to be moved upward to reset, and thus can carry out five metals vee-block 20 in omnibearing elimination Stress.
Because also including guide cylinder 26, guide cylinder 26 is located at base plate 1 top left side, and spring I 2 is located at guiding In cylinder 26, when preventing briquetting 19 from clashing into five metals vee-block 20, five metals vee-block 20 departs from from V shaped slab 21. Because also including vibrating motor 27, vibrating motor 27 is located on the left of elevating lever 17, and vibrating motor 27 is located at Below guide plate 24, after five metals vee-block 20 removes tank 4, Vibration on Start-up motor 27, make five metals Vee-block 20 vibrates, and can shake by the water on five metals vee-block 20, after vibration, closes vibration electricity Machine 27.
Embodiment described above only have expressed preferred implementation of the present utility model, its describe more concrete and In detail, but therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, For the person of ordinary skill of the art, without departing from the inventive concept of the premise, it is also possible to make Some deformation, improving and substitute, these broadly fall into protection domain of the present utility model.Therefore, this practicality is new The protection domain of type patent should be as the criterion with claims.

Claims (3)

1. a five metals vee-block comprehensive removal internal stress device, it is characterised in that include base plate (1), bullet Spring I (2), flame frame (3), tank (4), right support (5), right bearing seat (6), screw mandrel (7), Nut (8), ceiling hold (9), left shaft holder (10), servomotor (11), wedge (12), Contact roller (13), fixed stop (14), spring II (15), elevating lever (17), cylinder I (18), Briquetting (19), five metals vee-block (20), V shaped slab (21), cylinder II (22), fixed plate (23), Guide plate (24) and flame spray head (25), base plate (1) top be sequentially provided with from left to right spring I (2), Flame frame (3), tank (4) and right support (5), spring I (2) top connects V shaped slab (21), Flame frame (3) top is provided with flame spray head (25), and right support (5) top left side is provided with ceiling hold (9), Ceiling hold (9) bottom is sequentially provided with servomotor (11), left shaft holder (10) and right axle from left to right Bearing (6), is provided with screw mandrel (7), screw mandrel (7) between left shaft holder (10) and right bearing seat (6) Connecting with servomotor (11), screw mandrel (7) is provided with nut (8), nut (8) and screw mandrel (7) Coordinating, nut (8) bottom is provided with fixed plate (23), and fixed plate (23) left side sets the most successively Having cylinder II (22) and guide plate (24), cylinder II (22) left side connects wedge (12), leads Have pilot hole (16) to plate (24) left side, wedge (12) bottom is provided with contact roller (13), Contact roller (13) contacts with wedge (12), and contact roller (13) bottom is provided with elevating lever (17), Elevating lever (17) passes pilot hole (16), and elevating lever (17) is provided with fixed stop (14), fixing Block (14) is located at guide plate (24) top, sets between fixed stop (14) and guide plate (24) Have spring II (15), elevating lever (17) pass spring II (15), elevating lever (17) bottom about two Side is arranged with cylinder I (18), and cylinder I (18) bottom connects briquetting (19).
A kind of five metals vee-block comprehensive removal internal stress device the most according to claim 1, it is characterised in that Also including guide cylinder (26), guide cylinder (26) is located at base plate (1) top left side, spring I (2) It is located in guide cylinder (26).
A kind of five metals vee-block comprehensive removal internal stress device the most according to claim 1, it is characterised in that Also including vibrating motor (27), vibrating motor (27) is located at elevating lever (17) left side, vibration electricity Machine (27) is located at guide plate (24) lower section.
CN201620405222.6U 2016-05-06 2016-05-06 A kind of five metals vee-block comprehensive removal internal stress device Expired - Fee Related CN205741094U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620405222.6U CN205741094U (en) 2016-05-06 2016-05-06 A kind of five metals vee-block comprehensive removal internal stress device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620405222.6U CN205741094U (en) 2016-05-06 2016-05-06 A kind of five metals vee-block comprehensive removal internal stress device

Publications (1)

Publication Number Publication Date
CN205741094U true CN205741094U (en) 2016-11-30

Family

ID=57370511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620405222.6U Expired - Fee Related CN205741094U (en) 2016-05-06 2016-05-06 A kind of five metals vee-block comprehensive removal internal stress device

Country Status (1)

Country Link
CN (1) CN205741094U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106553929A (en) * 2016-12-02 2017-04-05 滁州瑞林包装材料有限公司 A kind of packaging foil quick slitting device
CN107042204A (en) * 2017-02-07 2017-08-15 刘养青 Vegetable seed fast screening devices are used in a kind of vegetable seed oil expression
CN108118133A (en) * 2017-12-20 2018-06-05 大连鑫鑫创世科技发展有限公司 A kind of leads of IC frame destressing device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106553929A (en) * 2016-12-02 2017-04-05 滁州瑞林包装材料有限公司 A kind of packaging foil quick slitting device
CN107042204A (en) * 2017-02-07 2017-08-15 刘养青 Vegetable seed fast screening devices are used in a kind of vegetable seed oil expression
CN108118133A (en) * 2017-12-20 2018-06-05 大连鑫鑫创世科技发展有限公司 A kind of leads of IC frame destressing device

Similar Documents

Publication Publication Date Title
CN205741094U (en) A kind of five metals vee-block comprehensive removal internal stress device
CN101285222A (en) Automatic cleaning device for bristle roll of combing machine and cleaning method thereof
CN106272768B (en) Moso bamboo squeezes flattening processing unit (plant) and squeezes flattening processing method
CN203600007U (en) Wheel online burring device
CN113618591B (en) Surface treatment device for steel wire rope
CN107855902A (en) A kind of five metalworkings iron staff high-efficient rust-removing equipment
CN212285381U (en) Steel band straightening machine with slagging-off function
CN206579608U (en) A kind of cleaning plant for being convenient to clean New-energy electric vehicle tire
CN205558289U (en) Building templates belt cleaning device
CN207806899U (en) A kind of laser laser carving equipment with dedusting function
CN103203338A (en) Ultrasound cleaning device of filter element in polyester industry
CN106827260A (en) A kind of method and device of high pressure waterjet
CN108032081A (en) A kind of laser cutting machine with surface of steel plate processing unit
CN205271636U (en) Online burring device of size adjustable self -adaptation formula wheel
CN201316745Y (en) High pressure water descaling unit
CN208829736U (en) A kind of annular workpieces heat treatment gauge device
CN115321800B (en) Integrated tempering and collecting tempering machine for glass insulator production
CN107953223B (en) Metal plate surface oxide skin polishing and removing machine
CN215748652U (en) Reciprocating type sand blasting machine
CN112246740B (en) Anti-oxidation treatment process before heat treatment of steel structure material
CN209520691U (en) A kind of stamping die manufacture cavity plate unit burr remover
CN203621322U (en) Steel bar bending machine
CN206613790U (en) A kind of wax-pattern automatic flushing device
CN207793331U (en) A kind of quenching workpiece after-treatment device
CN106211593B (en) Pcb board process line

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Du Siqing

Inventor before: Xu Ziguang

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170411

Address after: 523590 Guangdong city of Dongguan Province Ren Zi Yuan Cun Xie Gang Zhen Kan Industrial Zone

Patentee after: Dongguan City Dong Xiao Hardware Co., Ltd.

Address before: 362501 Dehua City, Quanzhou Province, the town of the class, Haruki, Dou Dou, No. 92

Patentee before: Xu Ziguang

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20180506

CF01 Termination of patent right due to non-payment of annual fee