CN205735440U - A kind of PCCP mould flexible operation platform - Google Patents

A kind of PCCP mould flexible operation platform Download PDF

Info

Publication number
CN205735440U
CN205735440U CN201620571341.9U CN201620571341U CN205735440U CN 205735440 U CN205735440 U CN 205735440U CN 201620571341 U CN201620571341 U CN 201620571341U CN 205735440 U CN205735440 U CN 205735440U
Authority
CN
China
Prior art keywords
mould
paralell
flexible
pccp
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620571341.9U
Other languages
Chinese (zh)
Inventor
张建
宋延林
其他发明人请求不公开姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINJIANG GUO TONG PIPELINE Co.,Ltd.
Original Assignee
Liaoning Branch Of Xinjiang Guotong Pipeline Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Branch Of Xinjiang Guotong Pipeline Co Ltd filed Critical Liaoning Branch Of Xinjiang Guotong Pipeline Co Ltd
Priority to CN201620571341.9U priority Critical patent/CN205735440U/en
Application granted granted Critical
Publication of CN205735440U publication Critical patent/CN205735440U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

This utility model relates to a kind of PCCP mould flexible operation platform.The technical scheme is that and include that Nei Mo and vibrator, the upper end of interior mould are provided with location hanger, paralell is connected with location hanger by flexible apparatus.Described flexible apparatus is made up of junction button and flexible strand, and flexible strand one end is connected with paralell, and the other end is connected with junction button, and junction button is flexibly connected with location hanger.Being provided with anti-skid mesh, anti-skid mesh is fixed on paralell.The outer rim of described paralell does not contacts with the inwall of interior mould.Compared with prior art, this utility model entirety can be dismantled, and changes and safeguards simply, durable, uses safety.Use flexible strand to be connected with mould to decrease owing to vibration gives the destruction of mould.The use of this flexible operation platform, can avoid manually linking up with, clears up, potential safety hazard when brushing.

Description

A kind of PCCP mould flexible operation platform
Technical field
This utility model belongs to PCCP tubing manufacture technology field, particularly relates to one and mixes PCC tubing steel cylinder PCCP mould flexible operation platform during solidifying soil perfusion.
Background technology
PCCP pipe is the abbreviation of Prestressed concrete cylinder pipe, is mainly used in large-scale water conservancy conveying engineering.It makes work Skill includes, steel cylinder makes, concrete tube core molding, cement mortar protection tube core being wound around outside ring orientation prestress steel wire and steel wire Layer makes four big operations.Wherein steel cylinder plays sealing in PCCP and couples PCCP socket ring and the effect of socket hoop.Steel cylinder makes Be the welding of the two ends of wall thickness 1.5mm 2.0mm steel cylinder hold/socket steel ring makes.Band holds/steel cylinder of socket be placed on interior, Between outer two-layer mould, then by concreting cavity between interior outer mold and steel cylinder, make concrete tube core.And Before concrete cast with pour after, internally will carry out assembly and disassembly by outer mold, during assembly and disassembly, operator need to be Operate on platform.In the prior art, operating platform is to be directly welded at the some of mould inside to mark time, and operative employee is on marking time Carrying out linking up with, clear up and brush the work such as oil, safety coefficient is extremely low, it is often more important that mark time around owing to the amplitude of vibrator causes Crack of die, makes to take out slurry during the product produced and occurs, but also need frequent maintenance die, reduce the mold use longevity Life.
Summary of the invention
For the defect overcoming prior art to exist, the purpose of this utility model be to provide a kind of easily operated, reduce hidden Suffer from, reduce mold repair frequency, improve the mould use cycle, particular avoid shaped article surface and occur smoking slurry problem PCCP mould flexible operation platform.
The technical solution adopted in the utility model is: a kind of PCCP mould flexible operation platform, including Nei Mo and vibrator, The upper end of interior mould is provided with location hanger, and paralell is connected with location hanger by flexible apparatus.
Above-mentioned a kind of PCCP mould flexible operation platform, described flexible apparatus is made up of junction button and flexible strand, soft Property rope one end be connected with paralell, the other end is connected with junction button, junction button with location hanger be flexibly connected.
Above-mentioned a kind of PCCP mould flexible operation platform, is provided with anti-skid mesh, and anti-skid mesh is fixed on paralell.
Above-mentioned a kind of PCCP mould flexible operation platform, the outer rim of described paralell does not contacts with the inwall of interior mould.
The beneficial effects of the utility model are: compared with prior art, and this utility model entirety can be dismantled, and change and safeguard Simply, durable, use safety.Use flexible strand to be connected with mould to decrease owing to vibration gives the destruction of mould.This flexible behaviour Make the use of platform, can avoid manually linking up with, clear up, potential safety hazard when brushing.Outer rim and mould inner wall due to paralell Do not contact, therefore avoid the operating platform that causes due to the amplitude of vibrator and mould generation collection and shake cracking, also avoid The product produced has takes out the phenomenon that slurry occurs, it is ensured that product quality.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
As it is shown in figure 1, a kind of PCCP mould flexible operation platform, by location hanger 1, junction button 2, anti-skid mesh 3, paralell 4, interior mould 5, vibrator 6 and flexible strand 7 are constituted.
The upper end of interior mould 5 is provided with location hanger 1, and paralell 4 is connected with location hanger 1 by flexible apparatus.
Described flexible apparatus is made up of junction button 2 and flexible strand 7, and flexible strand 7 one end is connected with paralell 4, the other end Being connected with junction button 2, junction button 2 is flexibly connected with location hanger 1.The setting of junction button facilitates the connection of flexible strand and hanger And dismounting.
Being provided with anti-skid mesh 3, anti-skid mesh 3 is fixed on paralell 4, and the setting of anti-skid mesh improves when operator works Safety.
The outer rim of described paralell 4 does not contacts with the inwall of interior mould 5.Owing to the outer rim of paralell does not connects with mould inner wall Touch, therefore avoid the operating platform that causes due to the amplitude of vibrator and mould generation collection and shake cracking, also avoid production The product gone out has takes out the phenomenon that slurry occurs, and particular avoid the product produced and there is quality flaw, it is ensured that product quality.

Claims (4)

1. a PCCP mould flexible operation platform, including interior mould (5) and vibrator (6), it is characterised in that: interior mould (5) upper End is provided with location hanger (1), and paralell (4) is connected with location hanger (1) by flexible apparatus.
A kind of PCCP mould flexible operation platform the most according to claim 1, it is characterised in that: described flexible apparatus by Junction button (2) and flexible strand (7) composition, flexible strand (7) one end is connected with paralell (4), and the other end is connected with junction button (2), Junction button (2) is flexibly connected with location hanger (1).
A kind of PCCP mould flexible operation platform the most according to claim 1, it is characterised in that: it is provided with anti-skid mesh (3), anti- Sliding net (3) is fixed on paralell (4).
A kind of PCCP mould flexible operation platform the most according to claim 1, it is characterised in that: described paralell (4) Outer rim do not contact with the inwall of interior mould (5).
CN201620571341.9U 2016-06-14 2016-06-14 A kind of PCCP mould flexible operation platform Active CN205735440U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620571341.9U CN205735440U (en) 2016-06-14 2016-06-14 A kind of PCCP mould flexible operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620571341.9U CN205735440U (en) 2016-06-14 2016-06-14 A kind of PCCP mould flexible operation platform

Publications (1)

Publication Number Publication Date
CN205735440U true CN205735440U (en) 2016-11-30

Family

ID=57385471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620571341.9U Active CN205735440U (en) 2016-06-14 2016-06-14 A kind of PCCP mould flexible operation platform

Country Status (1)

Country Link
CN (1) CN205735440U (en)

Similar Documents

Publication Publication Date Title
CN101806096A (en) Steel tube-concrete composite structure
CN103895098A (en) Process for forming vibration and extrusion process prestressed concrete pipe through core mold vibration method
CN102554122A (en) Novel modeling method for casting large-sized and ultra large-sized alloy steel track shoes
CN101303095B (en) Reinforced concrete and glass fiber reinforced plastic sand inclusion composite pipes and molding process thereof
CN202448226U (en) Molding mould group for prestressed steel cylinder concrete pipe applied to jacking construction method
CN207878287U (en) A kind of box culvert construct concrete placing installation
CN204278220U (en) Produce the concrete tubular pile perfusion mould of pile tube surface with barb structure
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN205735440U (en) A kind of PCCP mould flexible operation platform
CN107486939A (en) Lined Prestressed concrete cylinder pipe vertical vibrating shaped device
CN102267177B (en) Self-compacting concrete moulding method for PCCP (prestressed concrete cylinder pipe) cores
CN103614998A (en) Lining wall concrete placement top-down method based on underground diaphragm wall
CN106862514A (en) A kind of production method of ductile iron pipe with end face typefounding
CN103486349A (en) Nodular cast iron jacking pipe and producing method thereof
CN208163934U (en) A kind of septic tank mould
CN205630971U (en) Multi -functional prestressing force steel cylinder concrete pipe production mould
CN205766777U (en) PCCP tube core is vertical pours quick homogenizing device
CN202291329U (en) Novel centrifuge roller pouring pipe
CN203022346U (en) Three-section-head type water stop threaded rod
CN105965681A (en) Vertical pouring and fast homogenizing device and method for pipe cores of PCCPs
CN110936490A (en) Reinforced concrete drain pipe and manufacturing process thereof
CN202899123U (en) Pipe pile concreting reinforcement cage with circular ring internal supports
CN207787614U (en) A kind of high manganese steel casting casting hole sand core manufacturing device
CN204546757U (en) A kind of concrete duct external mold
CN205978859U (en) Prestressing force steel cylinder concrete pipe's anti structure of splitting of socket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: SICHUAN GUOTONG CONCRETE PRODUCTS Co.,Ltd.

Assignor: LIAONING BRANCH OF XINJIANG GUOTONG PIPELINE Co.,Ltd.

Contract record no.: X2021210000015

Denomination of utility model: A flexible operation platform for PCCP mould

Granted publication date: 20161130

License type: Common License

Record date: 20210401

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211208

Address after: 831407 no.765 Linquan West Road, Urumqi, Xinjiang Uygur Autonomous Region

Patentee after: XINJIANG GUO TONG PIPELINE Co.,Ltd.

Address before: 110401 Bai Jia Gou Zhen Dong tou Tai Zi Cun, Faku County, Shenyang City, Liaoning Province

Patentee before: LIAONING BRANCH OF XINJIANG GUOTONG PIPELINE Co.,Ltd.