CN205731751U - A kind of hook for paint-spraying production line - Google Patents

A kind of hook for paint-spraying production line Download PDF

Info

Publication number
CN205731751U
CN205731751U CN201620611925.4U CN201620611925U CN205731751U CN 205731751 U CN205731751 U CN 205731751U CN 201620611925 U CN201620611925 U CN 201620611925U CN 205731751 U CN205731751 U CN 205731751U
Authority
CN
China
Prior art keywords
hook
chute
gripper shoe
slide bar
paint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620611925.4U
Other languages
Chinese (zh)
Inventor
张义
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOSHAN HOYANG METAL TECHNOLOGY Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620611925.4U priority Critical patent/CN205731751U/en
Application granted granted Critical
Publication of CN205731751U publication Critical patent/CN205731751U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coating Apparatus (AREA)

Abstract

nullThe utility model discloses a kind of hook for paint-spraying production line,It includes guide rail (2) and several hooks (1) being located on guide rail (2),It is characterized in that: described guide rail (2) lower end is provided with gripper shoe (3),Described gripper shoe (3) is perpendicular to the plane at guide rail (2) place,Described gripper shoe (3) is provided with the chute (4) along gripper shoe (3) axial direction,The slide bar (5) being slidably matched with chute (4) it is provided with in described chute (4),Described slide bar (5) is positioned at the side of chute (4) and is provided with adjusting nut (6),Described slide bar (5) is positioned at the opposite side of chute (4) and is provided with fixing nut (7),Described hook (1) is fixed on slide bar (5),This utility model provides a kind of low cost、The hook for paint-spraying production line that efficiency is high and motility is good.

Description

A kind of hook for paint-spraying production line
Technical field
This utility model relates to plastic-blasting painting applications, a kind of hook for paint-spraying production line.
Background technology
The lacquer spraying technique that newsstand and bus shelter are required for carrying out spraying paint process, newsstand and bus shelter has special setting Standby, spray paint and carry out in dope room, then manually the newsstand or bus shelter that have sprayed paint are sent into baking oven by delivery track, then Delivery track sprays paint newsstand to be painted or bus shelter, and the circulation of this process is carried out, and delivery track has hook, newsstand Or bus shelter is suspended to link up with movement, according to prior art, the length of hook has been fixed, when big workpiece is hung on hook Time then need the short hook of length, when little workpiece hang over hook upper time need to change the hook of length length, so could be in fact The lacquer spraying technique of existing workpiece, needs to change whole hook, and cost is high, and efficiency is low, very flexible.
Utility model content
Technical problem to be solved in the utility model is: overcome the defect of above prior art, it is provided that a kind of low cost, The hook for paint-spraying production line that efficiency is high and motility is good.
Technical solution adopted in the utility model is: a kind of hook for paint-spraying production line, if it include guide rail and Dry the hook being located on guide rail, described guide rail lower end is provided with gripper shoe, and described gripper shoe is perpendicular to the flat of guide rail place Face, described gripper shoe is provided with the chute along gripper shoe axial direction, is provided with and coordinates with slide in described chute Slide bar, described slide bar is positioned at the side of chute and is provided with adjusting nut, and described slide bar is positioned at the opposite side of chute and is provided with fixing Nut, described hook is fixed on slide bar.
After using above structure, this utility model compared with prior art has the advantage that and arranges gripper shoe, exists simultaneously Chute is set in gripper shoe, allows hook in being slidably fitted in chute, regulate the upper-lower position of hook, big to adapt to different length Little hook uses, so that big small workpiece can hang on hook well, low cost, efficiency is high, fixing nut and regulation Nut makes slide bar be fixed on chute, and adjusting nut can regulate the slide bar position at chute simultaneously, and motility is good.
As preferably, described hook is positioned at slide bar and closely fixes one end of nut, facilitates adjusting nut to regulate.
As preferably, being fixed with at least one extension spring in described chute, described extension spring one end is fixed on chute upper end, The described extension spring other end is fixed on the upper end of slide bar, and have a pulling force upwards to fix slide bar to slide bar after, slide bar will not be past Lower slider, reliability is high.
As preferably, the quantity of described extension spring is two, and described extension spring is arranged in parallel, and described extension spring is evenly distributed In chute, effective.
As preferably, the thickness of described gripper shoe is 20 millimeters~30 millimeters, not only ensures the intensity of gripper shoe but also ensure Gripper shoe lightweight.
As preferably, the thickness of described gripper shoe is 25 millimeters, and thickness is optimum.
Accompanying drawing explanation
Fig. 1 is that a kind of hook for paint-spraying production line of this utility model removes the master of adjusting nut and fixing nut depending on showing It is intended to.
Fig. 2 is the left view schematic diagram of a kind of hook for paint-spraying production line of this utility model.
Wherein, 1, hook, 2, guide rail, 3, gripper shoe, 4, chute, 5, slide bar, 6, adjusting nut, 7, fixing nut, 8, draw Spring.
Detailed description of the invention
The utility model is described in further detail with detailed description of the invention below in conjunction with the accompanying drawings.
As it is shown in figure 1, this utility model provide a kind of hook for paint-spraying production line, it include guide rail 2 and several The hook 1 being located on guide rail 2, described guide rail 2 lower end is provided with gripper shoe 3, and described gripper shoe 3 is perpendicular to guide rail 2 place Plane, described gripper shoe 3 is provided with the chute 4 along gripper shoe 3 axial direction, is provided with and slides with chute 4 in described chute 4 The slide bar 5 coordinated, described slide bar 5 is positioned at the side of chute 4 and is provided with adjusting nut 6, and described slide bar 5 is positioned at the another of chute 4 Side is provided with fixing nut 7, and described hook 1 is fixed on slide bar 5, the utility model has the advantages that and arranges gripper shoe 3, simultaneously Gripper shoe 3 arranges chute 4, allows hook 1 regulate the upper-lower position of hook 1 in being slidably fitted in chute 4, to adapt to difference The hook 1 of length scale uses, so that big small workpiece can hang on hook 1 well, low cost, efficiency is high, fixing spiral shell Mother 7 and adjusting nut 6 make slide bar 5 be fixed on chute 4, and adjusting nut 6 can regulate the slide bar 5 position at chute 4 simultaneously, spirit Activity is good.
Described hook 1 is positioned at slide bar 5 and closely fixes one end of nut 7, facilitates adjusting nut 6 to regulate.
Being fixed with at least one extension spring 8 in described chute 4, described extension spring 8 one end is fixed on chute 4 upper end, described Extension spring 8 other end be fixed on the upper end of slide bar 5, slide bar 5 is had a pulling force upwards, to slide bar 5 fixing after slide bar 5 will not Down sliding, reliability is high.
The quantity of described extension spring 8 is two, and described extension spring 8 is arranged in parallel, and described extension spring 8 is evenly arranged in chute In 4, effective.
The thickness of described gripper shoe 3 is 20 millimeters~30 millimeters, not only ensures the intensity of gripper shoe 3 but also ensure gripper shoe 3 Lightweight.
The thickness of described gripper shoe 3 is 25 millimeters, and thickness is optimum.
Specifically, this utility model is to arrange gripper shoe 3, arranges chute 4 in gripper shoe 3 simultaneously, allows hook 1 slide Coordinate the upper-lower position regulating hook 1 in chute 4, use adapting to the hook 1 of different length size, so that size Workpiece can hang on hook 1 well, low cost, and efficiency is high, and fixing nut 7 and adjusting nut 6 make slide bar 5 be fixed on chute 4 On, adjusting nut 6 can regulate the slide bar 5 position at chute 4 simultaneously, and motility is good, and guide rail 2 moves together with gripper shoe 3.
Above this utility model preferred embodiment is described, but is not to be construed as limitations on claims. This utility model is not only limited to above example, and its concrete structure allows to change, all in this utility model demand for independence The various changes made in protection domain are all in protection domain of the present utility model.

Claims (6)

1., for a hook for paint-spraying production line, it includes guide rail (2) and several hooks (1) being located on guide rail (2), its Being characterised by: described guide rail (2) lower end is provided with gripper shoe (3), described gripper shoe (3) is perpendicular to the flat of guide rail (2) place Face, described gripper shoe (3) is provided with the chute (4) along gripper shoe (3) axial direction, is provided with sliding in described chute (4) The slide bar (5) that groove (4) is slidably matched, described slide bar (5) is positioned at the side of chute (4) and is provided with adjusting nut (6), described cunning Bar (5) is positioned at the opposite side of chute (4) and is provided with fixing nut (7), and described hook (1) is fixed on slide bar (5).
A kind of hook for paint-spraying production line the most according to claim 1, it is characterised in that: described hook (1) position One end of nut (7) is closely fixed in slide bar (5).
A kind of hook for paint-spraying production line the most according to claim 1, it is characterised in that: in described chute (4) Being fixed with at least one extension spring (8), described extension spring (8) one end is fixed on chute (4) upper end, described extension spring (8) other end It is fixed on the upper end of slide bar (5).
A kind of hook for paint-spraying production line the most according to claim 3, it is characterised in that: described extension spring (8) Quantity is two, and described extension spring (8) is arranged in parallel, and described extension spring (8) is evenly arranged in chute (4).
A kind of hook for paint-spraying production line the most according to claim 1, it is characterised in that: described gripper shoe (3) Thickness be 20 millimeters~30 millimeters.
A kind of hook for paint-spraying production line the most according to claim 5, it is characterised in that: described gripper shoe (3) Thickness be 25 millimeters.
CN201620611925.4U 2016-06-20 2016-06-20 A kind of hook for paint-spraying production line Expired - Fee Related CN205731751U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620611925.4U CN205731751U (en) 2016-06-20 2016-06-20 A kind of hook for paint-spraying production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620611925.4U CN205731751U (en) 2016-06-20 2016-06-20 A kind of hook for paint-spraying production line

Publications (1)

Publication Number Publication Date
CN205731751U true CN205731751U (en) 2016-11-30

Family

ID=57384472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620611925.4U Expired - Fee Related CN205731751U (en) 2016-06-20 2016-06-20 A kind of hook for paint-spraying production line

Country Status (1)

Country Link
CN (1) CN205731751U (en)

Similar Documents

Publication Publication Date Title
CN207103000U (en) One kind spray painting house system
CN206661529U (en) A kind of efficient powder spray coating device
CN109483245A (en) Color steel tile production system
CN205731751U (en) A kind of hook for paint-spraying production line
CN104437938B (en) One is fluorocarbon-sprayed gets plate automatic spraying equipment ready
CN205761897U (en) Electrostatic Spraying of powder Coatings coating line
CN203842787U (en) Aluminium section spraying production line with infrared heating system
CN109569931A (en) A kind of paint spray coater being exclusively used in spraying aluminium alloy plate
CN203508282U (en) Special manipulator for car bumper spraying production line
CN204412707U (en) A kind of electrostatic precipitation shower nozzle fixing device
CN203991108U (en) A kind of novel automatic coating device
CN204074367U (en) A kind of aluminium sheet spray painting room spray-painting plant
CN202438430U (en) Automatic paint sprayer inside container
CN105834050A (en) Efficient board paint spraying device
CN109296183A (en) A kind of telescopic wall plastering apparatus
CN205550691U (en) Automatic application equipment of electric tricycle
CN203370663U (en) Mechanical paint spraying device
CN204412527U (en) Car door is fixtures for painting
CN204276208U (en) A kind of sebific duct insulating liquid spray equipment
CN204365538U (en) One is fluorocarbon-sprayed gets plate automatic spraying equipment ready
CN205731750U (en) Hook for paint-spraying production line
CN206315964U (en) Automation spray painting apparatus
CN204148038U (en) A kind of hydraulic control paint spraying machine
CN204892267U (en) Two -sided painting device of aluminum plate
CN203508281U (en) Spraying mechanism of car bumper

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170918

Address after: 528200, No. 3, east science and technology road, A District, Shishan science and Technology Industrial Zone, Nanhai District, Guangdong, Foshan

Patentee after: Foshan Hoyang Metal Technology Co., Ltd.

Address before: 315191 Ningbo City, Zhejiang Province Yinzhou District Jiang Shanzhen with three villages East: Ningbo Yinzhou a precision machinery Co., Ltd.

Patentee before: Zhang Yi

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130

Termination date: 20210620

CF01 Termination of patent right due to non-payment of annual fee