CN205724591U - A kind of transformer station - Google Patents

A kind of transformer station Download PDF

Info

Publication number
CN205724591U
CN205724591U CN201620444778.6U CN201620444778U CN205724591U CN 205724591 U CN205724591 U CN 205724591U CN 201620444778 U CN201620444778 U CN 201620444778U CN 205724591 U CN205724591 U CN 205724591U
Authority
CN
China
Prior art keywords
transformer
chamber
transformer chamber
room
transformer station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620444778.6U
Other languages
Chinese (zh)
Inventor
高岩
李文升
赵颖
徐群
葛曼倩
葛艾丽
房涛
钱芳
马士超
郭常利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Qingdao Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620444778.6U priority Critical patent/CN205724591U/en
Application granted granted Critical
Publication of CN205724591U publication Critical patent/CN205724591U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model proposes a kind of transformer station, including the first transformer chamber, the second transformer chamber, the 3rd transformer chamber, in each transformer chamber, it is respectively arranged with transformer body and carries out the radiator dispelled the heat for described transformer body, it is characterized in that: described first transformer chamber and the second transformer chamber are arranged on the same side, described 3rd transformer chamber is arranged on the offside of described second transformer chamber, offside, the side of described 3rd transformer chamber of described first transformer chamber are provided with GIS room, and described GIS room is used for arranging GIS device.This technical scheme overcome of the prior art because substation location expropriation of land length and width smaller and the technological deficiency of transformer station's universal design requirement cannot be met, optimize transformer station with achieving treatment in accordance with local conditions arrange, reached to improve land utilization ratio and shortened the purpose of completion time of project simultaneously.

Description

A kind of transformer station
Technical field
This utility model relates to electricity power engineering design field, is specifically related to a kind of transformer station.
Background technology
Transformer station i.e. changes voltage, controls and distribute the place of electric energy, and transformator is the main of transformer station Equipment, in addition transformer station also includes the plurality of devices such as controller switching equipment, energy storage device, secondary device.
Along with the development in city, the requirement to transformer station is more and more higher, due to the master being used in transformer station Want equipment volume relatively big, so the floor space of transformer station is the biggest, this to electricity power engineering design and Quality and the speed built are had higher requirement, and designer typically requires and takes a significant amount of time root Design the structure of transformer station according to the land area planned in advance, thus make the structure between each transformer station poor The biggest, and the transformer station designed may be unsuitable for periphery situation, in the prior art, full family Interior transformer station typically uses two-layer to arrange, the completion time of project is longer, is additionally, since site land resource tight , being affected by area planning, expropriation of land region can not meet far away the requirement of universal design, such as, pin To State Grid Corporation of China's project of transmitting and converting electricity universal design " 110 (66)~500kV transformer station fascicle " 110-A2-4 scheme, it is desirable to transformer station arranges in the most indoor building, produces Composite Building First Floor and arranges main transformer Depressor, 110kV power distribution equipment and 10kV power distribution equipment, two floor arrange secondary device room and capacitor chamber, The site length that the program is given is to for 28 meters, and wide to for 9 meters, i.e. site length-width ratio is relatively large, right Require less than the program 28 meters of Yu Changxiang, and the wide expropriation of land region to require more than the program 9 meters Just cannot meet the requirement of this universal design, which limits the addressing scope of transformer station.
Therefore, how to overcome that cannot to meet transformer station general because substation location expropriation of land length and width are smaller The technological deficiency that design requires, it is achieved treatment in accordance with local conditions ground optimizes transformer station and arranges, becomes an assistant officer and waits to solve Technical problem certainly.
Utility model content
Therefore, the technical problems to be solved in the utility model is to overcome of the prior art because of transformer station Site expropriation of land length and width are smaller and cannot meet the technological deficiency of transformer station's universal design requirement, because of ground system Preferably optimize transformer station to arrange, reach to improve land utilization ratio and shorten the purpose of completion time of project simultaneously, from And a kind of the most indoor one layer of transformer station of 110kV split transformator is provided.
To achieve these goals, the utility model proposes a kind of transformer station, including the first transformer chamber, Second transformer chamber, the 3rd transformer chamber and electrical room, be respectively arranged with change in each transformer chamber Depressor body and carry out the radiator that dispels the heat for described transformer body, it is characterised in that: described the One transformer chamber and the second transformer chamber are arranged on the same side, and it is main that described 3rd transformer chamber is arranged on described second Become the offside of room, offside, the side of described 3rd transformer chamber of described first transformer chamber are provided with GIS Room, described GIS room is used for arranging GIS device.
Preferentially, described electrical room be arranged on described second transformer chamber and described 3rd transformer chamber it Between, between described first transformer chamber and described GIS room.
Preferentially, also include: capacitor chamber, for arranging the capacitor compensating reactive power, Described capacitor chamber is arranged on the side of described second transformer chamber.
Preferentially, also include: secondary device room, be used for arranging secondary device, described secondary device room It is arranged on the side of described 3rd transformer chamber.
Preferentially, described transformer station is 110kV transformer station, and described transformer body is 110kV transformation Device body.
Preferentially, described GIS room, described electrical room and each transformer chamber is equipped with and institute It is provided with between the import and export stating transformer station's ft connection, the transformer body room being disposed adjacent and radiator chamber Import and export, for passing through for personnel.
The transformer station that this utility model provides, uses a full layout layer scheme, by by the three of transformer station Group main transformer wherein two groups arrange face-to-face, overcoming in prior art substation location expropriation of land cannot expire In foot universal design three groups of main transformer the same sides arrange required for the technological deficiency of length-width ratio, make full use of Expropriation of land resource, improves land utilization ratio, has adapted to urban planning requirement, becomes in prior art The scheme that power station uses two-layer to arrange is compared, and the full layout layer of compact, not only the transport of equipment is more Convenient, and save construction area, accelerate area power grid engineering design and construction speed, improve Construction quality, and reduce transformer station's impact on the daylighting of Adjacent Buildings, promote resource Economizing type, pro-environmental society.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model detailed description of the invention or technical side of the prior art Case, will make simply the accompanying drawing used required in detailed description of the invention or description of the prior art below Introduce, it should be apparent that, the accompanying drawing in describing below is embodiments more of the present utility model, right From the point of view of those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to according to These accompanying drawings obtain other accompanying drawing.
Fig. 1 is a block diagram of transformer station in this utility model embodiment;
Fig. 2 is a plane structure chart of transformer station in this utility model embodiment;
Fig. 3 is a left view profile of transformer station in this utility model embodiment;
Fig. 4 is a front view of transformer station in this utility model embodiment;
Fig. 5 is another plane structure chart of transformer station in this utility model embodiment.
Detailed description of the invention
Below in conjunction with accompanying drawing, the technical solution of the utility model is clearly and completely described, aobvious So, described embodiment is a part of embodiment of this utility model rather than whole embodiments. Based on the embodiment in this utility model, those of ordinary skill in the art are not making creative work The every other embodiment obtained under premise, broadly falls into the scope of this utility model protection.
In description of the present utility model, it should be noted that term " offside ", " avris ", " left ", Orientation or the position relationship of the instruction such as " right " they are based on orientation shown in the drawings or position relationship, merely to It is easy to describe this utility model and simplification description rather than instruction or the device of hint indication or element must Must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to this practicality Novel restriction.Additionally, term " first ", " second ", " the 3rd " are only used for describing purpose, and can not It is interpreted as instruction or hint relative importance.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited, Term " is connected " and should be interpreted broadly, for example, it may be mechanically connected, it is also possible to be electrical connection;Can Being to be joined directly together, it is also possible to be indirectly connected to by intermediary, it is also possible to be two element internals Connection, can be wireless connections, it is also possible to be wired connection.For those of ordinary skill in the art For, above-mentioned term concrete meaning in this utility model can be understood with concrete condition.
The present embodiment provides a kind of transformer station, and Fig. 1 to Fig. 5 shows the power transformation that this utility model provides The structure stood, the equipment in each canyon described in the utility model and device room is in transformer station Common equipment, it will be appreciated by those skilled in the art that the annexation between each equipment, Gu Tuzhong Eliminate the connection cable of each equipment room.As it is shown in figure 1, described transformer station uses complete one layer of design, It is mainly provided with: the first transformer chamber 13 of the 11, second transformer chamber the 12, the 3rd of transformer chamber, in each transformer chamber Inside it is respectively arranged with transformer body 111 and carries out the radiator dispelled the heat for described transformer body 111 112, also include electrical room 14;Wherein said first transformer chamber 11 and the second transformer chamber 12 are arranged In the same side, described 3rd transformer chamber 13 is arranged on the offside of described second transformer chamber 12, i.e. uses Arrangement face-to-face.As in figure 2 it is shown, the concrete of each equipment of transformer station as shown in Figure 1 is divided Cloth relation is made that more specific displaying.This programme taking into full account, to combine State Grid Corporation of China defeated The basis of power transformation engineering universal design " 110 (66)~500kV transformer station fascicle " 110-A2-4 scheme On, use module spliced to switch through shifting, treatment in accordance with local conditions ground uses main transformer to arrange face-to-face, such as Fig. 3 institute Show, clearly show that the second transformer chamber 12 and the 3rd transformer chamber 13 position in left view profile Relation and the particular location of transformer body 111, will wherein two groups of three groups of main transformers of transformer station Arrange (the i.e. the 3rd transformer chamber 13 and the second transformer chamber 12 arrange face-to-face) face-to-face, overcome power transformation Site expropriation of land cannot meet the length-width ratio required by three groups of transformer chamber's the same sides layouts of tradition transformer station Defect, such as site expropriation of land is long to less than 28 meters of 110-A2-4 scheme, wide to more than 110-A2-4 During 9 meters (i.e. site expropriation of land length and width smaller) of scheme, the expropriation of land of this site just cannot set according to general Transformer station is arranged in the requirement of meter, and the technical solution of the utility model makes the problems referred to above have been resolved.
It addition, arrange on the side of the offside of described first transformer chamber 11, described 3rd transformer chamber 13 GIS room 15, described GIS room 15 is had to be used for arranging GIS device.This GIS room 15 uses cable to enter Outlet, as shown in Figure 4, in transformer station just clearly show that GIS room 15 and the 3rd transformer chamber 13 Position relationship in view.
As the preferred implementation of one, described electrical room 14 is arranged on described second transformer chamber Between 12 and described 3rd transformer chamber 13, between described first transformer chamber 11 and described GIS room 15. Wherein, power distribution equipment is indoor intermediate switchgear cabinet, specifically, and opening in described electrical room 14 Closing cabinet is that biserial is positioned opposite, the first transformer chamber 11 and the second transformer chamber the 12, the 3rd transformer chamber 13 and GIS room 15 is separately positioned on the both sides of this electrical room 14, in order to transformer chamber is with power distribution equipment even Connect.
Additionally, this transformer station also includes capacitor chamber 16, compensate reactive power for arranging Capacitor, described capacitor chamber 16 is arranged on the side of described second transformer chamber 12.
Additionally, this transformer station also includes secondary device room 17, it is used for arranging secondary device, described two Secondary device room 7 is arranged on described 3rd transformer chamber 13 side, as shown in Figure 4, clearly show that two Secondary device room 7 and the 3rd transformer chamber 13 position relationship in transformer station's front view.
As it is shown in figure 1, in such scheme, capacitor chamber 16 and secondary device room 17 are positioned opposite, Make full use of because of Liang Zu transformer chamber arrange face-to-face vacant go out site expropriation of land resource, need explanation It is, on the arrangement of capacitor chamber 16 of the present utility model and secondary device room 17 is not limited to The opposite positioning manner stated, as long as the arrangement that can realize the technical solution of the utility model is the suitableeest For this utility model.
As a kind of concrete scheme, this transformer station can be 110kV transformer station, transformer body 111 For 110kV transformer body.The present embodiment preferentially selects 110kV transformer station and 110kV transformator Body, it should be noted that the technical solution of the utility model is not limited to above-mentioned 110kV power transformation Stand and 110kV transformer body, as long as the transformer station of the technical solution of the utility model can be realized, All it is applicable to this utility model.
As further implementation, described GIS room 15, described electrical room 14 and each The transformer body that individual transformer chamber is equipped with the import and export with described transformer station ft connection, is disposed adjacent Import and export it are provided with, for passing through for personnel between room and radiator chamber.For the ease of equipment conveying, lifting, Maintenance and operational inspection, can also arrange annular transport passage 18, such as Fig. 5 institute around described transformer station Show, cable tunnel can be arranged on the lower section of annular transport passage 18, for cabling, and Transformer station's enclosure wall 19 can also be built annular transport passage 18 is peripheral, it is achieved transformer station with outside every From, to ensure the safe operation of transformer station.
The transformer station that this utility model provides, uses a full layout layer scheme, by by the three of transformer station Group transformer chamber wherein two groups arrange face-to-face, overcoming in prior art substation location expropriation of land cannot Meet in universal design three groups of transformer chamber and be arranged in the technological deficiency of the length-width ratio required for the same side, fill Divide and make use of expropriation of land resource, improve land utilization ratio, adapted to urban planning requirement, with existing skill The scheme that Shu Zhong transformer station uses two-layer to arrange is compared, the full layout layer of compact, the not only fortune of equipment Defeated convenient, and save construction area, accelerate area power grid engineering design and construction speed, Improve construction quality, and reduce transformer station's impact on the daylighting of Adjacent Buildings, promote Resource-conserving and environment-friendly society builds.
Obviously, above-described embodiment is only for clearly demonstrating example, and not to embodiment party The restriction of formula.For those of ordinary skill in the field, the most also may be used To make other changes in different forms.Here without also all of embodiment being given With exhaustive.And the obvious change thus extended out or variation are created still in this utility model Protection domain among.

Claims (6)

1. a transformer station, fills including the first transformer chamber, the second transformer chamber, the 3rd transformer chamber and distribution Put room, in each transformer chamber, be respectively arranged with transformer body and carry out for described transformer body The radiator of heat radiation, it is characterised in that:
Described first transformer chamber and the second transformer chamber are arranged on the same side, and described 3rd transformer chamber is arranged on The offside of described second transformer chamber, on offside, the side of described 3rd transformer chamber of described first transformer chamber While be provided with GIS room, described GIS room is used for arranging GIS device.
Transformer station the most according to claim 1, it is characterised in that described electrical room is arranged on Between described second transformer chamber and described 3rd transformer chamber, described first transformer chamber and described GIS room it Between.
Transformer station the most according to claim 2, it is characterised in that also include:
Capacitor chamber, for arranging the capacitor compensating reactive power, described capacitor chamber is arranged Side in described second transformer chamber.
Transformer station the most according to claim 3, it is characterised in that also include:
Secondary device room, is used for arranging secondary device, and it is main that described secondary device room is arranged on the described 3rd Become the side of room.
Transformer station the most according to claim 4, it is characterised in that described transformer station is 110kV Transformer station, described transformer body is 110kV transformer body.
Transformer station the most according to any one of claim 1 to 5, it is characterised in that
Described GIS room, described electrical room and each transformer chamber are equipped with and described transformer station It is provided with import and export between the import and export of ft connection, the transformer body room being disposed adjacent and radiator chamber, For passing through for personnel.
CN201620444778.6U 2016-05-16 2016-05-16 A kind of transformer station Expired - Fee Related CN205724591U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620444778.6U CN205724591U (en) 2016-05-16 2016-05-16 A kind of transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620444778.6U CN205724591U (en) 2016-05-16 2016-05-16 A kind of transformer station

Publications (1)

Publication Number Publication Date
CN205724591U true CN205724591U (en) 2016-11-23

Family

ID=57300385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620444778.6U Expired - Fee Related CN205724591U (en) 2016-05-16 2016-05-16 A kind of transformer station

Country Status (1)

Country Link
CN (1) CN205724591U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318563A (en) * 2019-06-18 2019-10-11 佛山电力设计院有限公司 A kind of 3 buildings arrangement formula substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110318563A (en) * 2019-06-18 2019-10-11 佛山电力设计院有限公司 A kind of 3 buildings arrangement formula substation

Similar Documents

Publication Publication Date Title
CN201667498U (en) Box type transformer substation for open-pit mine
CN205622124U (en) Prefabricated cabin formula transformer substation of 110kV
CN205724591U (en) A kind of transformer station
CN103956763A (en) Flexible DC converter station
CN204858370U (en) Prefabricated storehouse of 110kV integrated transformer substation of formula
CN204927909U (en) Pull whole flow box formula transformer substation
CN202423887U (en) Distributor box for construction site
CN205583475U (en) Integrated transformer substation of 110kV prepackage type
CN104967035A (en) Special inverter and distribution transformer all-in-one intelligent integrated preassembled transformer station for photovoltaic power generation
CN102361241A (en) Box type transformer station
CN204732755U (en) A kind of frame-type transformer station
CN204905731U (en) Complete indoor transformer substation of three winding components of a whole that can function independently transformers of 110kV
CN203826980U (en) Flexible DC converter station
CN105391154A (en) Container type energy supply system
CN204258114U (en) A kind of 500kV substation equipment arrangement
CN209603568U (en) Compound substation
CN204741208U (en) Photovoltaic power generation becomes intelligent integrated form of integration pre -installation transformer substation special contrary joining in marriage
Chen et al. Research on Key Technology and Technical and Economic Indicators of 220kV Prefabricated Cabin Substation
CN113241653A (en) Integrated resonance-eliminating intelligent boosting transformer substation
CN204615231U (en) The full indoor substation of a kind of 110kV double winding split transformer
CN113071347A (en) Box-type charging station
CN205265332U (en) Container formula energy supply system
CN105048324A (en) L-shaped distribution structure of valve hall converter transformer of extra-high-voltage direct-current converter station
CN104538861A (en) Intelligent simulation distribution box
CN205646453U (en) Chassis bus duct

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20180516