CN2057195U - Large wire mesh floor - Google Patents
Large wire mesh floor Download PDFInfo
- Publication number
- CN2057195U CN2057195U CN 89216868 CN89216868U CN2057195U CN 2057195 U CN2057195 U CN 2057195U CN 89216868 CN89216868 CN 89216868 CN 89216868 U CN89216868 U CN 89216868U CN 2057195 U CN2057195 U CN 2057195U
- Authority
- CN
- China
- Prior art keywords
- steel
- longitudinal
- reinforcement
- floor
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Abstract
The utility model relates to a large wire mesh floor used for building structure, comprising a longitudinal steel bar, a transverse steel bar, an anchoring steel bar and concrete. The longitudinal steel bar and the transverse steel bar are crossly arranged to form a network shape; the cross points are connected with spot welding; two anchoring steel bars in parallel arrangement are arranged at the periphery of an integral steel fabric sheet comprising the longitudinal and transversal steel bars; all the cross points between the anchoring steel bars and the longitudinal and transversal steel bars are connected with the spot welding. The utility model which has the advantages of high intensity, favorable structural property, saved material consumption and low cost is suitable for multi-story buildings and total-prefabricated tall buildings.
Description
The utility model is the big floor of a kind of building structural steel silk screen, and this floor can be adjusted size according to room-size, can adjust arrangement of reinforcement according to load level.The longitudinal reinforcement of steel fabric sheet all is connected with spot welding with place, the crosspoint of transverse reinforcement.
Building structure mainly contains and gives stress porous plate (batten), gives big floor of stress and the big floor of bi-steel in the prior art with floor.Fig. 1 is the production technology sketch that gives stress porous plate (batten).(4) be pedestal, (3) are electric winch, and hoist engine tension reinforcing steel bar (1) produces and gives stress.Go up concreting at reinforcing bar (1) then, make and give the stress floor, treat that maintenance expires then to cut off reinforcing bar between each piece floor.The defective of giving stress porous plate (batten) is: device therefor is many, complex process, and the production cycle is long, needs special production line and pedestal, reinforcing bar easily takes place in the reinforced bar stretching rupture suddenly, causes injury to personnel.Because of the spacing more than 10 centimetres is arranged, this part reinforcing bar is wasted between the every floor.Give the big floor of stress and to give the stress porous plate similar, also adopt the long-line pedestal production technology, except that the defective of stress porous plate is given in existence, also have following defective: plate is easily super thick, overweight, must use the high grade sacked cement.Fig. 2 is the big floor sketch of bi-steel.(5) (bi-steel is parallel by two, and spacing is 20~30 millimeters a vertical muscle and the spacing welding of some vertical with it bar dowels (horizontal bar) by 80~100 millimeters, the terraced lattice type skeleton of composition for horizontal bi-steel.) (6) be vertical bi-steel, its structure is with laterally bi-steel is identical.The defective of the big floor of bi-steel is: must special-purpose bi-steel welding machine (but bi-steel welding machine quality does not pass a test at present).Vertically, laterally the bi-steel of configuration works independently separately isolatedly respectively, compartment is brought into play thereby influence the reinforcing bar potentiality each other.In length and breadth to the anchor rib that is provided with being arranged respectively, thereby increased steel using amount promptly in length and breadth to bi-steel hyphen muscle separately.Every kind of reinforcing bar has only a kind of effect, promptly principal rod, anchor rib be provided with respectively, dual-purpose not mutually, thereby increased steel using amount.Carry out colligation to bi-steel for fixing its position in length and breadth, also improved cost.In addition because in length and breadth to bi-steel works in isolation separately, so that influenced the structural performance of big floor.
The purpose of this utility model provide a kind ofly have the intensity height, structural performance is good, material consumption is few, the big floor of building structural steel silk screen that cost is low.
The big floor of building structural steel silk screen described in the utility model is made up of longitudinal reinforcement, transverse reinforcement, anchor bar and concrete four parts, longitudinal reinforcement becomes latticed with the transverse reinforcement orthogonal arrangement, the crosspoint all connects with spot welding, at the whole steel fabric sheet periphery that is made of the vertical, horizontal reinforcing bar two anchor bars that are arranged in parallel are set, anchor bar all is connected with spot welding with the crosspoint of longitudinal reinforcement or transverse reinforcement.
Below in conjunction with drawings and Examples the utility model is elaborated:
Fig. 3,4 is respectively vertical view of the present utility model and elevation.(7) be longitudinal reinforcement, (8) are transverse reinforcement, and (9) are two parallel anchor bars, and (10) are body of wall.Reinforcing system cold-drawn low-carbon wire in the utility model, the cement high-mark cement that needn't non-ly be packed in bag can adopt cement in bulk.As shown in Figure 3, the utility model adopts gauze wire cloth chip structure, and the floor size can be adjusted with room-size.Longitudinal reinforcement (7) is orthogonal with transverse reinforcement (8), all connects with spot welding in all crosspoints; At the periphery of reinforced mesh, with each limit two anchor bars parallel to each other (9) are set abreast, anchor bar (9) all is connected with spot welding with longitudinal reinforcement (7) all crosspoints with transverse reinforcement (8).As shown in Figure 4, the position of anchor bar (9) after big floor is installed is within body of wall, and promptly anchor bar (9) is in big floor bearing length scope.In longitudinal reinforcement (7), all there is cold pier nose the termination of transverse reinforcement (8) and anchor bar (9), and the effect of cold pier nose is to replenish anchoring strength.After whole steel fabric sheet spot welding is finished, the net sheet is inserted in the template (using topotype) more, concreting treats that maintenance expires then, can lift by crane transportation.
The cost of floor depends on amount of reinforcement, and steel using amount of the present utility model is that the 1/5~1/3(steel using amount that gives the stress porous plate, gives the big floor of stress and the big floor steel using amount of bi-steel is domestic minimum). Therefore, economic benefit of the present utility model is extremely remarkable. Because the utility model intensity height (through ten big floor tests), strength assurance coefficient is at 1.83~2.41. Factor of safety against cracking is 1.20~1.5 (the utility model is the non-stress plate that gives, and this nothing cracking resistance requires), and cracking resistance is superior. Rigidity is big, and deflection span ratio is no more than 1/120 during destruction, and mark carries lower deflection span ratio 1/791~1/4895, only occurs splitting wide 1.5 millimeters destruction marking during test, is ductile fracture, and other destruction marking does not all occur. Therefore, because the utility model structural behaviour significantly is better than domestic existing floor, so not only can be used for tier building, and the skyscraper that can be used for complete assemblingization, to build the cycle that the assembled integral floor of continuing to use for a long time cast-in-situ floor causes long for solution, and progress is slow, high material consumption, the high cost problem provides a new way that gets twice the result with half the effort, and the utility model is except steel using amount little (whole nation is minimum), outside structural behaviour is superior, adopt simultaneously the utility model can simplify technology, reduce operation, minimizing equipment, do not need special production line, pedestal, do not need special means of transport, be easy to promote, be convenient to start. Give the brittle failure of stress plate, the hole of collapsing in producing has not existed in the utility model. Give stress porous plate (batten) and come off in a large number when earthquake, the problem that seriously causes casualties also is able to thorough solution. Thereby have significant economic benefit and a social benefit.
Claims (2)
1, the big floor of a kind of building structural steel silk screen is made up of longitudinal reinforcement (7), transverse reinforcement (8), anchor bar (9) and concrete four parts.It is characterized in that: longitudinal reinforcement (7) becomes latticed with transverse reinforcement (8) orthogonal arrangement, the crosspoint all connects with spot welding, the whole steel fabric sheet periphery that is constituting by the vertical, horizontal reinforcing bar, two anchor bars that are arranged in parallel (9) are set, and anchor bar (9) all is connected with spot welding with the crosspoint of longitudinal reinforcement (7) or transverse reinforcement (8).
2,, it is characterized in that all there is cold pier nose the end of all longitudinal reinforcements, transverse reinforcement, anchor bar by the big floor of the described gauze wire cloth of claim 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 89216868 CN2057195U (en) | 1989-09-21 | 1989-09-21 | Large wire mesh floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 89216868 CN2057195U (en) | 1989-09-21 | 1989-09-21 | Large wire mesh floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2057195U true CN2057195U (en) | 1990-05-16 |
Family
ID=4872234
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 89216868 Withdrawn CN2057195U (en) | 1989-09-21 | 1989-09-21 | Large wire mesh floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2057195U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101065547B (en) * | 2004-11-25 | 2011-05-25 | 罗杰·埃里克松 | A building element and a building structure comprising the building element |
CN104264880A (en) * | 2014-09-22 | 2015-01-07 | 黑龙江农垦建工有限公司 | Floor slab structure allowing significant reduction of steel bars |
CN104878873A (en) * | 2015-05-19 | 2015-09-02 | 华南理工大学 | Steel wire mesh reinforced ultra-high performance concrete cover plate and production method thereof |
CN104878876A (en) * | 2015-05-19 | 2015-09-02 | 华南理工大学 | Ultra-high performance concrete cover plate with optimized steel angles and production method of ultra-high performance concrete cover plate |
-
1989
- 1989-09-21 CN CN 89216868 patent/CN2057195U/en not_active Withdrawn
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101065547B (en) * | 2004-11-25 | 2011-05-25 | 罗杰·埃里克松 | A building element and a building structure comprising the building element |
CN104264880A (en) * | 2014-09-22 | 2015-01-07 | 黑龙江农垦建工有限公司 | Floor slab structure allowing significant reduction of steel bars |
CN104878873A (en) * | 2015-05-19 | 2015-09-02 | 华南理工大学 | Steel wire mesh reinforced ultra-high performance concrete cover plate and production method thereof |
CN104878876A (en) * | 2015-05-19 | 2015-09-02 | 华南理工大学 | Ultra-high performance concrete cover plate with optimized steel angles and production method of ultra-high performance concrete cover plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100545363C (en) | Structure conversion layer type steel concrete girder mould suspension construction method | |
CN103046645B (en) | A kind of whole casting structure and construction method of Large-span Precast | |
CN103806659A (en) | Single-layer comprehensive support, cracking-control and temperature-control construction technology for super-thick prestressed transfer slab | |
CN108678225A (en) | The built-in steel plate combined shear wall of built-in presstressed reinforcing steel steel pipe concrete frame and the practice | |
CN205530682U (en) | Precast prestressed frame construction | |
CN2057195U (en) | Large wire mesh floor | |
CN205804745U (en) | A kind of precast concrete shear wall component | |
CN208052253U (en) | A kind of positioning moulding bed prefabricated for T beam web reinforced frames | |
CN207260375U (en) | A kind of steel plate concrete combined shear wall | |
CN207987786U (en) | No. 0 block bracket prepressing structure of continuous beam bridge pier in water | |
CN217353122U (en) | Assembled exempts from to prop up mould building carrier plate | |
CN2221618Y (en) | Triangular precast reinforced concrete pile | |
CN201016187Y (en) | Built-in steel truss concrete combined giant-scale beam-column framework | |
CN208815672U (en) | The connecting joint structure of circular steel tube concrete column and reinforced beam | |
CN106760839A (en) | A kind of superelevation steel megastructure vibration damping integrated system | |
CN207739510U (en) | A kind of reinforced cold-bent pipe concrete column and structural system | |
CN208363611U (en) | Girder with rolled steel section en cased in concrete, which pours, to be smash without support hung formwork structure | |
CN216712591U (en) | Roadbed fixing structure for highway construction | |
CN217299742U (en) | Construction platform for crossing over aerial swimming pool between super high-rise buildings | |
CN206053118U (en) | A kind of steel truss makees the groove type plate of skeleton | |
CN215800930U (en) | Be applied to domes's rag bolt device | |
CN210067226U (en) | Reinforcing steel bar frame for superposed beam | |
CN212957893U (en) | Super high concrete water tank structure connected with upper floor | |
CN218713900U (en) | Fireproof shear wall building structure | |
CN218019270U (en) | Precast concrete member tensioning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |