CN205712229U - A kind of inclinometer pipe for base pit engineering - Google Patents
A kind of inclinometer pipe for base pit engineering Download PDFInfo
- Publication number
- CN205712229U CN205712229U CN201620521966.4U CN201620521966U CN205712229U CN 205712229 U CN205712229 U CN 205712229U CN 201620521966 U CN201620521966 U CN 201620521966U CN 205712229 U CN205712229 U CN 205712229U
- Authority
- CN
- China
- Prior art keywords
- vertical tube
- sleeve pipe
- lid
- pipe
- tube
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The utility model discloses a kind of inclinometer pipe for base pit engineering, feature is: include left inlet opening, left lid, left vertical tube, left camber sleeve pipe, horizontal tube, right camber sleeve pipe, right vertical tube, right lid and right inlet opening, the left lid sealed it is provided with on the top of left vertical tube, left inlet opening is located in left lid, the right lid sealed it is provided with on the top of right vertical tube, right inlet opening is located in right lid, the bottom of left vertical tube concatenate with left camber sleeve pipe, horizontal tube, right camber sleeve pipe successively after again bottom with right vertical tube connect;Left vertical tube, left camber sleeve pipe, horizontal tube, right camber sleeve pipe, right vertical tube collectively form " U " type.All it is cased with connecting sleeve pipe at the outer wall of left vertical tube and the outer wall of right vertical tube.This utility model has diaphram wall deviational survey effect more preferably, inclinometer pipe is completely embedded, ensure inclinometer pipe in use obtain exactly data, ensure inclinometer safe handling, the convenient advantage installed.
Description
Technical field
This utility model relates to base pit engineering, especially relates to a kind of inclinometer pipe for base pit engineering.
Background technology
In recent years, the underground engineering construction of China, water conservancy construction and urban transportation infrastructure construction all achieve front institute
Not some development, along with raising and a large amount of new technique, new construction, new technology, the new material of social production force level and newly set
Standby extensive application so that the building technology of underground engineering have also been obtained unprecedented development.
It is currently China and carries out the peak period of underground engineering construction construction, by resource-constrained between hemisphere, following basis
The development trend built is that city underground engineering exploitation application is it is necessary to excavate the subterranean excavation in city.In pit retaining monitoring, go along with sb. to guard him
The horizontal displacement of structure directly affects the stability of foundation ditch, and its Changing Pattern is one of big event evaluating base pit stability.
In Excavation Process, in order to ensure security of foundation ditch construction, the particularly poor area of soil property, it is necessary to building enclosure horizontal position
Move monitoring to monitor in real time.Before implementing this monitoring, inclinometer pipe need to be embedded in building enclosure in advance, go along with sb. to guard him knot for observation
Structure horizontal displacement.Inclinometer pipe typically uses straight tube, but owing to inclinometer pipe is fixing firm not, mud pours into and inclinometer pipe will be caused to lose
Effect, even damages inclinometer.
Summary of the invention
The purpose of this utility model be to provide a kind of to diaphram wall deviational survey effect more preferably, inclinometer pipe be completely embedded,
Ensure inclinometer pipe in use obtain data exactly, ensure inclinometer safe handling, convenient install for foundation ditch work
The inclinometer pipe of journey.
The purpose of this utility model is achieved in that
A kind of inclinometer pipe for base pit engineering, feature is: include left inlet opening, left lid, left vertical tube, left camber set
Pipe, horizontal tube, right camber sleeve pipe, right vertical tube, right lid and right inlet opening, be provided with the left side sealed on the top of left vertical tube
Lid, left inlet opening is located in left lid, is provided with the right lid sealed on the top of right vertical tube, and right inlet opening is located at the right side
In lid, the bottom of left vertical tube concatenate with left camber sleeve pipe, horizontal tube, right camber sleeve pipe successively after again with the bottom of right vertical tube even
Logical;Left vertical tube, left camber sleeve pipe, horizontal tube, right camber sleeve pipe, right vertical tube collectively form " U " type.
Outer wall at the outer wall of left vertical tube and right vertical tube is all cased with connecting sleeve pipe, connects sleeve pipe and left vertical tube, right vertical tube equal
Closely cooperate.
It is provided with several at the inwall connecting sleeve pipe and is easy to the colligation groove that tie wire passes.
Left lid and right lid are equipped with lid handle.
This practicality newly by left inlet opening, left lid, left vertical tube, left camber sleeve pipe, horizontal tube, right camber sleeve pipe, right vertical tube,
Right lid, right inlet opening and connection sleeve pipe composition, left camber sleeve pipe is for connecting the left port of left vertical tube and horizontal tube, right camber
Sleeve pipe is for connecting the right output port of right vertical tube and horizontal tube, after steel reinforcement cage colligation (welding) completes, can fix left vertical tube, right erect
Pipe and horizontal tube.In steel reinforcement cage sinking watching, i.e. when inclinometer pipe is pre-buried, left vertical tube, right vertical tube are played protection and make by horizontal tube
With, prevent left vertical tube, right vertical tube from rupturing, protection inclinometer pipe will not destroy in lifting, steel reinforcement cage sinking watching, causes surveying
Inclined tube lost efficacy, the most in use, if left vertical tube, right vertical tube connect not tight, if being mixed into the foreign bodies such as mud, and can be by the left
Pour water in camber sleeve pipe, right camber sleeve pipe, tube wall washes away to remove foreign body, ensure that inclinometer pipe in use obtains
Data exactly, also ensure the safe handling of inclinometer simultaneously.Adapter sleeve pipe is used for fixing left vertical tube, right vertical tube, makes inclinometer pipe
It is completely embedded.Left vertical tube, right vertical tube are separately installed with left lid, right lid, facilitate water inlet pressurization.Left lid, right lid
Inclinometer pipe can be protected again not filled by foreign body.
Therefore, this utility model has diaphram wall deviational survey effect more preferably, inclinometer pipe is completely embedded, ensures inclinometer pipe
In use obtaining data, guarantee inclinometer safe handling, the convenient advantage installed exactly, this utility model is for base
The deviational survey observation effect of hole engineering building enclosure is obvious, observes particular for diaphram wall deviational survey.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the schematic diagram connecting sleeve pipe.
Detailed description of the invention
Below in conjunction with embodiment and compare accompanying drawing this utility model is described in further detail.
A kind of inclinometer pipe for base pit engineering, including left inlet opening 1, left lid 2, left vertical tube 3, left camber sleeve pipe 4, water
Flat pipe 5, right camber sleeve pipe 6, right vertical tube 7, right lid 8 and right inlet opening 9, be provided with on the top of left vertical tube 3 and to seal
Left lid 2, left inlet opening 1 is located in left lid 2, is provided with the right lid 8 sealed, right water inlet on the top of right vertical tube 7
Hole 9 is located in right lid 8, the bottom of left vertical tube 6 concatenate with left camber sleeve pipe 4, horizontal tube 5, right camber sleeve pipe 6 successively after again with
The bottom connection of right vertical tube 7;Left vertical tube 3, left camber sleeve pipe 4, horizontal tube 5, right camber sleeve pipe 6, right vertical tube 7 collectively form " U
Shape ".
All it is cased with connecting sleeve pipe 11 at the outer wall of left vertical tube 3 and the outer wall of right vertical tube 7, connects sleeve pipe 11 and left vertical tube 3, the right side
Vertical tube 7 all closely cooperates, and adapter sleeve 11 pipe is used for fixing left vertical tube 3, right vertical tube 7, makes inclinometer pipe be completely embedded.
It is provided with several at the inwall connecting sleeve pipe 11 and is easy to the colligation groove 12 that tie wire passes, it is simple to sleeve pipe will be connected
11 and inclinometer pipe be fixed on steel reinforcement cage, make inclinometer pipe to damage.
Left lid 2 and right lid 8 are equipped with lid handle 10.
Claims (4)
1. the inclinometer pipe for base pit engineering, it is characterised in that: include left inlet opening, left lid, left vertical tube, left camber set
Pipe, horizontal tube, right camber sleeve pipe, right vertical tube, right lid and right inlet opening, be provided with the left side sealed on the top of left vertical tube
Lid, left inlet opening is located in left lid, is provided with the right lid sealed on the top of right vertical tube, and right inlet opening is located at the right side
In lid, the bottom of left vertical tube concatenate with left camber sleeve pipe, horizontal tube, right camber sleeve pipe successively after again with the bottom of right vertical tube even
Logical;Left vertical tube, left camber sleeve pipe, horizontal tube, right camber sleeve pipe, right vertical tube collectively form " U " type.
Inclinometer pipe for base pit engineering the most according to claim 1, it is characterised in that: erect on outer wall and the right side of left vertical tube
The outer wall of pipe is all cased with connecting sleeve pipe, connects sleeve pipe and all closely cooperates with left vertical tube, right vertical tube.
Inclinometer pipe for base pit engineering the most according to claim 2, it is characterised in that: it is provided with at the inwall connecting sleeve pipe
Several are easy to the colligation groove that tie wire passes.
Inclinometer pipe for base pit engineering the most according to claim 1, it is characterised in that: in left lid and right lid all
It is provided with lid handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620521966.4U CN205712229U (en) | 2016-06-01 | 2016-06-01 | A kind of inclinometer pipe for base pit engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620521966.4U CN205712229U (en) | 2016-06-01 | 2016-06-01 | A kind of inclinometer pipe for base pit engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205712229U true CN205712229U (en) | 2016-11-23 |
Family
ID=57300331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620521966.4U Expired - Fee Related CN205712229U (en) | 2016-06-01 | 2016-06-01 | A kind of inclinometer pipe for base pit engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205712229U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108756856A (en) * | 2018-06-21 | 2018-11-06 | 广东赛达交通科技股份有限公司 | A kind of construction method of distribution type fiber-optic drillhole inclination survey |
-
2016
- 2016-06-01 CN CN201620521966.4U patent/CN205712229U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108756856A (en) * | 2018-06-21 | 2018-11-06 | 广东赛达交通科技股份有限公司 | A kind of construction method of distribution type fiber-optic drillhole inclination survey |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104563164B (en) | A kind of ground-connecting-wall seam leak detection and grouting for water plugging method | |
CN105239598A (en) | Integral sinking construction method for well-type full-automatic stereo garage | |
CN104805854A (en) | Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment | |
CN103161476A (en) | Mechanical shaft-forming method of shield cutterhead maintenance shaft in tunnel and underground construction | |
CN103670448B (en) | A kind of underground utilities protective device and apply the supporting method of this device | |
CN104264663A (en) | Hard cutting construction technology for secant piles | |
CN104863183B (en) | Damping pilework and construction method is isolated in large cross-section tunnel proximity architecture construction | |
CN103572764A (en) | Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof | |
CN205712229U (en) | A kind of inclinometer pipe for base pit engineering | |
CN207143920U (en) | Water-stopping system between novel pile under a kind of complicated circumstance of flowing water | |
CN204282399U (en) | A kind of subway space enclosing structure | |
CN102220764A (en) | Deep foundation pit bracing system and construction method thereof | |
CN204898684U (en) | Super dark excavation supporting system | |
CN111733853A (en) | Tongue-and-groove type prefabricated underground continuous wall structure | |
CN202247924U (en) | Assembled steel structure open caisson in pipe jacking construction | |
CN204000836U (en) | A kind of structure for the ground stabilization of shield end well surrounding building | |
CN206477240U (en) | A kind of trestle pile foundation for deep water drift net riverbed | |
CN205604255U (en) | Dark foundation pit retaining structure seam stagnant water planar arrangement structure | |
CN205421303U (en) | High water level silt ground water treatment facilities falls | |
CN105386471A (en) | Wall brushing device for constructing seams of H-section steel of underground diaphragm wall | |
CN205242463U (en) | Subway station foundation pit retaining structure ground is construction monitoring structure of wall even | |
CN208251118U (en) | Slope reinforcement device | |
CN203891045U (en) | Leakage blocking and grouting device between deep foundation pit fender posts | |
CN204959781U (en) | Dewatering well plugging device | |
CN204551551U (en) | A kind of ground-connecting-wall seam leak detection and grouting for water plugging device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20170601 |
|
CF01 | Termination of patent right due to non-payment of annual fee |