CN205712183U - A kind of novel plastic inspection shaft - Google Patents

A kind of novel plastic inspection shaft Download PDF

Info

Publication number
CN205712183U
CN205712183U CN201620571275.5U CN201620571275U CN205712183U CN 205712183 U CN205712183 U CN 205712183U CN 201620571275 U CN201620571275 U CN 201620571275U CN 205712183 U CN205712183 U CN 205712183U
Authority
CN
China
Prior art keywords
inspection shaft
bearing
steel wire
wire rope
worm gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620571275.5U
Other languages
Chinese (zh)
Inventor
陈世良
庞庆委
庞江华
李方程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Pangshi Plastic Industry Co Ltd
Qianjiang College of Hangzhou Normal University
Original Assignee
Zhejiang Pangshi Plastic Industry Co Ltd
Qianjiang College of Hangzhou Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Pangshi Plastic Industry Co Ltd, Qianjiang College of Hangzhou Normal University filed Critical Zhejiang Pangshi Plastic Industry Co Ltd
Priority to CN201620571275.5U priority Critical patent/CN205712183U/en
Application granted granted Critical
Publication of CN205712183U publication Critical patent/CN205712183U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

This utility model relates to a kind of inspection shaft, particularly relates to a kind of novel plastic inspection shaft.The technical problems to be solved in the utility model is to provide a kind of novel structure, convenience of uncapping, checks simple novel plastic inspection shaft.In order to solve above-mentioned technical problem, this utility model provides such a novel plastic inspection shaft, include inspection shaft housing, slide rail, fixed pulley I, steel wire rope I, bearing I, mechanical box, worm gear I, worm screw I, bearing block I, crank I, case lid, well lid, fixed block, reel I, slide block, steel wire rope II, lifting support and lowering or hoisting gear, inspection shaft case top is hingedly connected with well lid, inspection shaft housing external right side top is provided with mechanical box, mechanical box inner bottom part is sequentially provided with fixed pulley I and bearing I from left to right, bearing I top is provided with worm gear I, reel I it is provided with on front side of worm gear I, steel wire rope I it is wound with on reel I.This utility model has reached novel structure, convenience of uncapping, has checked simple effect.

Description

A kind of novel plastic inspection shaft
Technical field
This utility model relates to a kind of inspection shaft, particularly relates to a kind of novel plastic inspection shaft.
Background technology
Inspection shaft be the power supply for Urban Underground infrastructure, feedwater, draining, blowdown, communication, cable television, gas pipe, Public lighting circuits etc. keep in repair, easy for installation and arrange.Be generally located at pipeline intersection, turning, caliber or gradient change, with And locate at a certain distance on straight line pipeline section, it is easy for making regular check on auxiliary construction.Plastics integrated injection molding inspection shaft refers to structure The main well seating portion becoming inspection shaft uses once injection moulding.In order to adapt to various drainage condition, plastic inspection well is simultaneously It is configured with the matched plastics integrated injection molding accessories such as reducer union, the joint that confluxes, pit shaft polylinker.Whole to ensure The smoothness of drainage system and sealing.Plastic inspection well can be divided into one residential draining plastic inspection well and municipal drainage with moulding Material inspection shaft.The functionality advantage of plastic inspection well mainly has 5 points: save land, energy-conservation, water saving, material-saving, environmental protection, plastic inspection well leads to Often will periodically be opened inspection.
Current plastic inspection well exists that structure is single, inconvenience of uncapping, check loaded down with trivial details shortcoming, therefore needs research and development one badly Plant novel structure, convenience of uncapping, check simple novel plastic inspection shaft.
Utility model content
(1) to solve the technical problem that
This utility model in order to overcome current plastic inspection well to exist structure is single, inconvenience of uncapping, check loaded down with trivial details Shortcoming, the technical problems to be solved in the utility model is to provide a kind of novel structure, convenience of uncapping, checks simple novel plastic Inspection shaft.
(2) technical scheme
In order to solve above-mentioned technical problem, this utility model provides such a novel plastic inspection shaft, includes inspection Look into well housing, slide rail, fixed pulley I, steel wire rope I, bearing I, mechanical box, worm gear I, worm screw I, bearing block I, crank I, case lid, well Lid, fixed block, reel I, slide block, steel wire rope II, lifting support and lowering or hoisting gear, inspection shaft case top is hingedly connected with well Lid, inspection shaft housing external right side top is provided with mechanical box, and mechanical box inner bottom part is sequentially provided with fixed pulley I and bearing I from left to right, Bearing I top is provided with worm gear I, is provided with reel I on front side of worm gear I, and reel I is wound with steel wire rope I, and steel wire rope I is walked around and determined cunning Take turns I, and steel wire rope I upper end is fixed on the right side of well lid, is provided with bearing block I, is provided with and shakes in bearing block I on the left of mechanical box inner right wall I, crank I lower end is provided with worm screw I, and worm screw I engages with worm gear I, and mechanical box top is hingedly connected with case lid, in inspection shaft housing Left wall is sequentially provided with fixed block and slide rail from top to bottom, and slide rail is provided with slide block, and slide block coordinates with slide rail, is provided with liter on the right side of slide block Descending branch frame, is provided with lowering or hoisting gear on the left of lifting support inner bottom part, lowering or hoisting gear includes casing, bearing II, reel II, crank II, bearing block II, worm screw II, worm gear II and fixed pulley II, casing inner left wall is provided with fixed pulley II, and casing inner bottom part is provided with bearing II, bearing II top is provided with worm gear II, is provided with reel II, reel II is wound with steel wire rope II, steel wire rope on front side of worm gear II II walks around fixed pulley II, and steel wire rope II upper end is connected with fixed block, is provided with bearing block II in the middle of the right wall of casing, pacifies in bearing block II Equipped with crank II, crank II left end is provided with worm screw II, and worm screw II engages with worm gear II.
Preferably, also include handle, handle is installed on the left of case lid.
Preferably, tank material is rustless steel.
Operation principle: when workman needs to check the pipeline bottom inspection shaft, first rotates clockwise case lid and beats Opening, the most clockwise shake crank I, crank I drives worm screw I to rotate clockwise, and worm screw I drives worm gear I to rotate clockwise, worm gear I drives reel I to rotate clockwise take-up, and under the effect of steel wire rope I, well lid rotates clockwise, when well lid is opened completely After, stop shake crank I.Then worker stands is on lifting support, and shake crank II clockwise, and crank II drives worm gear II suitable Hour hands rotate, and worm gear II drives reel II to rotate clockwise unwrapping wire, the most under gravity, and workman and lifting support one Rise and move downward, when correct position in workman is moved downwardly to inspection shaft housing, stop shake crank II.Now workman is permissible Checking the pipeline bottom inspection shaft, when needing to leave inspection shaft after checking out, workman shakes crank II counterclockwise, shakes Driving worm gear II to rotate counterclockwise II, worm gear II drives reel II inverse time hour hands to rotate take-up, now at steel wire rope II Under effect, steel wire rope II pulls lowering or hoisting gear to move upward with lifting support, so drive workman move upward, when workman upwards When moving to origin-location, stopping shake crank II, now workman can leave inspection shaft enclosure interior voluntarily and return to ground.So Rear shake crank I counterclockwise, now well lid rotates counterclockwise, and covers inspection shaft case top, stops shake crank I, finally Case lid is rotated counterclockwise, and covers mechanical box top.
Because also including handle, handle is installed on the left of case lid, so that workman opens case lid more easily.
Because tank material is rustless steel, can be with the service life of prolonged mechanical case.
(3) beneficial effect
This utility model has reached novel structure, convenience of uncapping, has checked simple effect.
Accompanying drawing explanation
Fig. 1 is the first main TV structure schematic diagram of the present utility model.
Fig. 2 is the main TV structure schematic diagram of this utility model lowering or hoisting gear.
Fig. 3 is the second of the present utility model main TV structure schematic diagram.
Being labeled as in accompanying drawing: 1-inspection shaft housing, 2-slide rail, 3-fixed pulley I, 4-steel wire rope I, 5-bearing I, 6-machinery Case, 7-worm gear I, 8-worm screw I, 9-bearing block I, 10-crank I, 11-case lid, 12-well lid, 13-fixed block, 14-reel I, 15-slide block, 16-steel wire rope II, 17-lifting support, 18-lowering or hoisting gear, 181-casing, 182-bearing II, 183-reel II, 184-crank II, 185-bearing block II, 186-worm screw II, 187-worm gear II, 188-fixed pulley II, 19-handle.
Detailed description of the invention
With embodiment, this utility model is further described below in conjunction with the accompanying drawings.
Embodiment 1
A kind of novel plastic inspection shaft, as Figure 1-3, includes inspection shaft housing 1, slide rail 2, fixed pulley I 3, steel wire Restrict I 4, bearing I 5, mechanical box 6, worm gear I 7, worm screw I 8, bearing block I 9, crank I 10, case lid 11, well lid 12, fixed block 13, around Line wheel I 14, slide block 15, steel wire rope II 16, lifting support 17 and lowering or hoisting gear 18, inspection shaft housing 1 top is hingedly connected with well Lid 12, inspection shaft housing 1 external right side top is provided with mechanical box 6, and mechanical box 6 inner bottom part is sequentially provided with fixed pulley I 3 He from left to right Bearing I 5, bearing I 5 top is provided with worm gear I 7, is provided with reel I 14, reel I 14 is wound with steel wire rope I 4 on front side of worm gear I 7, Fixed pulley I 3 walked around by steel wire rope I 4, and steel wire rope I 4 upper end is fixed on the right side of well lid 12, is provided with bearing on the left of mechanical box 6 inner right wall Seat I 9, is provided with crank I 10 in bearing block I 9, crank I 10 lower end is provided with worm screw I 8, and worm screw I 8 engages with worm gear I 7, mechanical box 6 Top is hingedly connected with case lid 11, and inspection shaft housing 1 inner left wall is sequentially provided with fixed block 13 and slide rail 2 from top to bottom, on slide rail 2 Being provided with slide block 15, slide block 15 coordinates with slide rail 2, is provided with lifting support 17, sets on the left of lifting support 17 inner bottom part on the right side of slide block 15 Lowering or hoisting gear 18, lowering or hoisting gear 18 is had to include casing 181, bearing II 182, reel II 183, crank II 184, bearing block II 185, worm screw II 186, worm gear II 187 and fixed pulley II 188, casing 181 inner left wall is provided with fixed pulley II 188, casing 181 inner bottom Portion is provided with bearing II 182, and bearing II 182 top is provided with worm gear II 187, is provided with reel II 183, coiling on front side of worm gear II 187 Taking turns and be wound with steel wire rope II 16 on II 183, fixed pulley II 188 walked around by steel wire rope II 16, and steel wire rope II 16 upper end is with fixed block 13 even Connect, in the middle of the right wall of casing 181, be provided with bearing block II 185, bearing block II 185 is provided with crank II 184, crank II 184 left end Being provided with worm screw II 186, worm screw II 186 engages with worm gear II 187.
Also include handle 19, handle 19 is installed on the left of case lid 11.
Casing 181 material is rustless steel.
Operation principle: when workman needs to check the pipeline bottom inspection shaft, first case lid 11 is rotated clockwise Opening, the most clockwise shake crank I 10, crank I 10 drives worm screw I 8 to rotate clockwise, and worm screw I 8 drives worm gear I 7 clockwise Rotating, worm gear I 7 drives reel I 14 to rotate clockwise take-up, and under the effect of steel wire rope I 4, well lid 12 rotates clockwise, when After well lid 12 is opened completely, stop shake crank I 10.Then worker stands is on lifting support 17, and shakes crank clockwise II 184, crank II 184 drives worm gear II 187 to rotate clockwise, and worm gear II 187 drives reel II 183 to rotate clockwise and puts Line, the most under gravity, workman and lifting support 17 move downwardly together, when workman is moved downwardly to inspection shaft housing In 1 during correct position, stop shake crank II 184.Now the pipeline bottom inspection shaft can be checked by workman, works as inspection When needing to leave inspection shaft after complete, workman shakes crank II 184 counterclockwise, and crank II 184 drives worm gear II 187 to turn counterclockwise Dynamic, worm gear II 187 drives reel II 183 inverse time hour hands to rotate take-up, now under the effect of steel wire rope II 16, steel wire rope II 16 pull lowering or hoisting gear 18 to move upward with lifting support 17, and then drive workman to move upward, when workman moves upward to former When coming position, stopping shake crank II 184, now workman can leave inspection shaft housing 1 inside voluntarily and return to ground.The most inverse Hour hands shake crank I 10, now well lid 12 rotates counterclockwise, and covers inspection shaft housing 1 top, stops shake crank I 10, After case lid 11 is rotated counterclockwise, and cover mechanical box 6 top.
Because also including handle 19, handle 19 is installed on the left of case lid 11, so that workman opens case more easily Lid 11.
Because casing 181 material is rustless steel, can be with the service life of prolonged mechanical case 6.
Embodiment described above only have expressed preferred implementation of the present utility model, and it describes more concrete and detailed, But therefore can not be interpreted as the restriction to this utility model the scope of the claims.It should be pointed out that, common for this area For technical staff, without departing from the inventive concept of the premise, it is also possible to making some deformation, improve and substitute, these are all Belong to protection domain of the present utility model.Therefore, the protection domain of this utility model patent should be as the criterion with claims.

Claims (3)

1. a novel plastic inspection shaft, it is characterised in that include inspection shaft housing (1), slide rail (2), fixed pulley I (3), steel Cord I (4), bearing I (5), mechanical box (6), worm gear I (7), worm screw I (8), bearing block I (9), crank I (10), case lid (11), Well lid (12), fixed block (13), reel I (14), slide block (15), steel wire rope II (16), lifting support (17) and lowering or hoisting gear (18), inspection shaft housing (1) top is hingedly connected with well lid (12), and inspection shaft housing (1) external right side top is provided with mechanical box (6), mechanical box (6) inner bottom part is sequentially provided with fixed pulley I (3) and bearing I (5) from left to right, and bearing I (5) top is provided with worm gear I (7), worm gear I (7) front side is provided with reel I (14), and reel I (14) is wound with steel wire rope I (4), and steel wire rope I (4) is walked around fixed Pulley I (3), and steel wire rope I (4) upper end is fixing with well lid (12) right side, is provided with bearing block I on the left of mechanical box (6) inner right wall (9), being provided with crank I (10) in bearing block I (9), crank I (10) lower end is provided with worm screw I (8), worm screw I (8) and worm gear I (7) Engagement, mechanical box (6) top is hingedly connected with case lid (11), and inspection shaft housing (1) inner left wall is sequentially provided with fixing from top to bottom Block (13) and slide rail (2), slide rail (2) is provided with slide block (15), and slide block (15) coordinates with slide rail (2), and slide block (15) right side is provided with Lifting support (17), is provided with lowering or hoisting gear (18) on the left of lifting support (17) inner bottom part, lowering or hoisting gear (18) includes casing (181), bearing II (182), reel II (183), crank II (184), bearing block II (185), worm screw II (186), worm gear II (187) and fixed pulley II (188), casing (181) inner left wall is provided with fixed pulley II (188), and casing (181) inner bottom part is provided with bearing II (182), bearing II (182) top is provided with worm gear II (187), and worm gear II (187) front side is provided with reel II (183), coiling Being wound with steel wire rope II (16) on wheel II (183), fixed pulley II (188) walked around by steel wire rope II (16), steel wire rope II (16) upper end with Fixed block (13) connects, and is provided with bearing block II (185), is provided with crank II in bearing block II (185) in the middle of casing (181) right wall (184), crank II (184) left end is provided with worm screw II (186), and worm screw II (186) engages with worm gear II (187).
A kind of novel plastic inspection shaft the most according to claim 1, it is characterised in that also include handle (19), case lid (11) left side is provided with handle (19).
A kind of novel plastic inspection shaft the most according to claim 1, it is characterised in that casing (181) material is rustless steel.
CN201620571275.5U 2016-06-14 2016-06-14 A kind of novel plastic inspection shaft Expired - Fee Related CN205712183U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620571275.5U CN205712183U (en) 2016-06-14 2016-06-14 A kind of novel plastic inspection shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620571275.5U CN205712183U (en) 2016-06-14 2016-06-14 A kind of novel plastic inspection shaft

Publications (1)

Publication Number Publication Date
CN205712183U true CN205712183U (en) 2016-11-23

Family

ID=57306244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620571275.5U Expired - Fee Related CN205712183U (en) 2016-06-14 2016-06-14 A kind of novel plastic inspection shaft

Country Status (1)

Country Link
CN (1) CN205712183U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558497A (en) * 2017-09-14 2018-01-09 安徽金贺财建筑工程有限公司 A kind of cleaning plant for inspection shaft
CN108502824A (en) * 2018-04-16 2018-09-07 安徽瑞瑶环保科技有限公司 A kind of special upper downhole device of inspection shaft
CN110984229A (en) * 2019-11-13 2020-04-10 重庆特斯联智慧科技股份有限公司 A well lid for wisdom fire control
CN112431288A (en) * 2020-12-16 2021-03-02 徐飞 Town road rainwater inspection shaft

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107558497A (en) * 2017-09-14 2018-01-09 安徽金贺财建筑工程有限公司 A kind of cleaning plant for inspection shaft
CN108502824A (en) * 2018-04-16 2018-09-07 安徽瑞瑶环保科技有限公司 A kind of special upper downhole device of inspection shaft
CN108502824B (en) * 2018-04-16 2019-09-03 安徽瑞瑶环保科技有限公司 A kind of dedicated upper downhole device of inspection shaft
CN110984229A (en) * 2019-11-13 2020-04-10 重庆特斯联智慧科技股份有限公司 A well lid for wisdom fire control
CN112431288A (en) * 2020-12-16 2021-03-02 徐飞 Town road rainwater inspection shaft

Similar Documents

Publication Publication Date Title
CN205712183U (en) A kind of novel plastic inspection shaft
CN206941524U (en) Lock with gallery
CN102628279A (en) Automatic lifting manhole cover
CN205934780U (en) Automatic lift post
CN108006542A (en) One kind is easy to cleaning-type LED street lamp
CN204111298U (en) Big machinery four seasons water-supply apparatus
CN105863030B (en) A kind of inspection shaft well lid and the inspection shaft for pipe gallery internal drainage pipeline
CN202745078U (en) Manhole cover
CN103835360A (en) Automatic drainage system of box culvert road
CN206396785U (en) The common cabin pattern synthesis piping lane section structure of the rain sewage of easy access
CN203892136U (en) Movable fully-automatic water drawing apparatus
CN207525813U (en) A kind of integrated prefabricated buried water intake pumping station
CN109371943A (en) Marine float object is salvaged and comprehensive survey device
CN109915778A (en) It is a kind of that clean device being carried out to lamp stand using solar energy
CN207063009U (en) Automatic drainage type inspection well cover assembly
CN2839386Y (en) Up-down manhole cover
CN205791615U (en) A kind of electric automobile charging pile
CN206569864U (en) A kind of floatation type pit overhaul device
CN206407760U (en) A kind of pipe robot cable hank
CN108547482A (en) Spiral lift bicycle parking garage
CN207499055U (en) Integrated discharge pump works
CN206956593U (en) A kind of automatic collision post
CN111719506A (en) Prefabricated pump station of integration
CN207452947U (en) A kind of buried cable inspection-pit
CN215594233U (en) Prefabricated booster pump station of outer integrative mill of station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20170614

CF01 Termination of patent right due to non-payment of annual fee