CN205712053U - Large area super soft foundation settlement monitoring device - Google Patents

Large area super soft foundation settlement monitoring device Download PDF

Info

Publication number
CN205712053U
CN205712053U CN201620372311.5U CN201620372311U CN205712053U CN 205712053 U CN205712053 U CN 205712053U CN 201620372311 U CN201620372311 U CN 201620372311U CN 205712053 U CN205712053 U CN 205712053U
Authority
CN
China
Prior art keywords
levelling rod
large area
monitoring device
steel pipe
super soft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620372311.5U
Other languages
Chinese (zh)
Inventor
葛国昌
姜建芳
徐振兴
吴雄伟
王建策
江晓益
金华辉
占川
汤明礼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Guangchuan Engineering Consulting Co Ltd
Original Assignee
Zhejiang Guangchuan Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Guangchuan Engineering Consulting Co Ltd filed Critical Zhejiang Guangchuan Engineering Consulting Co Ltd
Priority to CN201620372311.5U priority Critical patent/CN205712053U/en
Application granted granted Critical
Publication of CN205712053U publication Critical patent/CN205712053U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

This utility model large area super soft foundation settlement monitoring device, including reference stake, sedimentation plate, levelling rod, sedimentation plate is positioned over ground top layer to be measured, levelling rod is fixed on sedimentation plate, levelling rod with a scale one facing to described reference stake, the cope level of reference stake is higher than the bottom graduation mark of levelling rod.This utility model device, by the observation instrument being erected on reference stake, surveys the scale change reading levelling rod, it is thus achieved that the settling amount on ground top layer.This utility model has simple in construction, easy to operate, certainty of measurement advantages of higher, it is not necessary to manually holds up chi and turns station, is substantially reduced cost of labor, improves work efficiency, is with a wide range of applications.

Description

Large area super soft foundation settlement monitoring device
Technical field
This utility model relates to soil body settlement monitoring technology field, particularly to a kind of large area super soft foundation settlement monitoring device.
Background technology
Along with the quickening of China coast development process, coat at offshore beach and carry out large area reclaiming land around sea and become coastal cities and solve The important channel of land resource shortage.The shallow top layer generally enclosing district is new alluvial or the super soft weak soil of new hydraulic reclamation, and water content is high, Substantially without bearing capacity, it is impossible to meet construction machinery and march into the arena requirement, therefore ground must be carried out at reinforcing before enclosing district's development & construction Reason, using the soil of reclaiming land around sea gained as construction land, and could need to carry out settlement monitoring during stiffening basic ground, To understand the compression situation of foundation soil, evaluate basement process consolidation effect.At present, the settlement monitoring in foundation treatment engineering Mainly bury sedimentation plate underground on top layer, set up level gauge by tripod, manually hold up chi to obtain settlement of foundation by the way of turning station.But There is shortcomings in the method in large area super soft foundation settlement monitoring: 1) super soft weak soil engineering properties extreme difference, without the most steady Fixed tripod construction of platform, cannot realize settlement monitoring before super soft weak soil possesses certain bearing capacity;2) chi is manually held up to need to lean on Nearly subsidence survey point, the disturbance to super soft weak soil will cause sedimentation plate to topple, and test extremely difficult, and there is potential safety hazard;3) big Artificial turn of station pilot measurement in area super soft weak soil region, labor intensity is big, and inefficiency, accuracy of observation is poor, and destructible face And drainage pipe, interference construction.
Utility model content
For solving prior art problems present in the large area super soft foundation settlement monitoring, this utility model large area surpasses Soft foundation settlement monitoring device, is that levelling rod is arranged on sedimentation plate fixed placement is in ground top layer to be measured, by benchmark Set up observation instrument on Zhuan, survey the scale change reading levelling rod, and then obtain the settling amount on ground top layer.
The technical solution of the utility model is:
Large area super soft foundation settlement monitoring device, including reference stake, sedimentation plate, levelling rod, described sedimentation plate is positioned over to be treated Geodetic base table layer, described levelling rod is fixed on sedimentation plate, levelling rod with a scale one facing to described reference stake, reference stake Cope level is slightly above the bottom graduation mark of levelling rod.
Described reference stake includes steel pipe, bearing, fixing bolt, observation platform, and steel pipe bottom is placed in ground and consolidates soil layer, bearing Being fixed in steel pipe top, fixing bolt vertical welding is erected on bearing by fixing bolt in bearing, external observation instrument;? The surrounding of steel pipe is stacked earth bag and is built into observation platform.
Described sedimentation plate includes steel plate and channel-section steel, and channel-section steel is welded on steel plate, and the notch side of channel-section steel is towards reference stake.
Described levelling rod can use aluminum alloy material, levelling rod bottom sides to reserve positioning bolt hole, and fixed by bolt On channel-section steel, described levelling rod can merogenesis, flexible, levelling rod one side with a scale is placed in the notch side of channel-section steel.
Described steel pipe can be with merogenesis, and adjacent segments steel pipe uses screw thread affixed;Described bearing is fixed in described steel pipe top by screw thread.
When ground occurs sedimentation, levelling rod sinks with sedimentation plate, is surveyed by the external observation instrument being erected on reference stake Read the change of levelling rod scale, be the settling amount on ground top layer.
The monitoring method of this utility model device, comprises the following steps:
A () sets reference stake: steel pipe hammers the foundation soil of predeterminated position, until steel pipe bottom is placed in firm soil layer, and will weldering The bearing having fixing bolt is fixed in steel pipe top, stacks earth bag in steel pipe surrounding and builds observation platform;
B sedimentation plate is placed in ground top layer to be measured by (), the notch side of the channel-section steel of sedimentation plate is towards reference stake, and levelling rod is with a scale One facing to notch side, and be fixed on channel-section steel;
C () repeats step (b), be placed in by multiple sedimentation plates in the different measuring points on reference stake surrounding ground top layer;
D (), by being located on reference stake by external observation instrument stand, surveys the initial scale H reading i measuring point levelling rodi0
E () after a time, along with the generation of settlement of foundation, sedimentation plate drives levelling rod to sink together, again surveys and reads i measuring point water The scale H of object staffit
F () uses Hit-Hi0Obtain the scale changing value Δ H of i measuring point levelling roditIt is the heavy of i measuring point ground top layer in during this period of time Fall amount.
The beneficial effects of the utility model are:
The measuring point levelling rod fixed placement of this utility model device, can reduce the disturbance manually holding up chi to sedimentation plate, improves test essence Degree;Observation instrument is set up, it is to avoid carry out the office of settlement observation because super soft weak soil Lack of support cannot set up tripod on reference stake Limit, raising testing reliability, and set up also can realize the sight of reference stake surrounding multiple measuring point without artificial turn of station pilot measurement, an instrument Survey, be greatly improved work efficiency, reduce cost of labor, reduce the interference to construction.This device has simple in construction, operation side The advantage such as just, certainty of measurement is high, adaptable.This utility model effectively overcomes shortcomings present in prior art, It is applicable to the foundation treatment engineering of various complex working condition, is with a wide range of applications.
Accompanying drawing explanation
Fig. 1 is the use status architecture schematic diagram of this utility model device;
Fig. 2 is monitoring principle schematic diagram of the present utility model.
In figure: 1-reference stake;11-steel pipe;12-bearing;13-fixes bolt;14-observation platform;2-sedimentation plate;21-steel plate; 22-channel-section steel;23-bolt;3-levelling rod.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described in detail.
As it is shown in figure 1, this utility model large area super soft foundation settlement monitoring device, including reference stake 1, sedimentation plate 2, water Object staff 3, described sedimentation plate 2 is positioned over ground top layer to be measured, and described levelling rod 3 is fixed on sedimentation plate, and levelling rod 3 band is carved The one of degree is facing to described reference stake, and the cope level of reference stake 1 is slightly above the bottom graduation mark of levelling rod 3.Described reference stake 1 includes steel pipe 11, bearing 12, fixing bolt 13, observation platform 14, and steel pipe 11 bottom is placed in ground and consolidates soil layer, bearing 12 are fixed in steel pipe 11 top by screw thread, and fixing bolt 13 vertical welding is in bearing 12, and external observation instrument is by fixing spiral shell Bolt 13 is erected on bearing 12;Surrounding at steel pipe 11 is stacked earth bag and is built into observation platform 14.Described sedimentation plate 2 includes Steel plate 21 and channel-section steel 22, channel-section steel 22 is welded on steel plate 21, and notch side is towards reference stake 1;Described levelling rod 3 uses aluminum Alloy material, bottom sides reserves positioning bolt hole, and levelling rod 3 is fixed on channel-section steel 22 by bolt 23, levelling rod 3 can merogenesis, flexible, and one side with a scale is placed in the notch side of channel-section steel 22.Steel pipe 11 can be with merogenesis, adjacent segments steel pipe 11 Employing screw thread is affixed.
When ground occurs sedimentation, levelling rod 3 sinks with sedimentation plate 2, by being erected at the external observation on reference stake 1 The change reading levelling rod 3 scale surveyed by instrument, is the settling amount on ground top layer.
The monitoring method of this utility model large area super soft foundation settlement monitoring device, comprises the following steps:
A steel pipe 11 is hammered the foundation soil of predeterminated position by (), until steel pipe 11 bottom is placed in firm soil layer, will be welded with fixing The bearing 12 of bolt 13 is fixed in steel pipe 11 top, stacks earth bag in steel pipe 11 surrounding and builds observation platform 14;
B sedimentation plate 2 is placed in ground top layer to be measured by (), and make the notch side of channel-section steel 22 towards reference stake 1, by levelling rod 3 With a scale one is fixed on channel-section steel 22 facing to notch side;
C () repeats step (b), be placed in the different measuring points on reference stake 1 surrounding ground top layer by multiple sedimentation plates 2;
D (), by being located on reference stake 1 by external observation instrument stand, surveys the initial scale H reading i measuring point levelling rod 3i0
E () after a time, along with the generation of settlement of foundation, sedimentation plate 2 drives levelling rod 3 to sink together, again survey and read i survey The scale H of some levelling rod 3it
F () uses Hit-Hi0Obtain the scale changing value Δ H of i measuring point levelling rod 3itIt is i measuring point ground top layer in during this period of time Settling amount.
Above-described embodiment combines accompanying drawing and is described this utility model, but can not therefore be interpreted as this utility model special The restriction of profit scope.It should be pointed out that, for the person of ordinary skill of the art, conceiving without departing from this utility model On the premise of, it is also possible to making some deformation and improvement, these belong to protection domain of the present utility model.

Claims (6)

1. large area super soft foundation settlement monitoring device, including reference stake (1), sedimentation plate (2), levelling rod (3), it is special Levying and be: described sedimentation plate (2) is positioned over ground top layer to be measured, described levelling rod (3) is fixed on sedimentation plate (2), water Object staff (3) with a scale one facing to described reference stake (1), the cope level of reference stake (1) is higher than the end of levelling rod (3) Portion's graduation mark.
Large area super soft foundation settlement monitoring device the most according to claim 1, it is characterised in that: described reference stake (1) Including steel pipe (11), bearing (12), fixing bolt (13), observation platform (14), it is steady that steel pipe (11) bottom is placed in ground Gu soil layer, bearing (12) is fixed in steel pipe (11) top, and fixing bolt (13) vertical welding is seen in bearing (12), outside Surveying instrument to be erected on bearing (12) by fixing bolt (13), the surrounding at steel pipe (11) is stacked earth bag and is built into observation Platform (14).
Large area super soft foundation settlement monitoring device the most according to claim 1, it is characterised in that: described sedimentation plate (2) Including steel plate (21) and channel-section steel (22), channel-section steel (22) is welded on steel plate (21), and the notch side of channel-section steel (22) is towards base Quasi-stake (1).
Large area super soft foundation settlement monitoring device the most according to claim 1, it is characterised in that: described levelling rod (3) Bottom sides is reserved positioning bolt hole and is fixed on channel-section steel (22) by bolt (23), and levelling rod (3) is with a scale One side is placed in the notch side of channel-section steel (22).
5. according to the large area super soft foundation settlement monitoring device described in any one of Claims 1-4, it is characterised in that: institute State levelling rod (3) merogenesis, and flexible.
Large area super soft foundation settlement monitoring device the most according to claim 2, it is characterised in that: described steel pipe (11) Merogenesis, adjacent segments steel pipe (11) uses screw thread affixed;Described bearing (12) is fixed in described steel pipe (11) by screw thread and pushes up Portion.
CN201620372311.5U 2016-04-27 2016-04-27 Large area super soft foundation settlement monitoring device Expired - Fee Related CN205712053U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620372311.5U CN205712053U (en) 2016-04-27 2016-04-27 Large area super soft foundation settlement monitoring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620372311.5U CN205712053U (en) 2016-04-27 2016-04-27 Large area super soft foundation settlement monitoring device

Publications (1)

Publication Number Publication Date
CN205712053U true CN205712053U (en) 2016-11-23

Family

ID=57291363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620372311.5U Expired - Fee Related CN205712053U (en) 2016-04-27 2016-04-27 Large area super soft foundation settlement monitoring device

Country Status (1)

Country Link
CN (1) CN205712053U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804041A (en) * 2016-04-27 2016-07-27 浙江广川工程咨询有限公司 Large-area ultra-soft foundation settlement monitoring device and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804041A (en) * 2016-04-27 2016-07-27 浙江广川工程咨询有限公司 Large-area ultra-soft foundation settlement monitoring device and method

Similar Documents

Publication Publication Date Title
Zhu et al. Installation and lateral loading tests of suction caissons in silt
CN105804041A (en) Large-area ultra-soft foundation settlement monitoring device and method
CN106351268B (en) A kind of lateral loading stake soil dynamic response model test box
CN205557609U (en) Adopt water tank for piling deep dull and stereotyped loading test device that carries device
CN102635113A (en) Construction method for hydraulic vibrating sinking pipe cast-in-place piles
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN102061712A (en) Underwater sand conpaction pile composite foundation test system
CN106088172B (en) Testing device for combined measurement of pile top and pile end displacement of cast-in-place pile
CN104947649A (en) Control method for open caisson back soil deformation caused by pipe-jacking construction
CN103711151A (en) Wave pressure sensor embedding device and method
CN111021440A (en) CPT integrated geotechnical packaging granular pile indoor model test device and method
Clough et al. A study of earth loadings on floodway retaining structures in the 1971 San Fernando Valley earthquake
CN208254458U (en) Soft base deepwater diking settlement monitoring device
CN205712053U (en) Large area super soft foundation settlement monitoring device
CN203977432U (en) Multistage H type soil blocking pile
CN207348112U (en) The board-like counterforce device of pressure-bearing of anchor pole pullout tests
Arulrajah et al. Instrumentation at Changi land reclamation project, Singapore
CN102704512B (en) Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology
CN104746522B (en) A kind of for dredging silt matter soil district foundation ditch can intelligent deformation regulation tiltedly throw support support system
CN115164798B (en) Embedded multi-angle slope stability dynamic monitoring system
CN100564697C (en) Horizontal top pipe ground treatment construction method
Zhu et al. The land subsidence and building deformation during the excavation process of the deep foundation pit
CN202913431U (en) Immersed tube bottom end jack type deviation-rectifying accurate adjustment system
CN207367471U (en) A kind of native face flattening device suitable for building, water conservancy and ocean engineering indoor model experiments groove
CN207419552U (en) Arrangement structure for pile end deep layer plate load test

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

CF01 Termination of patent right due to non-payment of annual fee