CN205712053U - Large area super soft foundation settlement monitoring device - Google Patents
Large area super soft foundation settlement monitoring device Download PDFInfo
- Publication number
- CN205712053U CN205712053U CN201620372311.5U CN201620372311U CN205712053U CN 205712053 U CN205712053 U CN 205712053U CN 201620372311 U CN201620372311 U CN 201620372311U CN 205712053 U CN205712053 U CN 205712053U
- Authority
- CN
- China
- Prior art keywords
- levelling rod
- large area
- monitoring device
- steel pipe
- super soft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012806 monitoring device Methods 0.000 title claims abstract description 14
- 238000004062 sedimentation Methods 0.000 claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims description 55
- 239000010959 steel Substances 0.000 claims description 55
- 239000002689 soil Substances 0.000 claims description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 8
- 238000005259 measurement Methods 0.000 abstract description 4
- 238000012544 monitoring process Methods 0.000 description 9
- 238000000034 method Methods 0.000 description 5
- 238000012360 testing method Methods 0.000 description 3
- 229910000838 Al alloy Inorganic materials 0.000 description 2
- 239000000956 alloy Substances 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
This utility model large area super soft foundation settlement monitoring device, including reference stake, sedimentation plate, levelling rod, sedimentation plate is positioned over ground top layer to be measured, levelling rod is fixed on sedimentation plate, levelling rod with a scale one facing to described reference stake, the cope level of reference stake is higher than the bottom graduation mark of levelling rod.This utility model device, by the observation instrument being erected on reference stake, surveys the scale change reading levelling rod, it is thus achieved that the settling amount on ground top layer.This utility model has simple in construction, easy to operate, certainty of measurement advantages of higher, it is not necessary to manually holds up chi and turns station, is substantially reduced cost of labor, improves work efficiency, is with a wide range of applications.
Description
Technical field
This utility model relates to soil body settlement monitoring technology field, particularly to a kind of large area super soft foundation settlement monitoring device.
Background technology
Along with the quickening of China coast development process, coat at offshore beach and carry out large area reclaiming land around sea and become coastal cities and solve
The important channel of land resource shortage.The shallow top layer generally enclosing district is new alluvial or the super soft weak soil of new hydraulic reclamation, and water content is high,
Substantially without bearing capacity, it is impossible to meet construction machinery and march into the arena requirement, therefore ground must be carried out at reinforcing before enclosing district's development & construction
Reason, using the soil of reclaiming land around sea gained as construction land, and could need to carry out settlement monitoring during stiffening basic ground,
To understand the compression situation of foundation soil, evaluate basement process consolidation effect.At present, the settlement monitoring in foundation treatment engineering
Mainly bury sedimentation plate underground on top layer, set up level gauge by tripod, manually hold up chi to obtain settlement of foundation by the way of turning station.But
There is shortcomings in the method in large area super soft foundation settlement monitoring: 1) super soft weak soil engineering properties extreme difference, without the most steady
Fixed tripod construction of platform, cannot realize settlement monitoring before super soft weak soil possesses certain bearing capacity;2) chi is manually held up to need to lean on
Nearly subsidence survey point, the disturbance to super soft weak soil will cause sedimentation plate to topple, and test extremely difficult, and there is potential safety hazard;3) big
Artificial turn of station pilot measurement in area super soft weak soil region, labor intensity is big, and inefficiency, accuracy of observation is poor, and destructible face
And drainage pipe, interference construction.
Utility model content
For solving prior art problems present in the large area super soft foundation settlement monitoring, this utility model large area surpasses
Soft foundation settlement monitoring device, is that levelling rod is arranged on sedimentation plate fixed placement is in ground top layer to be measured, by benchmark
Set up observation instrument on Zhuan, survey the scale change reading levelling rod, and then obtain the settling amount on ground top layer.
The technical solution of the utility model is:
Large area super soft foundation settlement monitoring device, including reference stake, sedimentation plate, levelling rod, described sedimentation plate is positioned over to be treated
Geodetic base table layer, described levelling rod is fixed on sedimentation plate, levelling rod with a scale one facing to described reference stake, reference stake
Cope level is slightly above the bottom graduation mark of levelling rod.
Described reference stake includes steel pipe, bearing, fixing bolt, observation platform, and steel pipe bottom is placed in ground and consolidates soil layer, bearing
Being fixed in steel pipe top, fixing bolt vertical welding is erected on bearing by fixing bolt in bearing, external observation instrument;?
The surrounding of steel pipe is stacked earth bag and is built into observation platform.
Described sedimentation plate includes steel plate and channel-section steel, and channel-section steel is welded on steel plate, and the notch side of channel-section steel is towards reference stake.
Described levelling rod can use aluminum alloy material, levelling rod bottom sides to reserve positioning bolt hole, and fixed by bolt
On channel-section steel, described levelling rod can merogenesis, flexible, levelling rod one side with a scale is placed in the notch side of channel-section steel.
Described steel pipe can be with merogenesis, and adjacent segments steel pipe uses screw thread affixed;Described bearing is fixed in described steel pipe top by screw thread.
When ground occurs sedimentation, levelling rod sinks with sedimentation plate, is surveyed by the external observation instrument being erected on reference stake
Read the change of levelling rod scale, be the settling amount on ground top layer.
The monitoring method of this utility model device, comprises the following steps:
A () sets reference stake: steel pipe hammers the foundation soil of predeterminated position, until steel pipe bottom is placed in firm soil layer, and will weldering
The bearing having fixing bolt is fixed in steel pipe top, stacks earth bag in steel pipe surrounding and builds observation platform;
B sedimentation plate is placed in ground top layer to be measured by (), the notch side of the channel-section steel of sedimentation plate is towards reference stake, and levelling rod is with a scale
One facing to notch side, and be fixed on channel-section steel;
C () repeats step (b), be placed in by multiple sedimentation plates in the different measuring points on reference stake surrounding ground top layer;
D (), by being located on reference stake by external observation instrument stand, surveys the initial scale H reading i measuring point levelling rodi0;
E () after a time, along with the generation of settlement of foundation, sedimentation plate drives levelling rod to sink together, again surveys and reads i measuring point water
The scale H of object staffit;
F () uses Hit-Hi0Obtain the scale changing value Δ H of i measuring point levelling roditIt is the heavy of i measuring point ground top layer in during this period of time
Fall amount.
The beneficial effects of the utility model are:
The measuring point levelling rod fixed placement of this utility model device, can reduce the disturbance manually holding up chi to sedimentation plate, improves test essence
Degree;Observation instrument is set up, it is to avoid carry out the office of settlement observation because super soft weak soil Lack of support cannot set up tripod on reference stake
Limit, raising testing reliability, and set up also can realize the sight of reference stake surrounding multiple measuring point without artificial turn of station pilot measurement, an instrument
Survey, be greatly improved work efficiency, reduce cost of labor, reduce the interference to construction.This device has simple in construction, operation side
The advantage such as just, certainty of measurement is high, adaptable.This utility model effectively overcomes shortcomings present in prior art,
It is applicable to the foundation treatment engineering of various complex working condition, is with a wide range of applications.
Accompanying drawing explanation
Fig. 1 is the use status architecture schematic diagram of this utility model device;
Fig. 2 is monitoring principle schematic diagram of the present utility model.
In figure: 1-reference stake;11-steel pipe;12-bearing;13-fixes bolt;14-observation platform;2-sedimentation plate;21-steel plate;
22-channel-section steel;23-bolt;3-levelling rod.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described in detail.
As it is shown in figure 1, this utility model large area super soft foundation settlement monitoring device, including reference stake 1, sedimentation plate 2, water
Object staff 3, described sedimentation plate 2 is positioned over ground top layer to be measured, and described levelling rod 3 is fixed on sedimentation plate, and levelling rod 3 band is carved
The one of degree is facing to described reference stake, and the cope level of reference stake 1 is slightly above the bottom graduation mark of levelling rod 3.Described reference stake
1 includes steel pipe 11, bearing 12, fixing bolt 13, observation platform 14, and steel pipe 11 bottom is placed in ground and consolidates soil layer, bearing
12 are fixed in steel pipe 11 top by screw thread, and fixing bolt 13 vertical welding is in bearing 12, and external observation instrument is by fixing spiral shell
Bolt 13 is erected on bearing 12;Surrounding at steel pipe 11 is stacked earth bag and is built into observation platform 14.Described sedimentation plate 2 includes
Steel plate 21 and channel-section steel 22, channel-section steel 22 is welded on steel plate 21, and notch side is towards reference stake 1;Described levelling rod 3 uses aluminum
Alloy material, bottom sides reserves positioning bolt hole, and levelling rod 3 is fixed on channel-section steel 22 by bolt 23, levelling rod
3 can merogenesis, flexible, and one side with a scale is placed in the notch side of channel-section steel 22.Steel pipe 11 can be with merogenesis, adjacent segments steel pipe 11
Employing screw thread is affixed.
When ground occurs sedimentation, levelling rod 3 sinks with sedimentation plate 2, by being erected at the external observation on reference stake 1
The change reading levelling rod 3 scale surveyed by instrument, is the settling amount on ground top layer.
The monitoring method of this utility model large area super soft foundation settlement monitoring device, comprises the following steps:
A steel pipe 11 is hammered the foundation soil of predeterminated position by (), until steel pipe 11 bottom is placed in firm soil layer, will be welded with fixing
The bearing 12 of bolt 13 is fixed in steel pipe 11 top, stacks earth bag in steel pipe 11 surrounding and builds observation platform 14;
B sedimentation plate 2 is placed in ground top layer to be measured by (), and make the notch side of channel-section steel 22 towards reference stake 1, by levelling rod 3
With a scale one is fixed on channel-section steel 22 facing to notch side;
C () repeats step (b), be placed in the different measuring points on reference stake 1 surrounding ground top layer by multiple sedimentation plates 2;
D (), by being located on reference stake 1 by external observation instrument stand, surveys the initial scale H reading i measuring point levelling rod 3i0;
E () after a time, along with the generation of settlement of foundation, sedimentation plate 2 drives levelling rod 3 to sink together, again survey and read i survey
The scale H of some levelling rod 3it;
F () uses Hit-Hi0Obtain the scale changing value Δ H of i measuring point levelling rod 3itIt is i measuring point ground top layer in during this period of time
Settling amount.
Above-described embodiment combines accompanying drawing and is described this utility model, but can not therefore be interpreted as this utility model special
The restriction of profit scope.It should be pointed out that, for the person of ordinary skill of the art, conceiving without departing from this utility model
On the premise of, it is also possible to making some deformation and improvement, these belong to protection domain of the present utility model.
Claims (6)
1. large area super soft foundation settlement monitoring device, including reference stake (1), sedimentation plate (2), levelling rod (3), it is special
Levying and be: described sedimentation plate (2) is positioned over ground top layer to be measured, described levelling rod (3) is fixed on sedimentation plate (2), water
Object staff (3) with a scale one facing to described reference stake (1), the cope level of reference stake (1) is higher than the end of levelling rod (3)
Portion's graduation mark.
Large area super soft foundation settlement monitoring device the most according to claim 1, it is characterised in that: described reference stake (1)
Including steel pipe (11), bearing (12), fixing bolt (13), observation platform (14), it is steady that steel pipe (11) bottom is placed in ground
Gu soil layer, bearing (12) is fixed in steel pipe (11) top, and fixing bolt (13) vertical welding is seen in bearing (12), outside
Surveying instrument to be erected on bearing (12) by fixing bolt (13), the surrounding at steel pipe (11) is stacked earth bag and is built into observation
Platform (14).
Large area super soft foundation settlement monitoring device the most according to claim 1, it is characterised in that: described sedimentation plate (2)
Including steel plate (21) and channel-section steel (22), channel-section steel (22) is welded on steel plate (21), and the notch side of channel-section steel (22) is towards base
Quasi-stake (1).
Large area super soft foundation settlement monitoring device the most according to claim 1, it is characterised in that: described levelling rod (3)
Bottom sides is reserved positioning bolt hole and is fixed on channel-section steel (22) by bolt (23), and levelling rod (3) is with a scale
One side is placed in the notch side of channel-section steel (22).
5. according to the large area super soft foundation settlement monitoring device described in any one of Claims 1-4, it is characterised in that: institute
State levelling rod (3) merogenesis, and flexible.
Large area super soft foundation settlement monitoring device the most according to claim 2, it is characterised in that: described steel pipe (11)
Merogenesis, adjacent segments steel pipe (11) uses screw thread affixed;Described bearing (12) is fixed in described steel pipe (11) by screw thread and pushes up
Portion.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620372311.5U CN205712053U (en) | 2016-04-27 | 2016-04-27 | Large area super soft foundation settlement monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620372311.5U CN205712053U (en) | 2016-04-27 | 2016-04-27 | Large area super soft foundation settlement monitoring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205712053U true CN205712053U (en) | 2016-11-23 |
Family
ID=57291363
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620372311.5U Expired - Fee Related CN205712053U (en) | 2016-04-27 | 2016-04-27 | Large area super soft foundation settlement monitoring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205712053U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804041A (en) * | 2016-04-27 | 2016-07-27 | 浙江广川工程咨询有限公司 | Large-area ultra-soft foundation settlement monitoring device and method |
-
2016
- 2016-04-27 CN CN201620372311.5U patent/CN205712053U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804041A (en) * | 2016-04-27 | 2016-07-27 | 浙江广川工程咨询有限公司 | Large-area ultra-soft foundation settlement monitoring device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhu et al. | Installation and lateral loading tests of suction caissons in silt | |
CN105804041A (en) | Large-area ultra-soft foundation settlement monitoring device and method | |
CN106351268B (en) | A kind of lateral loading stake soil dynamic response model test box | |
CN205557609U (en) | Adopt water tank for piling deep dull and stereotyped loading test device that carries device | |
CN102635113A (en) | Construction method for hydraulic vibrating sinking pipe cast-in-place piles | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN102061712A (en) | Underwater sand conpaction pile composite foundation test system | |
CN106088172B (en) | Testing device for combined measurement of pile top and pile end displacement of cast-in-place pile | |
CN104947649A (en) | Control method for open caisson back soil deformation caused by pipe-jacking construction | |
CN103711151A (en) | Wave pressure sensor embedding device and method | |
CN111021440A (en) | CPT integrated geotechnical packaging granular pile indoor model test device and method | |
Clough et al. | A study of earth loadings on floodway retaining structures in the 1971 San Fernando Valley earthquake | |
CN208254458U (en) | Soft base deepwater diking settlement monitoring device | |
CN205712053U (en) | Large area super soft foundation settlement monitoring device | |
CN203977432U (en) | Multistage H type soil blocking pile | |
CN207348112U (en) | The board-like counterforce device of pressure-bearing of anchor pole pullout tests | |
Arulrajah et al. | Instrumentation at Changi land reclamation project, Singapore | |
CN102704512B (en) | Immersed tube bottom jack type deviation rectifying fine adjusting system and adjusting technology | |
CN104746522B (en) | A kind of for dredging silt matter soil district foundation ditch can intelligent deformation regulation tiltedly throw support support system | |
CN115164798B (en) | Embedded multi-angle slope stability dynamic monitoring system | |
CN100564697C (en) | Horizontal top pipe ground treatment construction method | |
Zhu et al. | The land subsidence and building deformation during the excavation process of the deep foundation pit | |
CN202913431U (en) | Immersed tube bottom end jack type deviation-rectifying accurate adjustment system | |
CN207367471U (en) | A kind of native face flattening device suitable for building, water conservancy and ocean engineering indoor model experiments groove | |
CN207419552U (en) | Arrangement structure for pile end deep layer plate load test |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |