CN205711877U - Freeway guardrail - Google Patents

Freeway guardrail Download PDF

Info

Publication number
CN205711877U
CN205711877U CN201620382647.XU CN201620382647U CN205711877U CN 205711877 U CN205711877 U CN 205711877U CN 201620382647 U CN201620382647 U CN 201620382647U CN 205711877 U CN205711877 U CN 205711877U
Authority
CN
China
Prior art keywords
buffer board
sleeve
hand member
lower buffer
sleeves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620382647.XU
Other languages
Chinese (zh)
Inventor
肖磊
杨传令
黄东东
刘梦溪
侍晓龙
晏勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Kangbo Intelligent Control Instrument Co Ltd
Original Assignee
Xuzhou Kangbo Intelligent Control Instrument Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Kangbo Intelligent Control Instrument Co Ltd filed Critical Xuzhou Kangbo Intelligent Control Instrument Co Ltd
Priority to CN201620382647.XU priority Critical patent/CN205711877U/en
Application granted granted Critical
Publication of CN205711877U publication Critical patent/CN205711877U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

nullThe utility model discloses a kind of freeway guardrail,Two sleeves are arranged at interval in the upper and lower,Detent projection on upper buffer board and the detent projection on lower buffer board engage each other,One end away from arcwall face of upper buffer board and lower buffer board is hinged with the right-hand member of two slide bars respectively,Two slide bars are inserted in two sleeves respectively,The middle part of slide bar is provided with ring-shaped step,The right-hand member of sleeve is provided with for ring-shaped step carries out spacing spacing annulus,Two springs lay respectively in two sleeves,The left end of spring is resisted against the left end of sleeve,The right-hand member of spring is sleeved on slide bar and is resisted against on ring-shaped step,The left end of two hydraulic dampers is hinged with column respectively,The right-hand member of two hydraulic dampers respectively with the bottom of upper buffer board、The upper articulation of lower buffer board,One end of clad is fixedly installed on the sleeve of upside,Its other end is fixedly installed on the sleeve of downside.This freeway guardrail can effectively absorb the impulsive force of errant vehicle.

Description

Freeway guardrail
Technical field
This utility model relates to a kind of freeway guardrail.
Background technology
The guard rail of highway both sides mainly by column be disposed thereon the protective plate in portion and form, protective plate and Column is made by rigid material, and it generally uses gun iron link mode, or weld together, or passes through bolt Protective plate is fixed on column.By the protective plate of gun iron link, not there is buffer structure, when vehicle out of control with When bigger impulsive force collides guardrail, protective plate is relatively big to the counteracting force of vehicle, can make vehicle excessive damage. Meanwhile, the protective plate being knocked often can occur gross distortion or with column be separated situation, and gross distortion or The protective plate shared with column can not play and errant vehicle is effectively protected effect.
Summary of the invention
The problem existed for above-mentioned prior art, this utility model provides a kind of freeway guardrail, and this is at a high speed Highway barrier can effectively absorb the impulsive force of errant vehicle, can reduce the damage to vehicle in knockout process, It is also possible to prevent the excessive deformation of safeguard structure or is separated with column.
To achieve these goals, this utility model provides a kind of freeway guardrail, including column, protection knot Structure, described safeguard structure include clad, upper buffer board, lower buffer board, two horizontally sets solid with column Fixed sleeve, two slide bars, two springs and about two the spaced hydraulic dampers connected, two sets Cylinder is arranged at interval in the upper and lower, and upper buffer board, the longitudinal section of lower buffer board are sector structure, upper buffer board and under One end of the arcwall face of buffer board is provided with multiple detent projection, the detent projection on upper buffer board and lower buffering Detent projection on plate engages each other, one end away from arcwall face of upper buffer board and lower buffer board respectively with two The right-hand member of slide bar is hinged, and two slide bars are inserted in two sleeves respectively, and the middle part of described slide bar is provided with annular table Rank, the right-hand member of described sleeve is provided with for ring-shaped step carries out spacing spacing annulus, two spring positions respectively In two sleeves, the left end of described spring is resisted against the left end of sleeve, and the right-hand member of spring is sleeved on slide bar also Being resisted against on ring-shaped step, the left end of two hydraulic dampers is hinged with column respectively, two hydraulic dampers Right-hand member respectively with the bottom of upper buffer board, the upper articulation of lower buffer board, one end of described clad is fixedly installed On the sleeve of upside, its other end is fixedly installed on after walking around buffer board and lower buffer board on the sleeve of downside.
In this technical scheme, upper buffer board and lower buffer board are engaged each other by detent projection, so work as cladding Layer is when being clashed into, act on buffer board and the right side of lower buffer board, upper buffer board and lower buffer board synchronize to Left part moves, and carries out first order buffering by intermeshing structure, and two hydraulic dampers are respectively acting on Upper buffer board and lower buffer board, carry out second level buffering to upper buffer board and lower buffer board to the impulsive force of left end, External impact power is born during left movement, two slide bars hinged with it at upper buffer board and lower buffer board Third level buffering is carried out by two springs.This guardrail can effectively absorb the impact force of errant vehicle, thus The excessive damage in rigid knockout process, vehicle produced can be reduced, meanwhile, also can prevent the mistake of safeguard structure Degree deformation or separated with column.
Further, in order to improve the resistance to impact of clad, described clad is that elastomeric material is made.
Further, in order to alleviate the overall weight of buffer board, described upper buffer board and lower buffer board are hollow knot Structure.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1, column, 2, safeguard structure, 3, clad, 4, upper buffer board, 5, lower buffer board, 6, sleeve, 7, slide bar, 8, spring, 9, hydraulic damper, 10, detent projection, 11, ring-shaped step, 12, spacing annulus.
Detailed description of the invention
The utility model is described in further detail below.
As it is shown in figure 1, a kind of freeway guardrail, including column 1, safeguard structure 2, described safeguard structure 2 include that clad 3, upper buffer board 4, the with column 1 fixing of 5, two horizontally sets of lower buffer board are connected Sleeve 7, two springs 8 of 6, two slide bars and about two spaced hydraulic dampers 9, two sets Cylinder 6 is arranged at interval in the upper and lower, and upper buffer board 4, the longitudinal section of lower buffer board 5 are sector structure, upper buffering One end of the arcwall face of plate 4 and lower buffer board 5 is provided with multiple detent projection 10, on upper buffer board 4 Detent projection 10 in detent projection 10 and lower buffer board 5 engages each other, upper buffer board 4 and lower buffer board 5 The one end away from arcwall face hinged with the right-hand member of two slide bars 7 respectively, two slide bars 7 are inserted into two respectively In sleeve 6, the middle part of described slide bar 7 is provided with ring-shaped step 11, and the right-hand member of described sleeve 6 is provided with for right Ring-shaped step 11 carries out spacing spacing annulus 12, and two springs 8 lay respectively in two sleeves 6, described The left end of spring 8 is resisted against the left end of sleeve 6, and the right-hand member of spring 8 is sleeved on slide bar 7 and is resisted against annular On step 11, the left end of two hydraulic dampers 9 is hinged with column 1 respectively, two hydraulic dampers 9 Right-hand member respectively with bottom, the upper articulation of lower buffer board 5 of upper buffer board 4, one end of described clad 3 is solid Surely being arranged on the sleeve 6 of upside, its other end is fixedly installed on after walking around buffer board 4 and lower buffer board 5 On the sleeve 6 of downside.Upper buffer board 4 and lower buffer board 5 are engaged each other by detent projection 10, so when When clad 3 is clashed into, act on buffer board 4 and the right side of lower buffer board 5, upper buffer board 4 and under Buffer board 5 synchronizes to move to left part, and carries out first order buffering, two hydraulic pressure resistances by intermeshing structure Buddhist nun's device 9 is respectively acting on buffer board 4 and lower buffer board 5, to upper buffer board 4 and lower buffer board 5 to left end Impulsive force carry out second level buffering, bear external impact power to left movement at upper buffer board 4 and lower buffer board 5 During, two slide bars 7 hinged with it carry out third level buffering by two springs 8.This guardrail is permissible Effectively absorb the impact force of errant vehicle, such that it is able to reduce in rigid knockout process to vehicle produce excessive Damage, meanwhile, also can prevent the excessive deformation of safeguard structure or be separated with column.
In order to improve the resistance to impact of clad, described clad 3 is made for elastomeric material.
In order to alleviate the overall weight of buffer board, described upper buffer board 4 and lower buffer board 5 are hollow-core construction.

Claims (3)

1. a freeway guardrail, including column (1) and safeguard structure (2), it is characterised in that described Safeguard structure (2) includes clad (3), upper buffer board (4), lower buffer board (5), two horizontally sets The sleeve (6), two slide bars (7), two springs (8) and about two that are connected fixing with column (1) Spaced hydraulic damper (9), two sleeves (6) are arranged at interval in the upper and lower, upper buffer board (4), The longitudinal section of lower buffer board (5) is sector structure, upper buffer board (4) and the arc of lower buffer board (5) The one end in face is provided with multiple detent projection (10), detent projection (10) on upper buffer board (4) and under Detent projection (10) on buffer board (5) engages each other, upper buffer board (4) and lower buffer board (5) One end away from arcwall face is hinged with the right-hand member of two slide bars (7) respectively, and two slide bars (7) are inserted into respectively In two sleeves (6), the middle part of described slide bar (7) is provided with ring-shaped step (11), described sleeve (6) Right-hand member is provided with for ring-shaped step (11) carries out spacing spacing annulus (12), and two springs (8) are respectively Being positioned in two sleeves (6), the left end of described spring (8) is resisted against the left end of sleeve (6), spring (8) Right-hand member to be sleeved on slide bar (7) upper and be resisted against on ring-shaped step (11), two hydraulic dampers (9) Left end is hinged with column (1) respectively, the right-hand member of two hydraulic dampers (9) respectively with upper buffer board (4) Bottom, the upper articulation of lower buffer board (5), one end of described clad (3) be fixedly installed on upside On sleeve (6), its other end is fixedly installed on downside after walking around buffer board (4) and lower buffer board (5) Sleeve (6) on.
A kind of freeway guardrail the most according to claim 1, it is characterised in that described clad (3) Make for elastomeric material.
A kind of freeway guardrail the most according to claim 1 and 2, it is characterised in that described upper buffering Plate (4) and lower buffer board (5) are hollow-core construction.
CN201620382647.XU 2016-04-29 2016-04-29 Freeway guardrail Expired - Fee Related CN205711877U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620382647.XU CN205711877U (en) 2016-04-29 2016-04-29 Freeway guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620382647.XU CN205711877U (en) 2016-04-29 2016-04-29 Freeway guardrail

Publications (1)

Publication Number Publication Date
CN205711877U true CN205711877U (en) 2016-11-23

Family

ID=57331540

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620382647.XU Expired - Fee Related CN205711877U (en) 2016-04-29 2016-04-29 Freeway guardrail

Country Status (1)

Country Link
CN (1) CN205711877U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178050A (en) * 2017-05-04 2017-09-19 江苏理工学院 A kind of hydraulic cushion road separator device
CN107524107A (en) * 2017-09-05 2017-12-29 陕西华路达公路勘察设计有限公司 A kind of freeway guardrail
CN107558406A (en) * 2017-08-30 2018-01-09 王洪根 A kind of highway sharp radius curve section protection system
WO2018135961A1 (en) * 2017-01-18 2018-07-26 Jorge Pereira Guard rail assembly
CN109371880A (en) * 2018-11-30 2019-02-22 北京博纳菲德科技有限公司 A kind of Combined type safety traffic guard rail
CN109537447A (en) * 2018-12-07 2019-03-29 徐俊 A kind of bridge spanning the sea multifunctional guard railing

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018135961A1 (en) * 2017-01-18 2018-07-26 Jorge Pereira Guard rail assembly
CN107178050A (en) * 2017-05-04 2017-09-19 江苏理工学院 A kind of hydraulic cushion road separator device
CN107178050B (en) * 2017-05-04 2019-05-07 江苏理工学院 A kind of hydraulic cushion road separator device
CN107558406A (en) * 2017-08-30 2018-01-09 王洪根 A kind of highway sharp radius curve section protection system
CN107558406B (en) * 2017-08-30 2019-06-25 王洪根 A kind of highway sharp radius curve section protection system
CN107524107A (en) * 2017-09-05 2017-12-29 陕西华路达公路勘察设计有限公司 A kind of freeway guardrail
CN107524107B (en) * 2017-09-05 2019-04-30 陕西华路达公路勘察设计有限公司 A kind of freeway guardrail
CN109371880A (en) * 2018-11-30 2019-02-22 北京博纳菲德科技有限公司 A kind of Combined type safety traffic guard rail
CN109371880B (en) * 2018-11-30 2021-01-08 广东中博交通环保设备有限公司 Combined safety traffic protective guard
CN109537447A (en) * 2018-12-07 2019-03-29 徐俊 A kind of bridge spanning the sea multifunctional guard railing

Similar Documents

Publication Publication Date Title
CN205711877U (en) Freeway guardrail
CN205711869U (en) Highway anticollision device, collision-prevention device
JP4976967B2 (en) Mobile landing gear
CN206467555U (en) A kind of bridge shock-proof check block device with runback bit function
CN104057854A (en) Energy-absorbing children automobile chair
CN207633255U (en) A kind of environment-friendly type municipal road isolated column
US10266186B2 (en) Bearing block for articulating a coupling rod to a car body of a track-guided vehicle
CN207403929U (en) A kind of damping chassis of low flyer landing
WO2017129078A1 (en) Seismic isolation elastic restoring mechanism with pre-set starting load and starting control seismic isolation device
CN208792152U (en) Bridge safety protection structure
CN107190632A (en) A kind of highway bridge girder falling stopping means
CN105197720A (en) Elevator buffering device
CN103016594B (en) Damper with automatic damping adjusting function
CN212353892U (en) Automobile collision buffer device
CN205573859U (en) Anti -collision beam structure that possesses buffer function
CN205529861U (en) High damping rubber draws and presses power consumption type easily to restore to subtract isolation bearing
CN209229146U (en) A kind of pipeline support of vibration isolation anti-impact
CN210104559U (en) Bridge guardrail
CN105065046B (en) Flexible protective device between a kind of adjacent frame of hydraulic support
CN203920498U (en) Energy-absorption type automobile seat for child
CN109236339B (en) Tunnel shock absorption and impact resistance support
CN106369104A (en) Damping base
CN211723128U (en) Fall breakage-proof animal epidemic disease diagnostic apparatus
CN210653371U (en) Front floor for automobile
CN111516632B (en) Cab anti-impact device, cab and engineering vehicle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20170429

CF01 Termination of patent right due to non-payment of annual fee