CN205711730U - A kind of novel bridge drainage system - Google Patents
A kind of novel bridge drainage system Download PDFInfo
- Publication number
- CN205711730U CN205711730U CN201620361567.6U CN201620361567U CN205711730U CN 205711730 U CN205711730 U CN 205711730U CN 201620361567 U CN201620361567 U CN 201620361567U CN 205711730 U CN205711730 U CN 205711730U
- Authority
- CN
- China
- Prior art keywords
- drain pipe
- water
- downpipe
- storage cavity
- drainage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model relates to a kind of novel bridge drainage system, be mainly made up of bridge, pit, drainage screen, downpipe, drain pipe, drainage conduit, water storage cavity, water-level gauge, flow transducer and drain pipe;Pit is arranged on the both sides of bridge end face, the lower end of pit is provided with drainage screen, the lower end of drainage screen connects downpipe, flow transducer is arranged on the side of downpipe, the other end of downpipe connects drain pipe, the other end of drain pipe connects water storage cavity, and drain pipe is arranged on the lower end of water storage cavity, and water-level gauge is arranged on the upper end of water storage cavity.This drainage system, simple in construction, the flow that can observe current according to flow transducer at any time judges stopping state, carry out dredging pipeline timely by relief hole, detected the water level of falling water flow by water-level gauge timely, simple to operation, improve operating efficiency, save man power and material, improve the service efficiency of drainage system, add economic benefit.
Description
Technical field
The utility model relates to the technical field of bridge construction, especially a kind of novel bridge drainage system.
Background technology
Along with the development of science and technology, bridge construction have also been obtained development rapidly.During bridge construction, the setting of bridge drainage system is one of highly important ingredient during bridge construction.It is related to the normal use of whole bridge.At existing bridge drainage system, usually there will be current and overstock, cause the current on bridge floor excessive, badly influence the normal use of bridge;And also can find regular blocking drainage pipeline during using for a long time so that people need regularly to reprocess, and have had a strong impact on the normal use of bridge.
In sum, existing novel bridge drainage system there is also the biggest defect in structure and design, it is impossible to meets the needs that modern actual society is actual.
Utility model content
The technical problems to be solved in the utility model is: in order to solve the problem that the prior art in above-mentioned background technology exists, a kind of novel bridge drainage system is provided, simple in construction, the flow that can observe current according to flow transducer at any time judges stopping state, dredging pipeline timely is carried out by relief hole, the water level of falling water flow is detected timely by water-level gauge, simple to operation, improve operating efficiency, save man power and material, improve the service efficiency of drainage system, add economic benefit.
This utility model solves its technical problem and be the technical scheme is that a kind of novel bridge drainage system, is mainly made up of bridge, pit, drainage screen, downpipe, drain pipe, drainage conduit, water storage cavity, water-level gauge, flow transducer and drain pipe;Described pit is arranged on the both sides of bridge end face, the lower end of described pit is provided with drainage screen, the lower end of described drainage screen connects downpipe, described flow transducer is arranged on the side of downpipe, the other end of described downpipe connects drain pipe, the other end of described drain pipe connects water storage cavity, and described drain pipe is arranged on the lower end of water storage cavity, and described water-level gauge is arranged on the upper end of water storage cavity.
The most specifically, in technique scheme, the side of described drain pipe is additionally provided with dewatering orifice.Such design is to when occurring that substantial amounts of current discharge when, shunt current, reducing the water flow pressure of downpipe.
The most specifically, in technique scheme, one end of described dewatering orifice is additionally provided with sealing lid.Such design is to play sealing effectiveness, when there is the draining of low discharge when, avoids the need for opening sealing lid and shunts.
The most specifically, in technique scheme, the upper end of described drain pipe is also equipped with drainage screen.Such design is to prevent dirt impurity from can block waterpipe, affecting the effect of draining.
The most specifically, in technique scheme, the spacing between described drainage conduit and pit is 30~50mm.Such design can utilize drainage conduit effectively to dredge occurring that downpipe blocks when, improves its permeability, it is ensured that the normal outflow of current.
The beneficial effects of the utility model are: the simple in construction of this novel bridge drainage system, the flow that can observe current according to flow transducer at any time judges stopping state, dredging pipeline timely is carried out by relief hole, the water level of falling water flow is detected timely by water-level gauge, simple to operation, improve operating efficiency, save man power and material, improve the service efficiency of drainage system, add economic benefit.
Accompanying drawing explanation
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Being numbered in accompanying drawing: 1, bridge, 2, pit, 3, drainage screen, 4, downpipe, 5, drain pipe, 6, drainage conduit, 7, water storage cavity, 8, water-level gauge, 9, flow transducer, 10, drain pipe, 11, dewatering orifice, 12, seal lid.
Detailed description of the invention
Presently in connection with accompanying drawing, this utility model is described in further detail.These accompanying drawings are the schematic diagram of simplification, and basic structure of the present utility model is described the most in a schematic way, and therefore it only shows the composition relevant with this utility model.
As shown in Figure 1 be a kind of novel bridge drainage system, be mainly made up of bridge 1, pit 2, drainage screen 3, downpipe 4, drain pipe 5, drainage conduit 6, water storage cavity 7, water-level gauge 8, flow transducer 9 and drain pipe 10;Pit 2 is arranged on the both sides of bridge 1 end face, the lower end of pit 2 is provided with drainage screen 3, the lower end of drainage screen 3 connects downpipe 4, flow transducer 9 is arranged on the side of downpipe 4, the other end of downpipe 4 connects drain pipe 5, the other end of drain pipe 5 connects water storage cavity 7, and drain pipe 10 is arranged on the lower end of water storage cavity 7, and described water-level gauge 8 is arranged on the upper end of water storage cavity 7.
Wherein, the side of drain pipe 5 is additionally provided with dewatering orifice 11.One end of dewatering orifice 11 is additionally provided with sealing lid 12.The upper end of drain pipe 10 is also equipped with drainage screen 3.Spacing between drainage conduit 6 and pit 2 is 30~50mm.
Flow transducer 9 is arranged on the side of downpipe 4;When draining occurs when, the streamflow regime in downpipe 4 can be measured by flow transducer 9, be apparent from stopping state therein;The water storage cavity 7 arranged by bridge lower end, the current fallen are carried out the interim discharge that focuses on, and the upper end of water storage cavity 7 is additionally provided with water-level gauge 8, it is clear that the water yield in water storage cavity 7, judge the penetrating situation in drain pipe 10 timely, facilitate operator to dredge timely.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff can carry out various change and amendment completely in the range of without departing from this utility model technological thought.The content that the technical scope of this utility model is not limited in description, it is necessary to determine its technical scope according to right.
Claims (5)
1. a novel bridge drainage system, it is characterised in that: mainly it is made up of bridge (1), pit (2), drainage screen (3), downpipe (4), drain pipe (5), drainage conduit (6), water storage cavity (7), water-level gauge (8), flow transducer (9) and drain pipe (10);Described pit (2) is arranged on the both sides of bridge (1) end face, the lower end of described pit (2) is provided with drainage screen (3), the lower end of described drainage screen (3) connects downpipe (4), described flow transducer (9) is arranged on the side of downpipe (4), the other end of described downpipe (4) connects drain pipe (5), the other end of described drain pipe (5) connects water storage cavity (7), described drain pipe (10) is arranged on the lower end of water storage cavity (7), and described water-level gauge (8) is arranged on the upper end of water storage cavity (7).
A kind of novel bridge drainage system the most according to claim 1, it is characterised in that: the side of described drain pipe (5) is additionally provided with dewatering orifice (11).
A kind of novel bridge drainage system the most according to claim 2, it is characterised in that: the one end of described dewatering orifice (11) is additionally provided with sealing lid (12).
A kind of novel bridge drainage system the most according to claim 1, it is characterised in that: the upper end of described drain pipe (10) is also equipped with drainage screen (3).
A kind of novel bridge drainage system the most according to claim 1, it is characterised in that: the spacing between described drainage conduit (6) and pit (2) is 30~50mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620361567.6U CN205711730U (en) | 2016-04-27 | 2016-04-27 | A kind of novel bridge drainage system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620361567.6U CN205711730U (en) | 2016-04-27 | 2016-04-27 | A kind of novel bridge drainage system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205711730U true CN205711730U (en) | 2016-11-23 |
Family
ID=57294504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620361567.6U Expired - Fee Related CN205711730U (en) | 2016-04-27 | 2016-04-27 | A kind of novel bridge drainage system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205711730U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108978459A (en) * | 2018-09-25 | 2018-12-11 | 重庆工商职业学院 | The bridge structure of included drainage system |
CN109594460A (en) * | 2017-07-19 | 2019-04-09 | 莫元平 | Waterproof bridge |
CN111535168A (en) * | 2020-05-12 | 2020-08-14 | 闫志伟 | Built-in drainage device based on building bridge |
CN112726397A (en) * | 2020-12-25 | 2021-04-30 | 河南永明市政园林建设有限公司 | Highway bridge deck drainage equipment |
CN114382184A (en) * | 2021-12-31 | 2022-04-22 | 杭州西曙置业有限公司 | Current type expansion joint drainage device for detecting falling object quality and drainage quantity |
-
2016
- 2016-04-27 CN CN201620361567.6U patent/CN205711730U/en not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109594460A (en) * | 2017-07-19 | 2019-04-09 | 莫元平 | Waterproof bridge |
CN108978459A (en) * | 2018-09-25 | 2018-12-11 | 重庆工商职业学院 | The bridge structure of included drainage system |
CN111535168A (en) * | 2020-05-12 | 2020-08-14 | 闫志伟 | Built-in drainage device based on building bridge |
CN112726397A (en) * | 2020-12-25 | 2021-04-30 | 河南永明市政园林建设有限公司 | Highway bridge deck drainage equipment |
CN112726397B (en) * | 2020-12-25 | 2022-05-31 | 河南永明市政园林建设有限公司 | Highway bridge deck drainage equipment |
CN114382184A (en) * | 2021-12-31 | 2022-04-22 | 杭州西曙置业有限公司 | Current type expansion joint drainage device for detecting falling object quality and drainage quantity |
CN114382184B (en) * | 2021-12-31 | 2023-10-17 | 杭州西曙置业有限公司 | Current type expansion joint drainage device for detecting weight and drainage quantity of falling materials |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205711730U (en) | A kind of novel bridge drainage system | |
CN107354917B (en) | A kind of gravity rock and its construction method | |
CN205917593U (en) | Bridge expansion joint drainage device | |
CN207260284U (en) | One kind shunting anti-blockage type road drainage pipeline | |
CN205557464U (en) | Type of can decontaminating intelligence flood control dam | |
CN206221740U (en) | Direct burial air inlet and exhaust valve | |
CN106525322A (en) | Reservoir dam pressure monitoring device and monitoring method thereof | |
CN110499789A (en) | A kind of floor structure pressure release construction method | |
CN205557545U (en) | Relief well sealing device with dual stagnant water function | |
CN205297646U (en) | Automatic water discharging device of gas drainage pipe remote control | |
CN210482395U (en) | Basement drainage blind ditch | |
CN204982940U (en) | Drainage formula retaining wall | |
CN107632622A (en) | A kind of reverse-filling sewage treatment well and reverse-filling control method | |
CN112127393A (en) | Anti system of floating of basement | |
CN209620172U (en) | A kind of novel aqueduct of falling rainbow spoil disposal emptying structure | |
CN205591241U (en) | Drainage mechanism falls | |
CN209585172U (en) | A kind of arrangement system of fire cistern and fire pump room | |
CN207452705U (en) | A kind of bridge rhone with deodorant function | |
CN209585447U (en) | A kind of gravity stream storm-water system energy dissipator | |
CN207645589U (en) | The cage of drainage arrangement is installed | |
CN214464199U (en) | Take alarming function's rich water stratum shield to construct dregs collection device | |
CN106120659B (en) | Protective device for phreatic high canal for water conveyance bottom plate | |
CN213773505U (en) | Anti system of floating of basement | |
CN204921033U (en) | A prevent drainage system for tunnel just props up construction stage | |
CN204475355U (en) | Plugging structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20170427 |
|
CF01 | Termination of patent right due to non-payment of annual fee |