CN205709583U - A kind of hoist tower crane building use - Google Patents
A kind of hoist tower crane building use Download PDFInfo
- Publication number
- CN205709583U CN205709583U CN201620370234.XU CN201620370234U CN205709583U CN 205709583 U CN205709583 U CN 205709583U CN 201620370234 U CN201620370234 U CN 201620370234U CN 205709583 U CN205709583 U CN 205709583U
- Authority
- CN
- China
- Prior art keywords
- tower crane
- bracing frame
- bearing block
- arranged above
- hoisting drum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of hoist tower crane building use, including firm banking, gantry bracing frame, hoisting drum, hanging basket, bearing block, described firm banking be arranged above described gantry bracing frame, described gantry bracing frame be arranged above described hoisting drum, the side of described hoisting drum is provided with described hanging basket, described hanging basket be arranged above described bearing block, the side of described bearing block is provided with draw-beam, the lower section of described draw-beam is provided with slip hanging wheel, the lower section of described slip hanging wheel is provided with crampon, the upper side of described crampon is provided with control room, described control room be arranged above connecting rod.Have the beneficial effects that: being suitable for complicated site construction, safe and reliable, efficiency height labor intensity is low, and unfailing performance is higher, is more suitable for skyscraper.
Description
Technical field
This utility model relates to hoist tower crane field, particularly relates to a kind of hoist tower crane building use.
Background technology
Along with domestic Large Infrastructure Projects construction constantly starts and the expansion of new Urbanization Construction, lifting tower crane
Field, car market will be had an optimistic view of for a long time.Should continue to improve big-and-middle-sized tower crane technology content and quality level, meet large-scale
Key project need, explore world market, accelerate base parts and components development, strengthen new technique, new material,
New technology, the basic research of new construction, promote performance and the security reliability of tower crane.The most each manufacturing firm
Need to strengthen product experiment test and industrial endurance link, promote tower crane total quality level, relevant industrial department
Strengthen the supervision to industry, guide industry healthy development.Hoist tower crane manufacturing industry chain has been formed and day
Becoming ripe, quality is reached advanced world standards, and foreign capitals tower crane enterprise product realizes localization the most substantially simultaneously.
Meanwhile, the hoist tower crane industry capability of independent innovation is advanced by leaps and bounds.Hoist tower crane export area exceedes
144 countries and regions, hoist tower crane has become as the indispensable part of world's tower crane.Exploitation adapts to
The product satisfied the need, meets technical standard and the regulation of importer, obtains the certification certificate that enters the market, with Zhong Lianchong section
For the hoist tower crane enterprise represented, the rate of increase of overseas market, become the important of its Internationalization level and examine
Figureofmerit.Hoist tower crane enterprise exposing again and again international, show China by tower crane big country to tower
Machine power strides forward.In order to allow China's hoist tower crane develop the most faster, we are to need the most further
Research with practice.
Utility model content
The purpose of this utility model is that provides a kind of hoist tower building use to solve the problems referred to above
Crane.
This utility model is achieved through the following technical solutions above-mentioned purpose:
A kind of hoist tower crane building use, including firm banking, gantry bracing frame, hoisting drum, hangs
Basket, bearing block, described firm banking be arranged above described gantry bracing frame, described gantry bracing frame
Being arranged above described hoisting drum, the side of described hoisting drum is provided with described hanging basket, described hanging basket
Being arranged above described bearing block, the side of described bearing block is provided with draw-beam, the lower section of described draw-beam
Being provided with slip hanging wheel, the lower section of described slip hanging wheel is provided with crampon, the upside of described crampon
Side control room is installed, described control room be arranged above connecting rod.
In said structure, weld together with described gantry bracing frame after described firm banking fixes, institute
Stating control room and will send instruction, after described control room sends instruction, described slip hanging wheel will move,
After described slip hanging wheel moves, described crampon just can work, described crampon work same
Shi Suoshu draw-beam is used for lifting, and described connecting rod plays the effect of fixing connection, and described bearing block rises
To the effect of holding balance, and described hoisting drum carries out volume while described crampon rises and changes a job
Make.
In order to improve hoist tower crane quality further, described firm banking and described gantry bracing frame are by weldering
Connecing and be connected, described gantry bracing frame is connected by bearing pin with described hoisting drum, described hoisting drum with
Described hanging basket is connected.
In order to improve hoist tower crane quality further, described hanging basket is connected by bolt with described bearing block,
Described bearing block connects by being weldingly connected with described draw-beam.
In order to improve hoist tower crane quality further, described draw-beam with described slip hanging wheel by being engaged phase
Connecting, described slip hanging wheel is connected by hinge with described crampon.
In order to improve hoist tower crane quality further, described crampon is connected with described control room, institute
State control room to be connected with described connecting rod.
Have the beneficial effects that: being suitable for complicated site construction, safe and reliable, efficiency height labor intensity is low,
Unfailing performance is higher, is more suitable for skyscraper.
Accompanying drawing explanation
Fig. 1 is the plan view of a kind of hoist tower crane building use described in the utility model;
Description of reference numerals is as follows:
1, firm banking;2, gantry bracing frame;3, hoisting drum;4, hanging basket;5, bearing block;6、
Draw-beam;7, slip hanging wheel;8, crampon;9, control room;10, connecting rod.
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings:
As it is shown in figure 1, a kind of hoist tower crane building use, including firm banking 1, gantry bracing frame 2,
Hoisting drum 3, hanging basket 4, bearing block 5, firm banking 1 is used for fixing, firm banking 1 installed above
Have gantry bracing frame 2, gantry bracing frame 2 to be used for supporting, gantry bracing frame 2 be arranged above hoisting drum
3, hoisting drum 3 is for spiral, and the side of hoisting drum 3 is provided with hanging basket 4, and hanging basket 4 is protected for safety
Protect, hanging basket 4 be arranged above bearing block 5, bearing block 5 is used for keeping balance, the side peace of bearing block 5
Equipped with draw-beam 6, draw-beam 6 is for lifting, and the lower section of draw-beam 6 is provided with slip hanging wheel 7, and slip is hung
Wheel 7 is used for sliding, and the lower section of slip hanging wheel 7 is provided with crampon 8, and crampon 8 is used for convenient fixing,
The upper side of crampon 8 is provided with control room 9, and control room 9 is used for controlling manipulation, the top of control room 9
Being provided with connecting rod 10, connecting rod 10 is used for connecting locking.
In said structure, weld together with gantry bracing frame 2 after firm banking 1 fixes, control room 9
Will send instruction, after control room 9 sends instruction, slip hanging wheel 7 will move, when slip hanging wheel 7
After movement, crampon 8 just can work, and while crampon 8 works, draw-beam 6 is for lifting,
And connecting rod 10 plays the effect of fixing connection, bearing block 5 plays the effect keeping balance, and lifting
Reel 3 carries out volume while crampon 8 rises and changes a job work.
In order to improve hoist tower crane quality further, firm banking 1 with gantry bracing frame 2 by welding phase
Connecting, gantry bracing frame 2 is connected by bearing pin with hoisting drum 3, and hoisting drum 3 is connected with hanging basket 4
Connecing, hanging basket 4 is connected by bolt with bearing block 5, and bearing block 5 connects by being weldingly connected with draw-beam 6,
Draw-beam 6 is connected by occlusion with slip hanging wheel 7, and slip hanging wheel 7 and crampon 8 are by hinge phase
Connecting, crampon 8 is connected with control room 9, and control room 9 is connected with connecting rod 10.
Of the present utility model ultimate principle, principal character and advantage have more than been shown and described.The skill of the industry
Art personnel are it should be appreciated that this utility model is not restricted to the described embodiments, in above-described embodiment and description
Describe simply illustrates principle of the present utility model, on the premise of without departing from this utility model spirit and scope,
This utility model also has various changes and modifications, and these changes and improvements both fall within this claimed practicality
In novel scope.This utility model claims scope and is defined by appending claims and effect thing thereof.
Claims (5)
1. the hoist tower crane building use, it is characterised in that: include firm banking, gantry bracing frame,
Hoisting drum, hanging basket, bearing block, described firm banking be arranged above described gantry bracing frame, described
Gantry bracing frame be arranged above described hoisting drum, the side of described hoisting drum is provided with described hanging basket,
Described hanging basket be arranged above described bearing block, the side of described bearing block is provided with draw-beam, described
The lower section of weight beam is provided with slip hanging wheel, and the lower section of described slip hanging wheel is provided with crampon, described lifting
The upper side of suspension hook is provided with control room, described control room be arranged above connecting rod.
A kind of hoist tower crane building use the most according to claim 1, it is characterised in that: described
Firm banking connects by being weldingly connected with described gantry bracing frame, described gantry bracing frame and described hoisting drum
Being connected by bearing pin, described hoisting drum is connected with described hanging basket.
A kind of hoist tower crane building use the most according to claim 1, it is characterised in that: described
Hanging basket is connected by bolt with described bearing block, and described bearing block connects by being weldingly connected with described draw-beam.
A kind of hoist tower crane building use the most according to claim 1, it is characterised in that: described
Draw-beam is connected by occlusion with described slip hanging wheel, and described slip hanging wheel and described crampon are by hinge
Chain is connected.
A kind of hoist tower crane building use the most according to claim 1, it is characterised in that: described
Crampon is connected with described control room, and described control room is connected with described connecting rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620370234.XU CN205709583U (en) | 2016-04-28 | 2016-04-28 | A kind of hoist tower crane building use |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620370234.XU CN205709583U (en) | 2016-04-28 | 2016-04-28 | A kind of hoist tower crane building use |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205709583U true CN205709583U (en) | 2016-11-23 |
Family
ID=57292507
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620370234.XU Expired - Fee Related CN205709583U (en) | 2016-04-28 | 2016-04-28 | A kind of hoist tower crane building use |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205709583U (en) |
-
2016
- 2016-04-28 CN CN201620370234.XU patent/CN205709583U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203998711U (en) | Civil engineering tower crane | |
CN207192616U (en) | A kind of gantry crane for preventing that goods from rocking | |
CN102774743A (en) | Box-type member turn-over lifting appliance with oversized cross section and application method thereof | |
CN207192617U (en) | A kind of gantry crane of stable operation | |
CN106241614B (en) | A kind of shield machine assembly and dual-purpose gantry crane of slagging tap | |
CN206665955U (en) | A kind of high-strength steel triangle suspender lifts framework constructing device | |
CN204625045U (en) | A kind of steel structure hoisting door shaped stent formula hanging apparatus | |
CN206590793U (en) | Connect arm assembly and the movable arm tower crane comprising the device in the air | |
CN204098472U (en) | Biplate is to holding card tool | |
CN206693061U (en) | A kind of hoisting device for main cable saddle of suspension bridge lifting | |
CN205531271U (en) | Hanging flower basket moving platform constructional device | |
CN205709583U (en) | A kind of hoist tower crane building use | |
CN207511723U (en) | A kind of flat arm tower crane supporting beam transporting device of new construction inner climbing type | |
CN206309000U (en) | A kind of new climbing frame lifting device | |
CN206599363U (en) | Vertical transferring apparatus | |
CN202240674U (en) | Turning device for turning wheel of francis hydraulic turbine | |
CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof | |
CN205187695U (en) | Steel construction has hoisted gallows | |
CN205527311U (en) | Go up a auxiliary fixtures | |
CN204873489U (en) | Large -scale bridge crane girder inner structure | |
CN206569910U (en) | The vertical hanging apparatus of slender member | |
CN207108239U (en) | A kind of Novel steel profile hoisting device | |
CN207986495U (en) | A kind of Bridge High-pier main reinforcement hanging apparatus | |
CN202558449U (en) | Lifting appliance for vertical lifting of rolling mill memorial archway | |
CN206827933U (en) | The overhead explosion-proof crane of robot type cutting machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170623 Address after: 528000 Guangdong Province Nanhai District of Foshan City Shishan town kiln stone Pengcun Ji Wei feet South (former ceramics factory) Patentee after: Foshan Nanhai state Concrete Co. Ltd. Address before: 430200 Jiangxia Road, Hubei District, Wuhan province ERON Island Villa Patentee before: Zhang Ruiquan |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161123 Termination date: 20210428 |
|
CF01 | Termination of patent right due to non-payment of annual fee |