CN205701007U - A kind of iron nail collection device for building - Google Patents

A kind of iron nail collection device for building Download PDF

Info

Publication number
CN205701007U
CN205701007U CN201620321283.4U CN201620321283U CN205701007U CN 205701007 U CN205701007 U CN 205701007U CN 201620321283 U CN201620321283 U CN 201620321283U CN 205701007 U CN205701007 U CN 205701007U
Authority
CN
China
Prior art keywords
electromagnet
casing
ith
bracing frame
slideway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620321283.4U
Other languages
Chinese (zh)
Inventor
张甘泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Dragon Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620321283.4U priority Critical patent/CN205701007U/en
Application granted granted Critical
Publication of CN205701007U publication Critical patent/CN205701007U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Portable Nailing Machines And Staplers (AREA)

Abstract

The utility model relates to a kind of collection device, particularly relates to a kind of iron nail collection device for building.The technical problems to be solved in the utility model is to provide a kind of simple in construction, easy to operate, collection iron nail collection device for building thoroughly.In order to solve above-mentioned technical problem, the utility model provides such a iron nail for building collection device, include base plate, bracing frame the Ith, staving, fixed plate the Ith, pole the Ith, electromagnet the Ith, slideway the Ith, feed hopper, slideway the IIth, electromagnet the IIth, pole the IIth, fixed plate the IIth, bracing frame the IIth, electric pushrod, electromagnet the IIIth, iron block, casing the IIth, movable plate, slide block, casing the Ith, slide rail and hopper, base plate top is sequentially provided with bracing frame the Ith, slide rail, bracing frame II from left to right, and slide rail is provided with slide block.The utility model has reached structure and has been simple and convenient to operate, collects effect thoroughly, not only eliminates the potential safety hazard producing due to iron nail discarded in building site, and has saved construction material.

Description

A kind of iron nail collection device for building
Technical field
The utility model relates to a kind of collection device, particularly relates to a kind of iron nail collection device for building.
Background technology
Iron nail: there is flat head one end, the other end is sharp-pointed, acts primarily as fixing or connection function.Iron nail divides very Multiple types, conventional has common nails, felt nails, cement steel nail, spring nail, nailing, volume nail.Surface has Zinc-plated, copper facing etc., select according to actual needs.In early days, because China is backward in technique, iron nail once leaning on into Mouthful, it is " thing from abroad ", so iron nail is all called " nail ".Usually need during all kinds of construction to use To the iron nail of all kinds of different sizes, because often having iron nail to drop on-site during using iron nail, So iron nail usually mixes with the earth on ground, building site is not only made to there is very big potential safety hazard, And be also the significant wastage to construction material.But the iron nail artificially collecting building site is wasted time and energy, and do not allow Easily thoroughly collect the iron nail in building site, therefore need badly a kind of simple in construction of research and development, easy to operate, collect thoroughly Iron nail collection device for building.
Utility model content
(1) to solve the technical problem that
The utility model is in order to overcome labor cleaning construction site iron nail to waste time and energy, and clears up halfway lacking Point, the technical problems to be solved in the utility model is to provide a kind of simple in construction, easy to operate, collection is thorough Iron nail collection device for building.
(2) technical scheme
In order to solve above-mentioned technical problem, the utility model provides such a iron nail for building collection device, bag Included base plate, bracing frame the Ith, staving, fixed plate the Ith, pole the Ith, electromagnet the Ith, slideway the Ith, feed hopper, Slideway the IIth, electromagnet the IIth, pole the IIth, fixed plate the IIth, bracing frame the IIth, electric pushrod, electromagnet the IIIth, iron Block, casing the IIth, movable plate, slide block, casing the Ith, slide rail and hopper, base plate top is from left to right successively Being provided with bracing frame the Ith, slide rail, bracing frame II, slide rail is provided with slide block, and slide block is connected with slide rail slidingtype, Slide block is provided with movable plate, and movable plate is placed with casing the Ith, casing II, casing I on the left side of casing II, Being provided with iron block on the right side of movable plate, being provided with staving between bracing frame I and bracing frame II, staving top left side is provided with Feed hopper, in staving, rear wall top is provided with fixed plate I, and fixed plate I is provided with pole I, and pole I sets Having electromagnet I, electromagnet I is provided with slideway I, and in staving, rear wall bottom is provided with fixed plate II, fixed plate II is provided with pole II, and pole II is provided with electromagnet II, and electromagnet II is provided with slideway II, bottom staving Left side is provided with hopper, and hopper is in the surface of casing I, and bracing frame II lower left side is provided with electric pushrod, Electric pushrod left end is provided with electromagnet III.
Preferably, also including vibration hammer I and vibration hammer II, staving inner left wall top is provided with vibration hammer I, Staving inner right wall bottom is provided with vibration hammer II.
Operation principle: when workman needs to collect iron nail, control electromagnet the Ith, electromagnet II is energized, and will be mixed with iron The earth of nail adds feed hopper, and the earth being mixed with iron nail is first fallen on slideway I, then by falling slideway I Falling slideway II, under the effect of electromagnet the Ith, electromagnet II, iron nail is attracted on slideway the Ith, slideway II, The earth not being mixed with iron nail is successively fallen in casing I by slideway the Ith, slideway II.Control electromagnet III is energized, Electromagnet III holds iron block, control electric pushrod elongation, electric pushrod band motor magnet the IIIth, iron block and movement Plate is together to left movement, and movable plate drives casing the Ith, casing II to left movement, when casing II moves to blanking During the underface struggled against, control electric pushrod stops elongation, and casing the Ith, casing II, to stopping to left movement, is controlled Electromagnet processed Ith, electromagnet II power-off, the iron nail on slideway the Ith, slideway II is fallen by slideway the Ith, slideway II Enter in casing II.Control electric pushrod shrinks, and electric pushrod band motor magnet the IIIth, iron block is together with movable plate Move right, movable plate drive casing the Ith, casing II move right, when casing I move to hopper just under Fang Shi, control electric pushrod stops shrinking, and then workman will be respectively provided with casing the Ith, the case of earth, iron nail Body II is taken away, controls electromagnet III power-off.
Because also including vibration hammer I and vibration hammer II, staving inner left wall top is provided with vibration hammer I, staving Inner right wall bottom is provided with vibration hammer II.When the earth being mixed with iron nail adds feed hopper, control Vibration on Start-up hammer Ith, vibration hammer II, vibration hammer the Ith, vibration hammer II vibrates, and band sliding way the Ith, slideway II vibrates, anti-on-slip Road the Ith, slideway II is blocked, reaches to improve the effect of operating efficiency.
(3) beneficial effect
The utility model has reached structure and has been simple and convenient to operate, collects effect thoroughly, not only eliminate by The potential safety hazard that discarded iron nail produces in building site, and saved construction material.
Brief description
Fig. 1 is the first front view structure schematic diagram of the present utility model.
Fig. 2 is the second front view structure schematic diagram of the present utility model.
Being labeled as in accompanying drawing: 1-base plate, 2-bracing frame I, 3-staving, 4-fixed plate I, 5-pole I, 6-electromagnet I, 7-slideway I, 8-feed hopper, 9-slideway II, 10-electromagnet II, 11-pole II, 12- Fixed plate II, 13-bracing frame II, 14-electric pushrod, 15-electromagnet III, 16-iron block, 17-casing II, 18-movable plate, 19-slide block, 20-casing I, 21-slide rail, 22-hopper, 23-vibration hammer I, 24-shakes Dynamic hammer II.
Detailed description of the invention
With embodiment, the utility model is further described below in conjunction with the accompanying drawings.
Embodiment 1
The 3rd, a kind of iron nail collection device for building, as shown in Figure 1-2, include base plate the 1st, bracing frame I 2, staving Fixed plate I 4, pole I 5, electromagnet I 6, slideway I 7, feed hopper the 8th, slideway II 9, electromagnet II 10, Pole II 11, fixed plate II 12, bracing frame II 13, electric pushrod the 14th, electromagnet III 15, iron block the 16th, case Body II 17, movable plate the 18th, slide block the 19th, casing I 20, slide rail 21 and hopper 22, base plate 1 top from Left-to-right is sequentially provided with bracing frame I 2, slide rail the 21st, bracing frame II 13, and slide rail 21 is provided with slide block 19, sliding Block 19 is connected with slide rail 21 slidingtype, and slide block 19 is provided with movable plate 18, and movable plate 18 is placed with casing I 20, casing II 17, casing I 20 is provided with iron block 16 on the right side of the left side of casing II 17, movable plate 18, Being provided with staving 3 between bracing frame I 2 and bracing frame II 13, staving 3 top left side is provided with feed hopper 8, staving In 3, rear wall top is provided with fixed plate I 4, and fixed plate I 4 is provided with pole I 5, and pole I 5 is provided with electromagnetism Iron I 6, electromagnet I 6 is provided with slideway I 7, and in staving 3, rear wall bottom is provided with fixed plate II 12, fixed plate II 12 are provided with pole II 11, and pole II 11 is provided with electromagnet II 10, and electromagnet II 10 is provided with slideway II 9, staving 3 bottom left is provided with hopper 22, hopper 22 in the surface of casing I 20, bracing frame II 13 lower left side are provided with electric pushrod 14, and electric pushrod 14 left end is provided with electromagnet III 15.
Also including vibration hammer I 23 and vibration hammer II 24, staving 3 inner left wall top is provided with vibration hammer I 23, Staving 3 inner right wall bottom is provided with vibration hammer II 24.
Operation principle: when workman needs to collect iron nail, control electromagnet I 6, electromagnet II 10 energising, will be mixed with The earth of iron nail adds feed hopper 8, and the earth being mixed with iron nail is first fallen on slideway I 7, then by falling cunning Slideway II 9 is fallen in road I 7, electromagnet I 6, electromagnet II 10 effect under iron nail be attracted on slideway I 7, On slideway II 9, the earth not being mixed with iron nail is successively fallen in casing I 20 by slideway I 7, slideway II 9. Control electromagnet III 15 energising, electromagnet III 15 holds iron block 16, and control electric pushrod 14 extends, electronic Push rod 14 carries motor magnet III 15, iron block 16 to left movement together with movable plate 18, and movable plate 18 drives Casing I 20, casing II 17 are to left movement, when casing II 17 moves to the underface of hopper 22, and control Electric pushrod 14 processed stops elongation, and casing I 20, casing II 17, to stopping to left movement, control electromagnet I 6th, electromagnet II 10 power-off, the iron nail on slideway I 7, slideway II 9 is fallen into by slideway I 7, slideway II 9 In casing II 17.Control electric pushrod 14 shrinks, and electric pushrod 14 carries motor magnet III 15, iron block 16 and Movable plate 18 moves right together, and movable plate 18 drives casing I 20, casing II 17 to move right, and works as case When body I 20 moves to immediately below hopper 22, control electric pushrod 14 stops shrinking, and then workman will divide Do not take away equipped with earth, the casing I 20 of iron nail, casing II 17, control electromagnet III 15 power-off.
Because also including vibration hammer I 23 and vibration hammer II 24, staving 3 inner left wall top is provided with vibration hammer I 23, Staving 3 inner right wall bottom is provided with vibration hammer II 24.When the earth being mixed with iron nail adds feed hopper 8, control Vibration on Start-up hammer I 23, vibration hammer II 24, vibration hammer I 23, vibration hammer II 24 vibration, band sliding way I 7, Slideway II 9 vibrates, and prevents slideway I 7, slideway II 9 blocked, reaches to improve the effect of operating efficiency.
Embodiment described above only have expressed preferred embodiment of the present utility model, its describe more concrete and In detail, but therefore can not be interpreted as the restriction to the utility model the scope of the claims.It should be pointed out that, For the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make Some deformation, improvement and replacement, these broadly fall into protection domain of the present utility model.Therefore, this practicality is new The protection domain of type patent should be as the criterion with claims.

Claims (2)

1. an iron nail collection device for building, it is characterised in that include base plate (1), bracing frame I (2), Staving (3), fixed plate I (4), pole I (5), electromagnet I (6), slideway I (7), charging Bucket (8), slideway II (9), electromagnet II (10), pole II (11), fixed plate II (12), Support II (13), electric pushrod (14), electromagnet III (15), iron block (16), casing II (17), Movable plate (18), slide block (19), casing I (20), slide rail (21) and hopper (22), base plate (1) top is sequentially provided with bracing frame I (2), slide rail (21), bracing frame II (13) from left to right, Slide rail (21) is provided with slide block (19), and slide block (19) is connected with slide rail (21) slidingtype, slide block (19) it is provided with movable plate (18), movable plate (18) is placed with casing I (20), casing II (17), Casing I (20) is on the left side of casing II (17), and movable plate (18) right side is provided with iron block (16), Being provided with staving (3) between bracing frame I (2) and bracing frame II (13), staving (3) top left side sets Having feed hopper (8), the interior rear wall top of staving (3) is provided with fixed plate I (4), in fixed plate I (4) Being provided with pole I (5), pole I (5) is provided with electromagnet I (6), and electromagnet I (6) is provided with Slideway I (7), the interior rear wall bottom of staving (3) is provided with fixed plate II (12), in fixed plate II (12) Being provided with pole II (11), pole II (11) is provided with electromagnet II (10), on electromagnet II (10) Being provided with slideway II (9), staving (3) bottom left is provided with hopper (22), and hopper (22) is at case The surface of body I (20), bracing frame II (13) lower left side is provided with electric pushrod (14), electronic Push rod (14) left end is provided with electromagnet III (15).
2. one according to claim 1 iron nail for building collection device, it is characterised in that also include and shake Dynamic hammer I (23) and vibration hammer II (24), staving (3) inner left wall top is provided with vibration hammer I (23), Staving (3) inner right wall bottom is provided with vibration hammer II (24).
CN201620321283.4U 2016-04-15 2016-04-15 A kind of iron nail collection device for building Expired - Fee Related CN205701007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620321283.4U CN205701007U (en) 2016-04-15 2016-04-15 A kind of iron nail collection device for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620321283.4U CN205701007U (en) 2016-04-15 2016-04-15 A kind of iron nail collection device for building

Publications (1)

Publication Number Publication Date
CN205701007U true CN205701007U (en) 2016-11-23

Family

ID=57308208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620321283.4U Expired - Fee Related CN205701007U (en) 2016-04-15 2016-04-15 A kind of iron nail collection device for building

Country Status (1)

Country Link
CN (1) CN205701007U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110065817A (en) * 2019-04-17 2019-07-30 瑞安市展瑞后勤服务有限公司 A kind of construction building site iron nail collection device
CN111408475A (en) * 2020-04-21 2020-07-14 福州台江筑途科技有限公司 Collection dust collector of fitment iron nail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110065817A (en) * 2019-04-17 2019-07-30 瑞安市展瑞后勤服务有限公司 A kind of construction building site iron nail collection device
CN111408475A (en) * 2020-04-21 2020-07-14 福州台江筑途科技有限公司 Collection dust collector of fitment iron nail

Similar Documents

Publication Publication Date Title
CN203044383U (en) Adjustable U-shaped support cleaning machine
CN205701007U (en) A kind of iron nail collection device for building
CN205272287U (en) Cloth system of vibrating of PC component production line
CN206256436U (en) One kind automation Quick-action type rammer
CN108671987A (en) Scrap glass processing equipment for pulverizing
CN210058390U (en) Breaker for construction
CN205444837U (en) Novel outer wall mechanical float
CN214080480U (en) A sweeps cleaning device for beveler
CN102248105A (en) Multi-functional electric automatic working machine
CN107984361A (en) A kind of building bar derusting device that can collect iron rust
CN202578013U (en) Wall building mortar bucket
CN205701812U (en) Processing means is followed closely with useless in a kind of construction site
CN205735583U (en) A kind of device conveniently carrying out cutting and crushing stone material
CN211922229U (en) Highway quartering hammer
CN211396661U (en) Vibrator for building engineering
CN110788074B (en) Solar cell panel anhydrous automatic cleaning device based on fixed rail
CN206801058U (en) A kind of mortar feed device for automatic sizing machine
CN109629804A (en) A kind of operating method of novel plastering machine
CN216194680U (en) Side support for forming cast-in-situ bored pile
CN109926525B (en) Reinforcing bar aligning collection device
CN211136475U (en) Novel chip removal device for electromechanical device
CN215150096U (en) High strength keeps warm and evaporates and presses unloader for aerated building block processing
CN201220259Y (en) Horizontal type machine for straightening and cutting steel bar
CN105856428B (en) Full-automatic stone groover
CN1272516C (en) Mechanical float pasting machine for wall space

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Zhijun

Inventor before: Zhang Ganquan

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170620

Address after: Foshan City, Guangdong province 528599 city streets Gaoming District Gaoming Road No. 780 east 2 shop No. 3

Patentee after: Guangdong Dragon Construction Engineering Co.,Ltd.

Address before: 362417 Quanzhou, Anxi County Peach boat Township South pit South pit No. No. 17

Patentee before: Zhang Ganquan

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123