CN205699209U - One is easy to line project installation climbers - Google Patents

One is easy to line project installation climbers Download PDF

Info

Publication number
CN205699209U
CN205699209U CN201620710784.1U CN201620710784U CN205699209U CN 205699209 U CN205699209 U CN 205699209U CN 201620710784 U CN201620710784 U CN 201620710784U CN 205699209 U CN205699209 U CN 205699209U
Authority
CN
China
Prior art keywords
climbers
climbers body
easy
project installation
line project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620710784.1U
Other languages
Chinese (zh)
Inventor
林正学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620710784.1U priority Critical patent/CN205699209U/en
Application granted granted Critical
Publication of CN205699209U publication Critical patent/CN205699209U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rehabilitation Tools (AREA)

Abstract

The utility model discloses one and be easy to line project installation foot button, including climbers body, the bottom of described climbers body is provided with support, one end of described support connects pedal, the both sides, bottom of described climbers body are provided with carrier, accumulator and motor are installed on described carrier, described motor is connected by wire controller, described climbers body Nei Bi lower end is symmetrically arranged with driving wheel, described climbers body Nei Bi upper end is symmetrically installed with driven pulley, the middle part of described climbers body is provided with regulation loop bar, described climbers body Nei Bi top is provided with electric expansion bar, described accumulator, electric expansion bar and motor are all electrically connected at controller.This device electric operating, save trouble and labor, reduce and manually climb muscle power, greatly improve the work efficiency of line project installation personnel.

Description

One is easy to line project installation climbers
Technical field
This utility model belongs to power engineering and installs equipment technical field, is specifically related to one and is easy to line project installation use Climbers.
Background technology
Climbers make the aid in power industry, especially during circuit project installation sets up, need at electricity Carrying out electric mounting and work high above the ground on line bar, the climbers being used mostly at present are substantially to be climbed by manpower, i.e. by foot dish with buckle Band forms, and utilizes formation angle between weight and the electric pole of human body self, keeps total balance of the body, but during climbing The most tired, when climbing upper end, physical power loss makes more greatly circuit installation difficulty strengthen.
Utility model content
The purpose of this utility model is to provide one to be easy to line project installation climbers, to solve above-mentioned background technology The problem of middle proposition.
For achieving the above object, this utility model provides following technical scheme: one is easy to line project installation climbers, Including climbers body, the bottom of described climbers body is provided with support, and one end of described support connects pedal, the end of described climbers body End both sides are provided with carrier, and described carrier is provided with accumulator and motor, and described motor is connected by wire control Device processed, described climbers body Nei Bi lower end is symmetrically arranged with driving wheel, and described climbers body Nei Bi upper end is symmetrically installed with driven pulley, institute The middle part stating climbers body is provided with regulation loop bar, and described climbers body Nei Bi top is provided with electric expansion bar, described accumulator, electricity Dynamic expansion link and motor are all electrically connected at controller.
Preferably, described support is hinged by two groups of poles, and hinged place is provided with adjusting nut.
Preferably, described driving wheel, driven pulley and electric expansion bar be mounted on skid resistant course, and described driving wheel, from Driving wheel is provided with the arc groove corresponding with electric pole cambered surface with electric expansion bar.
Preferably, described regulation loop bar is provided with threaded on stopper slot, and described stopper slot there is nut.
Technique effect of the present utility model and advantage: this is easy to line project installation climbers, by climbers body before climbing Two parts, fasten on utility poles, by regulation loop bar regulation climbers body to normal operating range, according to the custom of different people The angle of regulation support, is controlling driven by motor driving wheel by controller, and driving wheel and driven pulley form angle in-between, Ensure the stability of device, after arriving specified point, control electric expansion bar by controller and stretch out, with electric pole cambered surface even Connect, increase stability, prevent climbers from gliding.This device electric operating, save trouble and labor, reduce and manually climb muscle power, carry greatly The high work efficiency of line project installation personnel.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1 electric expansion bar, 2 driving wheels, 3 accumulator, 4 supports, 5 climbers bodies, 6 driven pulleys, 7 regulation loop bars, 8 electricity Machine, 9 carriers, 10 pedals, 11 controllers.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
This utility model provides one as shown in Figure 1 and is easy to line project installation climbers, including climbers body 5, institute The bottom stating climbers body 5 is provided with support 4, and one end of described support 4 connects pedal 10, the both sides, bottom of described climbers body 5 Being provided with carrier 9, described carrier 9 is provided with accumulator 3 and motor 8, described motor 8 is connected by wire control Device 11, described climbers body 5 inwall lower end is symmetrically arranged with driving wheel 2, and described climbers body 5 inwall upper end is symmetrically installed with driven pulley 6, the middle part of described climbers body 5 is provided with regulation loop bar 7, and described climbers body 5 inwall top is provided with electric expansion bar 1, described Accumulator 3, electric expansion bar 1 and motor 8 are all electrically connected at controller 11
Further, described support 4 is hinged by two groups of poles, and hinged place is provided with adjusting nut, comfortable according to individual Degree regulation adjusting nut and the angle of pedal 10.
Further, described driving wheel 2, driven pulley 6 and electric expansion bar 1 are mounted on skid resistant course, and described driving Wheel 2, driven pulley 6 are provided with the arc groove corresponding with electric pole cambered surface with electric expansion bar 1, arrange with electric pole cambered surface contact surface There is skid resistant course, greatly improve the stability of device.
Further, described regulation loop bar 7 is provided with threaded on stopper slot, and described stopper slot has nut, logical Cross stopper slot and the size of nut regulation climbers internal diameter.
This is easy to line project installation climbers, by two parts of climbers body 5 before climbing, fastens on utility poles, logical Overregulate loop bar 7 and regulate climbers body 5 to normal operating range, according to the angle of the custom regulation support 4 of different people, by control Device 11 processed controls motor 8 and drives driving wheel 2, driving wheel 2 and driven pulley 6 to form angle in-between, it is ensured that the stability of device, After arriving specified point, control electric expansion bar 1 by controller 11 and stretch out, be connected with electric pole cambered surface, increase stability, anti- Only climbers glide.This device electric operating, save trouble and labor, reduce and manually climb muscle power, greatly improve line project and install The work efficiency of personnel.
Last it is noted that the foregoing is only preferred embodiment of the present utility model, it is not limited to this Utility model, although being described in detail this utility model with reference to previous embodiment, for those skilled in the art For, the technical scheme described in foregoing embodiments still can be modified by it, or to wherein portion of techniques feature Carry out equivalent, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. made, all Within protection domain of the present utility model should be included in.

Claims (4)

1. it is easy to line project installation climbers, including climbers body (5), it is characterised in that: the bottom of described climbers body (5) Being provided with support (4), one end of described support (4) connects has pedal (10), the both sides, bottom of described climbers body (5) to be provided with Carrier (9), described carrier (9) is provided with accumulator (3) and motor (8), and described motor (8) is connected by wire control Device processed (11), described climbers body (5) inwall lower end is symmetrically arranged with driving wheel (2), and described climbers body (5) inwall upper end symmetry is pacified Equipped with driven pulley (6), the middle part of described climbers body (5) is provided with regulation loop bar (7), and described climbers body (5) inwall top is installed Electric expansion bar (1), described accumulator (3), electric expansion bar (1) and motor (8) is had all to be electrically connected at controller (11).
One the most according to claim 1 is easy to line project installation climbers, it is characterised in that: described support (4) by Two groups of poles are hinged, and hinged place is provided with adjusting nut.
One the most according to claim 1 is easy to line project installation climbers, it is characterised in that: described driving wheel (2), Skid resistant course, and described driving wheel (2), driven pulley (6) and electric expansion it is mounted on driven pulley (6) and electric expansion bar (1) Bar (1) is provided with the arc groove corresponding with electric pole cambered surface.
One the most according to claim 1 is easy to line project installation climbers, it is characterised in that: described regulation loop bar (7) being provided with on threaded on stopper slot, and described stopper slot has nut.
CN201620710784.1U 2016-06-21 2016-06-21 One is easy to line project installation climbers Expired - Fee Related CN205699209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620710784.1U CN205699209U (en) 2016-06-21 2016-06-21 One is easy to line project installation climbers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620710784.1U CN205699209U (en) 2016-06-21 2016-06-21 One is easy to line project installation climbers

Publications (1)

Publication Number Publication Date
CN205699209U true CN205699209U (en) 2016-11-23

Family

ID=57327469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620710784.1U Expired - Fee Related CN205699209U (en) 2016-06-21 2016-06-21 One is easy to line project installation climbers

Country Status (1)

Country Link
CN (1) CN205699209U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111589070A (en) * 2019-12-19 2020-08-28 年亚欣 Electric pole climbing device and method thereof
CN111701201A (en) * 2020-07-07 2020-09-25 丁西彦 Line tower climbing device for power maintenance and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111589070A (en) * 2019-12-19 2020-08-28 年亚欣 Electric pole climbing device and method thereof
CN111701201A (en) * 2020-07-07 2020-09-25 丁西彦 Line tower climbing device for power maintenance and using method thereof

Similar Documents

Publication Publication Date Title
CN205699209U (en) One is easy to line project installation climbers
CN204983905U (en) Convenient to use's interim guardrail of electric power construction
CN204798732U (en) Lower waist ware of adjustable height and camber
CN203469393U (en) Climber
CN206853013U (en) Upper and lower extremities comprehensive rehabilitation training device
CN204745519U (en) From electricity generation body -building device
CN202121256U (en) High voltage horizontal double-splitting line checking pulley
CN207609369U (en) One kind can be fixed on power construction construction ladder on electric pole
CN203469392U (en) Grappler assembly for telegraph pole climbing
CN204952123U (en) Braced system in electronic climbers
CN201643640U (en) Drift skate
CN104958874B (en) Support system in electronic climbers
CN203736798U (en) Auxiliary pedal for climbing steel pylon
CN205455292U (en) Over -and -under type police dog training diving tower
CN205355632U (en) Safe and reliable's high altitude safety hanger
CN202050189U (en) High-altitude line working clearance physical power adjusting device
CN205858169U (en) A kind of ladder of Anti-inclining
CN204407787U (en) A kind of power line construction center line take-up coaster
CN203978263U (en) A kind of cat ladder safety guard
CN104068953A (en) Dressing device for handless people
CN208340107U (en) A kind of sliding slide of crawler type environment-friendly type children
CN208193271U (en) Its rail parallel bar training system
CN205287465U (en) Novel improve electric power pole pole -climbing shoes of structure
CN204543396U (en) Force treadmill
CN207603081U (en) A kind of multi-functional livewire work ladder head

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161123

Termination date: 20170621