CN208193271U - Its rail parallel bar training system - Google Patents

Its rail parallel bar training system Download PDF

Info

Publication number
CN208193271U
CN208193271U CN201720607596.0U CN201720607596U CN208193271U CN 208193271 U CN208193271 U CN 208193271U CN 201720607596 U CN201720607596 U CN 201720607596U CN 208193271 U CN208193271 U CN 208193271U
Authority
CN
China
Prior art keywords
sliding block
sliding
stretch cord
safe
parallel bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720607596.0U
Other languages
Chinese (zh)
Inventor
樊天润
黄伟新
毕建明
何雷
吴强
吕鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Qianjing Rehabilitation Co Ltd
Original Assignee
Changzhou Qianjing Rehabilitation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Qianjing Rehabilitation Co Ltd filed Critical Changzhou Qianjing Rehabilitation Co Ltd
Priority to CN201720607596.0U priority Critical patent/CN208193271U/en
Application granted granted Critical
Publication of CN208193271U publication Critical patent/CN208193271U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rehabilitation Tools (AREA)

Abstract

The utility model relates to a kind of day rail parallel bar training systems, have support frame and track groups;The track groups fixed setting is on the support frame;Sliding is equipped with multiple suspenders for loss of weight in the track groups;The suspender includes sliding block, rail wheel, stretch cord, safe spacing component, limit connector and suspender belt;The rail wheel is arranged in sliding block;The safe spacing component is connected in sliding block;The safe spacing component is equipped with the stroke chamber for limiting stretch cord stretching travel;One end of the stretch cord is connect with sliding block or safe spacing component, and the other end is connect with limit connector;The stroke that the limit connector is slidably arranged in safe spacing component is intracavitary;The suspender belt is fixedly connected on limit connector.The utility model can realize more people while interact, and reduce entourage's workload, while compact-sized, and using effect is prominent.

Description

Its rail parallel bar training system
Technical field
The utility model relates to rehabilitation training equipment fields, in particular to a kind of day rail parallel bar training system.
Background technique
Its rail suspention training system is quickly grown in recent years, it is built upon cerebral function recombination and neural plasticity basis Upper new recovery training method is suitable for three section of one paralysis, parkinson's syndrome, brain loss, spinal injury, the diseases such as osteoporosis People.Its rail suspention training system mainly realizes various rehabilitation trainings by the auxiliary of track and suspender, to help patient real Existing rehabilitation.
Day rail suspention training system currently on the market is divided into suspension type and frame-type, and suspension type site requirements is big, installation It is complicated.Frame-type is limited to installation space, and steel construction is complicated.Meanwhile the suspender in existing day rail suspention training system is general Motorized adjustment is realized using directly suspention, or by electric lifting tool.It is directly suspended in use, being used due to not buffering Person's use feeling is bad, and suspend in midair height be inconvenient to adjust.And although electric lifting tool suspention height adjustment is convenient, it is slow It is also bad to rush effect, and expensive.
Utility model content
More people can be achieved the purpose of the utility model is to provide one kind while interacting, reduce entourage's workload, space The high day rail parallel bar training system of utilization rate.Meanwhile the system is suitable for various crowds and uses, fitness is high.
Realizing the technical solution of the utility model aim is: the utility model has support frame and track groups;The track Group fixed setting is on the support frame;Sliding is equipped with multiple suspenders for loss of weight in the track groups;The suspender includes sliding Block, rail wheel, stretch cord, safe spacing component, limit connector and suspender belt;The rail wheel is arranged in sliding block;It is described Safe spacing component is connected in sliding block;The safe spacing component is equipped with the stroke for limiting stretch cord stretching travel Chamber;One end of the stretch cord is connect with sliding block or safe spacing component, and the other end is connect with limit connector;The limit The stroke that connector is slidably arranged in safe spacing component is intracavitary;The suspender belt is fixedly connected on limit connector.
Above-mentioned track groups include circular orbit and the straight trip track that is arranged in circular orbit;The circular orbit is equipped with At least one suspender;The straight trip track is equipped at least one suspender.
Above-mentioned support frame is equipped with parallel bar;The lower section of track groups is arranged in the parallel bar;The parallel bar includes two The parallel grab bar of root;Inner passage is formed between two grab bars;It is described straight trip the internally positioned channel of track just on Side;The grab bar is arranged on the support frame by regulating device;The regulating device includes sliding rail, sliding block and reset bolt; The sliding rail fixed setting is on the support frame and perpendicular to ground;The sliding block is slidably arranged on sliding rail;Edge on the sliding rail Sliding rail extending direction is equipped with multiple jacks;The reset bolt is arranged on sliding block;The reset bolt includes pin shaft and reset Spring;The pin shaft, which cooperates under the action of reset spring with jack, to be positioned;It is equipped on each grab bar and ground level And the connecting rod vertical with sliding rail;The sliding block is equipped with the sliding slot for placing connecting rod;The extending direction of the sliding slot with The extending direction of connecting rod is consistent;The regulating device further includes being fixed on sliding block and for compressing the connection in sliding slot The locking clamping block of bar.
Above-mentioned locking clamping block includes briquetting and lock shaft;One end of the briquetting is rotatably connected on sliding block, and the other end is made For the connecting rod in sliding slot;The briquetting is equipped with through-hole, and sliding block is equipped with tapped blind hole corresponding with through-hole;The locking One end of axis is equipped with regulation handle, and the other end passes through the through-hole of briquetting and is threadedly coupled with the tapped blind hole of sliding block;The locking The tabletting of briquetting is fixed between regulation handle and briquetting and acted on axis.
Above-mentioned connecting rod is equipped with the scale for measuring connecting rod sliding distance.
Above-mentioned limit connector is the first safety buckle;The suspender belt is connected with stretch cord by the first safety buckle, and first The stroke that safety buckle be located in safe spacing component is intracavitary.
Above-mentioned safe spacing component includes at least one safe becket bridle;The safety rope ring is formed to be drawn for limiting stretch cord Stretch the stroke chamber of stroke.
As optimization, above-mentioned safe spacing component includes two symmetrically arranged safe becket bridles;Each safe becket bridle is equal Form the stroke chamber for limiting stretch cord stretching travel;The stretch cord is arranged between two safe becket bridles.
Above-mentioned stretch cord is in becket bridle shape.
Above-mentioned suspender further includes the second safety buckle;The sliding block is equipped with hanging hole;Second safety buckle is passed through and is slided The hanging hole of block, safe becket bridle and stretch cord, and sliding block, safe becket bridle and stretch cord are linked together.
The utility model has the effect of positive: (1) suspender mechanism is ingenious in design in the utility model, utilizes stretch cord reality Now good loss of weight and buffering effect are conducive to the rehabilitation training of patient;Safe spacing component and limit connector are matched simultaneously It closes, safety can be effectively improved;
(2) design of the utility model middle orbit group is conducive to more people while interacting, and may be implemented on circular orbit More people interact in the same direction, space are not only rationally utilized, but also greatly improve entertainment, facilitate promotion patient and restore confidence;
(3) it keeps straight in the utility model the cooperation of track and parallel bar, can increase training program, improve rehabilitation efficacy;
(4) in the utility model regulating device design, can between grab bar spacing and height be adjusted, thus Adapt to the different training requirements of different personnel;
(5) scale in the utility model in connecting rod further facilitates the adjustment of the spacing between grab bar;
(6) safe spacing component uses safe becket bridle in the utility model, and structure is simple, at low cost, and using effect It is good;
(7) the first safety buckle is used in the utility model, can facilitate the connection of suspender belt Yu stretch cord, safe spacing component;
(8) the second safety buckle is used in the utility model, further facilitates stretch cord, safe spacing component and sliding block Connection.
Detailed description of the invention
In order to make the content of the utility model be easier to be clearly understood, below according to specific embodiment and combine attached Figure, is described in further detail the utility model, wherein
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of suspender in the utility model;
Fig. 3 be the utility model in safety rope, stretch cord, the first safety buckle and the second safety buckle structural schematic diagram;
Fig. 4 is the structural schematic diagram of the utility model middle orbit group;
Fig. 5 is the structural schematic diagram of regulating device and grab bar in the utility model;
Fig. 6 is the structural schematic diagram of regulating device in the utility model.
Specific embodiment
(embodiment one)
See that Fig. 1, Fig. 4, Fig. 5 and Fig. 6, the utility model have support frame 1 and track groups 2;The track groups 2 are fixedly installed On support frame 1;Sliding is equipped with multiple suspenders 3 for loss of weight in the track groups 2;The suspender 3 includes sliding block 31, rail Road wheel, stretch cord 32, safe spacing component, limit connector and suspender belt 33;The rail wheel is arranged in sliding block 31;It is described Safe spacing component is connected in sliding block 31;The safe spacing component is equipped with the row for limiting stretch cord stretching travel Journey chamber;One end of the stretch cord 32 is connect with sliding block 31 or safe spacing component, and the other end is connect with limit connector;Institute State limit connector be slidably arranged in safe spacing component stroke it is intracavitary;The suspender belt 33 is fixedly connected on limit connector On.
The track groups 2 include circular orbit 21 and the straight trip track 22 being arranged in circular orbit 21;The circular rails Road 21 is equipped at least one suspender 3;The straight trip track 22 is equipped at least one suspender 3.
Support frame as described above 1 is equipped with parallel bar 4;The lower section of track groups 2 is arranged in the parallel bar 4;The parallel bar 4 wraps Include two parallel grab bars 41;Inner passage is formed between two grab bars 41;The straight trip track 22 is internally positioned The surface in channel;The grab bar 41 is arranged on support frame 1 by regulating device 5;The regulating device 5 includes sliding rail 51, sliding block 52 and reset bolt 53;The sliding rail 51 is fixed on support frame 1 and perpendicular to ground;The sliding block 52 is sliding It is dynamic to be arranged on sliding rail 51;Multiple jacks are equipped with along sliding rail extending direction on the sliding rail 51;The setting of reset bolt 53 exists On sliding block 52;The reset bolt 53 includes pin shaft 531 and reset spring 532;Work of the pin shaft 531 in reset spring 532 It is positioned with lower with jack cooperation;Each grab bar 41 is equipped with connecting rod 42 with ground level and vertical with sliding rail 51;Institute Sliding block 52 is stated equipped with the sliding slot 521 for placing connecting rod 42;The extending direction of the sliding slot 521 and the extension of connecting rod 42 Direction is consistent;The regulating device 5 further includes being fixed on sliding block 52 and for compressing the connecting rod 42 in sliding slot 521 Locking clamping block 54.
The locking clamping block 54 includes briquetting 541 and lock shaft 542;One end of the briquetting 541 is rotatably connected on sliding block On 52, the other end acts on the connecting rod 42 in sliding slot 521;The briquetting 541 is equipped with through-hole, and sliding block 52 is equipped with and through-hole Corresponding tapped blind hole;One end of the lock shaft 542 be equipped with regulation handle 542-1, the other end pass through briquetting 541 through-hole and It is threadedly coupled with the tapped blind hole of sliding block 52;It is fixed on the lock shaft 542 positioned at regulation handle 542-1 and briquetting 541 Between and act on the tabletting 542-2 of briquetting 541.
The connecting rod 42 is equipped with the scale for measuring connecting rod sliding distance.
(embodiment two)
See Fig. 2 and Fig. 3, safe spacing component includes two symmetrically arranged safe becket bridles 35 in the utility model;It is described Stretch cord 32 is in becket bridle shape;Each safe becket bridle 35 is respectively formed the stroke chamber for limiting stretch cord stretching travel;The bullet Power rope 32 is arranged between two safe becket bridles 35.
The limit connector is the first safety buckle 34;The suspender belt 33 and stretch cord 32 are connected by the first safety buckle 34 Connect, and the first safety buckle 34 be located in safe becket bridle 35 stroke it is intracavitary.
The suspender 3 further includes the second safety buckle 36;The sliding block 31 is equipped with hanging hole;Second safety buckle 36 is worn The hanging hole, safe becket bridle 35 and stretch cord 32 of sliding block 31 are crossed, and sliding block 31, safe becket bridle 35 and stretch cord 32 are connected to Together.Other technical characteristics are the same as example 1.
When 33 stress of suspender belt, stretch cord 32 is stretched, and due to the restriction of safe becket bridle 35, effectively avoids stretch cord 32 because of mistake Degree is stretched and is broken, and causes accident.And stretch cord 32 has resilience, can greatly promote buffering effect, improves use feeling By.
Particular embodiments described above has carried out into one the purpose of this utility model, technical scheme and beneficial effects Step is described in detail, it should be understood that being not limited to this foregoing is merely specific embodiment of the utility model Utility model, within the spirit and principle of the utility model, any modification, equivalent substitution, improvement and etc. done should all wrap Containing being within the protection scope of the utility model.

Claims (8)

1. a kind of day rail parallel bar training system has support frame (1) and track groups (2);The track groups (2) are fixed at On support frame (1);Sliding is equipped with multiple suspenders (3) for loss of weight on the track groups (2);It is characterized by: the suspender It (3) include sliding block (31), rail wheel, stretch cord (32), safe spacing component, limit connector and suspender belt (33);The rail Road wheel is arranged on sliding block (31);The safe spacing component is connected on sliding block (31);The safe spacing component packet Include at least one safe becket bridle (35);The safe becket bridle (35) forms the stroke chamber for limiting stretch cord stretching travel;Institute Stating limit connector is the first safety buckle (34);The suspender belt (33) and stretch cord (32) are connected by the first safety buckle (34), And first safety buckle (34) be located in safe spacing component stroke it is intracavitary;The stretch cord (32) and sliding block (31) or safety Limit assembly connection.
2. according to claim 1 day rail parallel bar training system, it is characterised in that: the track groups (2) include annular Track (21) and the straight trip track (22) being arranged in circular orbit (21);The circular orbit (21) is hung equipped at least one Have (3);The straight trip track (22) is equipped at least one suspender (3).
3. according to claim 2 day rail parallel bar training system, it is characterised in that: support frame as described above (1) is equipped with flat Row thick stick (4);Lower section of parallel bar (4) setting in track groups (2);The parallel bar (4) includes two parallel grab bars (41);Inner passage is formed between two grab bars (41);The surface in described straight trip track (22) internally positioned channel; The grab bar (41) is arranged on support frame (1) by regulating device (5);The regulating device (5) includes sliding rail (51), slides Block (52) and reset bolt (53);The sliding rail (51) is fixed on support frame (1) and perpendicular to ground;The sliding block (52) it is slidably arranged on sliding rail (51);Multiple jacks are equipped with along sliding rail extending direction on the sliding rail (51);Described reset is inserted (53) are sold to be arranged on sliding block (52);The reset bolt (53) includes pin shaft (531) and reset spring (532);The pin shaft (531) cooperate under the action of reset spring (532) with jack and position;Each grab bar (41) be equipped with ground level and The connecting rod (42) vertical with sliding rail (51);The sliding block (52) is equipped with the sliding slot (521) for placing connecting rod (42);Institute The extending direction for stating sliding slot (521) is consistent with the extending direction of connecting rod (42);The regulating device (5) further includes fixed setting Locking clamping block (54) on sliding block (52) and for compressing the connecting rod (42) in sliding slot (521).
4. according to claim 3 day rail parallel bar training system, it is characterised in that: the locking clamping block (54) includes pressure Block (541) and lock shaft (542);One end of the briquetting (541) is rotatably connected on sliding block (52), and the other end acts on sliding slot (521) connecting rod (42) in;The briquetting (541) is equipped with through-hole, and it is blind that sliding block (52) is equipped with screw thread corresponding with through-hole Hole;One end of the lock shaft (542) is equipped with regulation handle (542-1), and the other end passes through the through-hole and and sliding block of briquetting (541) (52) tapped blind hole is threadedly coupled;It is fixed on the lock shaft (542) positioned at regulation handle (542-1) and briquetting (541) between and the tablettings (542-2) of briquetting (541) is acted on.
5. according to claim 4 day rail parallel bar training system, it is characterised in that: the connecting rod (42), which is equipped with, to be used In the scale of metering connecting rod sliding distance.
6. according to claim 5 day rail parallel bar training system, it is characterised in that: the safe spacing component includes two A symmetrically arranged safe becket bridle (35);Each safe becket bridle (35) is respectively formed the stroke for limiting stretch cord stretching travel Chamber;The stretch cord (32) is arranged between two safe becket bridles (35).
7. according to claim 6 day rail parallel bar training system, it is characterised in that: the stretch cord (32) is in becket bridle Shape.
8. according to claim 7 day rail parallel bar training system, it is characterised in that: the suspender (3) further includes second Safety buckle (36);The sliding block (31) is equipped with hanging hole;Second safety buckle (36) passes through the hanging hole of sliding block (31), peace Full becket bridle (35) and stretch cord (32), and sliding block (31), safe becket bridle (35) and stretch cord (32) are linked together.
CN201720607596.0U 2017-05-26 2017-05-26 Its rail parallel bar training system Expired - Fee Related CN208193271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720607596.0U CN208193271U (en) 2017-05-26 2017-05-26 Its rail parallel bar training system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720607596.0U CN208193271U (en) 2017-05-26 2017-05-26 Its rail parallel bar training system

Publications (1)

Publication Number Publication Date
CN208193271U true CN208193271U (en) 2018-12-07

Family

ID=64489222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720607596.0U Expired - Fee Related CN208193271U (en) 2017-05-26 2017-05-26 Its rail parallel bar training system

Country Status (1)

Country Link
CN (1) CN208193271U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110507516A (en) * 2019-08-06 2019-11-29 北京航空航天大学 A kind of constant force human body suspension system for rehabilitation training

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110507516A (en) * 2019-08-06 2019-11-29 北京航空航天大学 A kind of constant force human body suspension system for rehabilitation training

Similar Documents

Publication Publication Date Title
CN202178552U (en) Double split conductor alternated conductor spacer installation aerodyne
CN204380114U (en) Free combat arm muscle power exercising device
CN208193271U (en) Its rail parallel bar training system
CN202876189U (en) Suspension device
CN209451226U (en) A kind of basketball upper body strength training device
CN206214658U (en) A kind of dance training is with lower waist device
CN204972135U (en) A slide rail suspends rehabilitation training device in midair for children
CN205531255U (en) Construction scaffold
CN106693373B (en) A kind of day rail parallel bar one training system
CN209405540U (en) A kind of high altitude operation safety belt
CN2920319Y (en) Climbing type tree climbing support
CN107261418B (en) Portable back type body-building massager
CN202876190U (en) Length-adjustable fitness flying ring
CN212466522U (en) Back connecting device for lower limb rehabilitation robot
CN204798733U (en) A intensive day net rehabilitation training device of slide rail for children
CN207804581U (en) A kind of auxiliary walking suspender
CN204601428U (en) Pole tower operation rail mounted individual safety protection device
CN104997614A (en) Multi-point and multi-axis posture correction walking training system
CN211675196U (en) Multifunctional limb training device for neurology patients
CN211635106U (en) Recovered telecontrol equipment of severe patient
CN204502281U (en) Waist building device
CN203634748U (en) Small portable power twister
CN202637770U (en) Anti-skid climbing safety belt
CN207856147U (en) The parallel bars of heavy burden can be added
CN206809663U (en) Dropproof steps on bar instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181207