CN205693210U - For spark gap charged for replacement leakage current table special complete instrument - Google Patents

For spark gap charged for replacement leakage current table special complete instrument Download PDF

Info

Publication number
CN205693210U
CN205693210U CN201620503502.0U CN201620503502U CN205693210U CN 205693210 U CN205693210 U CN 205693210U CN 201620503502 U CN201620503502 U CN 201620503502U CN 205693210 U CN205693210 U CN 205693210U
Authority
CN
China
Prior art keywords
screw
upper cover
box body
leakage current
spark gap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620503502.0U
Other languages
Chinese (zh)
Inventor
郭磊
寇晓适
张科
丁国君
董曼玲
王天
王伟
赵磊
李予全
郑含博
邵颖彪
王栋
付海金
蒲兵舰
辛伟峰
王吉
王震宇
马德英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Henan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Henan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620503502.0U priority Critical patent/CN205693210U/en
Application granted granted Critical
Publication of CN205693210U publication Critical patent/CN205693210U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

For spark gap charged for replacement leakage current table special complete instrument, including workbox, workbox includes upper cover and box body, upper cover and box body are insulant, being equipped with screw on upper cover and box body, the screw of upper cover is corresponding with the position of the screw on box body, and connecting between screw and the screw of box body of upper cover has insulation column, insulation column is porcelain insulator or composite insulator, and insulation column two ends are provided with screw rod;Instrument of the present utility model ensure that the new job mode that can carry out in the energized state changed by leakage current of an arrester table, it is to avoid power failure demand;The complete placement of specific purpose tool, wiring is simple and reliable, it is simple to carry installation, time saving and energy saving, can be greatly enhanced work efficiency;Combined insulating support, safety during more preferable support personnel's operation.

Description

For spark gap charged for replacement leakage current table special complete instrument
Technical field
This utility model relates to a kind of apparatus for examination and repair to spark gap charged for replacement leakage current table.
Background technology
One of spark gap important protection equipment being to ensure that safe operation of power system, is mainly used in restriction system the most electric Pressure, leakage current is a very important reference index of examination spark gap quality, and if leakage current table breaks down Be likely to result in leakage current misreads erroneous judgement, and therefore the moment keeps leakage current of an arrester table status most important.Mesh Front operation maintenance personnel is changed leakage current table and is mostly taked to first pass through scheduling application power failure, completes event under the not charged state of equipment The replacing of barrier leakage current table, the time between overhauls(TBO) is very long and reduces system power supply reliability.
Utility model content
The purpose of this utility model is to provide a kind of for spark gap charged for replacement leakage current table special complete instrument, Can be implemented in charged in the case of replacing to surge arrester failure leakage current table, it is to avoid application scheduling has a power failure, and saves the time, Improve system power supply reliability.
The technical solution of the utility model is:
For spark gap charged for replacement leakage current table special complete instrument, including workbox, workbox include upper cover and Box body, upper cover and box body are insulant, are equipped with screw on upper cover and box body, the screw on the screw of upper cover and box body Position corresponding, connect between screw and the screw of box body of upper cover and have insulation column, insulation column is porcelain insulator or multiple Closing insulator, insulation column two ends are provided with screw rod;Tray interior be placed with down conductor continuity test instrument, circuit tester and with The short circuit copper strips of fixing bolt.
Upper cover and box body are made by epoxy resin.
Screw is positioned at the corner of upper cover and the corner of box body.
Short circuit copper strips is two.
The cross section of short circuit copper strips is 60mm*10mm, a length of 0.8m.
Instrument of the present utility model ensure that the new job that can carry out in the energized state changed by leakage current of an arrester table Mode, it is to avoid power failure demand;The complete placement of specific purpose tool, wiring is simple and reliable, it is simple to carry installation, time saving and energy saving, can pole The earth improves work efficiency;Combined insulating support, safety during more preferable support personnel's operation.
After confirming that lightning arrester body is without exception, operating personnel can use this special complete instrument to carry out leakage current table Change.Operating personnel dresses insulating boot under guaranteeing arrester ground credible event and stands in and utilize two on dedicated insulated bracket With the short circuit copper strips of fixing bolt reliable for leakage current table short circuit, then use Work tool that fault leakage current table is carried out Change, after replacing, guarantee that measuring leakage current table is reliably connected with major loop, finally removes short circuit copper strips, site clearing.This is specially Ensure that the new job mode that can carry out in the energized state changed by leakage current of an arrester table with tool set, it is to avoid have a power failure Demand;The complete placement of specific purpose tool, wiring is simple and reliable, it is simple to carry installation, time saving and energy saving, can be greatly enhanced work effect Rate;Combined insulating support, safety during more preferable support personnel's operation, applied range, have good market prospect and Using value.
The beneficial effects of the utility model are:
(1) this device passes through insulating support and short circuit copper strips, and being effectively guaranteed that leakage current of an arrester table changes can be The new job mode that carries out under electriferous state, it is to avoid power failure demand;
(2) this device passes through the complete placement of specific purpose tool, and wiring is simple and reliable, it is simple to carry installation, time saving and energy saving, can pole The earth improves work efficiency;
(3) this device passes through simple combination formula insulating support, has preferably ensured safety during personnel's operation.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the fundamental diagram of operational method step 2 of the present utility model;
Fig. 3 is operational method step 4 of the present utility model and the fundamental diagram of step 5.
In figure: 1, insulator, 2, box body, 3, down conductor continuity test instrument, 4, circuit tester, 5, adjustable wrench, 6, slow-witted Spanner, 7, insulation column, 8, short circuit copper strips with fixing bolt, 9, screw, 10, upper cover.
Detailed description of the invention
As it is shown in figure 1, this utility model is when carrying out the work of spark gap charged for replacement leakage current table, this special complete work Tool can carry out modularization assembling, multiple specific purpose tool compound mode.
This special complete instrument entirety is a workbox, and the upper cover 10 in workbox and box body 2 are exhausted by epoxy resin etc. The compacting of edge material forms, and the corner correspondence position at upper cover 10 and box body 2 all has screw 9, and the screw 9 of upper cover 10 and box body 2 is used In fixed insulation pillar 7, insulation column 7 should be, intensity reliable porcelain insulator good with full skirt, insulation or compound inslation Son, there is screw rod at insulator 1 two ends, are securable to the screw 9 of corner.
Staff can stand on above the upper cover 10 in workbox when charged for replacement leakage current table 13;In box body 2 There are placement down conductor continuity test instrument 3, circuit tester 4, adjustable wrench 5, fork spanner 6, insulation column 7 and with fixing spiral shell in portion The short circuit copper strips 8 of bolt, short circuit copper strips 8 is two, and cross section is 60mm*10mm, a length of 0.8m.
The concrete steps of operational method:
Step one: operating personnel, before changing fault leakage current table 13, confirms this spark gap 1 current in resistance property live detection Result is qualified, and lightning arrester body is without exception;If lightning arrester body existing defects, this work can not be carried out.
Step 2: as in figure 2 it is shown, under operating personnel uses down conductor continuity test instrument 3 to draw this arrester ground Line 12 the most well judges with main earth mat connection, and spark gap 1 ground connection should be reliable.
Step 3: operating personnel uses upper cover 10, box body 2 and insulation column 7 to assemble easy insulating support, uses absolutely Should confirm before edge support that support is the most steady, then start operation;The purpose using insulating support is to protect operating personnel, anti- Only operating personnel is subjected to the floating potential injury that maloperation may cause.
As it is shown on figure 3,
Step 4: operating personnel uses two 8 leakage current table 13 short circuits of short circuit copper strips with fixing bolt, two Being intended to reliable short circuit, now leakage current table 13 reading should return 0, uses circuit tester 4 to measure whether leakage current table 1 makes after short circuit On leakage current table, lead-in wire 11 and down conductor 12 are reliably connected.Use two to be in order at dual fail-safe to consider, prevent one Root occurs that loose or dislocation situation occurs.
Step 5: after reliable short circuit leakage current table 13, uses the Work tool such as adjustable wrench 5, fork spanner 6 to leakage electricity Stream table is replaced, and the leakage current table 13 after replacing answers reading good.
Step 6: remove short circuit copper strips 8.
Step 7: site clearing, confirms without leaving over object.

Claims (5)

1., for spark gap charged for replacement leakage current table special complete instrument, including workbox, workbox includes upper cover and box Body, it is characterised in that: upper cover and box body are insulant, are equipped with screw on upper cover and box body, the screw of upper cover and box The position of the screw on body is corresponding, and connecting between screw and the screw of box body of upper cover has insulation column, and insulation column is porcelain Insulator or composite insulator, insulation column two ends are provided with screw rod;Tray interior be placed with down conductor continuity test instrument, ten thousand With table and with the short circuit copper strips of fixing bolt.
It is the most according to claim 1 for spark gap charged for replacement leakage current table special complete instrument, it is characterised in that: Upper cover and box body are made by epoxy resin.
It is the most according to claim 1 for spark gap charged for replacement leakage current table special complete instrument, it is characterised in that: Screw is positioned at the corner of upper cover and the corner of box body.
It is the most according to claim 1 for spark gap charged for replacement leakage current table special complete instrument, it is characterised in that: Short circuit copper strips is two.
5. according to described in claim 1 or 4 for spark gap charged for replacement leakage current table special complete instrument, its feature exists In: the cross section of short circuit copper strips is 60mm*10mm, a length of 0.8m.
CN201620503502.0U 2016-05-30 2016-05-30 For spark gap charged for replacement leakage current table special complete instrument Active CN205693210U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620503502.0U CN205693210U (en) 2016-05-30 2016-05-30 For spark gap charged for replacement leakage current table special complete instrument

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620503502.0U CN205693210U (en) 2016-05-30 2016-05-30 For spark gap charged for replacement leakage current table special complete instrument

Publications (1)

Publication Number Publication Date
CN205693210U true CN205693210U (en) 2016-11-16

Family

ID=57263435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620503502.0U Active CN205693210U (en) 2016-05-30 2016-05-30 For spark gap charged for replacement leakage current table special complete instrument

Country Status (1)

Country Link
CN (1) CN205693210U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105846330A (en) * 2016-05-30 2016-08-10 国网河南省电力公司电力科学研究院 Special assorted tool for changing leakage current meter of lightning arrester in live-working state and working method
CN107505490A (en) * 2017-09-08 2017-12-22 广东电网有限责任公司东莞供电局 Method for installing current transformer at grounding down lead of operating lightning arrester

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105846330A (en) * 2016-05-30 2016-08-10 国网河南省电力公司电力科学研究院 Special assorted tool for changing leakage current meter of lightning arrester in live-working state and working method
CN107505490A (en) * 2017-09-08 2017-12-22 广东电网有限责任公司东莞供电局 Method for installing current transformer at grounding down lead of operating lightning arrester

Similar Documents

Publication Publication Date Title
CN103558533B (en) Based on insulation ag(e)ing diagnostic system and the method for 10kV XLPE cable
CN103323751A (en) High-voltage short-cable insulation terminal partial discharge testing device and using method
CN103364648B (en) Nuclear phase device and electroscope used in cooperation with nuclear phase device
CN103926469A (en) Method for testing capacitive current of isolated neutral system
CN202471902U (en) 10 kv switch cabinet partial discharge detection testing system
CN106645825A (en) Lightning arrester live-line test overvoltage protection special test wire
CN205693210U (en) For spark gap charged for replacement leakage current table special complete instrument
CN105846330B (en) For arrester charged for replacement leakage current table special complete instrument and operational method
CN104113002B (en) A kind of high tension cable cross connection grounding system switching device
Jiang et al. Design and test of 500-kV lightning protection insulator
CN103901326A (en) Automatic withstand voltage detecting and automatic sorting device of safety equipment
WO2021052036A1 (en) Gis partial discharge detecting device and method based on flange bolts
CN104124680A (en) Arc harmonic elimination, line selection and overvoltage protection device
Miyazaki et al. A detailed field study of lightning stroke effects on distribution lines
CN202522537U (en) Insulating tool edge planar defect on-site detection device
CN105277751B (en) Sensor support device
CN204967077U (en) High tension switchgear's insulator spindle
CN206671376U (en) A kind of arrester charging test overvoltage protection dedicated testing wire
CN206832926U (en) For searching cable fault and carrying out the integrated apparatus of alternating current-direct current voltage-withstand test
CN103675540B (en) Shunt capacitor bank discharge device
CN203396835U (en) Monitoring and alarming system for grounding current of single-core cable
CN208955223U (en) A kind of safe attaching/detaching apparatus of transformer grounding pole
CN210720633U (en) GIS partial discharge detection device based on flange bolt
CN103454536A (en) Power transformer test method
CN209070019U (en) A kind of loop resistance test macro under double ground states

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant