CN205693210U - For spark gap charged for replacement leakage current table special complete instrument - Google Patents
For spark gap charged for replacement leakage current table special complete instrument Download PDFInfo
- Publication number
- CN205693210U CN205693210U CN201620503502.0U CN201620503502U CN205693210U CN 205693210 U CN205693210 U CN 205693210U CN 201620503502 U CN201620503502 U CN 201620503502U CN 205693210 U CN205693210 U CN 205693210U
- Authority
- CN
- China
- Prior art keywords
- screw
- upper cover
- box body
- leakage current
- spark gap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009413 insulation Methods 0.000 claims abstract description 15
- 239000012212 insulator Substances 0.000 claims abstract description 9
- 229910052573 porcelain Inorganic materials 0.000 claims abstract description 4
- 239000002131 composite material Substances 0.000 claims abstract 2
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 14
- 229910052802 copper Inorganic materials 0.000 claims description 14
- 239000010949 copper Substances 0.000 claims description 14
- 239000004020 conductor Substances 0.000 claims description 6
- 239000003822 epoxy resin Substances 0.000 claims description 3
- 229920000647 polyepoxide Polymers 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 3
- 150000001875 compounds Chemical class 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
For spark gap charged for replacement leakage current table special complete instrument, including workbox, workbox includes upper cover and box body, upper cover and box body are insulant, being equipped with screw on upper cover and box body, the screw of upper cover is corresponding with the position of the screw on box body, and connecting between screw and the screw of box body of upper cover has insulation column, insulation column is porcelain insulator or composite insulator, and insulation column two ends are provided with screw rod;Instrument of the present utility model ensure that the new job mode that can carry out in the energized state changed by leakage current of an arrester table, it is to avoid power failure demand;The complete placement of specific purpose tool, wiring is simple and reliable, it is simple to carry installation, time saving and energy saving, can be greatly enhanced work efficiency;Combined insulating support, safety during more preferable support personnel's operation.
Description
Technical field
This utility model relates to a kind of apparatus for examination and repair to spark gap charged for replacement leakage current table.
Background technology
One of spark gap important protection equipment being to ensure that safe operation of power system, is mainly used in restriction system the most electric
Pressure, leakage current is a very important reference index of examination spark gap quality, and if leakage current table breaks down
Be likely to result in leakage current misreads erroneous judgement, and therefore the moment keeps leakage current of an arrester table status most important.Mesh
Front operation maintenance personnel is changed leakage current table and is mostly taked to first pass through scheduling application power failure, completes event under the not charged state of equipment
The replacing of barrier leakage current table, the time between overhauls(TBO) is very long and reduces system power supply reliability.
Utility model content
The purpose of this utility model is to provide a kind of for spark gap charged for replacement leakage current table special complete instrument,
Can be implemented in charged in the case of replacing to surge arrester failure leakage current table, it is to avoid application scheduling has a power failure, and saves the time,
Improve system power supply reliability.
The technical solution of the utility model is:
For spark gap charged for replacement leakage current table special complete instrument, including workbox, workbox include upper cover and
Box body, upper cover and box body are insulant, are equipped with screw on upper cover and box body, the screw on the screw of upper cover and box body
Position corresponding, connect between screw and the screw of box body of upper cover and have insulation column, insulation column is porcelain insulator or multiple
Closing insulator, insulation column two ends are provided with screw rod;Tray interior be placed with down conductor continuity test instrument, circuit tester and with
The short circuit copper strips of fixing bolt.
Upper cover and box body are made by epoxy resin.
Screw is positioned at the corner of upper cover and the corner of box body.
Short circuit copper strips is two.
The cross section of short circuit copper strips is 60mm*10mm, a length of 0.8m.
Instrument of the present utility model ensure that the new job that can carry out in the energized state changed by leakage current of an arrester table
Mode, it is to avoid power failure demand;The complete placement of specific purpose tool, wiring is simple and reliable, it is simple to carry installation, time saving and energy saving, can pole
The earth improves work efficiency;Combined insulating support, safety during more preferable support personnel's operation.
After confirming that lightning arrester body is without exception, operating personnel can use this special complete instrument to carry out leakage current table
Change.Operating personnel dresses insulating boot under guaranteeing arrester ground credible event and stands in and utilize two on dedicated insulated bracket
With the short circuit copper strips of fixing bolt reliable for leakage current table short circuit, then use Work tool that fault leakage current table is carried out
Change, after replacing, guarantee that measuring leakage current table is reliably connected with major loop, finally removes short circuit copper strips, site clearing.This is specially
Ensure that the new job mode that can carry out in the energized state changed by leakage current of an arrester table with tool set, it is to avoid have a power failure
Demand;The complete placement of specific purpose tool, wiring is simple and reliable, it is simple to carry installation, time saving and energy saving, can be greatly enhanced work effect
Rate;Combined insulating support, safety during more preferable support personnel's operation, applied range, have good market prospect and
Using value.
The beneficial effects of the utility model are:
(1) this device passes through insulating support and short circuit copper strips, and being effectively guaranteed that leakage current of an arrester table changes can be
The new job mode that carries out under electriferous state, it is to avoid power failure demand;
(2) this device passes through the complete placement of specific purpose tool, and wiring is simple and reliable, it is simple to carry installation, time saving and energy saving, can pole
The earth improves work efficiency;
(3) this device passes through simple combination formula insulating support, has preferably ensured safety during personnel's operation.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the fundamental diagram of operational method step 2 of the present utility model;
Fig. 3 is operational method step 4 of the present utility model and the fundamental diagram of step 5.
In figure: 1, insulator, 2, box body, 3, down conductor continuity test instrument, 4, circuit tester, 5, adjustable wrench, 6, slow-witted
Spanner, 7, insulation column, 8, short circuit copper strips with fixing bolt, 9, screw, 10, upper cover.
Detailed description of the invention
As it is shown in figure 1, this utility model is when carrying out the work of spark gap charged for replacement leakage current table, this special complete work
Tool can carry out modularization assembling, multiple specific purpose tool compound mode.
This special complete instrument entirety is a workbox, and the upper cover 10 in workbox and box body 2 are exhausted by epoxy resin etc.
The compacting of edge material forms, and the corner correspondence position at upper cover 10 and box body 2 all has screw 9, and the screw 9 of upper cover 10 and box body 2 is used
In fixed insulation pillar 7, insulation column 7 should be, intensity reliable porcelain insulator good with full skirt, insulation or compound inslation
Son, there is screw rod at insulator 1 two ends, are securable to the screw 9 of corner.
Staff can stand on above the upper cover 10 in workbox when charged for replacement leakage current table 13;In box body 2
There are placement down conductor continuity test instrument 3, circuit tester 4, adjustable wrench 5, fork spanner 6, insulation column 7 and with fixing spiral shell in portion
The short circuit copper strips 8 of bolt, short circuit copper strips 8 is two, and cross section is 60mm*10mm, a length of 0.8m.
The concrete steps of operational method:
Step one: operating personnel, before changing fault leakage current table 13, confirms this spark gap 1 current in resistance property live detection
Result is qualified, and lightning arrester body is without exception;If lightning arrester body existing defects, this work can not be carried out.
Step 2: as in figure 2 it is shown, under operating personnel uses down conductor continuity test instrument 3 to draw this arrester ground
Line 12 the most well judges with main earth mat connection, and spark gap 1 ground connection should be reliable.
Step 3: operating personnel uses upper cover 10, box body 2 and insulation column 7 to assemble easy insulating support, uses absolutely
Should confirm before edge support that support is the most steady, then start operation;The purpose using insulating support is to protect operating personnel, anti-
Only operating personnel is subjected to the floating potential injury that maloperation may cause.
As it is shown on figure 3,
Step 4: operating personnel uses two 8 leakage current table 13 short circuits of short circuit copper strips with fixing bolt, two
Being intended to reliable short circuit, now leakage current table 13 reading should return 0, uses circuit tester 4 to measure whether leakage current table 1 makes after short circuit
On leakage current table, lead-in wire 11 and down conductor 12 are reliably connected.Use two to be in order at dual fail-safe to consider, prevent one
Root occurs that loose or dislocation situation occurs.
Step 5: after reliable short circuit leakage current table 13, uses the Work tool such as adjustable wrench 5, fork spanner 6 to leakage electricity
Stream table is replaced, and the leakage current table 13 after replacing answers reading good.
Step 6: remove short circuit copper strips 8.
Step 7: site clearing, confirms without leaving over object.
Claims (5)
1., for spark gap charged for replacement leakage current table special complete instrument, including workbox, workbox includes upper cover and box
Body, it is characterised in that: upper cover and box body are insulant, are equipped with screw on upper cover and box body, the screw of upper cover and box
The position of the screw on body is corresponding, and connecting between screw and the screw of box body of upper cover has insulation column, and insulation column is porcelain
Insulator or composite insulator, insulation column two ends are provided with screw rod;Tray interior be placed with down conductor continuity test instrument, ten thousand
With table and with the short circuit copper strips of fixing bolt.
It is the most according to claim 1 for spark gap charged for replacement leakage current table special complete instrument, it is characterised in that:
Upper cover and box body are made by epoxy resin.
It is the most according to claim 1 for spark gap charged for replacement leakage current table special complete instrument, it is characterised in that:
Screw is positioned at the corner of upper cover and the corner of box body.
It is the most according to claim 1 for spark gap charged for replacement leakage current table special complete instrument, it is characterised in that:
Short circuit copper strips is two.
5. according to described in claim 1 or 4 for spark gap charged for replacement leakage current table special complete instrument, its feature exists
In: the cross section of short circuit copper strips is 60mm*10mm, a length of 0.8m.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620503502.0U CN205693210U (en) | 2016-05-30 | 2016-05-30 | For spark gap charged for replacement leakage current table special complete instrument |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620503502.0U CN205693210U (en) | 2016-05-30 | 2016-05-30 | For spark gap charged for replacement leakage current table special complete instrument |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205693210U true CN205693210U (en) | 2016-11-16 |
Family
ID=57263435
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620503502.0U Active CN205693210U (en) | 2016-05-30 | 2016-05-30 | For spark gap charged for replacement leakage current table special complete instrument |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205693210U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105846330A (en) * | 2016-05-30 | 2016-08-10 | 国网河南省电力公司电力科学研究院 | Special assorted tool for changing leakage current meter of lightning arrester in live-working state and working method |
CN107505490A (en) * | 2017-09-08 | 2017-12-22 | 广东电网有限责任公司东莞供电局 | Method for installing current transformer at grounding down lead of operating lightning arrester |
-
2016
- 2016-05-30 CN CN201620503502.0U patent/CN205693210U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105846330A (en) * | 2016-05-30 | 2016-08-10 | 国网河南省电力公司电力科学研究院 | Special assorted tool for changing leakage current meter of lightning arrester in live-working state and working method |
CN107505490A (en) * | 2017-09-08 | 2017-12-22 | 广东电网有限责任公司东莞供电局 | Method for installing current transformer at grounding down lead of operating lightning arrester |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103558533B (en) | Based on insulation ag(e)ing diagnostic system and the method for 10kV XLPE cable | |
CN103323751A (en) | High-voltage short-cable insulation terminal partial discharge testing device and using method | |
CN103364648B (en) | Nuclear phase device and electroscope used in cooperation with nuclear phase device | |
CN103926469A (en) | Method for testing capacitive current of isolated neutral system | |
CN202471902U (en) | 10 kv switch cabinet partial discharge detection testing system | |
CN106645825A (en) | Lightning arrester live-line test overvoltage protection special test wire | |
CN205693210U (en) | For spark gap charged for replacement leakage current table special complete instrument | |
CN105846330B (en) | For arrester charged for replacement leakage current table special complete instrument and operational method | |
CN104113002B (en) | A kind of high tension cable cross connection grounding system switching device | |
Jiang et al. | Design and test of 500-kV lightning protection insulator | |
CN103901326A (en) | Automatic withstand voltage detecting and automatic sorting device of safety equipment | |
WO2021052036A1 (en) | Gis partial discharge detecting device and method based on flange bolts | |
CN104124680A (en) | Arc harmonic elimination, line selection and overvoltage protection device | |
Miyazaki et al. | A detailed field study of lightning stroke effects on distribution lines | |
CN202522537U (en) | Insulating tool edge planar defect on-site detection device | |
CN105277751B (en) | Sensor support device | |
CN204967077U (en) | High tension switchgear's insulator spindle | |
CN206671376U (en) | A kind of arrester charging test overvoltage protection dedicated testing wire | |
CN206832926U (en) | For searching cable fault and carrying out the integrated apparatus of alternating current-direct current voltage-withstand test | |
CN103675540B (en) | Shunt capacitor bank discharge device | |
CN203396835U (en) | Monitoring and alarming system for grounding current of single-core cable | |
CN208955223U (en) | A kind of safe attaching/detaching apparatus of transformer grounding pole | |
CN210720633U (en) | GIS partial discharge detection device based on flange bolt | |
CN103454536A (en) | Power transformer test method | |
CN209070019U (en) | A kind of loop resistance test macro under double ground states |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |