CN105846330B - For arrester charged for replacement leakage current table special complete instrument and operational method - Google Patents
For arrester charged for replacement leakage current table special complete instrument and operational method Download PDFInfo
- Publication number
- CN105846330B CN105846330B CN201610366849.XA CN201610366849A CN105846330B CN 105846330 B CN105846330 B CN 105846330B CN 201610366849 A CN201610366849 A CN 201610366849A CN 105846330 B CN105846330 B CN 105846330B
- Authority
- CN
- China
- Prior art keywords
- leakage current
- current meter
- short
- arrester
- box body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 11
- 239000012212 insulator Substances 0.000 claims abstract description 6
- 239000002131 composite material Substances 0.000 claims abstract description 3
- 229910052573 porcelain Inorganic materials 0.000 claims abstract description 3
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 claims description 22
- 229910052802 copper Inorganic materials 0.000 claims description 22
- 239000010949 copper Substances 0.000 claims description 22
- 230000002950 deficient Effects 0.000 claims description 3
- 239000011810 insulating material Substances 0.000 abstract description 3
- 238000009413 insulation Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 239000003822 epoxy resin Substances 0.000 description 2
- 229920000647 polyepoxide Polymers 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B3/00—Apparatus specially adapted for the manufacture, assembly, or maintenance of boards or switchgear
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Power Engineering (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
用于避雷器带电更换泄漏电流表专用成套工具,包括工具箱,工具箱包括上盖和盒体,上盖和盒体均为绝缘材料,在上盖和盒体上均设有螺孔,上盖的螺孔和盒体上的螺孔的位置相对应,上盖的螺孔和盒体的螺孔之间连接有绝缘支柱,绝缘支柱为瓷绝缘子或复合绝缘子,本发明的工具保证了避雷器泄漏电流表更换可在带电状态下进行的新作业方式,避免了停电需求。
A complete set of special tools for replacing the leakage current meter of the lightning arrester, including a tool box. The tool box includes an upper cover and a box body. Both the upper cover and the box body are made of insulating materials. There are screw holes on the upper cover and the box body. The positions of the screw holes and the screw holes on the box body are corresponding, and an insulating support is connected between the screw holes of the loam cake and the screw holes of the box body, and the insulating support is a porcelain insulator or a composite insulator. Replace the new work mode that can be carried out under the live state, avoiding the need for power failure.
Description
技术领域technical field
本发明涉及一种对避雷器带电更换泄漏电流表的检修装置。The invention relates to a maintenance device for replacing a leakage current meter with electricity on a lightning arrester.
背景技术Background technique
避雷器是保证电力系统安全运行的重要保护设备之一,主要用于限制系统过电压,泄漏电流是考核避雷器好坏的一个非常重要的参考指标,而如果泄漏电流表出现故障可能会造成泄漏电流的误读误判,因此时刻保持避雷器泄漏电流表状态良好至关重要。目前运维人员更换泄漏电流表大多采取先通过调度申请停电,在设备不带电状态下完成对故障泄漏电流表的更换,检修周期漫长且降低系统供电可靠性。Surge arrester is one of the important protection devices to ensure the safe operation of the power system. It is mainly used to limit the overvoltage of the system. The leakage current is a very important reference index for evaluating the quality of the arrester. If the leakage current meter fails, it may cause leakage current error. Therefore, it is very important to keep the leakage current meter of the arrester in good condition at all times. At present, most operation and maintenance personnel replace the leakage current meter by first applying for a power outage through dispatching, and then complete the replacement of the faulty leakage current meter when the equipment is not charged. The maintenance cycle is long and the reliability of the system power supply is reduced.
发明内容Contents of the invention
本发明的目的在于提供一种用于避雷器带电更换泄漏电流表专用成套工具及作业方法,可以实现在带电情况下对避雷器故障泄漏电流表的更换,避免了申请调度停电,节约时间,提高系统供电可靠性。The purpose of the present invention is to provide a special tool set and operation method for replacing the leakage current meter of the lightning arrester when it is live, which can realize the replacement of the leakage current meter of the lightning arrester fault when it is charged, avoiding the application for dispatching power outages, saving time, and improving the reliability of the system power supply .
本发明的技术方案是:Technical scheme of the present invention is:
用于避雷器带电更换泄漏电流表专用成套工具,包括工具箱,工具箱包括上盖和盒体,上盖和盒体均为绝缘材料,在上盖和盒体上均设有螺孔,上盖的螺孔和盒体上的螺孔的位置相对应,上盖的螺孔和盒体的螺孔之间连接有绝缘支柱,绝缘支柱为瓷绝缘子或复合绝缘子,绝缘支柱两端设有螺杆;盒体内部放置有接地引下线导通测试仪、万用表及带有固定螺栓的短接铜带。A complete set of special tools for replacing the leakage current meter of the lightning arrester, including a tool box. The tool box includes an upper cover and a box body. Both the upper cover and the box body are made of insulating materials. There are screw holes on the upper cover and the box body. The positions of the screw holes and the screw holes on the box body correspond to each other. There is an insulating post connected between the screw hole on the upper cover and the screw hole on the box body. Inside the body are placed a grounding downconductor continuity tester, a multimeter and a short-connected copper strip with fixing bolts.
上盖和盒体均由环氧树脂制成。Both the upper cover and the box body are made of epoxy resin.
螺孔位于上盖的四角和盒体的四角。The screw holes are located at the four corners of the loam cake and the four corners of the box body.
短接铜带为两根。There are two short copper strips.
短接铜带的截面为60mm*10mm,长度为0.8m。The cross-section of the short-connected copper strip is 60mm*10mm, and the length is 0.8m.
采用所述的专用成套工具用于避雷器带电更换泄漏电流表的作业方法,具体步骤为:Use the above-mentioned special complete set of tools for the operation method of replacing the leakage current meter while the arrester is live, and the specific steps are as follows:
步骤一:避雷器连接有泄漏电流表,作业人员在更换故障泄漏电流表前,确认该避雷器阻性电流带电检测结果合格,避雷器本体无异常;如果避雷器本体存在缺陷则停止作业;Step 1: The arrester is connected with a leakage current meter. Before replacing the faulty leakage current meter, the operator confirms that the resistive current live test result of the arrester is qualified, and the arrester body is normal; if the arrester body is defective, stop the operation;
步骤二:作业人员使用接地引下线导通测试仪对该避雷器接地引下线与主地网连接情况是否良好进行判断,避雷器接地应可靠;Step 2: Operators use the grounding downconductor continuity tester to judge whether the connection between the grounding downconductor of the arrester and the main ground network is good, and the grounding of the arrester should be reliable;
步骤三:作业人员使用上盖、盒体及绝缘支柱组装成简易的绝缘支架,然后开始作业;使用绝缘支架的目的在于保护作业人员,防止作业人员受到由于误操作可能导致的悬浮电位伤害;Step 3: The operator uses the upper cover, the box body and the insulating support to assemble a simple insulating support, and then starts to work; the purpose of using the insulating support is to protect the operator and prevent the operator from being injured by the floating potential caused by misoperation;
步骤四:作业人员使用带有固定螺栓的短接铜带把泄漏电流表短接,短接铜带应可靠短接,此时泄漏电流表读数应归零,短接后使用万用表测量泄漏电流表是否使泄漏电流表上引线和接地引下线可靠连接;Step 4: The operator uses a short-circuit copper tape with fixed bolts to short-circuit the leakage current meter. The short-circuit copper tape should be reliably short-circuited. At this time, the reading of the leakage current meter should return to zero. The upper lead of the ammeter and the grounding down lead are reliably connected;
步骤五:在可靠短接泄漏电流表后,使用工具对泄漏电流表进行更换,更换后的泄漏电流表应读数良好;Step 5: After reliably shorting the leakage current meter, use tools to replace the leakage current meter, and the replaced leakage current meter should read well;
步骤六:拆除短接铜带;Step 6: Remove the short-circuit copper strip;
步骤七:清理现场,确认无遗留物件。Step 7: Clean up the site and confirm that there are no leftover objects.
步骤四中,作业人员使用两根带有固定螺栓的短接铜带把泄漏电流表短接,两根短接铜带均应可靠短接,此时泄漏电流表读数应归零,使用两根是出于双保险考虑,防止出现一根出现松动脱落情况发生。In step 4, the operator uses two short-circuit copper strips with fixed bolts to short-circuit the leakage current meter. Both short-circuit copper strips should be reliably short-circuited. At this time, the reading of the leakage current meter should return to zero. In consideration of double insurance, prevent one from loosening and falling off.
本发明的工具保证了避雷器泄漏电流表更换可在带电状态下进行的新作业方式,避免了停电需求;专用工具成套放置,接线简单可靠,便于携带安装,省时省力,能极大地提高工作效率;组合式绝缘支架,更好的保障人员作业时的安全。The tool of the present invention ensures that the replacement of the leakage current meter of the lightning arrester can be carried out in a charged state, avoiding the need for power failure; the special tool is placed in a set, the wiring is simple and reliable, easy to carry and install, saves time and effort, and can greatly improve work efficiency; The combined insulation bracket better guarantees the safety of personnel during operation.
在确认避雷器本体无异常后,作业人员可使用该专用成套工具对泄漏电流表进行更换。作业人员在确保避雷器接地可靠情况下穿戴绝缘靴并站在专用绝缘支架上利用两根带有固定螺栓的短接铜带把泄漏电流表可靠短接,然后使用工器具对故障泄漏电流表进行更换,更换后确保测量泄漏电流表与主回路可靠连接,最后拆除短接铜带,清理现场。本专用成套工具保证了避雷器泄漏电流表更换可在带电状态下进行的新作业方式,避免了停电需求;专用工具成套放置,接线简单可靠,便于携带安装,省时省力,能极大地提高工作效率;组合式绝缘支架,更好的保障人员作业时的安全,应用范围广,具有很好的市场前景和应用价值。After confirming that there is no abnormality in the arrester body, the operator can use the special set of tools to replace the leakage current meter. Under the condition of ensuring the reliable grounding of the arrester, the operator wears insulating boots and stands on a special insulating support to reliably short-circuit the leakage current meter with two short-circuit copper straps with fixed bolts, and then replace the faulty leakage current meter with tools and tools. Finally, ensure that the leakage current meter is reliably connected to the main circuit, and finally remove the short-circuit copper strip to clean up the site. This special set of tools ensures that the replacement of the leakage current meter of the arrester can be carried out in a live state, avoiding the need for power failure; the special tools are placed in a set, the wiring is simple and reliable, easy to carry and install, saves time and effort, and can greatly improve work efficiency; The combined insulating support can better guarantee the safety of personnel during operation, has a wide range of applications, and has good market prospects and application values.
本发明的有益效果是:The beneficial effects of the present invention are:
(1)本装置通过绝缘支架和短接铜带,有效地保证了避雷器泄漏电流表更换可在带电状态下进行的新作业方式,避免了停电需求;(1) Through the insulation bracket and the short-connected copper strip, this device effectively ensures the new operation method that the replacement of the leakage current meter of the arrester can be carried out in the live state, avoiding the need for power failure;
(2)本装置通过专用工具成套放置,接线简单可靠,便于携带安装,省时省力,能极大地提高了工作效率;(2) The device is placed in a complete set with special tools, the wiring is simple and reliable, easy to carry and install, saves time and effort, and can greatly improve work efficiency;
(3)本装置通过简易组合式绝缘支架,更好的保障了人员作业时的安全。(3) This device better guarantees the safety of personnel during operation through the simple combined insulating bracket.
附图说明Description of drawings
图1是本发明的结构示意图。Fig. 1 is a structural schematic diagram of the present invention.
图2是本发明的作业方法步骤二的工作原理图;Fig. 2 is the working principle figure of working method step 2 of the present invention;
图3是本发明的作业方法步骤四及步骤五的工作原理图。Fig. 3 is the working principle figure of step 4 and step 5 of the working method of the present invention.
图中:1、避雷器,2、盒体,3、接地引下线导通测试仪,4、万用表,5、活动扳手,6、呆扳手,7、绝缘支柱,8、带有固定螺栓的短接铜带,9、螺孔,10、上盖。In the figure: 1. lightning arrester, 2. box body, 3. grounding downconductor continuity tester, 4. multimeter, 5. adjustable wrench, 6. dead wrench, 7. insulating support, 8. short Connect copper strip, 9, screw hole, 10, loam cake.
具体实施方式detailed description
如图1所示,本发明在进行避雷器带电更换泄漏电流表工作时,该专用成套工具可以进行模块化组装、多种专用工具组合方式。As shown in Fig. 1, when the present invention performs the work of replacing the leakage current meter while the lightning arrester is live, the special tool set can be assembled in a modular manner and combined with various special tools.
该专用成套工具整体是一个工具箱,工具箱的上盖10和盒体2均由环氧树脂等绝缘材料压制而成,在上盖10和盒体2的四角对应位置均有螺孔9,上盖10和盒体2的螺孔9用于固定绝缘支柱7,绝缘支柱7应是带有伞裙、绝缘良好、强度可靠的瓷绝缘子或复合绝缘子,避雷器1两端有螺杆,可固定于四角的螺孔9。The whole set of special tools is a toolbox. The upper cover 10 and the box body 2 of the toolbox are all pressed by insulating materials such as epoxy resin, and there are screw holes 9 at the corresponding positions of the four corners of the upper cover 10 and the box body 2. The screw holes 9 of the upper cover 10 and the box body 2 are used to fix the insulating support 7. The insulating support 7 should be a porcelain insulator or a composite insulator with an umbrella skirt, good insulation and reliable strength. There are screws at both ends of the arrester 1, which can be fixed on Four corner screw holes 9.
工作人员在带电更换泄漏电流表13时可以站立在工具箱的上盖10上面;盒体2内部有放置接地引下线导通测试仪3、万用表4、活动扳手5、呆扳手6、绝缘支柱7及带有固定螺栓的短接铜带8,短接铜带8为两根,截面为60mm*10mm,长度为0.8m。The staff can stand on the upper cover 10 of the toolbox when replacing the leakage current meter 13 with electricity; inside the box body 2 there is a grounding downconductor continuity tester 3, a multimeter 4, an adjustable wrench 5, a dead wrench 6, and an insulating support 7 And the short-connected copper strip 8 with fixing bolts, the short-connected copper strip 8 is two, the section is 60mm*10mm, and the length is 0.8m.
作业方法的具体步骤:The specific steps of the working method:
步骤一:作业人员在更换故障泄漏电流表13前,确认该避雷器1阻性电流带电检测结果合格,避雷器本体无异常;如果避雷器本体存在缺陷则不能进行此项工作。Step 1: Before replacing the faulty leakage current meter 13, the operator confirms that the arrester 1 resistive current live test result is qualified, and the arrester body is normal; if the arrester body is defective, this work cannot be performed.
步骤二:如图2所示,作业人员使用接地引下线导通测试仪3对该避雷器接地引下线12与主地网连接情况是否良好进行判断,避雷器1接地应可靠。Step 2: As shown in Figure 2, the operator uses the grounding downconductor continuity tester 3 to judge whether the connection between the grounding downconductor 12 of the arrester and the main ground network is good, and the grounding of the arrester 1 should be reliable.
步骤三:作业人员使用上盖10、盒体2及绝缘支柱7组装好简易的绝缘支架,使用绝缘支架前应确认支架是否平稳,然后开始作业;使用绝缘支架的目的在于保护作业人员,防止作业人员受到由于误操作可能导致的悬浮电位伤害。Step 3: The operator uses the upper cover 10, the box body 2 and the insulating support 7 to assemble a simple insulating support. Before using the insulating support, it should be confirmed whether the support is stable, and then start the operation; the purpose of using the insulating support is to protect the operator and prevent operation Personnel are injured by floating potentials that may be caused by mishandling.
如图3所示,As shown in Figure 3,
步骤四:作业人员使用两根带有固定螺栓的短接铜带8把泄漏电流表13短接,两根均要可靠短接,此时泄漏电流表13读数应归0,短接后使用万用表4测量泄漏电流表13是否使泄漏电流表上引线11和接地引下线12可靠连接。使用两根是出于双保险考虑,防止出现一根出现松动脱落情况发生。Step 4: The operator uses two short-circuit copper strips 8 with fixing bolts to short-circuit the leakage current meter 13, and both wires must be reliably short-circuited. At this time, the reading of the leakage current meter 13 should return to 0. After short-circuiting, use the multimeter 4 to measure Whether the leakage current meter 13 is reliably connected to the upper lead wire 11 of the leakage current meter and the grounding down conductor 12. The use of two is for double insurance considerations to prevent one from loosening and falling off.
步骤五:在可靠短接泄漏电流表13后,使用活动扳手5、呆扳手6等工器具对泄漏电流表进行更换,更换后的泄漏电流表13应读数良好。Step 5: After reliably short-circuiting the leakage current meter 13, replace the leakage current meter with adjustable wrench 5, blank wrench 6 and other tools. The replaced leakage current meter 13 should read well.
步骤六:拆除短接铜带8。Step 6: Remove the short-circuit copper strip 8.
步骤七:清理现场,确认无遗留物件。Step 7: Clean up the site and confirm that there are no leftover objects.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610366849.XA CN105846330B (en) | 2016-05-30 | 2016-05-30 | For arrester charged for replacement leakage current table special complete instrument and operational method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610366849.XA CN105846330B (en) | 2016-05-30 | 2016-05-30 | For arrester charged for replacement leakage current table special complete instrument and operational method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105846330A CN105846330A (en) | 2016-08-10 |
CN105846330B true CN105846330B (en) | 2017-12-19 |
Family
ID=56595011
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610366849.XA Active CN105846330B (en) | 2016-05-30 | 2016-05-30 | For arrester charged for replacement leakage current table special complete instrument and operational method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105846330B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3392987B1 (en) * | 2017-04-21 | 2020-12-02 | Rittal GmbH & Co. KG | Method and system for automated support of a connection process, in particular for components in a switch cabinet or on a mounting system |
CN107525998A (en) * | 2017-09-08 | 2017-12-29 | 广东电网有限责任公司东莞供电局 | System and method for detecting leakage current of zinc oxide arrester |
CN111293626B (en) * | 2018-12-07 | 2021-09-28 | 国网内蒙古东部电力有限公司经济技术研究院 | Live replacement method based on lightning protection device |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5558469A (en) * | 1978-10-27 | 1980-05-01 | Hitachi Ltd | Leakage current detector of arrester |
CN203722100U (en) * | 2014-02-18 | 2014-07-16 | 山西太钢不锈钢股份有限公司 | Portable insulation platform |
CN204366867U (en) * | 2015-01-04 | 2015-06-03 | 江苏省电力公司淮安供电公司 | Leakage current of an arrester table dismounting support |
CN105116253A (en) * | 2015-08-25 | 2015-12-02 | 国网新疆电力公司昌吉供电公司 | Live dismounting structure of lightning arrester on-line monitoring device |
CN205693210U (en) * | 2016-05-30 | 2016-11-16 | 国网河南省电力公司电力科学研究院 | For spark gap charged for replacement leakage current table special complete instrument |
-
2016
- 2016-05-30 CN CN201610366849.XA patent/CN105846330B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105846330A (en) | 2016-08-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204832431U (en) | High voltage DC tests integrated device | |
CN103901309B (en) | 220kV Zinc-Oxide Arrester non-dismantle high voltages fuse experimental rig test methods | |
CN102023249A (en) | Method for performing preventive test without detaching high-voltage lead of 220-kV zinc oxide arrestor | |
CN102156242B (en) | A test method for transformer insulation combination | |
CN105846330B (en) | For arrester charged for replacement leakage current table special complete instrument and operational method | |
CN101975913A (en) | Equipment and method for testing two or more sections of zinc oxide arresters without detaching leads | |
CN102128983A (en) | Method for measuring phase of power transmission and distribution line | |
CN110108923A (en) | The test method of high-voltage connection measurement Zinc-Oxide Arrester direct current leakage is not removed | |
CN204190234U (en) | High-tension switch cabinet ground connection and Test Integrated dolly | |
CN205693210U (en) | For spark gap charged for replacement leakage current table special complete instrument | |
CN102901894A (en) | Test method and device for testing 500kV zinc oxide arrester | |
CN204789639U (en) | Lightning arrester test platform | |
CN102221652A (en) | Method and device for testing 500kV metal oxide arrester | |
CN107894519B (en) | 220kV and above voltage level multi-section zinc oxide arrester comprehensive test box | |
CN104113002A (en) | High-voltage cable cross interconnection grounding system transfer device | |
CN104007354A (en) | Whole-group test circuit and method for 10 kV zinc oxide lightning arrester and cable | |
CN102879657B (en) | Method for checking phase sequences of lines | |
CN204166085U (en) | A kind of DC superposition method measuring circuit | |
CN105974229A (en) | Disconnection-free testing method for high voltage electric equipment in transformer substation | |
CN105223407A (en) | 500kV Zinc-Oxide Arrester non-dismantle high voltages fuse measures DC leakage method | |
CN103454536A (en) | Power transformer test method | |
CN211453905U (en) | Device capable of replacing arrester monitor in electrified mode | |
CN204203383U (en) | Testing apparatus | |
CN204495857U (en) | The portable test connection platform of high-potting | |
CN203786256U (en) | A Measurement Circuit of Low Frequency Superposition Method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |