CN205690891U - Smelting furnace slag charge collection system - Google Patents

Smelting furnace slag charge collection system Download PDF

Info

Publication number
CN205690891U
CN205690891U CN201620606660.9U CN201620606660U CN205690891U CN 205690891 U CN205690891 U CN 205690891U CN 201620606660 U CN201620606660 U CN 201620606660U CN 205690891 U CN205690891 U CN 205690891U
Authority
CN
China
Prior art keywords
slag charge
semi
circular tube
pond
smelting furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620606660.9U
Other languages
Chinese (zh)
Inventor
李智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN JINYE ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.
Original Assignee
Yongxing Jinye Smelting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongxing Jinye Smelting Co Ltd filed Critical Yongxing Jinye Smelting Co Ltd
Priority to CN201620606660.9U priority Critical patent/CN205690891U/en
Application granted granted Critical
Publication of CN205690891U publication Critical patent/CN205690891U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

Smelting furnace slag charge collection system includes smelting furnace slag charge collection device and granulating pit, semi-circular tube is supported by support, the left part of semi-circular tube has slag charge outlet, the left end of semi-circular tube has right baffle-plate, having half slot on right baffle-plate, the right-hand member of semi-circular tube has right baffle plate, the middle part of right baffle plate to have circular hole, two blocks of side plates are respectively welded on the right-hand member of semi-circular tube, the right of two blocks of side plates and the upper weld of right baffle plate;Right baffle plate, the bottom of right baffle-plate respectively weld a bearing mounting, and two bearing blocks are separately mounted on two bearing mountings, all have sealing ring and bearing in two bearing blocks, and axle is supported by the bearing in two bearing blocks;Being positioned on the axle of semi-circular tube and push away slag screw thread, belt pulley is arranged on the left end of axle;The base plate in slag charge pond forms an angle with horizontal line, and a sidewall in slag charge pond has overflow pipe, slag charge groove to be arranged on the right wall in slag charge pond, and the right-hand member of slag charge groove has outlet pipe.

Description

Smelting furnace slag charge collection system
Technical field
This utility model relates to smelting furnace slag charge collection system, belongs to smelting industry refuse process field.
Background technology
At present, the production that the smelting furnace that known smelting enterprise uses is carried out, is that melting sources becomes liquid, utilizes ratio Weight principle, separates metal with slag charge, together with the water that the slag charge separated flows out with outlet pipe, enters grain slag from through slag charge concentrated flow Pond, because liquid slag charge is in water, the liquid slag charge in granulating pit has been cooled to solid particle.And the slag charge in granulating pit is as long-term Do not clear up, will appear from slag charge and pile up the water surface exposing in granulating pit, cause slag charge can not fall in the water in granulating pit.Therefore, Smelting enterprise needs to arrange for the slag charge in workman's periodic cleaning granulating pit.Existing smelting enterprise way is: will leak slag charge car Shifting granulating pit side onto, workman pulls the slag charge in granulating pit out with instrument, puts into the slag charge car that leaks, in slag charge car to be leaked Water flow out after, the slag charge car that will leak shift onto slag charge stack field, then the slag charge of the slag charge car that leaks pour into slag charge stacking field.This , there is several shortcoming in working method: one is workman when the slag charge in granulating pit being pulled out with instrument, by the shadow of the water in granulating pit Ringing, it is big that workman pulls the slag charge difficulty in granulating pit out, weak effect;Two is workman's manual work, and the workload of workman is many, and work is strong Degree is big, inefficiency.
Summary of the invention
In order to overcome above-described defect.This utility model provides smelting furnace slag charge collection system, uses this system, no Needing workman with instrument, the slag charge in granulating pit to be pulled out, the workload of workman is few, and labor intensity is little, and work efficiency is high.
In order to achieve the above object, this utility model solves its technical problem and be employed technical scheme comprise that following design :
Smelting furnace slag charge collection system includes smelting furnace slag charge collection device and granulating pit, and semi-circular tube is supported by support, half The left part of pipe has slag charge outlet, the slag charge exit welding blow tank of semi-circular tube left part, and the left end of semi-circular tube has right baffle-plate, Having half slot on right baffle-plate, described half slot passes for axle.The right-hand member of semi-circular tube has right baffle plate, the middle part of right baffle plate to have Circular hole, the circular hole in the middle part of described right baffle plate passes for axle.Two blocks of side plates are respectively welded on the right-hand member of semi-circular tube, two blocks of side plates The upper weld of the right and right baffle plate;When this structure is during beneficially smelting furnace slag charge collection device puts into slag charge pond, more preferably Ground receives the slag charge that slag charge groove falls into.Right baffle plate, the bottom of right baffle-plate respectively weld a bearing mounting, and two bearing blocks are pacified respectively Being contained on two bearing mountings, all have sealing ring and bearing in two bearing blocks, the sealing ring in bearing block prevents water and slag charge In entrance bearing block, axle is supported by the bearing in two bearing blocks;It is positioned on the axle of semi-circular tube and pushes away slag screw thread, belt pulley It is arranged on the left end of axle.The base plate in slag charge pond is to tilt, and the base plate in slag charge pond forms an angle with horizontal line, the right side in slag charge pond The bottom of wall is vertical with the base plate in slag charge pond;This structure beneficially smelting furnace slag charge collection device is stably placed at slag charge On the base plate in pond.Overflow pipe, slag charge groove is had to be arranged on the right wall in slag charge pond on one sidewall in slag charge pond, the right-hand member of slag charge groove There is outlet pipe.
Angle formed by the base plate in slag charge pond and horizontal line is little, when pushing away slag threads turn, easily by the slag of semi-circular tube right-hand member Material solid particle, pushes to the slag charge exit of semi-circular tube left part;But need to make longer smelting furnace slag charge collection device and Build bigger slag charge pond, and make longer smelting furnace slag charge collection device and build bigger slag charge pond, the input of enterprise Cost is high.Formed by the base plate in slag charge pond and horizontal line, angle is big, when pushing away slag threads turn, it is more difficult to by the slag charge of semi-circular tube right-hand member Solid particle, pushes to the slag charge exit of semi-circular tube left part;But need make shorter smelting furnace slag charge collection device and build Making less slag charge pond, and make shorter smelting furnace slag charge collection device and build less slag charge pond, the input of enterprise becomes This is low.Through test of many times, it is preferable that: angle formed by the base plate in slag charge pond and horizontal line is 15 ~ 30 degree.Most preferably scheme It is: angle formed by the base plate in slag charge pond and horizontal line is 20 ~ 22 degree.
The beneficial effects of the utility model are: need not workman and with instrument, the slag charge in granulating pit is pulled out, the work of workman Work amount is few, and labor intensity is little, and work efficiency is high.Meanwhile, structure cylinder list, easy to use.
Accompanying drawing explanation
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is the front view of smelting furnace slag charge collection device.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the A A view of Fig. 1.
Fig. 4 is the organigram of granulating pit.
Fig. 5 is the top view of Fig. 4.
In figure
1, axle 2, belt pulley 3, bearing block 4, push away slag screw thread
5, side plate 6, right baffle plate 7, semi-circular tube 8, support
9, blow tank 10, bearing mounting 11, half slot 12, right baffle-plate
13, slag charge groove 14, slag charge pond 15, overflow pipe 16, outlet pipe.
Detailed description of the invention
In the embodiment shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, smelting furnace slag charge collection system includes smelting slag Material collection device and granulating pit, semi-circular tube 7 is supported by support 8, and the left part of semi-circular tube 7 has slag charge outlet, semi-circular tube 7 left part Slag charge exit welding blow tank 9, the left end of semi-circular tube 7 has right baffle-plate 12, and right baffle-plate 12 has half slot 11, described half Circular groove 11 passes for axle 1.The right-hand member of semi-circular tube 7 has right baffle plate 6, the middle part of right baffle plate 6 to have circular hole, in described right baffle plate 6 The circular hole in portion passes for axle 1.Two blocks of side plates 5 are respectively welded on the right-hand member of semi-circular tube 7, the right of two blocks of side plates 5 and right baffle plate 6 Upper weld;When this structure is during beneficially smelting furnace slag charge collection device puts into slag charge pond 14, preferably receive slag charge groove 13 slag charges fallen into.Right baffle plate 6, the bottom of right baffle-plate 12 respectively weld a bearing mounting 10, and two bearing blocks 3 are separately mounted to On two bearing mountings 10, sealing ring and bearing, the sealing ring in bearing block 3 in two bearing blocks 3, is all had to prevent water and slag charge Entering in bearing block 3, axle 1 is supported by the bearing in two bearing blocks 3;It is positioned on the axle 1 of semi-circular tube 7 and pushes away slag screw thread 4, Belt pulley 2 is arranged on the left end of axle 1.The base plate in slag charge pond 14 is to tilt, and the base plate in slag charge pond 14 becomes a clamp with horizontal line Angle, the bottom of the right wall in slag charge pond 14 is vertical with the base plate in slag charge pond 14;This structure is conducive to smelting furnace slag charge to collect Device is stably placed on the base plate in slag charge pond 14.Overflow pipe 15, slag charge groove 13 is had to be arranged on one sidewall in slag charge pond 14 On the right wall in slag charge pond 14, the right-hand member of slag charge groove 13 has outlet pipe 16.
Before work, smelting furnace slag charge collection device is stably placed on the base plate in slag charge pond 14, with belt by belt pulley 2 It is connected with the belt pulley on motor reel, the slag charge car that leaks is shifted onto the lower section of blow tank 9;Again with water pipe outlet pipe 16 with take out Water machine, pond connection.
During work, first starting water pumper, the water in pond is under the effect of water pumper, through water pipe, outlet pipe 16, slag charge groove 13 flow in slag charge pond 14.When overflow pipe 15 has water to overflow, start motor, open the outlet of smelting furnace slag charge, in smelting furnace Liquid slag charge fall into the right-hand member of slag charge groove 13, then together with the water flowed out with outlet pipe 16, flow into half from the left end of slag charge groove 13 The right-hand member of pipe 7, in the process, owing to liquid slag charge is in water, the liquid slag charge of semi-circular tube 7 right-hand member has been cooled to solid Grain.Slag charge together with water during the left end of slag charge groove 13 falls, common because of two blocks of side plates 5 and right baffle plate 6 top Stopping, slag charge all flows into the right-hand member of semi-circular tube 7.Meanwhile, motor through belt, belt pulley 2 band moving axis 1 and pushes away slag screw thread 4 rotate, rotation push away the slag screw thread 4 slag charge solid particle by semi-circular tube 7 right-hand member, push to semi-circular tube 7 left part slag charge outlet Place, slag charge solid particle falls into leaking in slag charge car below blow tank 9 through blow tank 9 again.Flow with slag charge solid particle Enter to leak the water in slag charge car, spills in the slag charge car that leaks, and the water spilt in the slag charge car that leaks flows back to pond through surface water channel. After slag charge solid particle filled by the slag charge car that leaks below blow tank 9, this slag charge car that leaks is pushed open, another slag that leaks The lower section of blow tank 9 shifted onto by truck.Subsequently, after the water leaked in slag charge car having been loaded with slag charge flows out, will be equipped with slag charge The slag charge car that leaks is shifted slag charge onto and is stacked field, then the slag charge of the slag charge car that leaks is poured into slag charge stacking field.
In whole work process, the water level in slag charge pond 14 is maintained at the lower edge of overflow pipe 15, in slag charge pond 14 Higher than the water of overflow pipe 15 lower limb, flow back to pond through overflow pipe 15, surface water channel.
Angle formed by the base plate in slag charge pond 14 and horizontal line is little, pushes away slag screw thread 4 when rotating, easily by semi-circular tube 7 right-hand member Slag charge solid particle, push to the slag charge exit of semi-circular tube 7 left part;But need to make longer smelting furnace slag charge and collect dress Put and build bigger slag charge pond 14, and make longer smelting furnace slag charge collection device and build bigger slag charge pond 14, enterprise The input cost of industry is high.Formed by the base plate in slag charge pond 14 and horizontal line, angle is big, pushes away slag screw thread 4 when rotating, it is more difficult to by semicircle The slag charge solid particle of pipe 7 right-hand member, pushes to the slag charge exit of semi-circular tube 7 left part;But need to make shorter smelting slag The slag charge pond 14 that material collection device is less with construction, and make shorter smelting furnace slag charge collection device and build less slag charge Pond 14, the input cost of enterprise is low.Through test of many times, it is preferable that: angle formed by the base plate in slag charge pond 14 and horizontal line It it is 15 ~ 30 degree.Most preferably scheme is: angle formed by the base plate in slag charge pond 14 and horizontal line is 20 ~ 22 degree.

Claims (6)

1. smelting furnace slag charge collection system includes smelting furnace slag charge collection device and granulating pit, it is characterized in that: semi-circular tube (7) is by propping up Frame (8) supports, and the left part of semi-circular tube (7) has slag charge outlet, and the left end of semi-circular tube (7) has right baffle-plate (12), right baffle-plate (12) On have half slot (11), the right-hand member of semi-circular tube (7) has right baffle plate (6), the middle part of right baffle plate (6) to have circular hole, two blocks of side plates (5) it is respectively welded on the right-hand member of semi-circular tube (7), the right of two pieces of side plates (5) and the upper weld of right baffle plate (6);Right baffle plate (6), the bottom of right baffle-plate (12) respectively weld a bearing mounting (10), two bearing blocks (3) are separately mounted to two bearing blocks On frame (10), all having sealing ring and bearing in two bearing blocks (3), axle (1) is supported by the bearing in two bearing blocks (3); Being positioned on the axle (1) of semi-circular tube (7) and push away slag screw thread (4), belt pulley (2) is arranged on the left end of axle (1);Slag charge pond (14) Base plate forms an angle with horizontal line, and slag charge groove (13) is arranged on the right wall in slag charge pond (14), and the right-hand member of slag charge groove (13) has Outlet pipe (16).
Smelting furnace slag charge collection system the most according to claim 1, is characterized in that: the slag charge outlet of semi-circular tube (7) left part Place's welding blow tank (9).
Smelting furnace slag charge collection system the most according to claim 1, is characterized in that: the bottom of the right wall of slag charge pond (14) with The base plate in slag charge pond (14) is vertical.
Smelting furnace slag charge collection system the most according to claim 1, is characterized in that: have on a sidewall of slag charge pond (14) Overflow pipe (15).
Smelting furnace slag charge collection system the most according to claim 1, is characterized in that: the base plate of slag charge pond (14) and horizontal line Formed angle is 15 ~ 30 degree.
Smelting furnace slag charge collection system the most according to claim 5, is characterized in that: the base plate of slag charge pond (14) and horizontal line Formed angle is 20 ~ 22 degree.
CN201620606660.9U 2016-06-21 2016-06-21 Smelting furnace slag charge collection system Active CN205690891U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620606660.9U CN205690891U (en) 2016-06-21 2016-06-21 Smelting furnace slag charge collection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620606660.9U CN205690891U (en) 2016-06-21 2016-06-21 Smelting furnace slag charge collection system

Publications (1)

Publication Number Publication Date
CN205690891U true CN205690891U (en) 2016-11-16

Family

ID=57415383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620606660.9U Active CN205690891U (en) 2016-06-21 2016-06-21 Smelting furnace slag charge collection system

Country Status (1)

Country Link
CN (1) CN205690891U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105865211A (en) * 2016-06-21 2016-08-17 永兴县金业冶炼有限责任公司 Smelting furnace slag charge collection system
CN107344269A (en) * 2017-05-12 2017-11-14 中信重工机械股份有限公司 Bottom-blown smelting stove is slagged tap the assembling and welding process of port system
CN108931134A (en) * 2018-08-19 2018-12-04 湖南建勋环保资源科技发展有限公司 Smelting furnace slag charge collection device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105865211A (en) * 2016-06-21 2016-08-17 永兴县金业冶炼有限责任公司 Smelting furnace slag charge collection system
CN105865211B (en) * 2016-06-21 2017-11-21 永兴县金业冶炼有限责任公司 Smelting furnace slag charge collection system
CN107344269A (en) * 2017-05-12 2017-11-14 中信重工机械股份有限公司 Bottom-blown smelting stove is slagged tap the assembling and welding process of port system
CN107344269B (en) * 2017-05-12 2019-09-06 中信重工机械股份有限公司 Bottom-blown smelting furnace is slagged tap the assembling and welding process of port system
CN108931134A (en) * 2018-08-19 2018-12-04 湖南建勋环保资源科技发展有限公司 Smelting furnace slag charge collection device

Similar Documents

Publication Publication Date Title
CN205690891U (en) Smelting furnace slag charge collection system
CN205495045U (en) Novel twin -tub is handled just heavy chi fuzhajing and is promoted device
CN205182360U (en) Recovery pond is depositd to filtrating with automatic control device
CN107961968A (en) A kind of construction sand sieve material device of automatic charging
CN105107615B (en) Silt screening equipment
CN105865211A (en) Smelting furnace slag charge collection system
CN207243440U (en) The retracting device of residual solution in a kind of bottle placer tremie pipe
CN210885588U (en) Industry tail water environmental protection treatment system
CN204747062U (en) Surplus mud processing system of building
CN206050714U (en) A kind of tuber mustard taking device
CN108943372A (en) For producing the injection molding device of concrete drain tile stake
CN208785920U (en) A kind of simple grit water separator
CN205307900U (en) High -efficient whirl sludge settling is concentrated jar
CN104511192A (en) Inclined plate type slag water separation device
CN207929425U (en) A kind of centrifugation water slurry knockout drum
CN207806614U (en) Prevent clinker from entering cavity device during a kind of casting pouring
CN207944546U (en) Unpowered rainwater runoff pollution object cuts dirty facility
CN207130864U (en) A kind of anti-silting drainage arrangement in municipal
CN220906064U (en) Bury formula refuse treatment station waste water collection mechanism
CN200951353Y (en) Heavy duty equipment for separating water from slag
CN204470266U (en) A kind of changing food waste slurry slag removing system
CN207402663U (en) One kind machine of clearing off clears off liquid conversion equipment
CN110327710B (en) Material separation mechanical device of internal flow guide separation tank
CN217567547U (en) Continuous automatic water distribution device in production of acetyl morpholine
CN207046859U (en) A kind of feeding of White Mineral Oil, storage and shunting use device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200713

Address after: No. 110 Yuanding Road, Bianjiang street, Yongxing County, Chenzhou City, Hunan Province

Patentee after: HUNAN JINYE ENVIRONMENTAL PROTECTION TECHNOLOGY Co.,Ltd.

Address before: Industrial Zone Chenzhou city Hunan province 423300 Jin Gui Zhen Yongxing county (Cao Jia Bian Cun spring group)

Patentee before: YONGXING JINYE SMELTING Co.,Ltd.

TR01 Transfer of patent right