CN205688546U - A kind of safe sewage water inspection well - Google Patents
A kind of safe sewage water inspection well Download PDFInfo
- Publication number
- CN205688546U CN205688546U CN201520974495.8U CN201520974495U CN205688546U CN 205688546 U CN205688546 U CN 205688546U CN 201520974495 U CN201520974495 U CN 201520974495U CN 205688546 U CN205688546 U CN 205688546U
- Authority
- CN
- China
- Prior art keywords
- well
- well body
- reinforced concrete
- borehole wall
- sewage water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a kind of safe sewage water inspection well, including circular glass fiber well lid, it is positioned at the prefabricated reinforced concrete cover plate below circular glass fiber well lid, is positioned at the first well body, the second well body being sequentially connected with below prefabricated reinforced concrete cover plate, and be positioned at the reinforced concrete shaft bottom plate below described second well body, be positioned at the concrete bed course below the plate of reinforced concrete shaft bottom, it is provided with the concrete chute for placing pipeline above the plate of described reinforced concrete shaft bottom and between the described second well body borehole wall;It is additionally provided with preventer between described first well body and described second well body, inside the described first well body borehole wall, is equipped with multiple climbing device with inside the described second well body borehole wall.Safe sewage water inspection well described in the utility model, has effectively acted as safety protection function, it is ensured that the security of the lives and property of people, and does not interferes with staff and overhaul inspection shaft, clear up.
Description
Technical field
This utility model relates to municipal works sewage water inspection well, particularly relates to a kind of safe sewage water inspection well.
Background technology
Sewage water inspection well is a kind of well for collecting sanitary sewage the most common in city, in urban road, community
All it be unable to do without sewage water inspection well, but, often occur that inspection shaft lid is prized away the situation that pedestrian falls in inspection shaft, threaten the life of people
Life property safety, also has in prior art and arranges the preventers such as anti-drop net in inspection shaft, but, when inspection shaft is entered by staff
When row maintenance, cleaning, need to lay down anti-drop net, install anti-drop net the most again, bother very much.
Utility model content
In view of the foregoing, this utility model provides a kind of safe sewage water inspection well, not only has function of safety protection, protects
Hinder the security of the lives and property of people, but also do not affect staff to inspection shaft maintenance, the work efficiency of cleaning.
For reaching above-mentioned purpose, this utility model solves its technical problem and be the technical scheme is that
A kind of safe sewage water inspection well, including circular glass fiber well lid, be positioned at below circular glass fiber well lid prefabricated
Reinforced concrete cover plate, it is positioned at the first well body, the second well body being sequentially connected with below prefabricated reinforced concrete cover plate, and is positioned at described second
Reinforced concrete shaft bottom plate below well body, be positioned at the concrete bed course below the plate of reinforced concrete shaft bottom, above the plate of described reinforced concrete shaft bottom with
It is provided with the concrete chute for placing pipeline between the described second well body borehole wall;Between described first well body and described second well body
It is additionally provided with preventer, inside the described first well body borehole wall, is equipped with multiple climbing dress with inside the described second well body borehole wall
Put.
Its further feature is as follows:
The borehole wall of described first well body is piled up by solid brick and is formed, and cement bonded sand is all used in the borehole wall medial and lateral of the first well body
Starch brush.
The powder face thickness of described cement mortar is 15mm.
Described preventer is made up of the first guard section and the second guard section, and described second guard section is positioned at described
Inside first guard section, the second guard section can be opened relative to the first protection.
Described second guard section while hinged with described first guard section.
Due to the utilization of technique scheme, this utility model compared with prior art has a following beneficial effect:
1. between the first well body and the second well body, it is provided with preventer, people can be blocked and fall into inspection shaft depths, protect
Hinder the security of the lives and property.
2. the second guard section in preventer can be opened relative to the first guard section, and this preventer not only rises
To stoping people to fall into the effect of inspection shaft depths, and during to sewage water inspection well inspection and cleaning, only need to open Part II i.e.
Can, convenient succinct, it is not necessary to dismounting.
3. it is equipped with multiple climbing device, people or object falls with inside the described second well body borehole wall inside the first well body borehole wall
After entering that inspection shaft is unfortunate and puncturing preventer, people can climb out of inspection shaft by climbing device, the most also facilitates staff to inspection shaft
Overhaul and clear up.
4. by arranging preventer and climbing device, it is achieved that dual safety protects.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, below will be to enforcement
In example or description of the prior art, the required accompanying drawing used is briefly described, it should be apparent that, the accompanying drawing in describing below is only
It is only embodiments more of the present utility model, for those of ordinary skill in the art, before not paying creative work
Put, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is front sectional view of the present utility model.
Fig. 2 is side view cutaway drawing of the present utility model.
Fig. 3 is the structural representation of preventer closure state in this utility model.
Fig. 4 is the structural representation of preventer open mode in this utility model.
In figure: 1, circular glass fiber well lid;2, prefabricated reinforced concrete cover plate;3, the first well body;4, the second well body;5, reinforcing bar
Concrete shaft bottom plate;6, concrete bed course;7, concrete chute;8, pipeline;9, preventer;91, the first guard section;92, the second guard section;
10, climbing device.
Detailed description of the invention
Below in conjunction with specific embodiment, content of the present utility model is described in further detail:
Refering to Fig. 1 to Fig. 4, a kind of safe sewage water inspection well, including circular glass fiber well lid 1, it is positioned at circular glass fiber
Prefabricated reinforced concrete cover plate 2 below well lid 1, it is positioned at first well body the 3, second well being sequentially connected with below prefabricated reinforced concrete cover plate 2
Body 4, and be positioned at the reinforced concrete shaft bottom plate 5 below described second well body 4, be positioned at the concrete pad below described reinforced concrete shaft bottom plate 5
Layer 6, is provided with the concrete chute for placing pipeline 8 above described reinforced concrete shaft bottom plate 5 and between described second well body 4 borehole wall
7;Preventer 9 it is additionally provided with, inside described first well body 3 borehole wall and institute between described first well body 3 and described second well body 4
State and be equipped with multiple climbing device 10 inside second well body 4 borehole wall.
The borehole wall of the first well body 3 is piled up by solid brick and is formed, and cement mortar is all used in the borehole wall medial and lateral of the first well body 3
Painting, cement mortar powder face thickness is 15mm.
Preventer 9 is made up of the first guard section 91 and the second guard section 92, and the second guard section 92 is positioned at first
Guard section 91 is internal, and the second guard section 92 can be opened relative to the first protection 91, the second guard section 92 with
First guard section 91 is hinged, and preventer 9 is arranged between the first well body and the second well body, can block people and fall into inspection shaft
Depths, though people or object fall into that inspection shaft is unfortunate puncture preventer 9 after, people can climb out of inspection shaft by climbing device 10, logical
Cross the dual function of preventer and climbing device, it is achieved that dual safety protects, additionally, the design that this utility model is unique,
Not only act as the effect of security protection, and on the exposure basis playing protection, do not affect staff to sewage
Inspection shaft carries out overhauling, clearing up, and when staff enters inspection shaft, only need to open the second guard section 92 in preventer 9,
Deeply, climbing device 10 can facilitate staff to carry out the work to entrance inspection shaft.
Above-described embodiment only for technology of the present utility model design and feature are described, its object is to allow and is familiar with technique
Personage will appreciate that content of the present utility model and be carried out, protection domain of the present utility model can not be limited with this,
All equivalence changes made according to this utility model spirit or modification, all should contain at protection domain of the present utility model
In.
Claims (5)
1. a safe sewage water inspection well, it is characterised in that include circular glass fiber well lid, be positioned under circular glass fiber well lid
The prefabricated reinforced concrete cover plate of side, it is positioned at the first well body, the second well body being sequentially connected with below prefabricated reinforced concrete cover plate, and is positioned at
Reinforced concrete shaft bottom plate below described second well body, it is positioned at the concrete bed course below the plate of reinforced concrete shaft bottom, in described reinforced concrete shaft bottom
The concrete chute for placing pipeline, described first well body and described second it is provided with above plate and between the described second well body borehole wall
Be additionally provided with preventer between well body, inside the described first well body borehole wall with the described second well body borehole wall inside be equipped with multiple
Climbing device.
The safe sewage water inspection well of one the most according to claim 1, it is characterised in that: the borehole wall of described first well body is by solid
Brick is piled up and is formed, and the borehole wall medial and lateral of the first well body are all painted by cement mortar.
The safe sewage water inspection well of one the most according to claim 2, it is characterised in that: the powder face thickness of described cement mortar is
15mm。
The safe sewage water inspection well of one the most according to claim 1, it is characterised in that: described preventer is by the first protection department
Dividing and the second guard section composition, described second guard section is positioned at inside described first guard section, and the second guard section can
To open relative to the first protection.
The safe sewage water inspection well of one the most according to claim 4, it is characterised in that: described second guard section with
Described first guard section is hinged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520974495.8U CN205688546U (en) | 2015-12-01 | 2015-12-01 | A kind of safe sewage water inspection well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520974495.8U CN205688546U (en) | 2015-12-01 | 2015-12-01 | A kind of safe sewage water inspection well |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205688546U true CN205688546U (en) | 2016-11-16 |
Family
ID=57263567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520974495.8U Expired - Fee Related CN205688546U (en) | 2015-12-01 | 2015-12-01 | A kind of safe sewage water inspection well |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205688546U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107630415A (en) * | 2017-09-08 | 2018-01-26 | 江苏国岩工程技术研究院有限公司 | A kind of tubular service alarm manhole well lid equipment |
-
2015
- 2015-12-01 CN CN201520974495.8U patent/CN205688546U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107630415A (en) * | 2017-09-08 | 2018-01-26 | 江苏国岩工程技术研究院有限公司 | A kind of tubular service alarm manhole well lid equipment |
CN107630415B (en) * | 2017-09-08 | 2019-11-19 | 江苏国岩工程技术研究院有限公司 | A kind of tubular service alarm manhole well lid equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205688546U (en) | A kind of safe sewage water inspection well | |
CN205637054U (en) | Inspection well lid and be used for inspection shaft that utility tunnel internal drain pipe said | |
CN105863030B (en) | A kind of inspection shaft well lid and the inspection shaft for pipe gallery internal drainage pipeline | |
CN107503365A (en) | Super High elevator high and big die plate installation engineering method | |
CN205804237U (en) | A kind of recycling roadbed concrete guardrail | |
CN208201856U (en) | A kind of concrete filling pile head laitance concrete collection device | |
CN201756705U (en) | Cracking control and seepage prevention structure for basement shear wall under construction | |
CN206646841U (en) | A kind of protector in balcony main structure construction unwrapping wire hole | |
CN204199237U (en) | A kind of two rib type counterfort | |
CN206599787U (en) | A kind of layer of sand catch pit dewatering device | |
CN106193609A (en) | High-rise concrete pump pipe tailing recycling and reusing system and method for recycling high-rise concrete pump pipe tailing | |
CN203684028U (en) | Prefabricated slab for temporary place and temporary road | |
CN209686454U (en) | A kind of high roadbed open cut tunnel inspection shaft construction | |
CN209413168U (en) | A kind of PC stone material precast stair | |
CN205604595U (en) | Transformer substation's enclosure bears down on one | |
CN206128648U (en) | High -rise concrete pump pipe tails is retrieved and system of recycling | |
CN207828803U (en) | A kind of Box-shaped Drainage Culvert of combination retaining wall | |
CN206034608U (en) | Rainwater well | |
CN205776677U (en) | A kind of seamless high Dank floor tile of the complex sand base for sewer drain | |
CN206616786U (en) | The ventilation structure for having completed roof is poured suitable for structure | |
CN205348357U (en) | Waste water drainage system in ordinary basement in people's air defense basement upper portion | |
CN204212123U (en) | Large volume concrete structural | |
CN206916784U (en) | A kind of anti-clogging well cover for sewer | |
CN103924620B (en) | The inspection well cover of drift is gushed in a kind of counnter attack | |
CN207538182U (en) | A kind of unpowered purification glass rainwater-collecting water-storing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161116 Termination date: 20211201 |