CN205677596U - Big orifice double loop pressure break high pressure pipe joint - Google Patents

Big orifice double loop pressure break high pressure pipe joint Download PDF

Info

Publication number
CN205677596U
CN205677596U CN201620449353.4U CN201620449353U CN205677596U CN 205677596 U CN205677596 U CN 205677596U CN 201620449353 U CN201620449353 U CN 201620449353U CN 205677596 U CN205677596 U CN 205677596U
Authority
CN
China
Prior art keywords
pipe joint
double loop
high pressure
big orifice
pressure break
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620449353.4U
Other languages
Chinese (zh)
Inventor
张国强
韩家新
张相权
陈卫东
蒋成白
豆瑞杰
李强
胡毅
林俊
代兆国
赵亚刚
吕江燕
陆文师
曾凡娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petrochemical Corp
Sinopec Oilfield Service Corp
Sinopec Jianghan Petroleum Engineering Co Ltd
Original Assignee
Sinopec Oilfield Service Corp
Sinopec Jianghan Petroleum Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinopec Oilfield Service Corp, Sinopec Jianghan Petroleum Engineering Co Ltd filed Critical Sinopec Oilfield Service Corp
Priority to CN201620449353.4U priority Critical patent/CN205677596U/en
Application granted granted Critical
Publication of CN205677596U publication Critical patent/CN205677596U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Quick-Acting Or Multi-Walled Pipe Joints (AREA)

Abstract

The utility model relates to a kind of big orifice double loop pressure break high pressure pipe joint, including flank plug valve (1), T-shaped threeway (2) and straight tube (3), the two ends of described T-shaped threeway (2) connect straight tube (3) respectively, the other end connects flank plug valve (1), by 12 T-shaped threeways (2), eight rigid straight pipe (3) are connected with ten plug valves (1), straight tube (3) point two row arranged, and two row's straight tubes (3) connect at one end through T-shaped threeway (2).The utility model big orifice double loop pressure break high pressure pipe joint can connect 10 fracturing unit trucks, maximum operational discharge capacity 9.08m3/ min, liquid flows to choose at random.The utility model big orifice double loop pressure break high pressure pipe joint is applied widely, safe and reliable, and pressure break efficiency is high.

Description

Big orifice double loop pressure break high pressure pipe joint
Technical field
The utility model relates to shale gas winning apparatus, more particularly, it relates to a kind of big orifice double loop pressure break high pressure Manifold.
Background technology
Shale gas, as a kind of emerging unconventional resource, receives more and more attention.Such reservoir is fine and close hard Firmly, there is the feature of low-porosity, low-permeability, for obtaining industrial gas, it is generally required to carry out fracturing reform operation.Big orifice Double loop pressure break high pressure pipe joint is with the obvious advantage at shale gas well shop, is mainly used in the acid fracturing construction containing shale gas, pressure break The operating modes such as operation.In work progress, flow is big, and pressure is high, and construction layer position is many, and the engineering time is long, and risk is high, and this is right beyond doubt The reliability of fracture manifold equipment is had higher requirement, and uses existing fracture manifold security risk high, it is impossible to meet need Ask, cause pressure break efficiency low.
Content of the invention
The technical problems to be solved in the utility model is, provides one can improve pressure break efficiency, reduces construction risk Big orifice double loop pressure break high pressure pipe joint.
The utility model solves its technical problem and be the technical scheme is that a kind of big orifice double loop pressure break of construction is high Pressure pipe is converged, including flank plug valve, T-shaped threeway and straight tube, the two ends of described T-shaped threeway connect straight tube respectively, and the other end connects Eight rigid straight pipe are connected with ten plug valves by flank plug valve by 12 T-shaped threeways, and straight tube divides two rows to arrange, Two row's straight tubes connect at one end through T-shaped threeway.
In such scheme, described flank plug valve uses independent base to support.
In such scheme, described base is skid-mounted type base.
In such scheme, described base uses that rubber blanket is U-shaped fastens seat supports.
In such scheme, described rubber blanket is canvas filler rubber.
In such scheme, the internal diameter of described plug valve is 2 ", and connecting union internal diameter is 3 ".
In such scheme, the part that described T-shaped threeway is connected with plug valve is single channel, and described T-shaped threeway is with straight tube even The part connecing is binary channels, and described single channel and twin-channel angle are 90 °.
In such scheme, described single channel is identical with the internal diameter of plug valve, and described binary channels is identical with the internal diameter of straight tube.
In such scheme, the distance between two flank plug valves is 1.2m~2.1m.
Implement big orifice double loop pressure break high pressure pipe joint of the present utility model, have the advantages that
1st, the utility model big orifice double loop pressure break high pressure pipe joint, at shale gas well factory fracture acidizing work pattern Under, with the obvious advantage, effect is notable, solves the quality accidents such as the thorn leakage, explosion that tradition pressure break high pressure pipe joint occurs, is specifically executing During work, high pressure pipe joint discharged by fracturing unit truck and the oscillation phenomenon of double loop pressure break high pressure pipe joint substantially weakens, and flow velocity is steady, Discharge capacity is stable, and through periodic detection, each member internal walls antiscour effect is obvious, and spoilage is low, and service life improves, and meets construction need Ask.
2nd, the utility model big orifice double loop pressure break high pressure pipe joint is applied widely, safe and reliable, and pressure break efficiency is high.
3rd, the utility model big orifice double loop pressure break high pressure pipe joint, 10 fracturing unit trucks can be connected in flank two ends, maximum Operational discharge capacity 9.08m3/ min, liquid flows to choose at random.
Brief description
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the structural representation of the utility model big orifice double loop pressure break high pressure pipe joint.
Detailed description of the invention
In order to be more clearly understood from technical characteristic of the present utility model, purpose and effect, now compare accompanying drawing detailed Detailed description of the invention of the present utility model is described.
As it is shown in figure 1, the utility model big orifice double loop pressure break high pressure pipe joint includes the 1st, the T-shaped threeway 2 of flank plug valve With straight tube 3.The two ends of T-shaped threeway 2 connect straight tube 3 respectively, and the other end connects flank plug valve 1.By 12 T-shaped threeways 2 Be connected eight rigid straight pipe 3 with ten plug valves 1, straight tube 3 point of two row arranged, and two row's straight tubes 3 are at one end through T-shaped threeway 2 connect.
The straight tube 3 of main channel all selects 4 " rigid straight pipe 3, the big antiscour of discharge capacity, and flank branch road is selected and thickeied T-shaped threeway 2 and plug valve 1, improve anti-shearing stress intensity.In plug valve 1, latus rectum is 2 ", and connecting union specification is 3 ", at 15000psi etc. Under level execution conditions, Peak Flow Rate, more than the highest discharge capacity of fracturing unit truck, meets construction requirement.T-shaped threeway 2 is connected with plug valve 1 Part be single channel, the part that T-shaped threeway 2 is connected with straight tube 3 is binary channels.Single channel union is connected as F type, and binary channels is left Wing passage union is connected as M type, and right channel union is connected as F type.Single channel and twin-channel angle are 90 °, high-pressure fluid It is collected to main channel through branch road, there is antiscour effect.Single channel is identical with the internal diameter of plug valve 1, and binary channels is interior with straight tube 3 Footpath is identical.
The concrete specifications and models of the T-shaped threeway 2 in the present embodiment are 3 " F × 4 " MF 1502, and in single channel, latus rectum is 2 ", Union is connected as 3 " 1502 and detains, and left and right binary channels is consistent with 4 " straight tube 3 structures.By the structural analysis to conventional T-shaped threeway 2, Find each side reason producing quality accident, structure optimization is carried out to weak part, changes single channel internal diameter into 2 ", integral wall Thick increase, identical with plug valve 1 internal diameter of outer connection, eliminate reducing defect, increase shear strength.
Adjacent legs spacing is 2.1m, facilitates fracturing unit truck discharge pipe to be connected with beeline with manifold plug valve 1, the shortest Distance, less than 1.0m, eliminates the resonance effects that fluid produces.The T-shaped threeway 2 in main channel, left and right is connected composition loop, eliminates The turbulent phenomenon that high-velocity fluid produces, keeps manifold main channel flow velocity stable equilibrium.
Flank plug valve 1 uses independent base to support, and eliminates extraneous stress.Base is skid-mounted type base, and base uses Rubber blanket is U-shaped fastens seat supports.Rubber blanket is 3mm canvas filler rubber.
Above in conjunction with accompanying drawing, embodiment of the present utility model is described, but on the utility model is not limited to The detailed description of the invention stated, above-mentioned detailed description of the invention is only schematically, rather than restricted, this area common Technical staff is under enlightenment of the present utility model, without departing from the utility model objective and scope of the claimed protection situation Under, it may also be made that a lot of form, these belong within protection of the present utility model.

Claims (9)

1. a big orifice double loop pressure break high pressure pipe joint, it is characterised in that include flank plug valve (1), T-shaped threeway (2) and Straight tube (3), the two ends of described T-shaped threeway (2) connect straight tube (3) respectively, and the other end connects flank plug valve (1), by 12 Eight rigid straight pipe (3) are connected by individual T-shaped threeway (2) with ten plug valves (1), and straight tube (3) point two row arranged, two row's straight tubes (3) connect at one end through T-shaped threeway (2).
2. big orifice double loop pressure break high pressure pipe joint according to claim 1, it is characterised in that described flank plug valve (1) independent base is used to support.
3. big orifice double loop pressure break high pressure pipe joint according to claim 2, it is characterised in that described base is skid-mounted type Base.
4. big orifice double loop pressure break high pressure pipe joint according to claim 2, it is characterised in that described base uses rubber Pad and U-shaped fasten seat supports.
5. big orifice double loop pressure break high pressure pipe joint according to claim 4, it is characterised in that described rubber blanket is folder cloth Rubber.
6. big orifice double loop pressure break high pressure pipe joint according to claim 1, it is characterised in that described plug valve (1) Internal diameter is 2 ", and connecting union internal diameter is 3 ".
7. big orifice double loop pressure break high pressure pipe joint according to claim 1, it is characterised in that described T-shaped threeway (2) with The part that plug valve (1) connects is single channel, and the part that described T-shaped threeway (2) is connected with straight tube (3) is binary channels, described list Passage and twin-channel angle are 90 °.
8. big orifice double loop pressure break high pressure pipe joint according to claim 7, it is characterised in that described single channel and cock The internal diameter of valve (1) is identical, and described binary channels is identical with the internal diameter of straight tube (3).
9. big orifice double loop pressure break high pressure pipe joint according to claim 1, it is characterised in that two flank plug valves (1) distance between is 1.2m~2.1m.
CN201620449353.4U 2016-05-17 2016-05-17 Big orifice double loop pressure break high pressure pipe joint Active CN205677596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620449353.4U CN205677596U (en) 2016-05-17 2016-05-17 Big orifice double loop pressure break high pressure pipe joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620449353.4U CN205677596U (en) 2016-05-17 2016-05-17 Big orifice double loop pressure break high pressure pipe joint

Publications (1)

Publication Number Publication Date
CN205677596U true CN205677596U (en) 2016-11-09

Family

ID=57436830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620449353.4U Active CN205677596U (en) 2016-05-17 2016-05-17 Big orifice double loop pressure break high pressure pipe joint

Country Status (1)

Country Link
CN (1) CN205677596U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112963134A (en) * 2021-04-25 2021-06-15 建湖县鸿达阀门管件有限公司 Ultrahigh-pressure double-channel large-drift-diameter high-low-pressure fracturing manifold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112963134A (en) * 2021-04-25 2021-06-15 建湖县鸿达阀门管件有限公司 Ultrahigh-pressure double-channel large-drift-diameter high-low-pressure fracturing manifold

Similar Documents

Publication Publication Date Title
CN109444339B (en) A kind of shale gas horizontal well refracturing fiber temporarily blocks up experimental test procedures
CN110107269B (en) Atomization generating device and working method thereof
CN104005742B (en) A kind of method for testing lab simulation Heterogeneous reservoir difference water filling and device
US11125217B2 (en) Pressure-reducing choke assembly
CN205677596U (en) Big orifice double loop pressure break high pressure pipe joint
CN203559878U (en) Drainage gas production pump for gas well
CN105239987B (en) A kind of high-pressure manifold device of suitable annular space SAND FRACTURING TECHNOLOGY
CN106499378A (en) A kind of concentric tube type down-hole supercritical carbon dioxide jet mixing device
CN110630239A (en) Acid fracturing method of deep carbonate rock stratum multi-acid-injection system
CN107060682A (en) A kind of high pressure self-locking packer and its set method
CN108612507A (en) A method of carrying out temporarily stifled turnaround fracture using shear thickening liquid
CN102893064B (en) Pressurized container
CN204082116U (en) Oil well horizontal well oil jacket is with note formula two envelope single deck tape-recorder volume fracturing tubing string
CN108952663B (en) The live fracturing process of complicated seam net is generated using interval pressure break mode
CN208122840U (en) A kind of protection sleeve pipe volume fracturing tubing string
CN208858330U (en) A kind of water pumping gas production integrating device
CN206801544U (en) A kind of new pressure break high pressure line connection combination and corresponding high pressure delivery system
CN106246155B (en) A kind of short arc compact divides chain type shale gas pressure break surface line
CN105089567B (en) Deep-well is adjustable low density flow quick fluid-discharge formation testing device and its operational method
CN104563999A (en) Nitrogen foam fracturing method of coal-bed gas well of low-pressure low-permeability reservoir
CN210370607U (en) Novel high-pressure manifold device
CN201416391Y (en) Down-hole supercharger
CN104261150A (en) Discharging system for ammonium nitrate tank truck
CN205895202U (en) Device for fracturing wellhead
CN204152475U (en) Layer-through drilling list pouch hole sealing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210607

Address after: 100728 No. 22 North Main Street, Chaoyang District, Beijing, Chaoyangmen

Patentee after: SINOPEC Group

Patentee after: SINOPEC OILFIELD SERVICE Corp.

Patentee after: SINOPEC JIANGHAN OILFIELD SERVICE Corp.

Address before: 100101 Chaoyang District, Beijing Hui Xin Street 6, Twelfth level.

Patentee before: SINOPEC OILFIELD SERVICE Corp.

Patentee before: SINOPEC JIANGHAN OILFIELD SERVICE Corp.