CN204152475U - Layer-through drilling list pouch hole sealing device - Google Patents

Layer-through drilling list pouch hole sealing device Download PDF

Info

Publication number
CN204152475U
CN204152475U CN201420602473.4U CN201420602473U CN204152475U CN 204152475 U CN204152475 U CN 204152475U CN 201420602473 U CN201420602473 U CN 201420602473U CN 204152475 U CN204152475 U CN 204152475U
Authority
CN
China
Prior art keywords
pouch
pipe
tube
grouting
sealing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420602473.4U
Other languages
Chinese (zh)
Inventor
李全瑞
徐玉胜
张育恒
王家健
成国清
张丰杰
曹雪芹
徐慧芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Shenyue Energy Saving Technology Co ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201420602473.4U priority Critical patent/CN204152475U/en
Application granted granted Critical
Publication of CN204152475U publication Critical patent/CN204152475U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本实用新型属于煤矿通风与安全领域,涉及一种井下的穿层钻孔封孔装置。穿层钻孔单囊袋封孔装置是一种在50mmPE管的一端加装一个能充空气的囊袋和一根注浆细管,同时距囊袋3米的PE管为筛孔花管,在注浆前先将连接好的带有囊袋的PE筛孔花管塞到穿层钻孔里,囊袋跟孔口的距离一般为5米。在注浆前先对囊袋进行充空气,充空气压力为0.3-0.4MPa,囊袋充足气后用注浆泵进行注专用水泥浆,直到水泥浆从有筛孔的花管流出后立即停止注浆。待浆液凝固后即可进行联孔抽放瓦斯。

The utility model belongs to the field of coal mine ventilation and safety, and relates to an underground layer-penetrating drilling and sealing device. The hole-sealing device of perforated layer drilling and single bladder is a kind of air-inflatable bladder and a thin grouting tube added to one end of the 50mm PE pipe, and the PE tube 3 meters away from the bladder is a sieve flower tube. Before grouting, plug the connected PE sieve flower tube with pouch into the drilled hole, and the distance between the pouch and the orifice is generally 5 meters. Before grouting, inflate the bag with air. The air pressure is 0.3-0.4MPa. After the bag is fully inflated, use a grouting pump to inject special cement slurry until the cement slurry flows out of the flower tube with sieve holes and stop immediately. Grouting. After the slurry is solidified, gas drainage can be carried out through joint holes.

Description

穿层钻孔单囊袋封孔装置Piercing Drilling Single Capsule Bag Sealing Device

技术领域 technical field

本实用新型属于煤矿通风与安全领域,涉及一种井下的穿层钻孔封孔装置。 The utility model belongs to the field of coal mine ventilation and safety, and relates to an underground layer-penetrating drilling and sealing device.

背景技术 Background technique

山西省长平矿区地质构造较复杂,井田内顶底板受构造应力的影响明显,近年来,随着矿井开采深度的增加及开采区域向西部延伸,造成开采区域内地应力大、瓦斯含量及压力大,其中四盘区现采掘活动区域的瓦斯原始最高已达到15.09m3/t,原始瓦斯压力为0.38~0.55Mpa,瓦斯放散初速度为14.3~20.6,透气性系数仅为0.0116 ~0.0520m2/(MPa2·d),同时施工的抽放钻孔封孔质量差,封孔时间长,孔口漏气大,新施工钻孔封孔后由于漏气大报废的钻孔多,造成钻孔抽放浓度低。 The geological structure of the Changping mining area in Shanxi Province is relatively complex, and the roof and floor of the mine field are obviously affected by the structural stress. In recent years, with the increase of the mining depth of the mine and the extension of the mining area to the west, the ground stress, gas content and pressure in the mining area are large. Among them, the original maximum gas in the mining activity area of the four panels has reached 15.09m 3 /t, the original gas pressure is 0.38-0.55Mpa, the initial gas release velocity is 14.3-20.6, and the air permeability coefficient is only 0.0116-0.0520m 2 / (MPa 2 d), the sealing quality of the drainage boreholes constructed at the same time is poor, the sealing time is long, and the air leakage is large at the orifice. The extraction concentration is low.

发明内容 Contents of the invention

本实用新型是针对施工穿钻孔后封孔采用聚氨酯封孔漏气,为了解决封孔漏气的特点设计的,以往采用聚氨酯封孔孔口漏气大,抽放瓦斯浓度低的问题,提供了一种新型的穿层钻孔单囊袋封孔装置,实现了穿层钻孔封孔后密封性好,操作简单封孔速度快,提高了钻孔单孔的抽放浓度和抽放量。 The utility model is designed to solve the characteristics of air leakage by using polyurethane to seal the hole after drilling and drilling. In the past, polyurethane sealing was used to seal the hole with large air leakage and low gas concentration. It provides A new type of single-pocket bag sealing device for perforated drilling has been developed, which has achieved good sealing performance after perforated drilling and sealing, simple operation and fast sealing speed, and improved drainage concentration and drainage volume of single drilling holes. .

本实用新型是采用如下技术方案实现的: The utility model is realized by adopting the following technical solutions:

一种穿层钻孔单囊袋封孔装置,包括一主管,所述主管的中部外周密封套装有一个单囊袋,所述主管的尾部管壁上开有若干筛孔;还包括注浆细管和充气管,所述注浆细管密封穿过单囊袋,所述充气管密封伸入单囊袋。 A device for perforating holes with a single-bag sealing device, which includes a main pipe, a single-bag bag is sealed in the middle of the main pipe, and a number of sieve holes are opened on the wall of the tail of the main pipe; it also includes a grouting fine tube and an inflation tube, the thin grouting tube seals through the single bladder bag, and the inflation tube seals and extends into the single bladder bag.

具体为,所述主管由三根通过接头依次连接在一起的PE管构成,每根PE(聚乙烯)管的长度是4m、直径为50mm,位于中间的PE管外周套装有一个单囊袋,所述单囊袋的两端分别通过卡箍实现密封装配在位于中间的PE管外;所述单囊袋膨胀后的最大直径为120-150mm;位于左边的PE管的管壁上开有若干筛孔。 Specifically, the main pipe is composed of three PE pipes connected in sequence through joints. Each PE (polyethylene) pipe has a length of 4m and a diameter of 50mm. The two ends of the single capsule bag are respectively sealed and assembled outside the middle PE pipe through clamps; the maximum diameter of the single capsule bag after expansion is 120-150mm; there are several screens on the wall of the PE pipe on the left. hole.

所述注浆细管一端密封穿过单囊袋、另一端延伸至位于右边的PE管外。 One end of the grouting thin tube is sealed through the single bladder bag, and the other end is extended to the outside of the PE tube on the right.

所述充气管一端密封伸入单囊袋、另一端延伸至位于右边的PE管外。 One end of the inflation tube seals and extends into the single bladder bag, and the other end extends out of the PE tube on the right.

注浆前,先将最里端的带有筛孔的PE管塞入钻孔内,并与中间带有单囊袋的PE管连接;并把中间带有单囊袋的PE管塞入钻孔,单囊袋也塞到钻孔内,单囊袋与孔口距离为5米。最外端的PE管露出300mm-500mm,然后将充气管与高压风管连接对单囊袋注入空气,充空气压力为0.3-0.4MPa。注完空气后即可进行注浆工作,将注浆管连接后进行注专用水泥浆,并观察最外端PE管情况,当最外端PE管有水泥浆流出立即停止注浆工作。等浆液凝固后即可进行联孔抽放瓦斯。 Before grouting, insert the innermost PE pipe with sieve holes into the drill hole, and connect it with the PE pipe with a single bag in the middle; then insert the PE pipe with a single bag in the middle into the drill hole , the single bladder is also plugged into the borehole, and the distance between the single bladder and the orifice is 5 meters. The outermost PE pipe exposes 300mm-500mm, and then connect the inflation pipe to the high-pressure air pipe to inject air into the single bag, and the inflation air pressure is 0.3-0.4MPa. After the air is injected, the grouting work can be carried out. After the grouting pipe is connected, the special grout is injected, and the condition of the outermost PE pipe is observed. When the outermost PE pipe has grout flowing out, the grouting work is stopped immediately. After the slurry is solidified, gas drainage can be carried out through joint holes.

封孔技术条件如下: The technical conditions for sealing holes are as follows:

囊袋充空气压力为0.3-0.4MPa; The air pressure of the bladder bag is 0.3-0.4MPa;

必须是施工上行孔且钻孔直径为85mm-95mm之间才符合本封孔装置的使用要求; The use requirements of this hole sealing device must be met when the upward hole is constructed and the diameter of the hole is between 85mm and 95mm;

水与专用水泥的混合比为2:1; The mixing ratio of water and special cement is 2:1;

单囊袋膨胀后的最大直径为120-150mm; The maximum diameter of the single bladder after expansion is 120-150mm;

单囊袋膨胀保持时间持续24h。 The inflation retention time of the single bladder bag lasted for 24 hours.

穿层钻孔单囊袋封孔装置使用时技术要求如下: The technical requirements for the use of the single-pocket bag sealing device for drilling through layers are as follows:

1、检查风压,供风压力是否符合技术要求(0.3-0.4MPa); 1. Check the air pressure and whether the air supply pressure meets the technical requirements (0.3-0.4MPa);

2、检查囊袋是否完好,三根封孔PE管是否连接好; 2. Check whether the pouch is intact and whether the three sealed PE pipes are connected well;

3、检查充气管,注浆细管是否连接好; 3. Check whether the inflatable pipe and the thin grouting pipe are well connected;

4、检查是不是专用封孔水泥; 4. Check whether it is special sealing cement;

5、检查水与专用封孔水泥是否是2:1。 5. Check whether the ratio of water and special sealing cement is 2:1.

本实用新型设计合理,穿层钻孔单囊袋封孔装置采用直径50mm的PE管和单囊袋,封孔简单、方便,通过充入空气使单囊袋与煤壁紧密接触达到一定压力后即可进行注水泥浆,水泥浆凝固后即可联孔进行抽放瓦斯,达到最佳的封孔效果。 The utility model has a reasonable design. The single-bag sealing device for drilling through layers adopts a PE pipe with a diameter of 50mm and a single-bag. The cement slurry can be injected, and after the cement slurry is solidified, the holes can be connected for gas drainage to achieve the best sealing effect.

附图说明 Description of drawings

图1是本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.

图中,1-PE管,2-单囊袋,3-接头,4-充气管,5-注浆细管,6-筛孔,7-煤(岩)层,8-穿层钻孔。 In the figure, 1-PE pipe, 2-single bladder, 3-joint, 4-inflatable pipe, 5-short grouting tube, 6-sieve hole, 7-coal (rock) layer, 8-perforated layer drilling.

具体实施方式 Detailed ways

下面结合附图对本实用新型的具体实施例进行详细说明。 Specific embodiments of the present utility model will be described in detail below in conjunction with the accompanying drawings.

一种穿层钻孔单囊袋封孔装置,如图1所示,包括一主管,所述主管由三根通过外丝矩形接头3依次连接在一起的PE管1构成,每根PE管1的长度是4m、直径为50mm,位于中间的PE管1外周套装有一个单囊袋2,所述单囊袋2的两端分别通过卡箍实现密封装配在位于中间的PE管1外;所述单囊袋2膨胀后的最大直径为120-150mm;位于左边的PE管(即最里端的PE管)1的管壁上开有若干筛孔6。 A perforated drilling single-bag sealing device, as shown in Figure 1, includes a main pipe, the main pipe is composed of three PE pipes 1 sequentially connected together through outer wire rectangular joints 3, each PE pipe 1 The length is 4m, the diameter is 50mm, and the outer circumference of the PE pipe 1 in the middle is covered with a single capsule bag 2, and the two ends of the single capsule bag 2 are sealed and assembled outside the PE pipe 1 in the middle through clamps respectively; The maximum diameter of the expanded single pouch 2 is 120-150mm; the PE tube on the left (ie, the innermost PE tube) 1 has a number of mesh holes 6 on the tube wall.

所述注浆细管5一端密封穿过单囊袋2、另一端延伸至位于右边的PE管1外,即位于最外端的PE管。 One end of the grouting thin tube 5 is sealed through the single bladder 2, and the other end extends to the outside of the PE tube 1 on the right, that is, the PE tube at the outermost end.

所述充气管4一端密封伸入单囊袋2、另一端延伸至位于右边的PE管1外,即位于最外端的PE管。 One end of the inflation tube 4 seals and extends into the single pouch 2, and the other end extends out of the PE tube 1 on the right, that is, the PE tube at the outermost end.

使用时,穿层钻孔单囊袋封孔工艺采用三根直径为50mm的PE管相互连接,在最里端为一根带有筛孔的花管,中间为一根安装有单囊袋的PE管,注浆细管穿过单囊袋,充气管伸入单囊袋,充气管外端有一个气门嘴。最外端PE管要捆绑有一根等长的充气管和注浆管。充气管与充气管,注浆管与注浆管之间用接头进行连接。 When in use, three PE pipes with a diameter of 50 mm are connected to each other in the hole-sealing process of drilling through layers, and a flower pipe with a sieve hole is used at the innermost end, and a PE pipe with a single bag is installed in the middle. Tube, the grouting thin tube passes through the single bladder, the inflation tube extends into the single bladder, and there is a valve at the outer end of the inflation tube. The outermost PE pipe should be bundled with an equal-length inflation pipe and grouting pipe. The inflation pipe is connected with the inflation pipe, and the grouting pipe is connected with the grouting pipe.

注浆前,先对单囊袋进行充空气,充空气压力为0.3-0.4MPa,囊袋充足气后用注浆泵进行注专用水泥浆,直到水泥浆从有筛孔的花管流出后立即停止注浆。待浆液凝固后即可进行联孔抽放瓦斯。 Before grouting, first inflate the single bag with air, the air pressure is 0.3-0.4MPa, after the bag is fully inflated, use a grouting pump to inject special cement slurry until the cement slurry flows out from the flower tube with sieve holes and immediately Stop grouting. After the slurry is solidified, gas drainage can be carried out through joint holes.

Claims (3)

1. a layer-through drilling list pouch hole sealing device, is characterized in that: comprise a supervisor, and periphery, the middle part sealing shroud of described supervisor is equipped with a single pouch, and the afterbody tube wall of described supervisor has some sieve apertures;
Also comprise slip casting tubule and gas tube, described slip casting tubule hermetically passing list pouch, single pouch is stretched in described gas tube sealing.
2. layer-through drilling list pouch hole sealing device according to claim 1, it is characterized in that: described supervisor manages (1) by the PE that three are connected in turn by joint (3) and forms, the length of every root PE pipe (1) is 4m, diameter is 50mm, be positioned at middle PE pipe (1) periphery and be set with a single pouch (2), the two ends of described single pouch (2) realize sealing being assemblied in respectively by clip and are positioned at middle PE pipe (1) outward; Maximum gauge after described single pouch (2) expansion is 120-150mm; Be positioned at the left side PE pipe (1) tube wall on have some sieve apertures (6);
Described slip casting tubule (5) one end hermetically passing list pouch (2), the other end extend to the PE being positioned at the right and manage (1) outward;
Single pouch (2) is stretched in the sealing of described gas tube (4) one end, the other end extends to the PE being positioned at the right and manages (1) outward.
3. layer-through drilling list pouch hole sealing device according to claim 2, is characterized in that: described joint (3) is outer silk rectangle joint.
CN201420602473.4U 2014-10-20 2014-10-20 Layer-through drilling list pouch hole sealing device Expired - Lifetime CN204152475U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420602473.4U CN204152475U (en) 2014-10-20 2014-10-20 Layer-through drilling list pouch hole sealing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420602473.4U CN204152475U (en) 2014-10-20 2014-10-20 Layer-through drilling list pouch hole sealing device

Publications (1)

Publication Number Publication Date
CN204152475U true CN204152475U (en) 2015-02-11

Family

ID=52510600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420602473.4U Expired - Lifetime CN204152475U (en) 2014-10-20 2014-10-20 Layer-through drilling list pouch hole sealing device

Country Status (1)

Country Link
CN (1) CN204152475U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105840134A (en) * 2016-04-08 2016-08-10 河南理工大学 Single-bag grouting hole sealing device for upward crossing boreholes and hole sealing method adopting single-bag grouting hole sealing device
CN105927214A (en) * 2016-05-19 2016-09-07 六盘水师范学院 Accurate measuring device and measuring method for current coal seam gas pressure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105840134A (en) * 2016-04-08 2016-08-10 河南理工大学 Single-bag grouting hole sealing device for upward crossing boreholes and hole sealing method adopting single-bag grouting hole sealing device
CN105840134B (en) * 2016-04-08 2018-05-22 河南理工大学 Wear layer single pouch injection hole sealing device of uplink drilling and its a method for sealing
CN105927214A (en) * 2016-05-19 2016-09-07 六盘水师范学院 Accurate measuring device and measuring method for current coal seam gas pressure

Similar Documents

Publication Publication Date Title
CN105840134B (en) Wear layer single pouch injection hole sealing device of uplink drilling and its a method for sealing
CN103590782B (en) A kind of mash gas pumping drilling air bag blocks injection hole sealing device with pressure and method
CN108119094A (en) Deep fractures mash gas pumping drilling two blocks up one row's hole sealing device of a note and application method
CN103452525B (en) Gas extraction fixed occluder and method of use thereof
CN108775233B (en) Deep hole is not hard up blasting water injection integration hole sealing device in pit
CN103195390B (en) The nearly horizontal mash gas pumping drilling encapsulating method in this coal seam a kind of
CN204609832U (en) A kind of coal mine gas quick fluid filling hole sealing device with pressure
CN101050696A (en) Bag type paste injection hole sealing device and its hole sealing method
CN208122817U (en) Deep fractures mash gas pumping drilling two blocks up one row's hole sealing device of a note
CN105863556A (en) Coal-mine gas extraction drilling pressurized grouting rapid hole packer and use method thereof
CN104563958B (en) A sealing device
CN105715230B (en) Ooze paddle list pouch injection hole sealing device and its method for sealing in middle part
CN204252941U (en) Mining hole-sealing gas hole packer with pressure
CN108278096B (en) Dynamic self-adaptive hole sealing device and method for coal seam floor penetrating drilling
CN102747980A (en) Expansion type multi-grade pressurized rapid hole sealing technology
CN101482026A (en) Gas extraction secondary high-pressure slip-casting hole-sealing apparatus and its hole-sealing method
CN102200024A (en) Gas extraction center divided-flow type grouting and hole sealing device and hole sealing method
CN107939333B (en) Multi-stage pressure type permeable sealing method and device
CN104405434B (en) A kind of method and its device of hypotonic seam area pit shaft gas phase pressure break rapid uncovering coal
CN205638348U (en) Secondary high pressure slip casting formula is in same direction as integrative hole sealing device of coal seam drilling gas drainage pressure measurement
CN210977392U (en) Gas drainage drilling hole sealing device
CN209261534U (en) A combined coal seam water injection and gas drainage sealing device
CN106121614B (en) A kind of multiple seam capsule isolation multiple fracturing device and method
CN203626720U (en) Anti-spray orifice multi-section bag hole packer
CN103758486A (en) Pipeless grouting hole sealing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160805

Address after: 048000 Jinming office building, Jinding Industrial Zone, Jincheng Coal Group, Jincheng coal mine, Jincheng, Shanxi, 413

Patentee after: SHANXI SHENYUE ENERGY SAVING TECHNOLOGY CO.,LTD.

Address before: 048006 Jincheng City, North Town, stone town, Shanxi

Patentee before: SHANXI JINCHENG ANTHRACITE COAL MINING GROUP Co.,Ltd.

CX01 Expiry of patent term

Granted publication date: 20150211

CX01 Expiry of patent term