CN205677333U - A kind of communications tower support - Google Patents
A kind of communications tower support Download PDFInfo
- Publication number
- CN205677333U CN205677333U CN201620362531.XU CN201620362531U CN205677333U CN 205677333 U CN205677333 U CN 205677333U CN 201620362531 U CN201620362531 U CN 201620362531U CN 205677333 U CN205677333 U CN 205677333U
- Authority
- CN
- China
- Prior art keywords
- main body
- screw hole
- sides
- pole
- mounting groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model discloses a kind of communications tower support, including main body and the support bar being arranged at main body both sides, described main body by the pole of a mobile jib and more than to lower and on be spliced, shown main body is that up-small and down-big structure is arranged, described mobile jib and pole upper end are equipped with a mounting groove, this mounting groove upper end open, described mounting groove bottom surface both sides are equipped with a locating slot, described locating slot inwall is equipped with a rubber layer, described mounting groove both sides are equipped with one first screw hole, communicate about described first screw hole, it is equipped with one in described first screw hole and fix bolt, described pole bottom surface both sides are equipped with a positioning block, both sides, described pole lower end are equipped with one second screw hole, in straight line between described second screw hole and the first screw hole, it is provided with a through hole in the middle of described main body.The utility model simple in construction, quick and easy for installation, financial cost is low, applied widely, more uniform to lower and upper stress, extends the shelf life of communications tower.
Description
Technical field
The utility model relates to a kind of communications tower support.
Background technology
At present, communications tower is generally adopted by single-pipe tower, corner angle steel tower, multiple-tube column.Corner angle steel tower and multiple-tube column account for
Ground area is big, processed complex;Single-pipe tower rolled steel dosage is big, wastes steel;Between tower section, general employing iron clad or flange connect, and execute
Work is complicated, but king-post sleeve joint device uses equal pipe, for integral basis tower, less and less to lower and upper stress, it is clear that
Structure is not reasonable.
Content of the invention
Technical problem to be solved in the utility model is to provide a kind of simple in construction, quick and easy for installation, to lower and on
The more uniform communications tower support of stress.
The utility model is achieved through the following technical solutions: a kind of communications tower support, including main body and being arranged at
The support bar of main body both sides, described main body by the pole of a mobile jib and more than to lower and on be spliced, shown main body
Arranging in up-small and down-big structure, described mobile jib and pole upper end are equipped with a mounting groove, this mounting groove upper end open, described installation
Groove bottom both sides are equipped with a locating slot, and the trapezoidal structure of this locating slot is arranged, and described locating slot inwall is equipped with a rubber layer,
Described mounting groove both sides are equipped with one first screw hole, communicate about described first screw hole, are all provided with in described first screw hole
Fixing bolt, described pole bottom surface both sides are equipped with a positioning block, and the trapezoidal structure of this locating piece is arranged, under described pole
End both sides are equipped with one second screw hole, in straight line between described second screw hole and the first screw hole, in described main body
Between be provided with a through hole, this through hole is vertically arranged, and described through hole communicates up and down.
As preferred technical scheme, described locating piece all inserts in the locating slot in mounting groove, described mounting groove both sides
Fixed screw pass through the screw-threaded engagement connection in the first screw hole and the second screw hole.
As preferred technical scheme, being provided with a retraction cord in the through hole in described main body, this retraction cord one end is being gone up most
Fixed installation one first buckle at the via openings of end pole, the another lower end of described retraction cord is solid at the lower end via openings of mobile jib
Dingan County fills one second buckle.
As preferred technical scheme, described mobile jib and pole both sides all fixedly mount two piece of first fixture, described
Fixedly mount second fixed block of more than a piece inside strut, between described main body and support bar, be provided with more than one support
Frame, fixes with the first fixture on the left of this bracing frame and is connected, and fixes with the second fixture and be connected on the right side of support frame as described above.
As preferred technical scheme, described post upper is fixing connects a lightning rod installing rack, and described lightning rod is pacified
Shelve fixed installation one lightning rod.
The beneficial effects of the utility model are: the utility model simple in construction, and quick and easy for installation, financial cost is low, suitable
Wide by scope, more uniform to lower and upper stress, extend the shelf life of communications tower.
Brief description
In order to be illustrated more clearly that the utility model embodiment or technical scheme of the prior art, below will be to embodiment
Or the accompanying drawing of required use is briefly described in description of the prior art, it should be apparent that, the accompanying drawing in describing below is only
It is some embodiments of the present utility model, for those of ordinary skill in the art, in the premise not paying creative work
Under, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is the partial enlarged drawing that in Fig. 1, A goes out.
Detailed description of the invention
All features disclosed in this specification, or disclosed all methods or during step, except mutually exclusive
Feature and/or step beyond, all can combine by any way.
Any feature disclosed in this specification (including any accessory claim, summary and accompanying drawing), unless chatted especially
State, all can be by other equivalences or there is the alternative features of similar purpose replaced.I.e., unless specifically stated otherwise, each feature is only
It is one of a series of equivalence or similar characteristics example.
As depicted in figs. 1 and 2, a kind of communications tower support of the present utility model, including main body (unmarked) and be arranged at master
The support bar 7 of body both sides, described main body by the pole 6 of a mobile jib 10 and more than to lower and on be spliced, shown master
Body is that up-small and down-big structure is arranged, and described mobile jib 10 and pole 6 upper end are equipped with a mounting groove 14, and this mounting groove 14 upper end is opened
Mouthful, described mounting groove 14 bottom surface both sides are equipped with a locating slot 18, and this trapezoidal structure of locating slot 18 is arranged, described locating slot 18
Inwall is equipped with a rubber layer (unmarked), and described mounting groove 14 both sides are equipped with one first screw hole 16, described first screw
Hole about 16 communicates, and is equipped with one and fixes bolt 13 in described first screw hole 16, and described pole 6 bottom surface both sides are equipped with necessarily
Position block 17, this trapezoidal structure of locating piece 17 is arranged, and both sides, described pole 6 lower end are equipped with one second screw hole 15, and described the
In straight line between two-screw hole 15 and the first screw hole 16, being provided with a through hole 9 in the middle of described main body, this through hole 9 vertically sets
Putting, described through hole communicates about 9.
In the present embodiment, described locating piece 17 all inserts in the locating slot 18 in mounting groove 14, described mounting groove 14 both sides
Fixed screw 13 pass through the first screw hole 16 and be connected with the screw-threaded engagement in the second screw hole 15;Through hole 9 in described main body
Inside being provided with a retraction cord 8, this retraction cord 1 end fixedly mounts one first buckle 11, institute at the via openings of the top pole 6
State the another lower end of retraction cord 8 at the lower end via openings of mobile jib 10, fixedly mount one second buckle 12.
In the present embodiment, described mobile jib 10 all fixedly mounts two piece of first fixture 3, described support bar 7 with pole 6 both sides
The second fixed block 5 that inner side fixed installation is more than one piece, is provided with more than one bracing frame 4 between described main body and support bar 7,
Fix with the first fixture 3 on the left of this bracing frame 4 and be connected, fix with the second fixture 5 on the right side of support frame as described above 4 and be connected;Described
Support bar 4 upper end is fixing connects a lightning rod installing rack 2, and described lightning rod installing rack 2 fixedly mounts a lightning rod 1.
Mounting means: be first stuck in retraction cord lower end at the through hole lower ending opening of mobile jib, then mobile jib is installed on ground,
Then sequentially into lower and on installation pole, splicing during, by pole locating piece alignment be placed on mounting groove
Locating slot in, by fixed screw, both are fixed, also have during installing, be by retraction cord along the through hole of pole
All the way up, until being stuck at the via openings of last pole, after installing main body, two support bars are aside erected,
To be connected between main body with support bar by bracing frame, increase the lifting surface area of communications tower.
The beneficial effects of the utility model are: the utility model simple in construction, and quick and easy for installation, financial cost is low, suitable
Wide by scope, more uniform to lower and upper stress, extend the shelf life of communications tower.
The above, detailed description of the invention only of the present utility model, but protection domain of the present utility model does not limit to
In this, any change expected without creative work or replacement, all should cover within protection domain of the present utility model.
Therefore, protection domain of the present utility model should be as the criterion with the scope of protecting that claims are limited.
Claims (5)
1. a communications tower support, it is characterised in that: including main body and being arranged at the support bar of main body both sides, described main body is by one
The pole of root mobile jib and more than one to lower and on be spliced, shown main body is that up-small and down-big structure is arranged, described mobile jib and
Pole upper end is equipped with a mounting groove, this mounting groove upper end open, and described mounting groove bottom surface both sides are equipped with a locating slot, and this is fixed
The position trapezoidal structure of groove is arranged, and described locating slot inwall is equipped with a rubber layer, and described mounting groove both sides are equipped with one first spiral shell
Silk hole, communicates about described first screw hole, is equipped with one and fixes bolt, described pole bottom surface both sides in described first screw hole
Being equipped with a positioning block, the trapezoidal structure of this locating piece is arranged, and both sides, described pole lower end are equipped with one second screw hole, described
In straight line between second screw hole and the first screw hole, being provided with a through hole in the middle of described main body, this through hole is vertically arranged, institute
State through hole to communicate up and down.
2. communications tower support according to claim 1, it is characterised in that: described locating piece all inserts the positioning in mounting groove
In groove, the fixed screw of described mounting groove both sides passes through the screw-threaded engagement in the first screw hole and the second screw hole and connects.
3. communications tower support according to claim 1, it is characterised in that: it is provided with a contraction in the through hole in described main body
Rope, this retraction cord one end fixedly mounts one first buckle at the via openings of the top pole, and the another lower end of described retraction cord exists
One second buckle is fixedly mounted at the lower end via openings of mobile jib.
4. communications tower support according to claim 1, it is characterised in that: described mobile jib and pole both sides all fixedly mount two
Block the first fixture, fixedly mounts second fixed block of more than a piece, between described main body and support bar inside described support bar
It is provided with more than one bracing frame, fix with the first fixture on the left of this bracing frame and be connected, solid with second on the right side of support frame as described above
Locking member is fixing to be connected.
5. communications tower support according to claim 1, it is characterised in that: described post upper is fixing connects a lightning rod
Installing rack, described lightning rod installing rack fixedly mounts a lightning rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620362531.XU CN205677333U (en) | 2016-04-22 | 2016-04-22 | A kind of communications tower support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620362531.XU CN205677333U (en) | 2016-04-22 | 2016-04-22 | A kind of communications tower support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205677333U true CN205677333U (en) | 2016-11-09 |
Family
ID=57438418
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620362531.XU Expired - Fee Related CN205677333U (en) | 2016-04-22 | 2016-04-22 | A kind of communications tower support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205677333U (en) |
-
2016
- 2016-04-22 CN CN201620362531.XU patent/CN205677333U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203255914U (en) | Unit-typed curtain wall lifting device | |
CN204848023U (en) | Braced system that climbing tower hung in external | |
CN205677333U (en) | A kind of communications tower support | |
CN207365244U (en) | A kind of supporting structure for building | |
CN204691020U (en) | A kind of T-shaped supporting steel keel of curtain wall | |
CN204491420U (en) | A kind of reinforcement structure of bracket | |
CN211396641U (en) | Formwork diagonal bracing for building construction | |
CN103669823B (en) | The rear support of angle rotatable | |
CN105293318A (en) | Super-lifting device for crane and use method | |
CN207588364U (en) | A kind of steel pipe type cable assembles vehicle | |
CN206956776U (en) | A kind of novel dismountable pole bracket | |
CN207022748U (en) | A kind of high support frame of stability | |
CN206646838U (en) | Self-interacting type steel plate wall corrects trivet | |
CN205400059U (en) | Novel aluminum alloy template is to pulling -on piece system | |
CN205172606U (en) | I -steel canopy | |
CN202636292U (en) | Mosquito net bracket | |
CN203998726U (en) | Tower crane climbing frame anti-twisting equipment | |
CN212226681U (en) | Novel combined aluminum profile structure | |
CN219241290U (en) | Fixing support for wall-attached support of climbing frame | |
CN204627098U (en) | Electric line pole self guy wire support | |
CN209025532U (en) | A kind of novel power tower easy to install | |
CN212583157U (en) | Straight-through type aluminum frame structure of scaffold | |
CN216108956U (en) | Assembled building element with concatenation location structure | |
CN202596180U (en) | Installation structure for steel frame in steel structural frame | |
CN210914885U (en) | Retaining wall rod fixing device of construction elevator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161109 Termination date: 20170422 |