CN205677190U - Face brick dried hanging hang structure - Google Patents

Face brick dried hanging hang structure Download PDF

Info

Publication number
CN205677190U
CN205677190U CN201620529849.2U CN201620529849U CN205677190U CN 205677190 U CN205677190 U CN 205677190U CN 201620529849 U CN201620529849 U CN 201620529849U CN 205677190 U CN205677190 U CN 205677190U
Authority
CN
China
Prior art keywords
suspension member
face brick
groove
pendant
group
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620529849.2U
Other languages
Chinese (zh)
Inventor
程发祥
李龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201620529849.2U priority Critical patent/CN205677190U/en
Application granted granted Critical
Publication of CN205677190U publication Critical patent/CN205677190U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a kind of face brick dried hanging hang structure, including the suspension member for connecting often adjacent two pieces of face bricks combines and the mounting structure for being installed on suspension member combination on metope;Lower edges at the back of each face brick offers the suspension member mounting groove that at least two groups are spaced and section is in " eight " shape respectively;Suspension member combination includes at least two group suspension members that the group number with the suspension member mounting groove being positioned at an edge matches, described suspension member includes main suspension member, upper pendant and lower pendant, main suspension member have the coupling part being connected with described mounting structure and for installing, lower pendant mounting portion, the lower end of described upper pendant is installed in described mounting portion, and upper end is installed for one group of suspension member mounting groove corresponding with at the lower edge position being positioned at lastblock face brick and coordinated;The upper end of described lower pendant is installed in described mounting portion, and lower end is installed for one group of suspension member mounting groove corresponding with at the upper marginal position being positioned at next block face brick and coordinated.

Description

Face brick dried hanging hang structure
Technical field
The utility model relates to walltile furnishing fields, particularly to a kind of face brick dried hanging hang structure.
Background technology
In recent years with the development of interior/exterior decoration trend, metope is as the important decorative cover of indoor and outdoor, a lot of owners and list Position can select big space of a whole page panel brick to be used as ornament materials.Major factor is: for stone material compared by brick, cost is low, and face brick is very Multi-texturing is also to use the design of high stone texture-like, is not typically easily distinguishable, and compares Difference Control more preferable of brick for stone material, whole The many merits that body is more coordinated, highly polished, easy to clean, the later stage maintains and maintenance cost is low.
So in current decoration present situation, as the metope majorities such as the public domain passage of high-grade office building, hall all use The bigger face brick of this space of a whole page of 600*1200mm is decorated.The construction technology of current this brick is generally also similar to dry-hang stone Way, owing to most of face brick thickness are 11-12mm on the market, thinner thickness, cladding groove can not be opened in side.So during construction First can only fix a bit brick with AB glue in brick back side dry hanging article position and thicken brick basic unit, it is simple to fixing dry hanging article, at present this Although kind of a construction technology is commercially used more.But from the consideration in service life and security standpoint, still there is improper part. Certainly can have the face brick of thickness 15-20mm according to customer demand producer made to order, but cost is too high, price even can exceed stone material valency Lattice.According to conventional actual utilization, the deficiency of this technique is summarized as follows:
Carrying out stress from the loading angle analysis glue mainly by gluing at back bar in fact, the service life of glue directly determines that it is pacified Full property and durability.Technics comparing is complicated, needs, first bonding for back bar brick, just can carry out after it is firm before installing face brick Installing, many one working procedures, the duration can lengthen.One piece of face brick can increase the price of two back bar bricks, virtually can strengthen into This.AB glue and cloud stone glue usage amount are very big, and burst size of methanal is high, is unfavorable for environmental protection.So in the urgent need to a kind of novel doing Hanging hang structure and technique overcome problem above and deficiency, and can give play to the advantage of dry-hanging, aobvious at present Obtain particularly important.
Utility model content
For above-mentioned the deficiencies in the prior art, technical problem to be solved in the utility model is: provide a kind of safer, Extend cladding face brick service life, reduce material cost and human cost, the reduction of erection time, minimizing viscose glue consumption face brick cladding Structure.
For solving above-mentioned technical problem, the technical scheme that the utility model uses is: provide a kind of cladding knot of face brick Structure, for by cladding for face brick in metope, including the suspension member for connecting often adjacent two pieces of face bricks combines and for by described Suspension member combines the mounting structure being installed on metope;Lower edges at the back of each piece of face brick offers at least two groups respectively Spaced and that section is in " eight " shape suspension member mounting groove, each group of suspension member mounting groove all includes two mounting grooves, two installations Groove is extended to the direction in front and to two contrary directions by the back side of face brick;
The combination of described suspension member includes at least two group suspension members that the group number with the suspension member mounting groove being positioned at an edge matches, Each group of suspension member all includes a main suspension member, upper pendant and lower pendant, and described main suspension member has one and is connected with described mounting structure Coupling part and be used for installing suspension member and lower pendant mounting portion, the lower end of described upper pendant is installed on described installation portion In Fen, upper end is installed for one group of suspension member mounting groove corresponding with at the lower edge position being positioned at lastblock face brick and is coordinated;Described The upper end of lower pendant is installed in described mounting portion, lower end for be positioned at the upper marginal position of next block face brick corresponding One group of suspension member mounting groove is installed and is coordinated.
As optimization, described mounting structure include many groups be located on metope erect very and be located at described perpendicular very go up along perpendicular Very many crossbeams of short transverse distribution, described many groups are perpendicular very arranges along the horizontal direction uniform intervals of metope, described each group The coupling part of the main suspension member of suspension member is connected with corresponding crossbeam.
As optimization, described crossbeam is angle steel, and one of them right-angle side of described angle steel is fixed on corresponding erecting and very goes up, separately One right-angle side is perpendicular very perpendicular with described, and another right-angle side of coupling part and this of described main suspension member is connected.
As optimization, the coupling part of described main suspension member is dismountable to be connected on corresponding crossbeam.
As optimization, the coupling part of described main suspension member is a contiguous block, the mounting portion of described main suspension member include for Installing the first mounting structure of suspension member and for installing the second mounting structure of lower pendant, described first mounting structure is served as reasons The fixture block being formed away from one end upwards bending of crossbeam on described contiguous block;Described second mounting structure is for being positioned under described fixture block The first opening up draw-in groove of side;
Described upper pendant include the second draw-in groove that one section of face takes the shape of the letter U and with described second draw-in groove on adjacent to the one of face brick The upper pendant body that individual cell wall connects, described second draw-in groove is opening down and is arranged on described fixture block;Described lower pendant includes The 3rd draw-in groove that one section takes the shape of the letter U and the lower pendant that is connected with a cell wall adjacent to face brick on described 3rd draw-in groove this Body, described 3rd draw-in groove opening down and being arranged on described first draw-in groove adjacent on the cell wall of face brick;Described upper pendant Body and lower pendant body are respectively provided with two hanging blocks matching with suspension member mounting groove.
As optimization, on described second draw-in groove, a cell wall adjacent to face brick upwardly extends formation one first extension board, Described first extension board upwards and to the direction of face brick extends first hanging block forming described upper pendant body, described upper pendant The upper beveled end of second hanging block of body is connected between first hanging block of described upper pendant body and the first extension board Angle, the lower beveled end of second hanging block of described upper pendant body downwards and tilts to the direction of face brick, described upper pendant Body is integrally in " people " shape matching with corresponding one group of suspension member mounting groove or " eight " shape.
As optimization, on described 3rd draw-in groove, a cell wall adjacent to face brick is downwardly extending one second extension board, Described second extension board extends downwards and to the direction of face brick first hanging block forming described lower pendant body, described lower pendant The lower beveled end of second hanging block of body is connected between first hanging block of described lower pendant body and the second extension board Angle, the upper beveled end of second hanging block of described lower pendant body upwards and tilts to the direction of face brick, described lower pendant Body is integrally in " people " shape matching with corresponding one group of suspension member mounting groove or " eight " shape.
Face brick dried hanging hang structure of the present utility model, by suspension member and corresponding upper and lower extension based on each group of suspension member design Part, and upper and lower suspension member is respectively provided with in towards " eight " shape in face brick direction or " people " shape, at the lower edges at the back of face brick The eight shape suspension member mounting grooves matching are set, then upper, suspension member are stuck in the installation position of main suspension member, then by main suspension member and crossbeam Connect, thus complete the cladding operation of panel.Each two assembly can the corresponding adjacent edge hanging up adjacent two pieces of face bricks, and each Block face brick is respectively provided with four groups of suspension members to compare the scheme that this face brick is hung on metope, can be greatly reduced the group number of suspension member, Reduce more cost.The suspension member mounting groove of face brick is offered technique and can be processed by producer, it is to avoid on-the-spot secondary operations makes, Scene only needs to install.Compared with in prior art in the technology of face brick back pad back bar brick, it is possible to reduce the cost of acting as a cushion bar brick, Considerably reduce complexity back bar brick being carried out cut the processing technology being then adhered to the face brick back side again, reduce greatly Set-up time, increase cladding efficiency, reduce substantial amounts of artificial and fee of material, and reduce the usage amount of glue, environmental protection.
Brief description
The scheme of installation of Fig. 1 the utility model face brick dried hanging hang structure.
Fig. 2 is that one of them lower pendant installs, with corresponding suspension member mounting groove, the schematic diagram coordinating.
Fig. 3 is that one of them lower pendant installs, with main suspension member and corresponding suspension member mounting groove, the scheme of installation coordinating.
Fig. 4 is that one of them upper pendant installs, with main suspension member and corresponding suspension member mounting groove, the scheme of installation coordinating.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of making creative work The every other embodiment being obtained, broadly falls into the scope of the utility model protection.
Referring to Fig. 1 to Fig. 4, the face brick dried hanging hang structure of the utility model embodiment with two pieces of neighbouring face bricks 1 is Example is illustrated, it will be appreciated that, in instantiation, however it is not limited to upper and lower two pieces, each row are likely to be of some pieces of face bricks 1, it simply in this some pieces of face bricks 1, as long as being positioned at adjacent two piece face brick 1, is all applicable to this face brick dried hanging hang structure.
The face brick dried hanging hang structure of the present embodiment, for indoor and outdoor metope being played role in decoration cladding for face brick in metope, This face brick dried hanging hang structure includes the suspension member combination for connecting often adjacent two pieces of face bricks 1 and for installing the combination of described suspension member Mounting structure 3 on metope;Lower edges at the back of each piece of face brick 1 offer respectively at least two groups spaced and Section is in the suspension member mounting groove 11 of " eight " shape, and each group of suspension member mounting groove 11 all includes two mounting grooves, and two mounting grooves are by face The back side (back side refers to carry on the back the one side in decorative cover, towards the one side of body of wall during installation) of brick 1 to the direction of front (decorative cover), And to two contrary directions (two rightabouts herein, be respectively facing upper and lower to) extend;Described suspension member combination bag At least two group suspension members that the group number of the suspension member mounting groove 11 including and being positioned at an edge matches are (that is, work as each piece of face brick 1 When the group number of the suspension member mounting groove 11 of top edge or lower limb is two groups, the suspension member group number of the adjacent two pieces of face bricks 1 of this connection two Also being two groups, when the group number of described suspension member mounting groove 11 is three groups, the group number of suspension member is also three groups, by that analogy.), each Group suspension member all include a main suspension member the 21st, upper pendant 22 and lower pendant 23, described main suspension member 21 have one with described mounting structure 3 Be connected coupling part 211 and be used for installing suspension member 22 and lower pendant 23 mounting portion 212, the lower end of described upper pendant 22 Being installed in described mounting portion 212, upper end is used for and is positioned at corresponding one group of suspension member at the lower edge position of lastblock face brick 1 Mounting groove 11 is installed and is coordinated;The upper end of described lower pendant 23 is installed in described mounting portion 212, and lower end is used for and is positioned at next At the upper marginal position of block face brick 1, corresponding one group of suspension member mounting groove 11 is installed and is coordinated.
In the present embodiment, described suspension member mounting groove 11 is four groups, top edge two groups, lower limb two groups, and connects lastblock The suspension member of face brick 1 and next block face brick 1 is also two groups, and the upper pendant 22 of two groups of suspension members is respectively used to and is positioned at lastblock face brick 1 Two groups of suspension member mounting grooves 11 install and coordinate, lower pendant 23 is respectively used to and the two groups of suspension member mounting grooves being positioned at next block face brick 1 11 install cooperation.Staff's fluting, increase fluting efficiency, reduction process complexity for convenience, four groups of suspension member mounting grooves 11 It is opened at four arms of angle of face brick 1 respectively, when offering each group of suspension member mounting groove 11, from a side of face brick 1 to separately One side surface direction is offered, and the degree of depth of two mounting grooves of each group of suspension member mounting groove 11 is respectively less than the thickness of face brick 1, it is ensured that face The globality of brick 1, each group of suspension member mounting groove 11 in splayed, the bottom land of two mounting groove respectively in the opposite direction and to (mounting groove i.e. above to front and upwardly extends formation, is positioned at a mounting groove of lower section in frontal inclination Downwards and extend to following direction), not through the thickness of face brick 1 while the extension mounting groove degree of depth, it is ensured that suspension member and suspension member The secure fit of mounting groove 11.
Described mounting structure 3 includes that many groups be located on metope are erected very 31 and are located at the described perpendicular edge endured on 31 perpendicular very 31 Many crossbeams 32 of short transverse distribution, described many groups perpendicular very 31 are arranged along the horizontal direction uniform intervals of metope, described each The coupling part 211 of the main suspension member 21 of group suspension member is connected with corresponding crossbeam 32.Described crossbeam 32 can directly use angle steel, institute State one of them right-angle side of angle steel to be fixed on corresponding perpendicular very 31, another right-angle side with described perpendicular endure 31 perpendicular, institute Another right-angle side of coupling part 211 and this stating main suspension member 21 is connected.
In certain embodiments, described crossbeam 32 can be located between two adjacent groups perpendicular very 31 with transverse strands, can be by crossbeam The two ends of 32 perpendicular with two adjacent groups very 31 are connected.Spacing distance between perpendicular very the 31 of every two adjacent groups is horizontal with on face brick 1 Spacing between two groups of suspension member mounting grooves 11 matches, so just so that the main suspension member 21 of two groups of suspension members can be fixed on correspondence Crossbeam 32 on.
The coupling part 211 of described main suspension member 21 is dismountable to be connected on corresponding crossbeam 32, when crossbeam 32 is angle steel When, the coupling part 211 of the main suspension member 21 of each group of suspension member is dismountable, and to be connected to described angle steel very 31 perpendicular another with perpendicular On one right-angle side (angle cross arm), such as the thread fiting mode in can using such as Fig. 1 and angle cross arm removably connect, also For example can use that snap fit is dismountable to be connected on angle cross arm.
The coupling part 211 of described main suspension member 21 is a contiguous block, when described main suspension member 21 uses threaded mode When being mounted on described corresponding crossbeam 32, as one can preferred scheme, described contiguous block is offered Bar hole 211a, the length direction of described bar hole 211a is consistent towards the bearing of trend of face brick 1 with described crossbeam 32 cross-arm, as This can regulate the position relative to crossbeam 32 for the described main suspension member 21.
The mounting portion 212 of described main suspension member 21 includes the first mounting structure for installing suspension member 22 and for pacifying Load the second mounting structure of suspension member 23.Wherein, described first mounting structure is towards away from the one of crossbeam 32 by described contiguous block Hold the fixture block 212a that upwards bending is formed;Described second mounting structure is opening up being positioned at below described fixture block 212a One draw-in groove 212b.
Described upper pendant 22 include the second draw-in groove 221 that one section of face takes the shape of the letter U and with described second draw-in groove 221 on adjacent to The upper pendant body 222 that one cell wall of face brick 1 connects, described second draw-in groove 221 is opening down and is arranged in described fixture block On 212a;Described lower pendant 23 include the 3rd draw-in groove 231 that a section takes the shape of the letter U and with described 3rd draw-in groove 231 on adjacent to The lower pendant body 232 that one cell wall of face brick 1 connects, described 3rd draw-in groove 231 opening down and be arranged in described first On draw-in groove 212b on the cell wall adjacent to face brick 1, described upper pendant body 222 and lower pendant body 232 are respectively provided with and suspension member peace Two hanging blocks that tankage 11 matches.Distance between described upper pendant body 222 and lower pendant body 232 and lastblock face brick 1 The suspension member mounting groove 11 of lower limb and next the block face brick 1 being disposed below top edge suspension member mounting groove 11 between away from From matching, two suspension member bodies of such guarantee can be installed in two groups of suspension member mounting grooves 11 accurately.Described Upper pendant body 222 and lower pendant body 232 may be located at same plane towards one end of face brick 1, mainly according on face brick 1 The whether identical decision of the degree of depth of suspension member mounting groove 11.
Preferred as one, on described second draw-in groove 221, a cell wall adjacent to face brick 1 upwardly extends formation 1 the One extension board 223, described first extension board 223 upwards and to the direction of face brick 1 extends and forms the of described upper pendant body 222 One hanging block 222a, the upper beveled end of second hanging block 222b of described upper pendant body 222 is connected to described upper pendant body Angle between first hanging block 222a of 222 and the first extension board 223, second hanging block of described upper pendant body 222 The lower beveled end of 222b tilts with downwards and to the direction of face brick 1, described upper pendant body 222 overall in corresponding one group of extension " people " shape that part mounting groove 11 matches or " eight " shape.Adjacent to a cell wall of face brick 1 to downward on described 3rd draw-in groove 231 Stretching formation one second extension board 233, described second extension board 233 extends downwards and to the direction of face brick 1 and forms described lower pendant First hanging block 232a of body 232, the lower beveled end of second hanging block 232b of described lower pendant body 232 is connected to described Angle between first hanging block 232a of lower pendant body 232 and the second extension board 233, described lower pendant body 232 The upper beveled end of second hanging block 232b upwards and tilts to the direction of face brick 1, described lower pendant body 232 overall in corresponding " people " shape of matching of one group of suspension member mounting groove 11.
Set up this first extension board 223 and the second extension board 233, make between upper pendant body 222 and lower pendant body 232 Spacing bigger, owing to the length and width size of face brick 1 is relatively big, therefore increase the spacing between two suspension member bodies, so that leaning on Spacing between the suspension member mounting groove 11 of nearly lower edges can reduce, and makes them draw close slightly towards relative direction, and is unlikely to position In too close edge, can increase to the supporting force in the middle part of face brick 1, make supporting force be unlikely to concentrate on the four of face brick 1 respectively Individual edge.
Face brick dried hanging hang structure of the present utility model, when utilizing face brick 1 to carry out decorative operation to metope, is first according to design and wants Ask installation perpendicular very 31(that built-in fitting can be set on metope, perpendicular very 31 by corresponding installation of embedded parts on metope), then will Each crossbeam 32 is horizontally installed on perpendicular very 31;Face brick 1 is before dispatching from the factory or all can add eight shape work suspension member mounting grooves after dispatching from the factory 11, four edges of each piece of face brick 1 offer one group of suspension member mounting groove 11 respectively;Then by the lower pendant 23 points of two groups of suspension members It is not installed in two groups of suspension member mounting grooves 11 of the upper corner being positioned at next block face brick 1, then by the upper pendant 22 of two groups of suspension members (by that analogy, until on each piece of face brick 1 in two groups of suspension member mounting grooves 11 of the lower corner being respectively arranged in lastblock face brick 1 Two groups of suspension member mounting grooves 11 of lower limb be mounted on corresponding upper pendant 22, two groups of extensions of the top edge of each piece of face brick 1 Part mounting groove 11 is mounted on corresponding lower pendant 23), by cloud stone glue or AB glue etc. fixing fill up suspension member mounting groove 11 with Gap between corresponding suspension member body, thus play the effect strengthening connecting further, then by often adjacent two pieces of face bricks 1 correspondence The main suspension member 21 of two groups of suspension members be mounted on described crossbeam 32, finally, by the lower pendant 23 on each piece of face brick 1 It is hung in the first draw-in groove 212b of corresponding main suspension member 21, the upper pendant 22 on each piece of face brick 1 is hung on corresponding main suspension member In the fixture block 212a of 21, then between second mounting groove and fixture block 212a of upper pendant 22, fill up viscose glue, at suspension member again and Filling up viscose glue between one draw-in groove 212b increases degree of being connected firmly further, is prevented from each piece of face brick and stirs about 1.
Face brick dried hanging hang structure of the present utility model, by suspension member 21 based on the design of each group of suspension member and corresponding upper and lower Suspension member 23, and upper and lower suspension member 23 is respectively provided with in towards " eight " shape in face brick 1 direction or " people " shape, upper at the back of face brick 1 Lower edge arranges the eight shape suspension member mounting grooves 11 matching, and then upper, suspension member are stuck in the installation position of main suspension member 21, then will Main suspension member 21 is connected with crossbeam 32, thus completes the cladding operation of panel.Each two assembly corresponding can hang up adjacent two pieces of faces The adjacent edge of brick 1, compared with the scheme that each piece of face brick 1 is respectively provided with four groups of suspension members to be hung on this face brick 1 on metope, Ke Yi great The earth reduces the group number of suspension member, reduces more cost.The suspension member mounting groove 11 of face brick 1 is offered technique and can be added by producer Work, it is to avoid on-the-spot secondary operations makes, scene only needs to install.With in prior art in the technology phase of face brick 1 back pad back bar brick Ratio, it is possible to reduce the cost of acting as a cushion bar brick, considerably reduces to carry out back bar brick cutting and is then adhered to face brick 1 back side again The complexity of processing technology, greatly reduces the set-up time, increases cladding efficiency, reduces substantial amounts of artificial and fee of material, and And the usage amount of minimizing glue, environmental protection.
By the original cladding brickwork skill of 08 year quota calculation, the expense needed for back bar of installing is: main material: 28.8 yuan /+auxiliary Material 23 yuan /+artificial 37 yuan /=88.8 yuan/.Technology after improvement: based on the brick of one piece of 600*1200 comes, needs to increase Aluminium alloy suspension member 2 overlaps, unit price 4 yuan/set, adds up to 8 yuan, and brick fluting takes 4 yuan/block, mounting suspension member labour cost 10 yuan/block of+AB glue.Always 22 yuan/block of meter, equivalent 30.55 yuan/.Compare the every square meter of traditional method save 58.25 yuan/.Cost savings rate is 65.59%. Decoration corporation used the area about 11000 of cladding brick construction last year, and quantity is also being incremented by every year, it is contemplated that save into every year These more than 640,000 yuan.So the economic benefit that this technology is brought is considerable.
These are only embodiment of the present utility model, not thereby limit the scope of the claims of the present utility model, every profit The equivalent structure made by the utility model specification and accompanying drawing content or equivalence flow process conversion, or it is directly or indirectly used in it The technical field that he is related to, all in like manner includes in scope of patent protection of the present utility model.

Claims (7)

1. a face brick dried hanging hang structure, for by cladding for face brick in metope, it is characterised in that: include for connecting often adjacent two The suspension member combination of block face brick and the mounting structure for being installed on the combination of described suspension member on metope;The back of the body at each piece of face brick The lower edges in portion offers the suspension member mounting groove that at least two groups are spaced and section is in " eight " shape, each group of suspension member peace respectively Tankage all includes two mounting grooves, and two mounting grooves are prolonged to the direction in front and to two contrary directions by the back side of face brick Stretch;
The combination of described suspension member includes at least two group suspension members that the group number with the suspension member mounting groove being positioned at an edge matches, each Group suspension member all includes a main suspension member, upper pendant and lower pendant, and described main suspension member has a company being connected with described mounting structure Connecing part and for installing suspension member and lower pendant mounting portion, the lower end of described upper pendant is installed on described mounting portion In, upper end is installed for one group of suspension member mounting groove corresponding with at the lower edge position being positioned at lastblock face brick and is coordinated;Under described The upper end of suspension member is installed in described mounting portion, lower end for be positioned at the upper marginal position of next block face brick corresponding one Group suspension member mounting groove is installed and is coordinated.
2. face brick dried hanging hang structure as claimed in claim 1, it is characterised in that: described mounting structure includes being located on metope many Group is perpendicular very and be located at the described perpendicular many crossbeams along the distribution of perpendicular very short transverse very gone up, and described many groups are perpendicular very along the water of metope Square to uniform intervals arrange, the coupling part of the main suspension member of described each group of suspension member is connected with corresponding crossbeam.
3. face brick dried hanging hang structure as claimed in claim 2, it is characterised in that: described crossbeam is angle steel, and described angle steel is wherein One right-angle side is fixed on corresponding erecting and very goes up, and another right-angle side is perpendicular very perpendicular with described, the connecting portion of described main suspension member Divide and be connected with this another right-angle side.
4. face brick dried hanging hang structure as claimed in claim 2, it is characterised in that: the dismountable company in coupling part of described main suspension member It is connected on corresponding crossbeam.
5. face brick dried hanging hang structure as claimed in claim 2, it is characterised in that: the coupling part of described main suspension member is a connection Block, the mounting portion of described main suspension member includes the first mounting structure for installing suspension member and for installing the of lower pendant Two mounting structures, described first mounting structure is the fixture block being formed by one end upwards bending away from crossbeam on described contiguous block; Described second mounting structure is the first opening up draw-in groove being positioned at below described fixture block;
Described upper pendant include the second draw-in groove that one section of face takes the shape of the letter U and with described second draw-in groove on adjacent to a groove of face brick The upper pendant body that wall connects, described second draw-in groove is opening down and is arranged on described fixture block;Described lower pendant includes that one breaks The 3rd draw-in groove that face takes the shape of the letter U and the lower pendant body being connected with a cell wall adjacent to face brick on described 3rd draw-in groove, institute State the opening down of the 3rd draw-in groove and be arranged on described first draw-in groove adjacent on the cell wall of face brick;Described upper pendant body and Lower pendant body is respectively provided with two hanging blocks matching with suspension member mounting groove.
6. face brick dried hanging hang structure as claimed in claim 5, it is characterised in that: adjacent to one of face brick on described second draw-in groove Cell wall upwardly extends formation one first extension board, and described first extension board upwards and to the direction of face brick extends and forms described upper extension First hanging block of part body, the upper beveled end of second hanging block of described upper pendant body is connected to described upper pendant body Angle between first hanging block and the first extension board, the lower beveled end of second hanging block of described upper pendant body downwards and Tilt to the direction of face brick, described upper pendant body integrally in " people " shape matching with corresponding one group of suspension member mounting groove or " eight " shape.
7. the face brick dried hanging hang structure as described in claim 5 or 6, it is characterised in that: adjacent to face brick on described 3rd draw-in groove One cell wall is downwardly extending one second extension board, and it is described that described second extension board extends downwards and to the direction of face brick formation First hanging block of lower pendant body, the lower beveled end of second hanging block of described lower pendant body is connected to described lower pendant originally Angle between first hanging block of body and the second extension board, the upper beveled end of second hanging block of described lower pendant body to Above and tilting to the direction of face brick, described lower pendant body is integrally in " people " shape matching with corresponding one group of suspension member mounting groove Or " eight " shape.
CN201620529849.2U 2016-06-03 2016-06-03 Face brick dried hanging hang structure Active CN205677190U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620529849.2U CN205677190U (en) 2016-06-03 2016-06-03 Face brick dried hanging hang structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620529849.2U CN205677190U (en) 2016-06-03 2016-06-03 Face brick dried hanging hang structure

Publications (1)

Publication Number Publication Date
CN205677190U true CN205677190U (en) 2016-11-09

Family

ID=57433724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620529849.2U Active CN205677190U (en) 2016-06-03 2016-06-03 Face brick dried hanging hang structure

Country Status (1)

Country Link
CN (1) CN205677190U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888179A (en) * 2016-06-03 2016-08-24 中冶建工集团有限公司 Facing brick dry-hanging structure and facing brick dry-hanging technology
CN107620442A (en) * 2017-08-21 2018-01-23 广州市名晋机电设备技术有限公司 A kind of novel unit formula exterior wall panel cladding system
CN109779191A (en) * 2019-02-19 2019-05-21 嘉兴宝仕龙集成家居有限公司 A kind of integrated wall Quick assembling structure system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888179A (en) * 2016-06-03 2016-08-24 中冶建工集团有限公司 Facing brick dry-hanging structure and facing brick dry-hanging technology
CN107620442A (en) * 2017-08-21 2018-01-23 广州市名晋机电设备技术有限公司 A kind of novel unit formula exterior wall panel cladding system
CN109779191A (en) * 2019-02-19 2019-05-21 嘉兴宝仕龙集成家居有限公司 A kind of integrated wall Quick assembling structure system

Similar Documents

Publication Publication Date Title
CN105888179A (en) Facing brick dry-hanging structure and facing brick dry-hanging technology
CN205677190U (en) Face brick dried hanging hang structure
CN206233443U (en) A kind of arc concealed light light slot structure
CN207469649U (en) One kind can adjust, dismountable integrated wall Modularized installing structure
CN205677189U (en) The cladding suspension member of face brick
CN212026903U (en) Stone decoration canopy
CN207160487U (en) Can quickly and be precisely controlled wallboard installation gap assembled type bar assembly
CN205840109U (en) A kind of flexible hanging piece suspended ceiling of tubulose
CN204715603U (en) A kind of parallel wide keel smallpox
CN209499431U (en) A kind of integrated pelmet
CN208501912U (en) A kind of modular cabinet bottom beam mounting structure
CN203440974U (en) Suspended ceiling pendant
CN220504272U (en) Slotted stone sunshade system
CN204326434U (en) Bar door cover screen wall facing the gate of a house mounting structure
CN206091156U (en) Decoration member suitable for outer facade of building
CN206110421U (en) Stone material curtain adjustable combination pendant is hung futilely to back of body bolt formula
CN214273076U (en) Pavilion framework
CN209837790U (en) Novel door head structure of gate building architectural design
CN206607731U (en) A kind of dark frame square plate furred ceiling of card triangular keel
CN205134691U (en) Integrated furred ceiling of suspending free
CN105464274A (en) Novel aluminum grid ceiling mounting structure
CN208777645U (en) A kind of wallboard hanging strip component
CN203742039U (en) Novel component type curtain wall system
CN210342579U (en) Slender stone line curtain wall system
CN205857484U (en) A kind of Aluminium and plastic board curtain wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant