CN205676431U - Coal gas vertical spray cooling and dewatering integral system - Google Patents

Coal gas vertical spray cooling and dewatering integral system Download PDF

Info

Publication number
CN205676431U
CN205676431U CN201620554703.3U CN201620554703U CN205676431U CN 205676431 U CN205676431 U CN 205676431U CN 201620554703 U CN201620554703 U CN 201620554703U CN 205676431 U CN205676431 U CN 205676431U
Authority
CN
China
Prior art keywords
coal gas
import
gas
water
integral system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620554703.3U
Other languages
Chinese (zh)
Inventor
徐庆余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN201620554703.3U priority Critical patent/CN205676431U/en
Application granted granted Critical
Publication of CN205676431U publication Critical patent/CN205676431U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/10Process efficiency

Abstract

The open a kind of coal gas vertical spray cooling and dewatering integral system of the utility model, mainly for system can be easily at existing gas piping or arrange on newly-built gas piping and take up an area that space is little and the design that carries out.The utility model coal gas vertical spray cooling and dewatering integral system includes connecting into the circulating water device of closed circuit, vertical coal gas dehydration device, collecting-tank device along liquid flow direction, is provided with at least one spraying ventilating device on Import Gas pipeline.The utility model takes up an area that space is less can be arranged on easily on existing or newly-built gas piping; whole system carries out spraying cooling first with a small amount of water atomization water and washs the blast furnace gas containing noxious acidic material and salt to coal gas of high temperature; again the coal gas containing mechanical water is carried out high-speed rotational in vertical coal gas dehydration device; removing machinery water droplet under the effect of centrifugal force; it is possible not only to protection pipe network and equipment; improve the heat utilization efficiency of coal gas simultaneously, save the energy.

Description

Coal gas vertical spray cooling and dewatering integral system
Technical field
The utility model relates to a kind of coal gas vertical spray cooling and dewatering integral system.
Background technology
Blast furnace gas is the manufacture gas in smelter blast furnace ironmaking process, occupies important in iron and steel enterprise's energy resource structure Position.Before 2000, Purify Process of Blast Furnace mainly in a wet process based on, with raising and the dry method cloth of environmental protection requirement Reaching its maturity and the innovation of filtering material (cloth bag) of bag dedusting technology, dry method dust had become as a kind of trend and based on The purification technique of stream.Compared with wet dedusting, dry method dust top pressure power generation amount increases about 25%~30% on year-on-year basis, has occupation of land Few, reduced investment, the advantages such as dust content of gas is low, and available gas heat is big, do not produce waste water, environmental pollution is relatively small. On the other hand, blast furnace gas dry dusting also brings obvious shortcoming: gas temperature after is dry type TRT or after pressure regulator valve group Higher, typically at 70 DEG C~about 100 DEG C, it is difficult to meet equipment component such as dry gas holder, CCPP generating set etc. to coal gas Air inlet lower temperature requires;Two be dry method dust coal gas in contain partially acidic gas (SO2、SO3、H2S, HCL etc.) and NH4CL salt, causes corrosion and channel blockage to gas piping and annex and use equipment thereof, produces harm to pipeline and equipment, Cause great potential safety hazard, increase operation expense.
For the problems referred to above, the solution of current Some Enterprises is to increase on the gas piping of TRT outlet or user Scrubbing towers etc. wash cooling installation, to remove the harmful substance in coal gas.Although this method is effective, but due to scrubbing tower and It is big (scrubbing tower diameter 6~10m, different according to heat size size) to there is floor space in affiliated facility, and investment height, water consumption is big (being 2~4 times of the present utility model on year-on-year basis), the reasons such as operating cost is high and be very restricted, especially in built operation System in increase scrubbing tower more have bigger difficulty.
Utility model content
For the problems referred to above, the utility model offer one can be easily at existing gas piping or at newly-built gas pipe The coal gas vertical spray cooling and dewatering integral system arranging on road, coal gas vertical spray cooling and dewatering integral system not only may be used To reduce the temperature of coal gas, the partially acidic material in coal gas and salt can also be removed, improve the quality of coal gas, extend gas pipe Road and the service life of equipment, and can save the area, reduce operation and maintenance cost.
For reaching above-mentioned purpose, a kind of coal gas vertical spray cooling and dewatering integral system of the utility model, described system Including connect into the circulating water device of closed circuit, vertical coal gas dehydration device, collecting tank along liquid flow direction;
The dehydration device series connection of described vertical coal gas is vertically mounted on gas piping, and described vertical coal gas dehydration device includes It is vertically connected with import diversion section, eddy flow mechanism, the dehydration housing of setting successively, export diversion section, wherein, described import water conservancy diversion Section, outlet diversion section respectively with Import Gas pipeline, outlet gas piping connect, described be dehydrated housing be positioned at described outlet guide The lower section of stream section is provided with discharge outlet, and described discharge outlet and described collecting tank are provided by the pipeline of drain water seal device even Connect;It is provided with at least one spraying ventilating device, the water inlet of described spraying ventilating device and institute on described Import Gas pipeline State circulating water device to be connected by feed pipe;
The height that described collecting tank is arranged is less than the height of described discharge outlet, described collecting tank and described circulating water device Between pipeline on be provided with washings elevator pump.
Further, described Import Gas pipeline is provided with import partition apparatus, described outlet gas piping is arranged Have outlet device, described Import Gas pipeline import partition apparatus upstream with outlet gas piping on outlet every It is provided with coal gas bypass between the downstream of disconnected device, the bypass of described coal gas is provided with bypass partition apparatus.
Further, on described Import Gas pipeline, the downstream span at described import partition apparatus is provided with two sprays Heat sink, respectively one-level spraying ventilating device and two grades of spraying ventilating devices, described one-level spraying ventilating device includes one Level spray equipment housing, one-level manhole, first order jet nozzle, described two grades of spraying ventilating devices include two grades of spray equipment housings, Two grades of manholes, secondary nozzles;
Described first order jet nozzle and described secondary nozzle are solid double fluid atomization nozzle.
Further, described supply line and described one-level spraying ventilating device and two grades of spraying ventilating devices pass through respectively One-level arm, two grades of arm connections, described one-level arm, two grades of arms are respectively arranged with one-level valve and secondary valve door;
Supply line described in the upstream of one-level arm and two grades of arms described in the downstream of described water circulating pump is provided with Flow control valve and flowmeter, described flow control valve is interlocked with described flowmeter.
Further, being provided with nitrogen bubble pipe bottom described collecting tank, described nitrogen bubble pipe is provided with aperture;Described collection Liquid pool top is provided with the collecting tank delivery pipe for discharging the coal gas being entrained in water;
It is additionally provided with the first liquid level gauge, PH meter in described collecting tank.
Further, described circulating water device includes circulating water pool and is arranged on the recirculated water cooling above described circulating water pool But tower;
The pipeline that described collecting tank is provided by washings elevator pump is connected with the water inlet of described circulating water cooling tower, The delivery port of described circulating water pool is connected with described spraying ventilating device by supply line.
Further, being provided with nitrogen bubble pipe bottom described circulating water pool, nitrogen bubble pipe is provided with aperture;
Described circulating water pool top is provided with the circulating water pool delivery pipe for discharging the coal gas being entrained in water.
Further, described circulating water pool is connected with filling pipe, and described filling pipe is provided with moisturizing control valve, described follows Ring pond is provided with the second liquid level gauge;
Described liquid level gauge is interlocked with described moisturizing control valve.
Further, described import partition apparatus, outlet device and bypass partition apparatus all include butterfly valve and blind plate Valve.
Further, described eddy flow mechanism includes the eddy flow housing being connected with described dehydration housing and is arranged on eddy flow shell Internal eddy flow, is provided with two-dimensional current or three-dimensional flow blade between the sub and described eddy flow housing of described eddy flow;
The upper end of described dehydration housing is provided with top manhole, and the lower end of described dehydration housing arranges underlying vent holes, It is equipped with seal member on described top manhole and underlying vent holes, described seal member is provided with nitrogen blow valve port;
The top of described import diversion section is provided with releasing device, and described releasing device includes with described dehydration housing even The exhaust stack connecing and the probe tube being arranged on described exhaust stack, diffusion valve.
The utility model coal gas vertical spray cooling and dewatering integral system may be mounted at a certain seat height stove low pressure clean coal On pipeline between gas outlet and full factory total pipe network, it is also possible to be arranged on before Single gas user on gas piping, Import Gas Pipeline can be connected with the outlet of blast furnace gas pressure regulator valve group, the welding of TRT (BPRT, STRT) outlet conduit or flange, or and user Gas piping connects;Outlet gas piping can be connected with full factory blast furnace gas main pipe, or is connected with a certain user entry pipeline.
Owing to taking up an area, space is less can be increased the utility model coal gas vertical spray cooling and dewatering integral system easily Add and be arranged on existing or newly-built gas piping, whole system first with the spraying ventilating device being arranged on pipeline to coal gas Carrying out spraying cooling, washing part noxious acidic material and salt simultaneously, the coal gas then containing mechanical water is dehydrated at vertical coal gas Device carries out high-speed rotational, and removing machinery water droplet under the influence of centrifugal force, be possible not only to protection pipe network and equipment, and by It is stripped of mechanical water in coal gas, improve the heat utilization efficiency of media, saved the energy.
Brief description
Fig. 1 is the utility model coal gas vertical spray cooling and dewatering integral system schematic diagram.
Detailed description of the invention
Below in conjunction with Figure of description, the utility model is further described.
Embodiment 1
The present embodiment coal gas vertical spray cooling and dewatering integral system, described system includes along liquid flow direction even It is connected into circulating water device the 8th, vertical coal gas dehydration device the 6th, the collecting tank device 7 of closed circuit.Described vertical coal gas is dehydrated device 6 Series connection is vertically mounted on gas piping, and described vertical coal gas dehydration device 6 includes the import water conservancy diversion being vertically connected with setting successively The 66th, section the 60th, eddy flow mechanism, dehydration housing export diversion section 64, and described eddy flow mechanism includes different with what described dehydration housing was connected Footpath pipe 61 and eddy flow 62 being arranged in described eddy flow housing, be provided with between described eddy flow 62 and described reduced pipe 61 Three-dimensional flow or two-dimensional current blade;The 60th, described import diversion section exports and is provided with deflector, described dehydration housing in diversion section 64 The lower section being positioned at described outlet diversion section 64 of 66 is provided with discharge outlet, the height that the collecting tank 71 of described collecting tank device 7 is arranged Degree is less than the height of described discharge outlet, and described discharge outlet and described collecting tank 71 are provided by the pipeline of liquid packing 67 even Connect.
Circulating water device 8 includes circulating water pool 82 and is arranged on the circulating water cooling tower 84 above described circulating water pool 82; Described collecting tank 71 is connected by drainpipe with the water inlet of described circulating water cooling tower 84, and described drainpipe is provided with washing Water elevator pump 76.
The 61st, described import diversion section exports diversion section 64 and the 10th, exports gas piping 11 with Import Gas pipeline respectively Connection.Be provided with import partition apparatus 1 on described Import Gas pipeline 10, described outlet gas piping 11 is provided with outlet every Disconnected device 2, at the upstream of import partition apparatus 1 of described Import Gas pipeline and the outlet device on outlet gas piping It is provided with coal gas bypass conduit 12 between the downstream of 2, described coal gas bypass conduit 12 is provided with bypass partition apparatus 3.Described Import partition apparatus 1 is made up of import butterfly valve 101 and import blank-plate valve 102, and described outlet device 2 is by exit butterfly valve 21 He Outlet blank-plate valve 22 forms, and described bypass partition apparatus 3 is by including that bypass butterfly valve 31 and bypass blank-plate valve 32 form.Described enter On mouth gas piping 10, the downstream span at described import partition apparatus 1 is provided with two spraying ventilating devices, respectively one-levels Spraying ventilating device 4 and two grades of spraying ventilating devices 5, wherein, described two grades of spray equipments 5 are dehydrated device 6 near vertical coal gas Arrange, and after two grades of spray equipments 5 gas piping keep certain length straight length (its length should according to gas temperature and Evaporation conditions determines).Described one-level spray equipment 4 and two grades of spray equipments 5 are by the supply line being connected with circulating water pool 82 810 water inlets.
Described one-level spraying ventilating device 4 includes one-level spray equipment housing the 41st, one-level manhole the 42nd, first order jet nozzle 43, Described two grades of spraying ventilating devices 5 include two grades of spray equipment housings the 51st, two grades of manhole the 52nd, secondary nozzle 53;Described one-level Nozzle 43 and described secondary nozzle 53 are solid double fluid atomization nozzle.
Described supply line 810 and described one-level spraying ventilating device 4 and two grades of spraying ventilating devices 5 pass through one-level respectively Arm, two grades of arm connections, described one-level arm, two grades of arms are respectively arranged with one-level valve and secondary valve door;Described give Water lines is disposed with water circulating pump in the upstream of described one-level arm along the flow direction of recirculated water and the 89th, feeds water U-shaped water seal Section, adjusting means 9, described adjusting means 9 includes flow control valve 91 and flowmeter 92.The U-shaped aqua seal section of described feedwater can in case Only coal gas flows backward to circulating water pool 82.
Circulating water device 8 has and will cool down from the recirculated water washing and after desalination, quenched, the effect of precipitation, And a part of underproof recirculated water is sent to plant area's water treatment system by recirculated water discharge pipe 85 processes, institute simultaneously State circulating water pool and be also associated with filling pipe 87, supplement the water losing in washing temperature-fall period and a small amount of outer draining.Cooling tower 84 Bottom is provided with circulating water pool 82, is provided with nitrogen bubble pipe 81 bottom circulating water pool 82, and it is little that nitrogen bubble pipe 81 is provided with rule shape Hole, described circulating water pool top is provided with the circulating water pool delivery pipe 86 for discharging the coal gas being entrained in water, presss from both sides in recirculated water The coal gas of band is discharged by circulating water pool delivery pipe 86 by after bubbling buoyance lift, prevents coal gas from assembling.Set on nitrogen bubble pipe 81 The miniature passage of rule has anti-clogging and self-cleaning function.
It is provided with the first nitrogen bubble pipe 73 bottom the collecting tank 71 of the present embodiment vertical coal gas washing dehydration integral system, Described first nitrogen bubble pipe 73 is provided with aperture;Described collecting tank 71 top is provided with for discharging the coal gas being entrained in water Collecting tank delivery pipe 74, be additionally provided with in described collecting tank the first liquid level gauge the 72nd, PH meter 75.Draining is carried secretly and enters liquid collecting Coal gas in pond 71 is discharged by collecting tank delivery pipe 74 after bubbling buoyance lift, prevents coal gas from assembling;PH meter 75 may be used for PH value in measurement collecting tank 71, can judge to control injection flow rate by the pH value of liquid further.First nitrogen bubble 73 On set regular miniature passage there is anti-clogging and self-cleaning function.
The one-level spraying ventilating device 4 of the present embodiment coal gas vertical spray cooling and dewatering integral system and two grades of spray falls The temperature first order jet nozzle 43 of device 5 and secondary nozzle 53, use the form along spray or inverse spray, utilize atomizing medium nitrogen or other Inert gas is as atomizing medium, and the water smoke of formation can all cover in whole spray equipment housing, after then washing cooling Coal gas entrance vertical coal gas dehydration device is after eddy flow mechanism eddy flow, and mechanical water to dehydrator tube wall and is deposited on the end by eddy flow Portion, by overwhelming majority mechanical water removing in coal gas.For the convenience overhauled, the upper end of described dehydration housing 66 arranges top maintenance Hole 63, the lower end of described dehydration housing 66 arranges underlying vent holes 65, described top manhole 63 and underlying vent holes 65 sets Being equipped with seal member, seal member is provided with nitrogen blow valve port;Described dehydration housing 66 is arranged on the top of import diversion section 60 Having releasing device 68, described releasing device 68 includes putting with the described dehydration exhaust stack 683 that is connected of housing and described in being arranged on Dissipate probe tube the 682nd, diffusion valve 681 on pipe 683.
The import partition dress that maintenance uses is set before and after the utility model coal gas vertical spray cooling and dewatering integral system Put and outlet device, and bypass duct and bypass partition apparatus are set in the side of described vertical coal gas dehydration device, from And bypass duct still can use as maintenance bypass when coal gas vertical spray cooling and dewatering integral system overhauls, do not affect The use of whole air supply system;Circulation below pipeline and described in the setting of side appropriate location, it is achieved that washings Recycle, saved resource and reduced production cost.
Having the beneficial effect that of the present embodiment coal gas vertical spray cooling and dewatering integral system
1st, the present embodiment coal gas vertical spray cooling and dewatering integral system floor space is little, invests low, it is easy to accomplish, have It is beneficial to the transformation realizing carrying out spraying cooling and dehydration to existing piped gas.The utility model floor space is about large-scale on year-on-year basis The 10%~20% of washing device, investment reduces about about 60% on year-on-year basis.
2nd, newly-built blast furnace and the coal gas system thereof for narrow field, it is possible to according to this present embodiment coal gas vertical spray fall The dewatering integrated system of temperature is implemented, to solve the etching problem of coal gas cooling demand and pipe network and equipment.
3rd, the present embodiment coal gas vertical spray cooling and dewatering integral system can be additionally used in part in full factory coal gas system needs The terminal use washing or being dehydrated, to meet individual needs and special service.
4th, for large-scale scrubbing tower, owing to the present embodiment coal gas vertical spray cooling and dewatering integral system exists Pipeline is provided with at least one-level spraying ventilating device be provided with two-dimensional current or three-dimensional flow in vertical coal gas desalting dewatering device The efficient swirler of blade, thus cooling and dehydrating effect are good, water spray is few, and after system, coal gas moisture content is low, its investment Cost and operation and maintenance cost are low, and Subscriber Unit gas consumption amount is few.
The present embodiment coal gas vertical spray cooling and dewatering integral system, its system is run both can be automatic, it is also possible to hand Dynamic.Being provided with the second liquid level gauge 83 in cooling tower 84 and the control valve 88 with filling pipe 88 being interlocked, namely liquid level gauge reaches pre- If sending signal to control system during value, the control valve of the described filling pipe of control system control opens or closes;On feed pipe Described flow control valve and described flowmeter interlock, namely flowmeter by reaching preset value when send letter to control system Number, control system sends command adapted thereto according to the signal that flowmeter sends to flow control valve, thus can automatically control as required System or PLC Non-follow control nozzle confluent.
The utility model spraying ventilating device is not limited to the form of the two-stage providing in embodiment, to spraying ventilating device Quantity calculates according to gas temperature condition and gas quality, typically at least provided with a spraying ventilating device.
Above, preferred embodiment only of the present utility model, but protection domain of the present utility model is not limited thereto, and appoints What those familiar with the art in the technical scope that the utility model discloses, the change that can readily occur in or replace Change, all should cover within protection domain of the present utility model.Therefore, protection domain of the present utility model should be with claim The protection domain being defined is as the criterion.

Claims (10)

1. a coal gas vertical spray cooling and dewatering integral system, it is characterised in that: described system includes along liquid flowing side To connect into closed circuit circulating water device, vertical coal gas dehydration device, collecting tank;
The dehydration device series connection of described vertical coal gas is vertically mounted on gas piping, and described vertical coal gas dehydration device includes successively It is vertically connected with the import diversion section of setting, eddy flow mechanism, dehydration housing, outlet diversion section, wherein, described import diversion section, Outlet diversion section respectively with Import Gas pipeline, outlet gas piping connect, described dehydration housing be positioned at described export water conservancy diversion The lower section of section is provided with discharge outlet, and the pipeline that described discharge outlet is provided by drain water seal device with described collecting tank is connected; Being provided with at least one spraying ventilating device on described Import Gas pipeline, the water inlet of described spraying ventilating device follows with described Ring water device is connected by feed pipe;
The height that described collecting tank is arranged is less than the height of described discharge outlet, between described collecting tank and described circulating water device It is provided with washings elevator pump on pipeline.
2. coal gas vertical spray cooling and dewatering integral system according to claim 1, it is characterised in that: described Import Coal It is provided with import partition apparatus in feed channel, described outlet gas piping is provided with outlet device, at described Import Coal It is provided with coal gas between the downstream of the outlet device on the upstream of the import partition apparatus of feed channel and outlet gas piping Bypass, the bypass of described coal gas is provided with bypass partition apparatus.
3. coal gas vertical spray cooling and dewatering integral system according to claim 2, it is characterised in that: described Import Coal In feed channel, the downstream span at described import partition apparatus is provided with two spraying ventilating devices, respectively one-level spraying cooling Device and two grades of spraying ventilating devices, described one-level spraying ventilating device include one-level spray equipment housing, one-level manhole, one Level nozzle, described two grades of spraying ventilating devices include two grades of spray equipment housings, two grades of manholes, secondary nozzles;
Described first order jet nozzle and described secondary nozzle are solid double fluid atomization nozzle.
4. coal gas vertical spray cooling and dewatering integral system according to claim 3, it is characterised in that: described feed pipe Road is connected by one-level arm, two grades of arms respectively with described one-level spraying ventilating device and two grades of spraying ventilating devices, described It is respectively arranged with one-level valve and secondary valve door on one-level arm, two grades of arms;
Supply line described in the upstream of one-level arm and two grades of arms described in the downstream of described water circulating pump is provided with flow Regulation valve and flowmeter, described flow control valve is interlocked with described flowmeter.
5. coal gas vertical spray cooling and dewatering integral system according to claim 1, it is characterised in that: described collecting tank Bottom is provided with nitrogen bubble pipe, and described nitrogen bubble pipe is provided with aperture;Described collecting tank top is provided with carries secretly for discharge The collecting tank delivery pipe of the coal gas in water;
It is additionally provided with the first liquid level gauge, PH meter in described collecting tank.
6. coal gas vertical spray cooling and dewatering integral system according to claim 1, it is characterised in that: described recirculated water Device includes circulating water pool and is arranged on the circulating water cooling tower above described circulating water pool;
The pipeline that described collecting tank is provided by washings elevator pump is connected with the water inlet of described circulating water cooling tower, described The delivery port of circulating water pool is connected with described spraying ventilating device by supply line.
7. coal gas vertical spray cooling and dewatering integral system according to claim 6, it is characterised in that: described recirculated water Being provided with nitrogen bubble pipe bottom pond, nitrogen bubble pipe is provided with aperture;
Described circulating water pool top is provided with the circulating water pool delivery pipe for discharging the coal gas being entrained in water.
8. coal gas vertical spray cooling and dewatering integral system according to claim 6, it is characterised in that: described recirculated water Pond is connected with filling pipe, described filling pipe is provided with moisturizing control valve, is provided with the second liquid level gauge in described circulating water pool;
Described liquid level gauge is interlocked with described moisturizing control valve.
9. coal gas vertical spray cooling and dewatering integral system according to claim 2, it is characterised in that: described import every Disconnected device, outlet device and bypass partition apparatus all include butterfly valve and blank-plate valve.
10. coal gas vertical spray cooling and dewatering integral system according to claim 1, it is characterised in that: described eddy flow Mechanism include and described dehydration the housing eddy flow housing being connected and be arranged in eddy flow housing eddy flow, described eddy flow and It is provided with two-dimensional current or three-dimensional flow blade between described eddy flow housing;
The upper end of described dehydration housing is provided with top manhole, and the lower end of described dehydration housing arranges underlying vent holes, described It is equipped with seal member on top manhole and underlying vent holes, described seal member is provided with nitrogen blow valve port;
The top of described import diversion section is provided with releasing device, and described releasing device includes and putting that described dehydration housing is connected Dissipate pipe and the probe tube being arranged on described exhaust stack, diffusion valve.
CN201620554703.3U 2016-06-02 2016-06-02 Coal gas vertical spray cooling and dewatering integral system Withdrawn - After Issue CN205676431U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620554703.3U CN205676431U (en) 2016-06-02 2016-06-02 Coal gas vertical spray cooling and dewatering integral system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620554703.3U CN205676431U (en) 2016-06-02 2016-06-02 Coal gas vertical spray cooling and dewatering integral system

Publications (1)

Publication Number Publication Date
CN205676431U true CN205676431U (en) 2016-11-09

Family

ID=57435749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620554703.3U Withdrawn - After Issue CN205676431U (en) 2016-06-02 2016-06-02 Coal gas vertical spray cooling and dewatering integral system

Country Status (1)

Country Link
CN (1) CN205676431U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105950226A (en) * 2016-06-02 2016-09-21 中冶华天工程技术有限公司 Vertical type spray cooling and dehydration integrated system for coal gas

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105950226A (en) * 2016-06-02 2016-09-21 中冶华天工程技术有限公司 Vertical type spray cooling and dehydration integrated system for coal gas
CN105950226B (en) * 2016-06-02 2018-10-02 中冶华天工程技术有限公司 Coal gas vertical spray cooling and dewatering integral system

Similar Documents

Publication Publication Date Title
CN105950226B (en) Coal gas vertical spray cooling and dewatering integral system
CN206168089U (en) Dust fall groove structure that exhaust gas manifold said
CN105176599B (en) A kind of percussion flow wash mill and purification technique for raw gas purifying
CN105885959B (en) Vertical coal gas washing dehydration integral system
CN205676432U (en) Coal gas Horizental showering cooling and dewatering integral system
CN205676431U (en) Coal gas vertical spray cooling and dewatering integral system
CN102586523B (en) Blast furnace gas purification plant
CN110527564A (en) Blast furnace gas desulfurizing tower
CN201711068U (en) Dual-tower water dust collector
CN208472004U (en) A kind of cleaning dust device of synthesis gas
CN105861076B (en) Coal gas Horizental showering cooling and dewatering integral system
CN103418225A (en) High-efficiency carbon-absorbing tower
CN201493049U (en) Waste gas purifying device
CN106621629A (en) Spraying type dust removing device for producing chemical fertilizer
CN105885960B (en) Vertical coal gas desalting and dewatering integral system
CN206700988U (en) A kind of New type wet cleaner
CN105885961B (en) The horizontal dewatering integrated system of gas washing
CN212731620U (en) Multistage spraying washing recovery equipment
CN211462590U (en) Metallurgical flue gas dust removal device
CN205953949U (en) Vertical coal gas desalination and dehydration integration system
CN205953948U (en) Horizontal coal gas desalination and dehydration integration system
CN205774369U (en) Vertical coal gas washing dehydration integral system
CN205774367U (en) The dewatering integrated system of horizontal gas washing
CN105950228B (en) Horizontal coal gas desalting and dewatering integral system
CN202569874U (en) Water mist dust removal device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161109

Effective date of abandoning: 20181002

AV01 Patent right actively abandoned