CN205659725U - Colliery underground operation face is from moving broken system - Google Patents

Colliery underground operation face is from moving broken system Download PDF

Info

Publication number
CN205659725U
CN205659725U CN201620539453.6U CN201620539453U CN205659725U CN 205659725 U CN205659725 U CN 205659725U CN 201620539453 U CN201620539453 U CN 201620539453U CN 205659725 U CN205659725 U CN 205659725U
Authority
CN
China
Prior art keywords
coal
belt
rock
conveyor
screening roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620539453.6U
Other languages
Chinese (zh)
Inventor
朱稳樑
许存良
谢树鹏
张文明
李刚
闫保灿
翁明月
丛利
何军
陈云民
周剑
刘宝江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhong Tianhechuan Ltd Energy Responsible Co
Beijing Bochuangkaisheng Mechanical Manufacturing Co ltd
Original Assignee
Zhong Tianhechuan Ltd Energy Responsible Co
Beijing Bochuangkaisheng Mechanical Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhong Tianhechuan Ltd Energy Responsible Co, Beijing Bochuangkaisheng Mechanical Manufacturing Co ltd filed Critical Zhong Tianhechuan Ltd Energy Responsible Co
Priority to CN201620539453.6U priority Critical patent/CN205659725U/en
Application granted granted Critical
Publication of CN205659725U publication Critical patent/CN205659725U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a colliery underground operation face is from moving broken system, including bridge conveyor and the crossheading belt of connection at the bridge conveyor discharge gate bridge conveyor with still be equipped with a plurality of screening roller and the crushing roller corresponding with this screening roller between the crossheading belt, the screening roller will the elevating conveyor carries coal cinder, bold waste rock and the rock of the coal of crossheading belt in flowing to screen out to the coal cinder, bold waste rock and the rock that come out the screening carry for the crushing roller is accomplished brokenly, the discharge gate of crushing roller is in the top of crossheading belt. The beneficial effects of the utility model are that: the effectual crossheading belt of having solved the working face is often by coal cinder, the tearing problem of bold waste rock, great improvement work efficiency and user's the economic benefits of working face.

Description

Underground coal mine work surface is from moving crushing system
Technical field
This utility model relates to mining machine, is specifically related to underground coal mine work surface from moving crushing system.
Background technology
In prior art: the coal of work surface extraction transports on bridge conveyor by scrapper conveyor, the elevating conveyor of operating will Coal falls on gateway belt again, owing to there being drop between elevating conveyor and gateway belt, and the coal on elevating conveyor, bulk spoil rock pair Gateway belt has bigger impact, wherein also has scraper plate and the pick of partial destruction in coal cinder, will also result in gateway belt Certain injury, runs into sharp ironware and likely can tear whole piece belt, user causes the biggest loss, it is impossible in reality Production in extensively practical.
Utility model content
In sum, in order to overcome the deficiencies in the prior art, technical problem to be solved in the utility model is to provide coal Ore deposit mining face under mine is from moving crushing system.
The technical scheme that this utility model solves above-mentioned technical problem is as follows: underground coal mine work surface moves crushing system certainly, Including bridge conveyor and the gateway belt being connected to bridge conveyor discharging opening, at described bridge conveyor and described crossheading skin Being additionally provided with several screening roller and breaker rolls corresponding with this screening roller between band, described elevating conveyor is carried by described screening roller Coal cinder, bulk spoil and rock in the coal stream of gateway belt screen, and by the coal cinder screened, bulk spoil and Rock flows to described breaker roll and completes to crush, and the discharge outlet of described breaker roll is in the top of gateway belt.
The beneficial effects of the utility model are: effectively solve the gateway belt of work surface often by coal cinder, bulk cash The problem of stone tear, is greatly improved the work efficiency of work surface and the economic benefit of user.
On the basis of technique scheme, this utility model can also do improvement further below:
Further, described screening roller is provided with two or more.
Further, be provided with can be with elevating conveyor described in sucking-off the top between described bridge conveyor and described gateway belt The tramp iron separator of the iron block in upper coal stream.
Use above-mentioned further scheme has the beneficial effect that the iron block removed in coal stream, it is to avoid sharp ironware has tear Whole piece belt.
Further, described tramp iron separator is permanent-magnetic iron expeller.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model.
In accompanying drawing, the list of parts representated by each label is as follows:
1, bridge conveyor, 2, tramp iron separator, 3, screening roller, 4, breaker roll, 5, self-movable foot end.
Detailed description of the invention
Being described principle of the present utility model and feature below in conjunction with accompanying drawing, example is served only for explaining this practicality Novel, it is not intended to limit scope of the present utility model.
As it is shown in figure 1, underground coal mine work surface is from moving crushing system, including bridge conveyor 1 be connected to Bridge type transfer The gateway belt of machine 1 discharging opening, is additionally provided with several screening roller 3 Hes between described bridge conveyor 1 and described gateway belt The breaker roll 4 corresponding with this screening roller 3, preferably: described screening roller 3 is provided with two or more.Described screening roller 3 is by described turn Carrier aircraft 1 is transported to the coal cinder in the coal stream of gateway belt, bulk spoil and rock and screens, and by the coal cinder screened, Bulk spoil and rock flow to described breaker roll 4 and complete to crush, upper in gateway belt of the discharge outlet of described breaker roll 4 Side.Bulk spoil, rock in coal stream can first be thrown along coal stream and tentatively sieve on the screening roller 3 of rotation, meets granularity Material screening go down with gateway belt export, bulk materials i.e. bulk spoil, rock transports breaker roll 4 backward and breaks Broken, until meeting granularity, the material meeting granularity the most also can export with gateway belt.This crushing system meets coal-winning machine Cut deep 865mm, the operating type that three cuttves one push away, and the gateway belt of the big freight volume of applicable distance.Complete machine meets left and right work Make face and exchange needs, and can disintegrating transportation.By above-mentioned design effectively solve the gateway belt of work surface often by coal cinder, The problem of bulk spoil tear, is greatly improved the work efficiency of work surface and the economic benefit of user.
Top between described bridge conveyor 1 and described gateway belt is provided with can be with coal on elevating conveyor described in sucking-off 1 The tramp iron separator 2 of the iron block in stream, preferably: described tramp iron separator 2 is Magnet.Upper between bridge conveyor 1 and gateway belt Portion hangs a movable iron remover 2, the iron block in coal stream all can be sucked out, it is to avoid sharp ironware has tear whole piece Belt.During overhaul of the equipments, tramp iron separator 2 can be shifted out the ironware manually removing top.
The foregoing is only preferred embodiment of the present utility model, not in order to limit this utility model, all in this practicality Within novel spirit and principle, any modification, equivalent substitution and improvement etc. made, should be included in guarantor of the present utility model Within the scope of protecting.

Claims (4)

1. underground coal mine work surface is from moving crushing system, including bridge conveyor (1) be connected to bridge conveyor (1) discharging opening Gateway belt, it is characterised in that be additionally provided with between described bridge conveyor (1) and described gateway belt several screening roller (3) and the breaker roll (4) corresponding with this screening roller (3), described elevating conveyor (1) is transported to crossheading skin by described screening roller (3) Coal cinder, bulk spoil and rock in the coal stream of band screen, and the coal cinder screened, bulk spoil and rock are carried Completing to crush to described breaker roll (4), the discharge outlet of described breaker roll (4) is in the top of gateway belt.
Crushing system the most according to claim 1, it is characterised in that described screening roller (3) is provided with two or more.
Crushing system the most according to claim 1 and 2, it is characterised in that at described bridge conveyor (1) and described crossheading Top between belt is provided with can be with the tramp iron separator (2) of the iron block in the upper coal stream of elevating conveyor described in sucking-off (1).
Crushing system the most according to claim 3, it is characterised in that described tramp iron separator (2) is permanent-magnetic iron expeller.
CN201620539453.6U 2016-06-06 2016-06-06 Colliery underground operation face is from moving broken system Active CN205659725U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620539453.6U CN205659725U (en) 2016-06-06 2016-06-06 Colliery underground operation face is from moving broken system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620539453.6U CN205659725U (en) 2016-06-06 2016-06-06 Colliery underground operation face is from moving broken system

Publications (1)

Publication Number Publication Date
CN205659725U true CN205659725U (en) 2016-10-26

Family

ID=57157529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620539453.6U Active CN205659725U (en) 2016-06-06 2016-06-06 Colliery underground operation face is from moving broken system

Country Status (1)

Country Link
CN (1) CN205659725U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106311389A (en) * 2016-10-19 2017-01-11 宁夏天地奔牛实业集团有限公司 Gate roadway loader raw coal transporting and crushing system for underground coal mining
CN106975538A (en) * 2017-05-15 2017-07-25 北京博创凯盛机械制造有限公司 Coal mine roadway conveys crushing system
CN115138429A (en) * 2022-06-28 2022-10-04 唐山天和环保科技股份有限公司 Raw coal self-moving screening and crushing system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106311389A (en) * 2016-10-19 2017-01-11 宁夏天地奔牛实业集团有限公司 Gate roadway loader raw coal transporting and crushing system for underground coal mining
CN106975538A (en) * 2017-05-15 2017-07-25 北京博创凯盛机械制造有限公司 Coal mine roadway conveys crushing system
CN106975538B (en) * 2017-05-15 2019-02-15 北京博创凯盛机械制造有限公司 Coal mine roadway conveys crushing system
CN115138429A (en) * 2022-06-28 2022-10-04 唐山天和环保科技股份有限公司 Raw coal self-moving screening and crushing system

Similar Documents

Publication Publication Date Title
AU2005203753B2 (en) A recovery method for nickel sulfide and copper mining tailings
CN205659725U (en) Colliery underground operation face is from moving broken system
CN103133031B (en) Method and equipment for separating, conveying and filling underground coal and gangues
CN206577824U (en) A kind of mine crushing equipment
CN203695136U (en) Waste crushing and sorting device
CN106111297A (en) The ore-dressing technique of a kind of chromium depleted zone and production system thereof
CN103567056A (en) Downhole jigging and gangue discharging method
CN204583308U (en) A kind of colliery disintegrating screening machine
CN206577810U (en) A kind of ore crushing-ore system
CN204746555U (en) Colliery is two washing systems in pit
CN205098953U (en) Crossheading is from broken system of telephone -moving tail formula for coal mine
CN205673162U (en) A kind of ore crusher discharging opening sorting unit reducing belt abrasion
CN206642867U (en) A kind of coal separation graded crushing device in colliery
CN206425079U (en) A kind of many particle diameter screening disintegrating machines of noise-proofing
CN105597866A (en) Two-channel screening crushing device for coal mine
CN204911715U (en) Concrete constructs breaker
CN102269012B (en) Process and equipment for increasing block coal rate
CN202215290U (en) Equipment for improving block coal yield
CN208786623U (en) A kind of efficient ore crushing system
CN202594253U (en) Material falling hopper for buffering material falling
CN205761568U (en) A kind of three axles synchronize disintegrating machine
CN112403647B (en) Arrangement method of intelligent dry separation system for underground transfer points
CN106622459A (en) Ore crushing system
CN107152308A (en) A kind of crossheading transfer system with anti-clogging and two-stage crushing function
CN209254933U (en) A kind of mine tailings graded crushing screening machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant