CN205637649U - Paste anchor convolution concrete trompil roof beam reinforcing apparatus - Google Patents

Paste anchor convolution concrete trompil roof beam reinforcing apparatus Download PDF

Info

Publication number
CN205637649U
CN205637649U CN201620467691.0U CN201620467691U CN205637649U CN 205637649 U CN205637649 U CN 205637649U CN 201620467691 U CN201620467691 U CN 201620467691U CN 205637649 U CN205637649 U CN 205637649U
Authority
CN
China
Prior art keywords
anchor
large openings
beam body
carbon cloth
beams
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620467691.0U
Other languages
Chinese (zh)
Inventor
王志东
李志鹏
王振元
黄良鹏
高艳花
刘秀芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Original Assignee
Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd filed Critical Second Engineering Co Ltd of China Railway 14th Bureau Co Ltd
Priority to CN201620467691.0U priority Critical patent/CN205637649U/en
Application granted granted Critical
Publication of CN205637649U publication Critical patent/CN205637649U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a paste anchor convolution concrete trompil roof beam reinforcing apparatus, including carbon cloth and pressurization anchor, the carbon cloth paste in the side and the bottom surface of the trompil roof beam body, and the carbon cloth that is located the side makes its and the trompil roof beam body become a common atress of whole through a pressurization anchor. The carbon cloth is L type strip, glues vertical long the pasting in the side and the bottom surface of the trompil roof beam body of leading to through the structure. The carbon cloth includes two, and its symmetrical setting is in roof beam body both sides, and the U type that forms is pasted at the breast overlap joint to two carbon cloths. The anchor includes screw rod, anchor gasket and bolt, screw rod one end embedded in trompil roof beam internal, the other end passes the carbon cloth and exposes in trompil roof beam body surface face, and through anchor gasket and bolt fastening.

Description

A kind of patch anchor convolution concrete Beams with Large Openings bracing means
Technical field
This utility model relates to a kind of because special requirement is to the reinforcement technique after building structure concrete beam body perforate, is specifically related to one Plant patch anchor convolution concrete Beams with Large Openings bracing means.
Background technology
Along with the sustainable development of Chinese national economy, it is the newest in order to meet that China builds a large amount of concrete constructions used in early days Use functional requirement, it is often necessary to perforate in original beam body, thus facilitate new pipeline to pass.Owing to concrete beam body is being opened Becoming weakness zone after hole around aperture, stress performance has occurred to change inevitable, thus further result in beam body bearing capacity and Anti-seismic performance decreases, and has had a strong impact on structural safety and people life property safety, it is necessary to mend opening area Force solid, improve its bearing capacity and shock resistance.
Although there is numerous reinforcement material and reinforcement means at present on the market, but owing to structure stress character and reinforcing position are different, And various reinforcement material own material is distinct, if blindly do not reinforced according to practical situation, easily cause the waste of material, More serious will cause owing to consolidation effect is the best, it is impossible to reaches intended and reinforces purpose.So under this background, needing badly open Bracing means and the reinforcement means of requirement is used after sending out a kind of to disclosure satisfy that concrete beam body perforate, such that it is able to relatively low investment, The less construction period improves bearing capacity and the anti-seismic performance of perforate concrete beam body, and reinforced perforate beam body can be made to meet Original design load requirement, it is ensured that it uses safety, can reduce again material usage, reduces cost, increases economic efficiency.
Utility model content
The purpose of this utility model is to overcome the deficiency mentioned in background above technology and defect, it is provided that a kind of material usage is few, Simple structure, reasonable stress, construction and installation are convenient, consolidation effect patch good, lower-cost anchor convolution concrete Beams with Large Openings adds It is fixedly mounted with and puts.
For achieving the above object, this utility model adopts the following technical scheme that
A kind of patch anchor convolution concrete Beams with Large Openings bracing means, including carbon cloth and pressurization anchor, described carbon fiber Cloth is pasted on side and the bottom surface of perforate beam body, and carbon cloth on the side makes itself and perforate by a pressurization anchor Beam body becomes a common stress of entirety.
Further, described carbon cloth is L-type strip, by the most elongated side being pasted on perforate beam body of structure glue and Bottom surface.
Further, described carbon cloth includes two, its symmetry be arranged on beam body both sides, and two carbon cloths are at beam It is U-shaped that end overlap joint pastes formation.
Further, described anchor includes that screw rod, anchor pad and bolt, described screw rod one end are embedded in Beams with Large Openings Internal, the other end exposes to Beams with Large Openings surface through carbon cloth, and is fixed by anchor pad and bolt.
Further, being additionally provided with a strengthening steel slab between described anchor pad and carbon cloth, described strengthening steel slab is provided with spiral shell Rod aperture, screw rod passes strengthening steel slab.
Further, described strengthening steel slab is pasted pressurization by structure glue and anchor bolt and is anchored in beam body side to be reinforced.
Further, described screw pre-buried length in Beams with Large Openings body is no less than 10cm, and screw rod exposes to the length on beam body surface Degree is no less than 7cm.
Further, described strengthening steel slab be strip cross direction profiles in hole over and under, and vertical with vertical carbon cloth Overlap joint.Strengthening steel slab is provided with screw hole, the most fixing by structure glue, screws pre-buried anchor bolt after adding anchor pad.
Compared with prior art, this utility model has the advantages that
(1) patch anchor convolution concrete Beams with Large Openings bracing means described in the utility model, according to the special stress of perforate concrete beam body Condition, is vertically arranged carbon cloth and resists shear stress in both sides, aperture area, steel plate strip is transversely arranged on aperture area upper-lower position Opposing bending normal stresses, has played the material that carbon cloth tensile strength height, steel plate tensile strength and integral rigidity are big to greatest extent Characteristic, saves material, reduces cost, has reached raising original structure bearing capacity and anti-seismic performance purpose simultaneously, has met former Design load requirement
(2) this patch anchor convolution concrete Beams with Large Openings bracing means, uses sqtructural adhesive, and ensures both sides L-type carbon cloth Pasting at overlap overlap joint at the bottom of beam, steel plate overlap joint vertically superposed with carbon fiber cloth is pasted, so that reinforcement material forms entirety.Logical Cross beam body pre embedded bolt, after steel plate passes screw rod and tights a bolt, steel plate is applied with certain pressure, further increases reinforcing The globality of material, it is ensured that beam body, carbon cloth, steel plate strip, three forms overall common stress.
Accompanying drawing explanation
Fig. 1 this utility model embodiment is pasted the side view of anchor convolution concrete Beams with Large Openings bracing means;
Fig. 2 this utility model embodiment is pasted the A-A sectional view of anchor convolution concrete Beams with Large Openings bracing means;
In figure: 1-reinforces beam body, 2-beam body hole, reinforcing bar in 3-beam, 4-carbon cloth, 5-steel plate strip, 6-screw rod, and 7-anchors Pad, 8-bolt, 9-structure glue, overlap at the bottom of 10-beam.
Detailed description of the invention
With detailed description of the invention, this utility model is described in further detail below in conjunction with the accompanying drawings.
This utility model patch anchor convolution concrete Beams with Large Openings bracing means is mainly by carbon cloth 4, steel plate strip 5, screw rod 6, anchor Gu pad 7, bolt 8, structure glue 9 forms.Shown in Fig. 1, Fig. 2, carbon cloth 4 includes two, each all in L-type, its strip is vertically arranged in beam body hole 2 both sides, reinforces beam body 1 two sides correspondence position L-type carbon cloth 4 at the bottom of beam Overlap joint 10 stickup is formed U-shaped;
Anchor includes that screw rod 6, anchor pad 7 and bolt 8, described screw rod 6 one end are embedded in Beams with Large Openings body, another End exposes to Beams with Large Openings surface through carbon cloth, and is fixed by anchor pad and bolt.
Being additionally provided with a steel plate strip 5 between anchor pad 7 and carbon cloth, described steel plate strip 5 is provided with screw hole, and screw rod passes Steel plate strip 5.
Wherein: screw pre-buried length in Beams with Large Openings body is no less than 10cm, and screw rod exposes to the length on beam body surface and is no less than 7cm。
Reinforce beam body 1 both sides steel plate strip 5 to be laterally respectively arranged in beam body hole 2 over and under, and vertical with carbon cloth 4 Overlap joint;Strengthening steel slab is provided with screw hole, and steel plate strip 5, through screw hole, is pasted pressurization by structure glue and anchor bolt and is anchored in Beam body side to be reinforced.
Described patch anchor convolution reinforcement means, including following step:
1) patch anchor carbon cloth 4 and steel plate strip 5 operation platform are set up;
2) unwrapping wire location, screw rod 6 is implanted in beam body boring;
In using reinforcing bar survey meter to carry out perforate reinforcing area beam according to beam body position of opening and position, unwrapping wire hole situation, reinforcing bar 3 detects, Combining unwrapping wire situation according to detection event and finally determine position, hole, and use percussion drilling row to hole, bore diameter is 8-32mm, Drilling depth must not be less than 10cm, blows off dust in hole, by slow for the screw rod 6 filling anchoring adhesive by compressed air after boring Rotating to insert has filled in the hole of anchoring adhesive, the planted a diameter of 8-30mm of screw rod 6, and should ensure that and at least expose outside reinforcing beam body 17cm。
3) according to the concrete bore size of beam body and unwrapping wire position, make corresponding size carbon cloth 4 and steel plate strip 5, and press screw rod 6 Hole in steel plate strip 5 in position;
4) beam body concrete and strengthening steel slab bar 5 are carried out surface process;
The most slightly cut opening area beams of concrete surface unconsolidated formation, then with polishing machine, concrete surface polished flat, For recessed position patching material leveling.Brush away surface scum with file steel brush, and with air compressor machine, concrete surface is dried up Only.Steel plate cuts into given size steel plate strip 5, and surface to be pasted is polishing to metallic luster, then by steel plate strip 5 polishing machine Lines is polished along steel plate stress vertical direction with coarse plain emery wheel sheet.
5) preparation structure glue 9, affixes to predetermined reinforcing position by carbon cloth 4;
Structure glue 9 should be prepared in right amount according to requirement and consumption, and after having prepared, rapid cutter spreads upon processed good coagulation Soil precalculated position, surface, structure glue 9 thickness 1-3mm is advisable, and thick middle both sides are thin.Carbon cloth 4 answers whole piece L-shaped from beam One side vertically affixes at the bottom of beam, carbon cloth 4 tension after and ensure that structure glue 9 fully presses closely with carbon cloth 4.Beam Body correspondence position both sides carbon cloth should be pasted at the low overlap joint of beam 10.
6) affixing steel plate bar 5 to precalculated position;
Smearing structure glue 9 is to affixing steel plate bar 5 precalculated position and processed good steel plate binding face, by steel plate strip 5 through corresponding Position pre embedded bolt 6 affixes to precalculated position, uses hand hammer to beat steel plate strip 5 the most gently and checks 5 times structures of steel plate strip in time Glue 9 turgor, if finding, a part structure glue 9 is not enough, should carry out glue in time.
7) steel plate strip 5 surface shimming, tights a bolt 8;
The order that bolt 8 is tightened should be carried out by by mesophase both sides, and alternate repetition is carried out, until steel plate strip 5 pressure is not less than 0.5MPa, structure glue 9 is extruded from steel plate strip 5 edge by extruding.
8) to carbon cloth 4 and steel plate strip 5 external coating surfacecti proteon, Demolition Construction platform.
Although detailed description of the invention of the present utility model is described by the above-mentioned accompanying drawing that combines, but not this utility model is protected The restriction of scope, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, art technology Personnel need not to pay various amendments or deformation that creative work can make still within protection domain of the present utility model.

Claims (8)

1. a patch anchor convolution concrete Beams with Large Openings bracing means, it is characterised in that: include carbon cloth and pressurization anchor, Described carbon cloth is pasted on side and the bottom surface of perforate beam body, and carbon cloth on the side is by a pressurization anchoring dress Put and make itself and perforate beam body become a common stress of entirety.
2. patch anchor convolution concrete Beams with Large Openings bracing means as claimed in claim 1, it is characterised in that: described carbon fiber Cloth is L-type strip, by the most elongated side being pasted on perforate beam body of structure glue and bottom surface.
3. patch anchor convolution concrete Beams with Large Openings bracing means as claimed in claim 2, it is characterised in that: described carbon fiber Cloth includes two, its symmetry be arranged on beam body both sides, and two carbon cloths overlap joint at the bottom of beam paste formed U-shaped.
4. patch anchor convolution concrete Beams with Large Openings bracing means as claimed in claim 1, it is characterised in that: described pressurization anchor Being fixedly mounted with to put and include screw rod, anchor pad and bolt, described screw rod one end is embedded in Beams with Large Openings body, and the other end passes carbon fiber Cloth exposes to Beams with Large Openings surface, and is fixed by anchor pad and bolt.
5. patch anchor convolution concrete Beams with Large Openings bracing means as claimed in claim 4, it is characterised in that: described screw rod is pre- The length being embedded in Beams with Large Openings body is no less than 10cm, and screw rod exposes to the length on beam body surface no less than 7cm.
6. patch anchor convolution concrete Beams with Large Openings bracing means as claimed in claim 5, it is characterised in that: described anchoring pad Being additionally provided with a strengthening steel slab between sheet and carbon cloth, described strengthening steel slab is provided with screw hole, and screw rod passes strengthening steel slab.
7. patch anchor convolution concrete Beams with Large Openings bracing means as claimed in claim 6, it is characterised in that: described reinforcing steel Plate is pasted pressurization by structure glue and anchor bolt and is anchored in beam body side to be reinforced.
8. patch anchor convolution concrete Beams with Large Openings bracing means as claimed in claim 6, it is characterised in that: described reinforcing steel Plate be strip cross direction profiles in Beams with Large Openings body opening hole over and under, and vertical with vertical carbon cloth overlap.
CN201620467691.0U 2016-05-20 2016-05-20 Paste anchor convolution concrete trompil roof beam reinforcing apparatus Expired - Fee Related CN205637649U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620467691.0U CN205637649U (en) 2016-05-20 2016-05-20 Paste anchor convolution concrete trompil roof beam reinforcing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620467691.0U CN205637649U (en) 2016-05-20 2016-05-20 Paste anchor convolution concrete trompil roof beam reinforcing apparatus

Publications (1)

Publication Number Publication Date
CN205637649U true CN205637649U (en) 2016-10-12

Family

ID=57055236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620467691.0U Expired - Fee Related CN205637649U (en) 2016-05-20 2016-05-20 Paste anchor convolution concrete trompil roof beam reinforcing apparatus

Country Status (1)

Country Link
CN (1) CN205637649U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984620A (en) * 2019-12-30 2020-04-10 扬州大学 Shape memory alloy prestressed U-shaped hoop-FRP reinforced concrete beam and construction process thereof
CN113338658A (en) * 2021-06-25 2021-09-03 贵州桥梁建设研究院有限公司 Reinforcing system and reinforcing method for T-shaped beam web

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984620A (en) * 2019-12-30 2020-04-10 扬州大学 Shape memory alloy prestressed U-shaped hoop-FRP reinforced concrete beam and construction process thereof
CN110984620B (en) * 2019-12-30 2022-06-07 扬州大学 Construction method of shape memory alloy prestressed U-shaped hoop-FRP reinforced concrete beam
CN113338658A (en) * 2021-06-25 2021-09-03 贵州桥梁建设研究院有限公司 Reinforcing system and reinforcing method for T-shaped beam web

Similar Documents

Publication Publication Date Title
CN205637649U (en) Paste anchor convolution concrete trompil roof beam reinforcing apparatus
CN109057392B (en) Construction method of steel structure for reinforcement
CN110306722A (en) A kind of big plate of assembled integral
CN207647215U (en) Punch ruggedized construction after a kind of shear wall large area
CN103741607B (en) The reinforcement means of large span frame bridge and the large span frame bridge after reinforcing
CN108951940A (en) A kind of frame wall filled with masonry and the practice discharging attachment device certainly using stress
CN101929254B (en) Method for lapping and anchoring fiber sheet around rod to reinforce structural component
CN113622702B (en) Plugging structure and plugging method for small-section deep hole in civil air defense faced hollow wall
CN105735666A (en) Method for reinforcing concrete column rapidly
CN205577465U (en) Utilize device of FRP reinforcing concrete shear force wall
CN2469046Y (en) Prefabricated steel bar reinforced concrete bulk head for piles
CN212224717U (en) Bending-resistant reinforcing structure of shear wall
CN101178008B (en) Coal mine tunnel broken two sides anchoring support method
CN208831032U (en) High strength anchor bar is used in anchoring outside a kind of
CN104153594B (en) A kind of method that improves reinforced concrete member staight scissors bearing capacity
CN203960860U (en) A kind of detachable anchoring piece
CN209907580U (en) Bamboo-concrete composite structure that gluing formula is connected
CN209211934U (en) A kind of reinforced steel concrete framed floor structure
CN206859464U (en) The attachment means of fabricated shear wall horizontal joint
CN2911185Y (en) Steel strips for anchoring support
CN213269030U (en) Section steel reinforcing structure for improving floor bearing capacity
CN202831324U (en) Dry hanging wall panel point containing self-drilling built-in embedded part
CN103541559B (en) Reinforced composite board based on concrete bending member
CN204983176U (en) Prefabricated plate is connecting piece for amalgamation
CN219653724U (en) Spliced foundation protection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

CF01 Termination of patent right due to non-payment of annual fee