CN205637612U - Be used for controlling thick regularization component of cast -in -place board - Google Patents
Be used for controlling thick regularization component of cast -in -place board Download PDFInfo
- Publication number
- CN205637612U CN205637612U CN201620514893.6U CN201620514893U CN205637612U CN 205637612 U CN205637612 U CN 205637612U CN 201620514893 U CN201620514893 U CN 201620514893U CN 205637612 U CN205637612 U CN 205637612U
- Authority
- CN
- China
- Prior art keywords
- rod
- cast
- component
- iron plate
- thickness
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model discloses a be used for controlling thick regularization component of cast -in -place board, including the component main part, the component main part be rectangle form distribute be fixed in the structure plank sheathing on, the main structure body includes the body of rod, the welded fastening position casing on the body of rod is located to the iron plate at body of rod top and cover, the bottom of the body of rod is inserted on the structure plank sheathing and is fixed through nut locking, the utility model discloses can be through the position casing who chooses different length for use, then on the structure plank sheathing is fixed in in locking respectively with the rectangle form with whole component main part, then concreting, utilize specialized tool to make level for concrete and iron plate upper surface flush, pour the completion after, dismantle the body of rod and nut, and fill hole department, can accomplish pinpointing of cast -in -place plate thickness, simplified cast -in -place board thickness measurement step, improve cast -in -place board preparation efficiency.
Description
Technical field
This utility model relates to building trade technical field, is specifically related to a kind of for controlling Bars In Poured Concrete Slab thickness of slab canalization component.
Background technology
Now in the current onboard casting process of cast-in-place concrete, often through batten, cast in place concrete plate upper surface is carried out levelling, then control is measured by steel ruler, in actual applications, owing to cannot disposably carry out thickness location, so that repeated measurement, inefficiency, thickness is difficult to control simultaneously.
Utility model content
(1) to solve the technical problem that
In order to overcome prior art not enough, it is proposed that one is used for controlling Bars In Poured Concrete Slab thickness of slab canalization component, and it can well control the thickness of cast in place concrete plate, improves preparation efficiency.
(2) technical scheme
This utility model is achieved through the following technical solutions: the utility model proposes a kind of for controlling Bars In Poured Concrete Slab thickness of slab canalization component, including member body, the distribution of described member body rectangular shape is fixed in structural wood template, main structure body includes the body of rod, the iron plate being fixedly welded on body of rod top and the locating sleeve being sheathed on the body of rod, fixes on the bottom insert structure plank sheathing of the body of rod and by nut check.
Further, described iron plate is square iron plate and its thickness is 3mm.
Further, the member body of rectangular shape distribution its laterally and longitudinally the most at least include two and be also equipped with one in rectangular central portion.
Further, the side, bottom of the described body of rod is provided with the external screw thread spun with nut.
(3) beneficial effect
This utility model, relative to prior art, has the advantages that
The one that this utility model is mentioned is for controlling Bars In Poured Concrete Slab thickness of slab canalization component, it can be by selecting the locating sleeve of different length, then whole member body is locked in structural wood template respectively with rectangular-shaped, then casting concrete, utilize specific purpose tool levelling, make concrete and iron plate upper surface flush, after having poured, by the body of rod and nut dismounting, and fill up at hole, being accurately positioned of Bars In Poured Concrete Slab thickness can be completed, simplify Bars In Poured Concrete Slab thickness measure step, improve Bars In Poured Concrete Slab preparation efficiency.
Accompanying drawing explanation
Fig. 1 is member body site plan.
Fig. 2 is A-A sectional view in Fig. 1.
1-member body;2-structural wood template;The 11-body of rod;12-iron plate;13-locating sleeve;14-nut.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, this utility model is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain this utility model, is not used to limit this utility model.
One as depicted in figs. 1 and 2 is used for controlling Bars In Poured Concrete Slab thickness of slab canalization component, including member body 1, the distribution of described member body 1 rectangular shape is fixed in structural wood template 2, main structure body 1 includes the body of rod 11, the iron plate 12 being fixedly welded on the body of rod 11 top and the locating sleeve 13 being sheathed on the body of rod 11, is locked on the bottom insert structure plank sheathing 2 of the body of rod 11 and by nut 14.
Wherein, described iron plate 12 is 3mm for square iron plate and its thickness;The member body 1 of rectangular shape distribution its laterally and longitudinally the most at least include two and be also equipped with one in rectangular central portion;The side, bottom of the described body of rod 11 is provided with the external screw thread spun with nut 14.
The one that this utility model is mentioned is for controlling Bars In Poured Concrete Slab thickness of slab canalization component, it is when specifically used, member planar layout drawing as shown in Figure 1, a member body 1 is respectively placed in cast-in-site concrete floor corner, each room and centre, every block of plate totally five, if floor length or width are relatively big, the number of components can be increased accordingly.
Fig. 2 is A-A sectional view in Fig. 1, the body of rod 11 top is the iron plate 12 of 50X50X3mm, the a diameter of 10mm of the body of rod 11, the a length of 8cm of top half is without silk mouth, for smooth surface round steel, convenient and top Plate Welding, surface, the latter half is with external screw thread, convenient fixing nut, reach changes because thickness of slab is different.Being cased with the locating sleeve 13 of a diameter of 20cm on the body of rod 11, locating sleeve 13 is plastic tube, is used for controlling thickness of slab, and during practical operation, locating sleeve 13 length adds top iron plate 12 thickness and is Bars In Poured Concrete Slab thickness of slab.
During on-the-spot placement, Durchgangshohle on polycrystalline substance plank sheathing 2, below structural wood template 2, add nut 14 with pad fix bottom the body of rod 11, simultaneously sheathed locating sleeve 13 on the body of rod 11, this way is advantageous in that the component controlling thickness of slab is not fixed with reinforcing bar.Will not conjugate because vibrating during casting concrete, and each room location is fixed, workman pours and levelling all also can can be recycled with more precise control thickness of slab with iron plate 12 upper surface reference.Time especially light received by concrete, strip thickness control is even more important by this member body 1.Workman can utilize the top of these 5 components as reference, vertically and horizontally with surveying concrete surface smoothness.Also the flatness of concrete surface can be effectively controlled.
Embodiment described above is only to be described preferred implementation of the present utility model, is not defined spirit and scope of the present utility model.On the premise of without departing from this utility model design concept; various modification that the technical solution of the utility model is made by this area ordinary person and improvement; protection domain of the present utility model all should be dropped into, the technology contents that this utility model is claimed, all record in detail in the claims.
Claims (4)
1. one kind is used for controlling Bars In Poured Concrete Slab thickness of slab canalization component, it is characterized in that: include member body (1), the distribution of described member body (1) rectangular shape is fixed in structural wood template (2), main structure body (1) includes the body of rod (11), the iron plate (12) being fixedly welded on the body of rod (11) top and the locating sleeve (13) being sheathed on the body of rod (11), and bottom insert structure plank sheathing (2) of the body of rod (11) is upper and is locked by nut (14).
One the most according to claim 1 is used for controlling Bars In Poured Concrete Slab thickness of slab canalization component, it is characterised in that: described iron plate (12) is square iron plate and its thickness is 3mm.
One the most according to claim 1 is used for controlling Bars In Poured Concrete Slab thickness of slab canalization component, it is characterised in that: the member body (1) of rectangular shape distribution its laterally and longitudinally the most at least include two and be also equipped with one in rectangular central portion.
One the most according to claim 1 is used for controlling Bars In Poured Concrete Slab thickness of slab canalization component, it is characterised in that: the side, bottom of the described body of rod (11) is provided with the external screw thread spun with nut (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620514893.6U CN205637612U (en) | 2016-05-31 | 2016-05-31 | Be used for controlling thick regularization component of cast -in -place board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620514893.6U CN205637612U (en) | 2016-05-31 | 2016-05-31 | Be used for controlling thick regularization component of cast -in -place board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205637612U true CN205637612U (en) | 2016-10-12 |
Family
ID=57051537
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620514893.6U Expired - Fee Related CN205637612U (en) | 2016-05-31 | 2016-05-31 | Be used for controlling thick regularization component of cast -in -place board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205637612U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110145127A (en) * | 2019-06-20 | 2019-08-20 | 中建新疆建工集团第五建筑工程有限公司 | A kind of concrete cast-in-situ plate thickness controller and Bars In Poured Concrete Slab construction |
-
2016
- 2016-05-31 CN CN201620514893.6U patent/CN205637612U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110145127A (en) * | 2019-06-20 | 2019-08-20 | 中建新疆建工集团第五建筑工程有限公司 | A kind of concrete cast-in-situ plate thickness controller and Bars In Poured Concrete Slab construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102720362B (en) | A kind of high accuracy steel concrete counter force wall construction technology | |
CN206784951U (en) | A kind of concreting floorslab thickness control device | |
CN205839599U (en) | Pier stud reinforcing bar location auxiliary moulding bed | |
CN106049879A (en) | Concrete floor slab thickness control device and construction method thereof | |
CN108487630A (en) | Coagulation earth steps platform prefabrication and assembly construction construction method | |
CN205637612U (en) | Be used for controlling thick regularization component of cast -in -place board | |
CN205935425U (en) | Thick and concrete protective layer gauge control spare of board | |
CN111042594B (en) | Construction process of elevator foundation at post-cast strip position of garage top plate settlement | |
CN207923064U (en) | A kind of easy device detecting concrete floor slab construction thickness and flatness | |
CN207829483U (en) | Slab thickness controller | |
CN207878799U (en) | Build conversion layer bar reinforcement positioning device | |
CN210857752U (en) | Structure falls board and hangs split heads muscle for mould | |
CN215760524U (en) | Main structure floor thickness control block | |
CN212836701U (en) | Concrete floor entrance to a cave shutoff mould lifting tool | |
CN207499463U (en) | A kind of cast-in-place concrete floor elevation control device | |
CN205421871U (en) | On --spot elevation measuring tool of construction | |
CN205975369U (en) | A reinforcing bar pinion rack template that is used for case liang fuwanjuchu | |
CN216740749U (en) | Novel insert fine instrument of concrete thickness of measurement among concrete placement process | |
CN220454461U (en) | Plate thickness measuring device | |
CN220377654U (en) | Reinforcing steel bar member for controlling thickness of wall | |
CN216276486U (en) | Device for simultaneously controlling thickness of floor slab and reinforcing steel bar protection layer | |
CN210636805U (en) | Device for erecting concrete hanging formwork | |
CN214302918U (en) | Concrete floor thickness control device | |
CN216866025U (en) | Cast-in-place concrete floor thickness control measuring tool chi | |
CN211923434U (en) | Novel miniature operation platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20170531 |