CN205636511U - Bridge engineering construction platform - Google Patents

Bridge engineering construction platform Download PDF

Info

Publication number
CN205636511U
CN205636511U CN201620444869.XU CN201620444869U CN205636511U CN 205636511 U CN205636511 U CN 205636511U CN 201620444869 U CN201620444869 U CN 201620444869U CN 205636511 U CN205636511 U CN 205636511U
Authority
CN
China
Prior art keywords
bearing
construction platform
equipment
crane girder
bridge construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620444869.XU
Other languages
Chinese (zh)
Inventor
李楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620444869.XU priority Critical patent/CN205636511U/en
Application granted granted Critical
Publication of CN205636511U publication Critical patent/CN205636511U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the construction machinery field just discloses a bridge engineering construction platform, including longmen loop wheel machine case, crane girder, elasticity hydraulic pressure hinge, pier, apron piece, tendency sliding support, axle, bearing pad board, hydraulic jack, angle of slide support, support track, signal receiver, pulley, lifting hook and equipment board steel the heart, longmen loop wheel machine case connects through crane girder and elasticity hydraulic pressure hinge, elasticity hydraulic pressure hinge is connected with the apron piece through the pier, the apron piece is connected with the tendency sliding support. The utility model discloses, simple structure, the equipment is convenient, and staying of the construction joint of being convenient for is established, and the working face is broad, and translation rate is fast, and ability and mobile concrete pump cooperation are used, concrete pouring when making things convenient for the bridge construction, equipment adopts the design of symmetrical formula, and the stress is more balanced, and the both sides settling amount equals, can not lead to the equipment slope, and each spare part of equipment all adopts the electro -galvanizing to handle, and the durability is strong, and rigidity is big, and factor of safety is high.

Description

A kind of Bridge Construction platform
Technical field
This utility model relates to a kind of Bridge Construction platform, is specifically related to a kind of science of bridge building Operation platform, belongs to building machinery field.
Background technology
Bridge Construction platform, refers in bridge construction, and the beam between two pier studs uses During integral cast-in-situ, a pier stud connect the construction machinery of another pier stud, Bridge Construction The use of platform makes having turned into of China's long-span bridge possible, has saved construction material, Improve speed of application, so the Bridge Construction platform of a function admirable is at bridge construction Very important effect is served during construction.
But the trimmer of the construction refuse regenerated aggregate of present stage, huge structure, assemble complexity, Being not easy to staying of construction joint set, work surface is narrow, and translational speed is slower, it is impossible to and concrete pump Car with the use of, it has not been convenient to the pouring of concrete during bridge construction, structure entirety stress is the most equal Weighing apparatus, both sides settling amount differs greatly, and can cause device inclined, and each parts of equipment are not adopted Processing by corrosion resistance, durability is weak, and rigidity is little, and safety coefficient is low so that user uses Come the most inconvenient.
Utility model content
The technical problems to be solved in the utility model overcomes existing defect, it is provided that a kind of bridge work Journey operation platform, can effectively solve the problem in background technology.
In order to solve above-mentioned technical problem, this utility model provides following technical scheme:
This utility model provides a kind of Bridge Construction platform, including straddle truck cabinet, crane Beam, elastic hydraulic hinge, bridge pier, apron piece, trend sliding support, axle of steeling the heart, Pressure-bearing pads, Hydraulic jack, slide angle bearing, bearing track, signal receiver, pulley, suspension hook and set Slave board, described straddle truck cabinet is hinged with elastic hydraulic by crane girder, described elastic hydraulic Hinge is connected with apron piece by bridge pier, and described apron piece is connected with trend sliding support, described dynamic The downside of sliding support is provided with axle of steeling the heart, described in axle of steeling the heart be connected with Pressure-bearing pads, described The right side of Pressure-bearing pads is provided with hydraulic jack, and the downside of described hydraulic jack is provided with cunning Dynamic angle bearing, the downside of described slide angle bearing is provided with bearing track, described straddle truck cabinet Inner side be provided with signal receiver, the right side of described signal receiver is provided with pulley, described The downside of pulley is provided with suspension hook, and the upside of described suspension hook is provided with device board.
As a kind of optimal technical scheme of the present utility model, described straddle truck cabinet and crane girder Between use magnetic suspension soap-free emulsion polymeization process.
As a kind of optimal technical scheme of the present utility model, described elastic hydraulic hinge is respectively symmetrically It is arranged in the two ends of crane girder.
As a kind of optimal technical scheme of the present utility model, described slide angle bearing can prop up Move on seat track.
As a kind of optimal technical scheme of the present utility model, described bearing track uses wolfram steel whole Body is laid.
This utility model is reached to provide the benefit that: a kind of Bridge Construction platform, structure Simply, easy to assembly, it is simple to staying of construction joint sets, and work surface is broad, translational speed is fast, energy With concrete mixer with the use of, the pouring of concrete when facilitating bridge construction, it is right that equipment uses Title formula designs, and overall stress more equalizes, and both sides settling amount is equal, is not result in device inclined, Each parts of equipment all use electrogalvanizing to process, and durability is strong, and rigidity is big, and safety coefficient is high.
Accompanying drawing explanation
Accompanying drawing is used for providing being further appreciated by of the present utility model, and constitutes the one of description Part, is used for explaining this utility model, it is right to be not intended that together with embodiment of the present utility model Restriction of the present utility model.
In the accompanying drawings:
Fig. 1 is a kind of Bridge Construction platform entirety knot described in this utility model embodiment Structure schematic diagram;
Fig. 2 is gantry of a kind of Bridge Construction platform described in this utility model embodiment The internal structure schematic diagram of loop wheel machine case;
Label in figure: 1, straddle truck cabinet;2, crane girder;3, elastic hydraulic hinge;4、 Bridge pier;5, apron piece;6, trend sliding support;7, steel the heart axle;8, Pressure-bearing pads;9、 Hydraulic jack;10, slide angle bearing;11, bearing track;12, signal receiver;13、 Pulley;14, suspension hook;15, device board.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is illustrated, it will be appreciated that Preferred embodiment described herein is merely to illustrate and explains this utility model, is not used to limit Determine this utility model.
Embodiment: refer to Fig. 1 and Fig. 2, this utility model one Bridge Construction platform, Including straddle truck cabinet 1, crane girder 2, elastic hydraulic hinge 3, bridge pier 4, apron piece 5, move To sliding support 6, axle 7 of steeling the heart, Pressure-bearing pads 8, hydraulic jack 9, slide angle bearing 10, bearing track 11, signal receiver 12, pulley 13, suspension hook 14 and device board 15, Described straddle truck cabinet 1 is connected with elastic hydraulic hinge 3 by crane girder 2, described elastic hydraulic Hinge 3 is connected with apron piece 5 by bridge pier 4, and described apron piece 5 is with trend sliding support 6 even Connecing, the downside of described trend sliding support 6 is provided with axle 7 of steeling the heart, described in steel the heart axle 7 and hold Pressure pad plate 8 connects, and the right side of described Pressure-bearing pads 8 is provided with hydraulic jack 9, described liquid The downside of pressure jack 9 is provided with slide angle bearing 10, the downside of described slide angle bearing 10 Being provided with bearing track 11, the inner side of described straddle truck cabinet 1 is provided with signal receiver 12, The right side of described signal receiver 12 is provided with pulley 13, and the downside of described pulley 13 is arranged Suspension hook 14, the upside of described suspension hook 14 is had to be provided with device board 15.
Magnetic suspension soap-free emulsion polymeization is used to process between described straddle truck cabinet 1 and crane girder 2 so that Therebetween frictional force is greatly reduced, and reduces the energy loss of whole equipment;Described elasticity Hydraulic pressure hinge 3 is respectively symmetrically the two ends being arranged in crane girder 2 so that total stress is more equal Even, add the stability of equipment;Described slide angle bearing 10 can be on bearing track 11 Mobile so that equipment is more flexible, and reduces the generation of covibration;Described bearing track 11 use wolfram steel entirety to lay so that whole bearing track 11 is durable in use indeformable, and Substantially increase the durability of equipment.
It should be noted that this utility model is a kind of Bridge Construction platform, should using During equipment, first elastic hydraulic hinge 3 is fixed on bridge pier 4 top of side, and checks whether It is firm to install, and is then being welded on by crane girder 2 in elastic hydraulic hinge 3, weld seam width during welding Degree should strictly be held, the most again by after whole for straddle truck cabinet 1 being placed on crane girder 2, Start construction casting concrete, when pouring straddle truck cabinet 1 by side bridge pier 4 to opposite side Bridge pier 4 moves, and moves while pour, and pours while supporting, after completing a construction section, Rearrange equipment, carry out the construction of next construction section.
It is last it is noted that the foregoing is only preferred embodiment of the present utility model, It is not limited to this utility model, although this utility model being carried out with reference to previous embodiment Detailed description, for a person skilled in the art, it still can be to aforementioned each enforcement Technical scheme described in example is modified, or wherein portion of techniques feature is carried out equivalent replaces Change.All within spirit of the present utility model and principle, any amendment of being made, equivalent, Improve, within should be included in protection domain of the present utility model.

Claims (5)

1. a Bridge Construction platform, including straddle truck cabinet (1), crane girder (2), Elastic hydraulic hinge (3), bridge pier (4), apron piece (5), trend sliding support (6), Steel the heart axle (7), Pressure-bearing pads (8), hydraulic jack (9), slide angle bearing (10), Bearing track (11), signal receiver (12), pulley (13), suspension hook (14) and set Slave board (15), it is characterised in that: described straddle truck cabinet (1) by crane girder (2) with Elastic hydraulic hinge (3) connects, and described elastic hydraulic hinge (3) is by bridge pier (4) and cushion cap Beam (5) connects, and described apron piece (5) is connected with trend sliding support (6), described dynamic The downside of sliding support (6) is provided with axle of steeling the heart (7), described in steel the heart axle (7) and hold Pressure pad plate (8) connects, and the right side of described Pressure-bearing pads (8) is provided with hydraulic jack (9), The downside of described hydraulic jack (9) is provided with slide angle bearing (10), described slide angle The downside of bearing (10) is provided with bearing track (11), described straddle truck cabinet (1) Inner side is provided with signal receiver (12), and the right side of described signal receiver (12) is provided with Pulley (13), the downside of described pulley (13) is provided with suspension hook (14), described suspension hook (14) Upside be provided with device board (15).
A kind of Bridge Construction platform the most according to claim 1, it is characterised in that Magnetic suspension soap-free emulsion polymeization is used to process between described straddle truck cabinet (1) and crane girder (2).
A kind of Bridge Construction platform the most according to claim 1, it is characterised in that Described elastic hydraulic hinge (3) is respectively symmetrically the two ends being arranged in crane girder (2).
A kind of Bridge Construction platform the most according to claim 1, it is characterised in that Described slide angle bearing (10) can be upper mobile at bearing track (11).
A kind of Bridge Construction platform the most according to claim 1, it is characterised in that Described bearing track (11) uses wolfram steel entirety to lay.
CN201620444869.XU 2016-05-11 2016-05-11 Bridge engineering construction platform Expired - Fee Related CN205636511U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620444869.XU CN205636511U (en) 2016-05-11 2016-05-11 Bridge engineering construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620444869.XU CN205636511U (en) 2016-05-11 2016-05-11 Bridge engineering construction platform

Publications (1)

Publication Number Publication Date
CN205636511U true CN205636511U (en) 2016-10-12

Family

ID=57056185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620444869.XU Expired - Fee Related CN205636511U (en) 2016-05-11 2016-05-11 Bridge engineering construction platform

Country Status (1)

Country Link
CN (1) CN205636511U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012794A (en) * 2017-05-23 2017-08-04 义乌市雄发尔机械设备有限公司 A kind of equipment for bridge construction
CN110820577A (en) * 2019-11-14 2020-02-21 李诺 Intelligent support system for highway bridge construction in frozen earth section and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107012794A (en) * 2017-05-23 2017-08-04 义乌市雄发尔机械设备有限公司 A kind of equipment for bridge construction
CN107012794B (en) * 2017-05-23 2019-02-15 南通壹选工业设计有限公司 A kind of equipment for bridge construction
CN110820577A (en) * 2019-11-14 2020-02-21 李诺 Intelligent support system for highway bridge construction in frozen earth section and construction method thereof

Similar Documents

Publication Publication Date Title
CN205636511U (en) Bridge engineering construction platform
CN208105050U (en) A kind of wet seam construction formwork of bridge
CN107351860A (en) A kind of quasi- zero stiffness central mounting device of stepless changing
CN209576767U (en) Expansion Units for Highway Bridges is comprehensive performance test bed
CN204549797U (en) A kind of steel hanging apparatus
CN206801038U (en) A kind of concreting crossbeam based on building
CN201716246U (en) Rotation abrasion testing device for support saddles of bridge
CN203428719U (en) Equipment moving head
CN208071100U (en) It is a kind of can multinomial while operation lifting pipeline device
CN2801872Y (en) Moving device of hanging basket main truss front supporting point
CN204847830U (en) Bridge crane girder
CN205074716U (en) Boats and ships makeup location dolly
CN204848000U (en) Monospar gantry crane
CN212004551U (en) Connecting frame for laying natural gas pipeline
CN208071108U (en) Continuous rigid frame PC track beam hoist
CN206189394U (en) Steel reinforcement cage with deep water resistance to compression
CN206392644U (en) A kind of hydraulic pipe bender for project installation
CN204823757U (en) Downhill path hoist of setting a roof beam in place on stride
CN219465520U (en) Metal processing stop device
CN205636519U (en) Hydraulic pre -compression construction device for cantilever suspension basket
CN205741941U (en) A kind of detachable Rotary ball hinge
CN207861729U (en) A kind of winding type reversal hanger
CN204873504U (en) Hoist walking switching -over device
CN213297993U (en) Box culvert trolley template
CN108657964A (en) A kind of double cucurbit gantry cranes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

Termination date: 20170511