CN205631005U - Concrete mixing station - Google Patents
Concrete mixing station Download PDFInfo
- Publication number
- CN205631005U CN205631005U CN201620309941.8U CN201620309941U CN205631005U CN 205631005 U CN205631005 U CN 205631005U CN 201620309941 U CN201620309941 U CN 201620309941U CN 205631005 U CN205631005 U CN 205631005U
- Authority
- CN
- China
- Prior art keywords
- aggregate
- chassis
- concrete mixing
- mixing plant
- hopper
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 claims abstract description 51
- 230000007704 transition Effects 0.000 claims abstract description 30
- 239000004568 cement Substances 0.000 claims abstract description 22
- 238000003756 stirring Methods 0.000 claims abstract description 20
- 230000000977 initiatory effect Effects 0.000 claims abstract description 5
- 238000005303 weighing Methods 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims abstract 5
- 241000276425 Xiphophorus maculatus Species 0.000 claims description 3
- 230000015271 coagulation Effects 0.000 claims description 3
- 238000005345 coagulation Methods 0.000 claims description 3
- 239000002689 soil Substances 0.000 claims description 3
- 210000000988 bone and bone Anatomy 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 15
- 238000009434 installation Methods 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
Abstract
The utility model relates to a concrete mixing equipment especially relates to a concrete mixing station. For reduce cost, improve equipment's transition efficiency, the utility model provides a concrete mixing station, including all having the chassis and all settling at subaerial aggregate feed proportioning system, hopper, stirring host computer and cement bin through the chassis, the transmission initiating terminal of the transition material loading transmission band in the aggregate feed proportioning system is installed on the chassis and is lain in aggregate proportioning bins's below, and the transmission terminal of transition material loading transmission band lies in aggregate measuring bin's top, will follow the aggregate that falls among the aggregate proportioning bins and transmit to in the aggregate weighing hopper, aggregate material loading transmission band includes that the aggregate receives section and aggregate span line, and the aggregate is received the section and is installed on the chassis and lie in aggregate weighing hopper below, and the aggregate span line is that the slope sets up and receives the aggregate during a section received aggregate transmits the hopper to. Such concrete mixing station, basic construction cycle is short, and construction cost is low, and it is efficient to cut to.
Description
Technical field
This utility model relates to concrete batch plant, particularly relates to a kind of concrete mixing plant.
Background technology
At present, concrete mixing plant common on market is the most all to be fixedly mounted on foundation pier, so,
In a pre-installation, the foundation pier installed need to be built in the fabricating yard of concrete mixing plant.Further, since
Aggregate batching bin in concrete mixing plant is positioned at the surface of aggregate measuring bucket, and the height of aggregate batching bin is relatively
Height, for enabling transport vehicle directly to import in aggregate batching bin by the aggregate of transport, it is necessary at aggregate batching bin
Installation site near build transport ramp.As can be seen here, before existing concrete mixing plant is installed, need to build
Making foundation pier and transport ramp, foundation construction amount is big, long construction period, and then causes the foundation construction of user
Increase with processing cost, and fixed installation is unfavorable for the transition transport of equipment.
Utility model content
For reducing cost, improve the transition efficiency of equipment, the utility model proposes a kind of concrete mixing plant,
This concrete mixing plant includes all with chassis and being all placed in ground aggregate batching system by described chassis
System, hopper, stirring host and cement bin, described aggregate batching system includes aggregate batching bin, transition feeding
Transmission belt, aggregate measuring bucket and aggregate feeding transmission belt, and the transmission initiating terminal of described transition feeding transmission belt
It is arranged on described chassis and is positioned at the lower section of described aggregate batching bin, the transmission of described transition feeding transmission belt
Terminal is positioned at the top of described aggregate measuring hopper, the aggregate fallen is transferred to from described aggregate batching bin
In described aggregate measuring bucket;Described aggregate feeding transmission belt includes aggregate receiver section and aggregate span line, described
Aggregate receiver section is arranged on described chassis and is positioned at below described aggregate measuring bucket, described aggregate span line in
It is obliquely installed and the aggregate that described aggregate receiver section receives is transferred in described hopper.Such concrete
Mixing plant, owing to aggregate batching system, hopper, stirring host and cement bin are all placed in ground by chassis
On, and the aggregate batching bin in aggregate batching system is provided separately with aggregate measuring bucket, reduces aggregate batching
The height in storehouse, when mounted, only need to carry out disposing according to layout, easy for installation, and need not open
Dig ground, build foundation pier and transport ramp, greatly reduce foundation construction amount, shorten foundation construction week
Phase, reduce construction cost.When shifting place, staff can will be fixed on same chassis
Parts are directly placed in transition transport vehicle and carry out transition transport, thus improve transition efficiency.
Preferably, the lower section of the transmission terminal of described transition feeding transmission belt is provided with terminal support, this terminal
The lower end of support is vertical with described chassis to be connected, and the upper end of this terminal support supports the end of described transmission terminal
Portion.Further, the upper end of described terminal support and the bottom of described transmission terminal are by being articulated and connected.This
Sample, installation personnel can select the terminal support of differing heights as required, to meet aggregate transmission needs.
Preferably, described cement bin includes warehouse and warehouse bracing frame, and described warehouse is propped up by described warehouse
Support is fixed on chassis.Further, the supporting leg being connected with described chassis in described warehouse bracing frame
It is inclined to set relative to described chassis, forms the warehouse bracing frame of horn-like structure.So, warehouse supports
The lower base of frame is relatively big, can improve the stability of cement bin.
Preferably, described chassis is frame structure or platy structure, simple in construction, and preparation is convenient, low cost.
Preferably, the metering device in described concrete mixing plant all uses electronic scale to measure, to improve metering
Precision, and then improve the proportion speed degree of concrete.
Preferably, described concrete mixing plant uses microcomputer automatic control system to be controlled, to improve control
Precision and control reliability.
Preferably, described stirring host is Double-horizontal-shaft forced action type stirring host, improves mixing evenness and production
Efficiency.
Accompanying drawing explanation
Fig. 1 is the front view of this utility model concrete mixing plant;
Fig. 2 is that the A-A in Fig. 1 is to enlarged drawing;
Fig. 3 is that the master of the cement bin in this utility model concrete mixing plant and cement transporter regards enlarged drawing.
Detailed description of the invention
As it is shown in figure 1, this utility model concrete mixing plant includes aggregate batching system 1, hopper 2, stirring
Main frame 3 and cement bin 4, and aggregate batching system 1, hopper 2, stirring host 3 and the bottom of cement bin 4
It is provided with chassis 5.So, user, before installing this concrete mixing plant, need to will dispose site preparation smooth
And it is compacted formation horizontal hard place;When installing this concrete mixing plant, due in concrete mixing plant
Aggregate batching system 1, hopper 2, stirring host 3 and cement bin 4 are provided with chassis 5, the direct root of user
According to layout, aggregate batching system 1, hopper 2, stirring host 3 and cement bin 4 are disposed by chassis 5
Relevant position in horizontal hard place, both need not excavate out ground in advance and had formed arrangement hopper 2
Geosyncline, need not again to build fixed installation aggregate batching system 1, stirring host 3 and cement bin 4
Foundation pier, substantially reduces the foundation construction amount installed needed for concrete mixing plant, shortens construction period,
Reduce foundation construction cost.Further, since aggregate batching system 1, hopper 2, stirring host 3 and cement
The bottom in storehouse 4 is provided with chassis 5, and when shifting place, staff can will be fixed on the same end
Parts on dish 5 are directly placed in transition transport vehicle and carry out transition transport, and then can improve transition efficiency.
Chassis 5 can be selected for steel plate and tailors the platy structure of formation, prepares simple and convenient, the most preferably uses channel-section steel
The frame structure that welding is formed, to reduce chassis weight, reduces the cost making chassis.
As illustrated in fig. 1 and 2, aggregate batching system 1 include aggregate batching bin 11, transition feeding transmission belt 12,
Aggregate measuring bucket 13 and aggregate feeding transmission belt 14.Wherein, the transmission initiating terminal of transition feeding transmission belt 12
121 are arranged on chassis 5 and are positioned at the lower section of aggregate batching bin 11, for receiving from aggregate batching bin 11
The aggregate fallen;The middle part of transition feeding transmission belt 12 is inclined to set relative to chassis 5 and makes transmission terminal 122
It is positioned at the top of aggregate measuring bucket 13, thus the transmission initiating terminal 121 of transition feeding transmission belt 12 is received
To aggregate be transferred in aggregate measuring bucket 13.Preferably, the transmission terminal 122 of transition feeding transmission belt 12
Lower section be provided with terminal support 15, and the lower end of this terminal support 15 is vertical with chassis 5 is connected, this terminal
The upper end of support 15 is connected with the bottom of transmission terminal 122, with by the transmission of transition feeding transmission belt 12 eventually
End 122 supports, and makes the middle part of transition feeding transmission belt 12 be inclined to set.So, by aggregate batching
In system 1, aggregate batching bin 11 and aggregate measuring bucket 13 are provided separately, and utilize transition feeding transmission belt 12
The aggregate being transported in aggregate batching bin 11 by transport vehicle is transferred in aggregate measuring bucket 13, thus reduces
The height of aggregate batching bin 11 in aggregate batching system 1, makes the transport vehicle resting on the ground directly will transport
The aggregate come is poured in aggregate batching bin 11, without building transport ramp near aggregate batching bin 11,
Reduce foundation construction amount further, shorten the foundation construction cycle, reduce construction cost.Preferably, terminal is propped up
Frame 15 and transition feeding transmission belt 12 are by being articulated and connected, so, when installing concrete mixing plant, and peace
Dress personnel can select suitable terminal support 15 as required, thus to the middle part of transition feeding transmission belt 12
Gradient is adjusted.Aggregate feeding transmission belt 14 includes aggregate receiver section 141 and aggregate span line 142,
And aggregate receiver section 141 is arranged on chassis 5 and is positioned at below aggregate measuring bucket 13, for receiving from aggregate
The aggregate fallen in weighing hopper 13, and the aggregate received is transferred on aggregate span line 142;Aggregate passes
It is inclined to set, by aggregate between aggregate measuring bucket 13 and hopper 2 and relative to chassis 5 for defeated section 142
The aggregate that receiver section 141 receives is transferred in hopper 2.Aggregate span line 142 is near aggregate measuring bucket 13
One end be arranged on chassis 5, aggregate span line 142 near one end of hopper 2 by being vertically set on the end
Transmission support 16 on dish 5 supports, and sets so that aggregate span line 142 is inclined relative to chassis 5
Put.Preferably, the upper end of transmission support 16 is provided with gripper shoe, and this transmission support 16 passes through gripper shoe
Support the bottom of aggregate span line 142, to increase Area of bearing.
As shown in figs. 1 and 3, cement bin 4 includes warehouse 41 and warehouse bracing frame 42, and warehouse 41 is installed
On warehouse bracing frame 42, warehouse bracing frame 42 is fixedly mounted on chassis 5.Preferably, warehouse supports
The supporting leg 421 being connected with chassis 5 in frame 42 is inclined to set relative to chassis 5, to form horn-like structure
Warehouse bracing frame 42.So, in the case of the upper brace area keeping warehouse bracing frame 42 is constant,
The lower base of warehouse bracing frame 42 is relatively big, and then improves the stability of cement bin.Preferably, supporting leg 421
It is fixed on chassis 5 by connector, so, when shifting place, can be by the warehouse 41 of cement bin and storehouse
Body bracing frame 42 disassembles from chassis 5, to facilitate transhipment.
When this utility model concrete mixing plant is operated, aggregate is first transported to aggregate batching system by transport vehicle
In aggregate batching bin 11 in system 1, then transmit to aggregate measuring bucket 13 via transition feeding transmission belt 12,
Then fall from aggregate measuring bucket 13 on the aggregate receiver section 141 of aggregate feeding transmission belt 14, then via
Aggregate span line 142 is transported in hopper 2, after in aggregate transporter 6 is sent to stirring host 3;
Meanwhile, the cement in cement bin 4 is in cement transporter 7 is sent to stirring host 3;It is sent to stirring
Aggregate and the most agitated main frame of cement 3 in main frame 13 add water to stir and form concrete.Preferably, this coagulation
Metering device in soil mixing station all uses electronic scale to measure, and to improve measuring accuracy, and then improves concrete
Proportion speed degree.Preferably, concrete mixing plant uses microcomputer automatic control system to be controlled, it is achieved
Signal detection, data process, proportioning stores, drop compensates and abnormal conditions alarm lamp function automatically, control
Precision processed and reliability all effectively improve.Preferably, stirring host is Double-horizontal-shaft forced action type stirring host,
Thus improve mixing evenness and production efficiency.
Claims (9)
1. a concrete mixing plant, it is characterised in that this concrete mixing plant includes all with chassis and pass through institute
Stating chassis and be placed in ground aggregate batching system, hopper, stirring host and cement bin, described aggregate is joined
Material system includes aggregate batching bin, transition feeding transmission belt, aggregate measuring bucket and aggregate feeding transmission belt, and
The transmission initiating terminal of described transition feeding transmission belt is arranged on described chassis and is positioned at described aggregate batching bin
Lower section, the transmission terminal of described transition feeding transmission belt is positioned at the top of described aggregate measuring hopper, will be from institute
State the aggregate fallen in aggregate batching bin to be transferred in described aggregate measuring bucket;Described aggregate feeding transmission belt bag
Including aggregate receiver section and aggregate span line, described aggregate receiver section is arranged on described chassis and is positioned at described bone
Below material weighing hopper, the aggregate that described aggregate span line is inclined to set and is received by described aggregate receiver section
It is transferred in described hopper.
Concrete mixing plant the most according to claim 1, it is characterised in that described transition feeding transmission belt
The lower section of transmission terminal is provided with terminal support, and the lower end of this terminal support is vertical with described chassis to be connected, should
The upper end of terminal support supports the bottom of described transmission terminal.
Concrete mixing plant the most according to claim 2, it is characterised in that the upper end of described terminal support with
The bottom of described transmission terminal is by being articulated and connected.
4. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described cement
Storehouse includes warehouse and warehouse bracing frame, and described warehouse is fixed on chassis by described warehouse bracing frame.
Concrete mixing plant the most according to claim 4, it is characterised in that with institute in described warehouse bracing frame
The supporting leg stating chassis connection is inclined to set relative to described chassis, forms the warehouse bracing frame of horn-like structure.
6. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described chassis
For frame structure or platy structure.
7. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described coagulation
Metering device in soil mixing station all uses electronic scale to measure.
8. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described coagulation
Soil mixing station uses microcomputer automatic control system to be controlled.
9. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described stirring
Main frame is Double-horizontal-shaft forced action type stirring host.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620309941.8U CN205631005U (en) | 2016-04-13 | 2016-04-13 | Concrete mixing station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620309941.8U CN205631005U (en) | 2016-04-13 | 2016-04-13 | Concrete mixing station |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205631005U true CN205631005U (en) | 2016-10-12 |
Family
ID=57063969
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620309941.8U Expired - Fee Related CN205631005U (en) | 2016-04-13 | 2016-04-13 | Concrete mixing station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205631005U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111136793A (en) * | 2019-12-31 | 2020-05-12 | 江苏丹凤建筑集成化科技有限公司 | Energy-saving concrete mixing plant special for preparing concrete prefabricated part |
CN117428939A (en) * | 2023-12-11 | 2024-01-23 | 湖南三力智工机械股份有限公司 | Engineering spoil agitated vessel |
-
2016
- 2016-04-13 CN CN201620309941.8U patent/CN205631005U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111136793A (en) * | 2019-12-31 | 2020-05-12 | 江苏丹凤建筑集成化科技有限公司 | Energy-saving concrete mixing plant special for preparing concrete prefabricated part |
CN117428939A (en) * | 2023-12-11 | 2024-01-23 | 湖南三力智工机械股份有限公司 | Engineering spoil agitated vessel |
CN117428939B (en) * | 2023-12-11 | 2024-03-08 | 湖南三力智工机械股份有限公司 | Engineering spoil agitated vessel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212554475U (en) | Integrated folding type base-free mixing station batching machine | |
CN205631005U (en) | Concrete mixing station | |
US20170188620A1 (en) | Static plant for preparing feed mixes for ruminant livestock | |
CN107718285A (en) | A kind of foam concrete automatic mixing plant | |
CN201645663U (en) | Movable concrete mixing plant | |
CN204398146U (en) | The automatic matching device of a kind of construction site cement mixing equipment | |
CN206034248U (en) | Formula of pressure asphalt mixture stirring device | |
CN205704733U (en) | A kind of foam concrete automatic mixing plant | |
CN108177252A (en) | A kind of application method for the three-in-one stirring complexes for producing three kinds of engineering material | |
CN108274635A (en) | A kind of novel architecture concrete central mix plant and its application method | |
CN208247148U (en) | It is a kind of for producing the proportioning machine of water-permeable brick | |
CN215094565U (en) | Cement stabilized macadam blending station | |
CN205572723U (en) | Little storehouse cement measuring equipment of two transition | |
CN210453263U (en) | Movable mixing station | |
CN107754715A (en) | A kind of automatic blanking system of confectionary pellets mixture | |
CN205366124U (en) | Full-automatic filling system of fertilizer | |
CN211310171U (en) | Efficient, environment-friendly and energy-saving dry powder mortar production line | |
CN209333688U (en) | A kind of asphalt concrete batching & mixing plant rock asphalt automatical feeding system | |
CN113183326A (en) | Construction method for refilling silo of mixing station under complex geological condition | |
CN217494718U (en) | Liquid gelled material preparation facilities | |
CN111136793A (en) | Energy-saving concrete mixing plant special for preparing concrete prefabricated part | |
CN216941302U (en) | Concrete mixing plant system | |
CN217075973U (en) | Bulk cement integral weighing and quantitative feeding device and bulk cement mixing station | |
CN202702408U (en) | Device suitable for mixing concrete by four powder admixtures in mixing plant | |
CN218847365U (en) | Independent continuous metering belt weigher |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 |
|
CF01 | Termination of patent right due to non-payment of annual fee |