CN205631005U - Concrete mixing station - Google Patents

Concrete mixing station Download PDF

Info

Publication number
CN205631005U
CN205631005U CN201620309941.8U CN201620309941U CN205631005U CN 205631005 U CN205631005 U CN 205631005U CN 201620309941 U CN201620309941 U CN 201620309941U CN 205631005 U CN205631005 U CN 205631005U
Authority
CN
China
Prior art keywords
aggregate
chassis
concrete mixing
mixing plant
hopper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620309941.8U
Other languages
Chinese (zh)
Inventor
陈金保
张承兴
刘金峰
王辉
高登发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ji'nan Long Cheng Friends Construction Machinery Co Ltd
Original Assignee
Ji'nan Long Cheng Friends Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ji'nan Long Cheng Friends Construction Machinery Co Ltd filed Critical Ji'nan Long Cheng Friends Construction Machinery Co Ltd
Priority to CN201620309941.8U priority Critical patent/CN205631005U/en
Application granted granted Critical
Publication of CN205631005U publication Critical patent/CN205631005U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)

Abstract

The utility model relates to a concrete mixing equipment especially relates to a concrete mixing station. For reduce cost, improve equipment's transition efficiency, the utility model provides a concrete mixing station, including all having the chassis and all settling at subaerial aggregate feed proportioning system, hopper, stirring host computer and cement bin through the chassis, the transmission initiating terminal of the transition material loading transmission band in the aggregate feed proportioning system is installed on the chassis and is lain in aggregate proportioning bins's below, and the transmission terminal of transition material loading transmission band lies in aggregate measuring bin's top, will follow the aggregate that falls among the aggregate proportioning bins and transmit to in the aggregate weighing hopper, aggregate material loading transmission band includes that the aggregate receives section and aggregate span line, and the aggregate is received the section and is installed on the chassis and lie in aggregate weighing hopper below, and the aggregate span line is that the slope sets up and receives the aggregate during a section received aggregate transmits the hopper to. Such concrete mixing station, basic construction cycle is short, and construction cost is low, and it is efficient to cut to.

Description

Concrete mixing plant
Technical field
This utility model relates to concrete batch plant, particularly relates to a kind of concrete mixing plant.
Background technology
At present, concrete mixing plant common on market is the most all to be fixedly mounted on foundation pier, so, In a pre-installation, the foundation pier installed need to be built in the fabricating yard of concrete mixing plant.Further, since Aggregate batching bin in concrete mixing plant is positioned at the surface of aggregate measuring bucket, and the height of aggregate batching bin is relatively Height, for enabling transport vehicle directly to import in aggregate batching bin by the aggregate of transport, it is necessary at aggregate batching bin Installation site near build transport ramp.As can be seen here, before existing concrete mixing plant is installed, need to build Making foundation pier and transport ramp, foundation construction amount is big, long construction period, and then causes the foundation construction of user Increase with processing cost, and fixed installation is unfavorable for the transition transport of equipment.
Utility model content
For reducing cost, improve the transition efficiency of equipment, the utility model proposes a kind of concrete mixing plant, This concrete mixing plant includes all with chassis and being all placed in ground aggregate batching system by described chassis System, hopper, stirring host and cement bin, described aggregate batching system includes aggregate batching bin, transition feeding Transmission belt, aggregate measuring bucket and aggregate feeding transmission belt, and the transmission initiating terminal of described transition feeding transmission belt It is arranged on described chassis and is positioned at the lower section of described aggregate batching bin, the transmission of described transition feeding transmission belt Terminal is positioned at the top of described aggregate measuring hopper, the aggregate fallen is transferred to from described aggregate batching bin In described aggregate measuring bucket;Described aggregate feeding transmission belt includes aggregate receiver section and aggregate span line, described Aggregate receiver section is arranged on described chassis and is positioned at below described aggregate measuring bucket, described aggregate span line in It is obliquely installed and the aggregate that described aggregate receiver section receives is transferred in described hopper.Such concrete Mixing plant, owing to aggregate batching system, hopper, stirring host and cement bin are all placed in ground by chassis On, and the aggregate batching bin in aggregate batching system is provided separately with aggregate measuring bucket, reduces aggregate batching The height in storehouse, when mounted, only need to carry out disposing according to layout, easy for installation, and need not open Dig ground, build foundation pier and transport ramp, greatly reduce foundation construction amount, shorten foundation construction week Phase, reduce construction cost.When shifting place, staff can will be fixed on same chassis Parts are directly placed in transition transport vehicle and carry out transition transport, thus improve transition efficiency.
Preferably, the lower section of the transmission terminal of described transition feeding transmission belt is provided with terminal support, this terminal The lower end of support is vertical with described chassis to be connected, and the upper end of this terminal support supports the end of described transmission terminal Portion.Further, the upper end of described terminal support and the bottom of described transmission terminal are by being articulated and connected.This Sample, installation personnel can select the terminal support of differing heights as required, to meet aggregate transmission needs.
Preferably, described cement bin includes warehouse and warehouse bracing frame, and described warehouse is propped up by described warehouse Support is fixed on chassis.Further, the supporting leg being connected with described chassis in described warehouse bracing frame It is inclined to set relative to described chassis, forms the warehouse bracing frame of horn-like structure.So, warehouse supports The lower base of frame is relatively big, can improve the stability of cement bin.
Preferably, described chassis is frame structure or platy structure, simple in construction, and preparation is convenient, low cost.
Preferably, the metering device in described concrete mixing plant all uses electronic scale to measure, to improve metering Precision, and then improve the proportion speed degree of concrete.
Preferably, described concrete mixing plant uses microcomputer automatic control system to be controlled, to improve control Precision and control reliability.
Preferably, described stirring host is Double-horizontal-shaft forced action type stirring host, improves mixing evenness and production Efficiency.
Accompanying drawing explanation
Fig. 1 is the front view of this utility model concrete mixing plant;
Fig. 2 is that the A-A in Fig. 1 is to enlarged drawing;
Fig. 3 is that the master of the cement bin in this utility model concrete mixing plant and cement transporter regards enlarged drawing.
Detailed description of the invention
As it is shown in figure 1, this utility model concrete mixing plant includes aggregate batching system 1, hopper 2, stirring Main frame 3 and cement bin 4, and aggregate batching system 1, hopper 2, stirring host 3 and the bottom of cement bin 4 It is provided with chassis 5.So, user, before installing this concrete mixing plant, need to will dispose site preparation smooth And it is compacted formation horizontal hard place;When installing this concrete mixing plant, due in concrete mixing plant Aggregate batching system 1, hopper 2, stirring host 3 and cement bin 4 are provided with chassis 5, the direct root of user According to layout, aggregate batching system 1, hopper 2, stirring host 3 and cement bin 4 are disposed by chassis 5 Relevant position in horizontal hard place, both need not excavate out ground in advance and had formed arrangement hopper 2 Geosyncline, need not again to build fixed installation aggregate batching system 1, stirring host 3 and cement bin 4 Foundation pier, substantially reduces the foundation construction amount installed needed for concrete mixing plant, shortens construction period, Reduce foundation construction cost.Further, since aggregate batching system 1, hopper 2, stirring host 3 and cement The bottom in storehouse 4 is provided with chassis 5, and when shifting place, staff can will be fixed on the same end Parts on dish 5 are directly placed in transition transport vehicle and carry out transition transport, and then can improve transition efficiency. Chassis 5 can be selected for steel plate and tailors the platy structure of formation, prepares simple and convenient, the most preferably uses channel-section steel The frame structure that welding is formed, to reduce chassis weight, reduces the cost making chassis.
As illustrated in fig. 1 and 2, aggregate batching system 1 include aggregate batching bin 11, transition feeding transmission belt 12, Aggregate measuring bucket 13 and aggregate feeding transmission belt 14.Wherein, the transmission initiating terminal of transition feeding transmission belt 12 121 are arranged on chassis 5 and are positioned at the lower section of aggregate batching bin 11, for receiving from aggregate batching bin 11 The aggregate fallen;The middle part of transition feeding transmission belt 12 is inclined to set relative to chassis 5 and makes transmission terminal 122 It is positioned at the top of aggregate measuring bucket 13, thus the transmission initiating terminal 121 of transition feeding transmission belt 12 is received To aggregate be transferred in aggregate measuring bucket 13.Preferably, the transmission terminal 122 of transition feeding transmission belt 12 Lower section be provided with terminal support 15, and the lower end of this terminal support 15 is vertical with chassis 5 is connected, this terminal The upper end of support 15 is connected with the bottom of transmission terminal 122, with by the transmission of transition feeding transmission belt 12 eventually End 122 supports, and makes the middle part of transition feeding transmission belt 12 be inclined to set.So, by aggregate batching In system 1, aggregate batching bin 11 and aggregate measuring bucket 13 are provided separately, and utilize transition feeding transmission belt 12 The aggregate being transported in aggregate batching bin 11 by transport vehicle is transferred in aggregate measuring bucket 13, thus reduces The height of aggregate batching bin 11 in aggregate batching system 1, makes the transport vehicle resting on the ground directly will transport The aggregate come is poured in aggregate batching bin 11, without building transport ramp near aggregate batching bin 11, Reduce foundation construction amount further, shorten the foundation construction cycle, reduce construction cost.Preferably, terminal is propped up Frame 15 and transition feeding transmission belt 12 are by being articulated and connected, so, when installing concrete mixing plant, and peace Dress personnel can select suitable terminal support 15 as required, thus to the middle part of transition feeding transmission belt 12 Gradient is adjusted.Aggregate feeding transmission belt 14 includes aggregate receiver section 141 and aggregate span line 142, And aggregate receiver section 141 is arranged on chassis 5 and is positioned at below aggregate measuring bucket 13, for receiving from aggregate The aggregate fallen in weighing hopper 13, and the aggregate received is transferred on aggregate span line 142;Aggregate passes It is inclined to set, by aggregate between aggregate measuring bucket 13 and hopper 2 and relative to chassis 5 for defeated section 142 The aggregate that receiver section 141 receives is transferred in hopper 2.Aggregate span line 142 is near aggregate measuring bucket 13 One end be arranged on chassis 5, aggregate span line 142 near one end of hopper 2 by being vertically set on the end Transmission support 16 on dish 5 supports, and sets so that aggregate span line 142 is inclined relative to chassis 5 Put.Preferably, the upper end of transmission support 16 is provided with gripper shoe, and this transmission support 16 passes through gripper shoe Support the bottom of aggregate span line 142, to increase Area of bearing.
As shown in figs. 1 and 3, cement bin 4 includes warehouse 41 and warehouse bracing frame 42, and warehouse 41 is installed On warehouse bracing frame 42, warehouse bracing frame 42 is fixedly mounted on chassis 5.Preferably, warehouse supports The supporting leg 421 being connected with chassis 5 in frame 42 is inclined to set relative to chassis 5, to form horn-like structure Warehouse bracing frame 42.So, in the case of the upper brace area keeping warehouse bracing frame 42 is constant, The lower base of warehouse bracing frame 42 is relatively big, and then improves the stability of cement bin.Preferably, supporting leg 421 It is fixed on chassis 5 by connector, so, when shifting place, can be by the warehouse 41 of cement bin and storehouse Body bracing frame 42 disassembles from chassis 5, to facilitate transhipment.
When this utility model concrete mixing plant is operated, aggregate is first transported to aggregate batching system by transport vehicle In aggregate batching bin 11 in system 1, then transmit to aggregate measuring bucket 13 via transition feeding transmission belt 12, Then fall from aggregate measuring bucket 13 on the aggregate receiver section 141 of aggregate feeding transmission belt 14, then via Aggregate span line 142 is transported in hopper 2, after in aggregate transporter 6 is sent to stirring host 3; Meanwhile, the cement in cement bin 4 is in cement transporter 7 is sent to stirring host 3;It is sent to stirring Aggregate and the most agitated main frame of cement 3 in main frame 13 add water to stir and form concrete.Preferably, this coagulation Metering device in soil mixing station all uses electronic scale to measure, and to improve measuring accuracy, and then improves concrete Proportion speed degree.Preferably, concrete mixing plant uses microcomputer automatic control system to be controlled, it is achieved Signal detection, data process, proportioning stores, drop compensates and abnormal conditions alarm lamp function automatically, control Precision processed and reliability all effectively improve.Preferably, stirring host is Double-horizontal-shaft forced action type stirring host, Thus improve mixing evenness and production efficiency.

Claims (9)

1. a concrete mixing plant, it is characterised in that this concrete mixing plant includes all with chassis and pass through institute Stating chassis and be placed in ground aggregate batching system, hopper, stirring host and cement bin, described aggregate is joined Material system includes aggregate batching bin, transition feeding transmission belt, aggregate measuring bucket and aggregate feeding transmission belt, and The transmission initiating terminal of described transition feeding transmission belt is arranged on described chassis and is positioned at described aggregate batching bin Lower section, the transmission terminal of described transition feeding transmission belt is positioned at the top of described aggregate measuring hopper, will be from institute State the aggregate fallen in aggregate batching bin to be transferred in described aggregate measuring bucket;Described aggregate feeding transmission belt bag Including aggregate receiver section and aggregate span line, described aggregate receiver section is arranged on described chassis and is positioned at described bone Below material weighing hopper, the aggregate that described aggregate span line is inclined to set and is received by described aggregate receiver section It is transferred in described hopper.
Concrete mixing plant the most according to claim 1, it is characterised in that described transition feeding transmission belt The lower section of transmission terminal is provided with terminal support, and the lower end of this terminal support is vertical with described chassis to be connected, should The upper end of terminal support supports the bottom of described transmission terminal.
Concrete mixing plant the most according to claim 2, it is characterised in that the upper end of described terminal support with The bottom of described transmission terminal is by being articulated and connected.
4. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described cement Storehouse includes warehouse and warehouse bracing frame, and described warehouse is fixed on chassis by described warehouse bracing frame.
Concrete mixing plant the most according to claim 4, it is characterised in that with institute in described warehouse bracing frame The supporting leg stating chassis connection is inclined to set relative to described chassis, forms the warehouse bracing frame of horn-like structure.
6. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described chassis For frame structure or platy structure.
7. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described coagulation Metering device in soil mixing station all uses electronic scale to measure.
8. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described coagulation Soil mixing station uses microcomputer automatic control system to be controlled.
9. according to the concrete mixing plant described in any one in claim 1-3, it is characterised in that described stirring Main frame is Double-horizontal-shaft forced action type stirring host.
CN201620309941.8U 2016-04-13 2016-04-13 Concrete mixing station Expired - Fee Related CN205631005U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620309941.8U CN205631005U (en) 2016-04-13 2016-04-13 Concrete mixing station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620309941.8U CN205631005U (en) 2016-04-13 2016-04-13 Concrete mixing station

Publications (1)

Publication Number Publication Date
CN205631005U true CN205631005U (en) 2016-10-12

Family

ID=57063969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620309941.8U Expired - Fee Related CN205631005U (en) 2016-04-13 2016-04-13 Concrete mixing station

Country Status (1)

Country Link
CN (1) CN205631005U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111136793A (en) * 2019-12-31 2020-05-12 江苏丹凤建筑集成化科技有限公司 Energy-saving concrete mixing plant special for preparing concrete prefabricated part
CN117428939A (en) * 2023-12-11 2024-01-23 湖南三力智工机械股份有限公司 Engineering spoil agitated vessel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111136793A (en) * 2019-12-31 2020-05-12 江苏丹凤建筑集成化科技有限公司 Energy-saving concrete mixing plant special for preparing concrete prefabricated part
CN117428939A (en) * 2023-12-11 2024-01-23 湖南三力智工机械股份有限公司 Engineering spoil agitated vessel
CN117428939B (en) * 2023-12-11 2024-03-08 湖南三力智工机械股份有限公司 Engineering spoil agitated vessel

Similar Documents

Publication Publication Date Title
CN212554475U (en) Integrated folding type base-free mixing station batching machine
CN205631005U (en) Concrete mixing station
US20170188620A1 (en) Static plant for preparing feed mixes for ruminant livestock
CN107718285A (en) A kind of foam concrete automatic mixing plant
CN201645663U (en) Movable concrete mixing plant
CN204398146U (en) The automatic matching device of a kind of construction site cement mixing equipment
CN206034248U (en) Formula of pressure asphalt mixture stirring device
CN205704733U (en) A kind of foam concrete automatic mixing plant
CN108177252A (en) A kind of application method for the three-in-one stirring complexes for producing three kinds of engineering material
CN108274635A (en) A kind of novel architecture concrete central mix plant and its application method
CN208247148U (en) It is a kind of for producing the proportioning machine of water-permeable brick
CN215094565U (en) Cement stabilized macadam blending station
CN205572723U (en) Little storehouse cement measuring equipment of two transition
CN210453263U (en) Movable mixing station
CN107754715A (en) A kind of automatic blanking system of confectionary pellets mixture
CN205366124U (en) Full-automatic filling system of fertilizer
CN211310171U (en) Efficient, environment-friendly and energy-saving dry powder mortar production line
CN209333688U (en) A kind of asphalt concrete batching & mixing plant rock asphalt automatical feeding system
CN113183326A (en) Construction method for refilling silo of mixing station under complex geological condition
CN217494718U (en) Liquid gelled material preparation facilities
CN111136793A (en) Energy-saving concrete mixing plant special for preparing concrete prefabricated part
CN216941302U (en) Concrete mixing plant system
CN217075973U (en) Bulk cement integral weighing and quantitative feeding device and bulk cement mixing station
CN202702408U (en) Device suitable for mixing concrete by four powder admixtures in mixing plant
CN218847365U (en) Independent continuous metering belt weigher

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

CF01 Termination of patent right due to non-payment of annual fee