CN205622179U - Aerial cable de -icing device - Google Patents

Aerial cable de -icing device Download PDF

Info

Publication number
CN205622179U
CN205622179U CN201620364496.5U CN201620364496U CN205622179U CN 205622179 U CN205622179 U CN 205622179U CN 201620364496 U CN201620364496 U CN 201620364496U CN 205622179 U CN205622179 U CN 205622179U
Authority
CN
China
Prior art keywords
frame
jump bit
deicing
belt pulley
aerial cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620364496.5U
Other languages
Chinese (zh)
Inventor
徐丹丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Boao Zongheng Network Technology Co ltd
Guangxi Kefei Science And Technology Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620364496.5U priority Critical patent/CN205622179U/en
Application granted granted Critical
Publication of CN205622179U publication Critical patent/CN205622179U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G7/00Overhead installations of electric lines or cables
    • H02G7/16Devices for removing snow or ice from lines or cables

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model relates to an aerial cable de -icing device, a plurality of blanking holes have been seted up to the frame bottom, are equipped with the first back shaft and the second back shaft that are parallel to each other in the frame, and the leading wheel rotates to be connected on first back shaft, and action wheel and first belt pulley all rotate the connection and on the second back shaft, still are equipped with driving motor in the frame, and the drive of driving motor output shaft is connected with the second belt pulley, adjusting pole one end and articulating in the frame, the other end rotates the connection and is close to the take -up pulley that the action wheel set up, and the telescopic link both ends are articulated frame and regulation pole respectively, the deicing subassembly lies in between action wheel and the leading wheel, and the deicing subassembly includes the last jump bit and lower jump bit that is corresponding setting from top to bottom, and upward jump bit and lower jump bit all hinge through lever subassembly and trace one end, and the trace other end hinges the crank. The utility model provides an aerial cable de -icing device need not the manual work and strikes the deicing, thoroughly liberates the manpower, its low in labor strength, and the deicing is efficient, and the deicing is effectual.

Description

A kind of aerial cable deicer
Technical field
This utility model relates to technical field of electric power, more specifically to a kind of aerial cable deicer.
Background technology
In the winter of very cold, when air humidity is bigger, easily there is icing phenomenon in aerial cables surface, As time goes on and the lasting reduction of temperature and, the ice amount that cable surface condenses also is gradually increased, Under long high load capacity effect, cable is easily pressed down, and more serious will cause tower from collapse.Above-mentioned Under problem, when cable surface condensation ice amount is bigger, needing to carry out cable deicing process, existing cable removes Mostly ice mode is that artificial percussion is carried out, and this mode labor intensity is big, inefficiency, the peace to cable run Row for the national games also brings certain impact.The problems referred to above need solution badly.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of aerial cable deicer, to solve Above-mentioned technical problem.
The aerial cable deicer that the utility model proposes, including: frame, directive wheel, drivewheel, One belt pulley, deicing assembly and cleaning assembly;Offer multiple material-dropping hole bottom frame, in frame, be provided with phase The first the most parallel support shaft and the second support shaft, directive wheel is rotatably connected in the first support shaft, drivewheel All it is rotatably connected in the second support shaft with the first belt pulley, in frame, is additionally provided with driving motor, drive motor Output shaft drive connection has the second belt pulley, between the second belt pulley and the first belt pulley by belt transmission even Connect;Adjusting rod one end is hinged in frame, and the other end is rotationally connected the regulating wheel arranged near drivewheel, stretches Contracting bar two ends are respectively articulated with frame and adjusting rod;Deicing assembly between drivewheel and directive wheel, deicing group Part includes that the upper jump bit being correspondingly set up and down and lower jump bit, upper jump bit and lower jump bit all pass through thick stick Bar assembly is hinged with trace one end, the hinged crank of the trace other end, and crank is hinged on the second belt pulley; Cleaning assembly includes two clean-up wheels being correspondingly set up and down, and clean-up wheel periphery is socketed with cleaning brush.
Preferably, upper jump bit work surface is distributed sawtooth.
Preferably, lower jump bit work surface is distributed sawtooth.
Preferably, during work, upper jump bit and undershoot hammer movement are in opposite direction.
Preferably, clean-up wheel is positioned at Shelf External.
The aerial cable deicer that the utility model proposes, the artificial one section of icing removed on cable, by electricity Cable crosses frame, adjusts the length of adjusting rod, makes cable be clamped, and starts and drives motor, and crank is second Circling on belt pulley, the motion of crank drives the crank rocker motion of drive link, and then passes through lever Assembly is converted into jump bit and the up and down motion of lower jump bit, upper and lower jump bit in motor process to electricity Cable is constantly patted, it is achieved thereby that the deicing to cable processes;In ice detachment, drivewheel and tensioning Cable is compressed by wheel, it is ensured that this deicer can carry out steady, safe walking on cable, Along direction of travel, two clean-up wheels are grinding remaining trash ice on power down cable during conductive cable contacts.This practicality The aerial cable deicer of novel proposition, it is not necessary to manually tapping deicing, thorough liberation manpower, its work is strong Spending low, deicing efficiency is high, and deicing is effective.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of aerial cable deicer that the utility model proposes.
Detailed description of the invention
As it is shown in figure 1, the structural representation that Fig. 1 is a kind of aerial cable deicer that the utility model proposes Figure.
With reference to Fig. 1, the utility model proposes a kind of aerial cable deicer, including: frame 1, directive wheel 4, drivewheel the 5, first belt pulley 6, deicing assembly and cleaning assembly;Offer bottom frame 1 multiple fall Material hole, is provided with the first support shaft 2 and the second support shaft 3 being parallel to each other in frame 1, directive wheel 4 rotates Being connected in the first support shaft 2, drivewheel 5 and the first belt pulley 6 are all rotatably connected on the second support shaft 3 On, it is additionally provided with driving motor 7 in frame 1, drives motor 7 output shaft drive connection to have the second belt pulley 8, It is in transmission connection by belt 9 between second belt pulley 8 and the first belt pulley 6;Adjusting rod 10 one end is hinged on In frame 1, the other end is rotationally connected the regulating wheel 11 arranged near drivewheel 5, and expansion link 12 two ends are divided Other articulated frame 1 and adjusting rod 10;Deicing assembly between drivewheel 5 and directive wheel 4, deicing assembly Including the upper jump bit 13 being correspondingly set up and down and lower jump bit 14, upper jump bit 13 and lower jump bit 14 All hinged with trace 16 one end by lever assembly 15, the hinged crank of trace 16 other end 17, bent Handle 17 is hinged on the second belt pulley 8;Cleaning assembly includes two clean-up wheels 18 being correspondingly set up and down, Clean-up wheel 18 periphery is socketed with cleaning brush 19.
Operation principle of the present utility model is: the artificial one section of icing removed on cable, and cable is crossed frame 1, adjust the length of adjusting rod 12, make cable be clamped, start and drive motor 7, crank 17 is at the second skin Circling on belt wheel 8, the motion of crank 17 drives the crank rocker motion of drive link 16, Jin Ertong Crossing lever assembly 15 and be converted into jump bit 13 and the up and down motion of lower jump bit 14, upper and lower jump bit exists Cable is constantly patted by motor process, it is achieved thereby that the deicing to cable processes;In ice detachment, Cable is compressed by drivewheel 5 and regulating wheel 11, it is ensured that this deicer can be put down on cable Surely, the walking of safety, along direction of travel, two clean-up wheels 18 are grinding on power down cable during conductive cable contacts Remaining trash ice.
For improving deicing effect, upper jump bit 13 and lower jump bit 14 work surface are distributed sawtooth, during work, Upper jump bit 13 and lower jump bit 14 direction of motion are contrary.
During design, it is outside that clean-up wheel 18 is positioned at frame 1, and the trash ice after cleaning can directly be fallen by deadweight.
The aerial cable deicer that the utility model proposes, it is not necessary to manually tap deicing, thorough liberation manpower, Its labor intensity is low, and deicing efficiency is high, and deicing is effective.
The above, only this utility model preferably detailed description of the invention, but protection model of the present utility model Enclose and be not limited thereto, the technology model that any those familiar with the art discloses at this utility model In enclosing, conceive in addition equivalent or change according to the technical solution of the utility model and utility model thereof, all Should contain within protection domain of the present utility model.

Claims (5)

1. an aerial cable deicer, it is characterised in that including: frame (1), directive wheel (4), Drivewheel (5), the first belt pulley (6), deicing assembly and cleaning assembly;Frame (1) bottom offers Multiple material-dropping holes, are provided with the first support shaft (2) and the second support shaft (3) being parallel to each other in frame (1), Directive wheel (4) is rotatably connected in the first support shaft (2), drivewheel (5) and the first belt pulley (6) All it is rotatably connected in the second support shaft (3), in frame (1), is additionally provided with driving motor (7), drive electricity Machine (7) output shaft drive connection has the second belt pulley (8), the second belt pulley (8) and the first belt pulley (6) Between be in transmission connection by belt (9);Adjusting rod (10) one end is hinged in frame (1), the other end Being rotationally connected the regulating wheel (11) arranged near drivewheel (5), expansion link (12) two ends are respectively articulated with machine Frame (1) and adjusting rod (10);Deicing assembly is positioned between drivewheel (5) and directive wheel (4), deicing Assembly includes upper jump bit (13) and the lower jump bit (14) being correspondingly set up and down, upper jump bit (13) All hinged with trace (16) one end by lever assembly (15) with lower jump bit (14), trace (16) The hinged crank of the other end (17), crank (17) is hinged on the second belt pulley (8);Cleaning assembly includes Two clean-up wheels (18) being correspondingly set up and down, clean-up wheel (18) periphery is socketed with cleaning brush (19).
Aerial cable deicer the most according to claim 1, it is characterised in that upper jump bit (13) Work surface is distributed sawtooth.
Aerial cable deicer the most according to claim 1, it is characterised in that lower jump bit (14) Work surface is distributed sawtooth.
Aerial cable deicer the most according to claim 1, it is characterised in that during work, upper punch Hammer (13) and lower jump bit (14) direction of motion are contrary.
Aerial cable deicer the most according to claim 1, it is characterised in that clean-up wheel (18) It is positioned at frame (1) outside.
CN201620364496.5U 2016-04-20 2016-04-20 Aerial cable de -icing device Expired - Fee Related CN205622179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620364496.5U CN205622179U (en) 2016-04-20 2016-04-20 Aerial cable de -icing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620364496.5U CN205622179U (en) 2016-04-20 2016-04-20 Aerial cable de -icing device

Publications (1)

Publication Number Publication Date
CN205622179U true CN205622179U (en) 2016-10-05

Family

ID=57028490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620364496.5U Expired - Fee Related CN205622179U (en) 2016-04-20 2016-04-20 Aerial cable de -icing device

Country Status (1)

Country Link
CN (1) CN205622179U (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107887873A (en) * 2017-11-15 2018-04-06 国家电网公司 A kind of self-propelled power circuit barrier clearing device
CN108110719A (en) * 2018-02-06 2018-06-01 郑香莲 A kind of power transmission line deicer for being capable of non-destructive testing
CN108110718A (en) * 2018-02-06 2018-06-01 郑香莲 A kind of power transmission line deicer
CN108493885A (en) * 2018-04-17 2018-09-04 东莞市智配机电科技有限公司 A kind of de-icing device for electric wire based on crank rocker driving
CN108493886A (en) * 2018-04-17 2018-09-04 东莞市智配机电科技有限公司 A kind of de-icing device for electric wire
CN109038443A (en) * 2018-08-20 2018-12-18 国网河北省电力有限公司沧州供电分公司 A kind of aerial cables deicing robot
CN110460000A (en) * 2019-08-14 2019-11-15 南方电网科学研究院有限责任公司 A kind of overhead transmission line mechanical deicing device
CN110649552A (en) * 2019-08-20 2020-01-03 贵州电网有限责任公司 Deicing stick for deicing device of icing line
CN110932217A (en) * 2019-12-31 2020-03-27 郑州铁路职业技术学院 Electric locomotive deicing system
CN110932216A (en) * 2019-12-31 2020-03-27 郑州铁路职业技术学院 Electric locomotive deicing method
CN111106586A (en) * 2020-02-26 2020-05-05 许昌学院 Cable deicing device for high-voltage power grid
CN111564809A (en) * 2020-05-06 2020-08-21 衢州学院 High-voltage cable ice breaker
CN112186691A (en) * 2020-09-28 2021-01-05 来一萍 High-altitude cable deicing device with high safety performance for power construction
CN113270840A (en) * 2021-06-10 2021-08-17 国网河南省电力公司唐河县供电公司 Cable deicing device
LU500689A1 (en) * 2021-01-05 2022-03-28 Univ Anhui Sci & Technology Novel high-voltage cable deicing device

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107887873B (en) * 2017-11-15 2019-12-10 国家电网公司 Self-propelled power line clearance sacrifice device
CN107887873A (en) * 2017-11-15 2018-04-06 国家电网公司 A kind of self-propelled power circuit barrier clearing device
CN108110718B (en) * 2018-02-06 2019-11-05 郑香莲 A kind of power transmission line deicer
CN108110719A (en) * 2018-02-06 2018-06-01 郑香莲 A kind of power transmission line deicer for being capable of non-destructive testing
CN108110718A (en) * 2018-02-06 2018-06-01 郑香莲 A kind of power transmission line deicer
CN108493886A (en) * 2018-04-17 2018-09-04 东莞市智配机电科技有限公司 A kind of de-icing device for electric wire
CN108493885A (en) * 2018-04-17 2018-09-04 东莞市智配机电科技有限公司 A kind of de-icing device for electric wire based on crank rocker driving
CN109038443A (en) * 2018-08-20 2018-12-18 国网河北省电力有限公司沧州供电分公司 A kind of aerial cables deicing robot
CN110460000A (en) * 2019-08-14 2019-11-15 南方电网科学研究院有限责任公司 A kind of overhead transmission line mechanical deicing device
CN110649552A (en) * 2019-08-20 2020-01-03 贵州电网有限责任公司 Deicing stick for deicing device of icing line
CN110932217A (en) * 2019-12-31 2020-03-27 郑州铁路职业技术学院 Electric locomotive deicing system
CN110932216A (en) * 2019-12-31 2020-03-27 郑州铁路职业技术学院 Electric locomotive deicing method
CN111106586A (en) * 2020-02-26 2020-05-05 许昌学院 Cable deicing device for high-voltage power grid
CN111564809A (en) * 2020-05-06 2020-08-21 衢州学院 High-voltage cable ice breaker
CN111564809B (en) * 2020-05-06 2021-05-18 衢州学院 High-voltage cable ice breaker
CN112186691A (en) * 2020-09-28 2021-01-05 来一萍 High-altitude cable deicing device with high safety performance for power construction
CN112186691B (en) * 2020-09-28 2021-12-21 国网天津市电力公司培训中心 High-altitude cable deicing device with high safety performance for power construction
LU500689A1 (en) * 2021-01-05 2022-03-28 Univ Anhui Sci & Technology Novel high-voltage cable deicing device
CN113270840A (en) * 2021-06-10 2021-08-17 国网河南省电力公司唐河县供电公司 Cable deicing device

Similar Documents

Publication Publication Date Title
CN205622179U (en) Aerial cable de -icing device
CN203983921U (en) A kind of simple and easy lead wire and earth wire deicer
CN205393032U (en) Automatic snow removal device of power equipment
CN110474276A (en) A kind of suspension type high-altitude steel cable device for expelling ice and snow
CN109936103B (en) A kind of power Transmission tower cable installation safety protection structure and its application method
CN205986061U (en) Power equipment's snow removing device
CN201868822U (en) Deicing machine for overhead transmission line
CN218124270U (en) Deicing mechanism for power distribution network line
CN109119963A (en) A kind of cable de-icing device
CN209119772U (en) A kind of cable de-icing device
CN110649552B (en) Deicing stick for deicing device of icing line
CN111614052A (en) Deicing device for high-voltage transmission line
CN208986502U (en) A kind of power transmission and transformation line Multifunctional tightener
CN107514109A (en) Warmhouse booth automatic snow remover
CN207339038U (en) Electrodynamic type substation deicer
CN203233128U (en) Cable deicer
CN106911113B (en) Icing sweeping robot applied to overhead power transmission line
CN219394214U (en) Cleaning device for electric power maintenance
CN108110717A (en) A kind of Split type power transmission line deicer
CN203760994U (en) Power transmission line snow removal apparatus
CN207876717U (en) Novel band hairbrush shaking(-pan) conveyer head cleaner
CN206323109U (en) A kind of automatic deicer of high-voltage line
CN201887409U (en) Mechanical withdrawal device for antivibration hammer of overhead power transmission line
CN202840436U (en) High-voltage cable snow-removing device
CN110460002B (en) Flight type cable deicing robot

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181205

Address after: 530022 East Gehuadu 9 Floor 917, 31 Dongge Road, Qingxiu District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Kefei Science and Technology Development Co.,Ltd.

Address before: 510000 B1B2, one, two, three and four floors of the podium building 231 and 233, science Avenue, Guangzhou, Guangdong.

Patentee before: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Effective date of registration: 20181205

Address after: 510000 B1B2, one, two, three and four floors of the podium building 231 and 233, science Avenue, Guangzhou, Guangdong.

Patentee after: BOAO ZONGHENG NETWORK TECHNOLOGY Co.,Ltd.

Address before: No. 20, Nanliu Lane, Shisong Street, Gaocheng Village, Dengfeng City, Zhengzhou City, Henan Province

Patentee before: Xu Dandan

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161005

Termination date: 20200420

CF01 Termination of patent right due to non-payment of annual fee